Sie sind auf Seite 1von 4

Chevron Bangladesh Drilling Morning Report

Date: 11/6/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 18.67 Time from Spud: 18.06 Days Since Last DAFW / RI Case :
TVD End (mKB): 2,573.28
Water Depth (m) Target Depth (MD) (mKB)

Rpt No: 20 Hours: 24.00 1,093 / 137

SBU Drilling Well Category : Drlg Well Category 1


Depth End (MD) (mKB): 2,812
Field Name Original Spud Date Country

Original KB to Mud Line (m) Target Depth (TVD) (mKB)

Bibiyana
Actual Start Date

6/13/2013
Actual End Date

Bangladesh 4,410
Total AFE Amount (Cost)

7/19/2013 08:30
AFE/WBS Number

3,865.89 22,183,123

100794 Safety/Inspections
Date Safety Check Tour Des

11/6/2013 00:00 11/6/2013 00:00 11/6/2013 00:00 11/6/2013 06:00 11/6/2013 06:00 11/6/2013 06:00 11/6/2013 06:30 11/6/2013 06:30 11/6/2013 06:30 11/6/2013 07:00 11/6/2013 11:00 11/6/2013 11:30 11/6/2013 12:15 11/6/2013 12:15 11/6/2013 14:00 11/6/2013 14:00 11/6/2013 17:00 11/6/2013 17:00 11/6/2013 18:00 11/6/2013 18:00 11/6/2013 18:30 11/6/2013 18:30 11/6/2013 18:30 11/6/2013 19:30

Pre-Tour Safety Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Tour Safety Meeting Pre-Job Meeting Pre-Job Meeting Safety Procedures Pre-Tour Safety Meeting Pre-Job Meeting Pre-Job Meeting PTW Audit CHESM Rigsite Inspection Safety Meeting PTW Audit Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Tour Safety Meeting Pre-Job Meeting Safety Procedures

Night Night Night Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Night Night Night Night Night Night Night Night

RADAR, Ops, Tnt#06 & GEMS#06 @BYWP Gen. Crane Lifting @BYWP Gen. Forklift Ops @BYWP Diesel transfer @BYWP(PTW) Welding, cutting, grinding at Workshop @BYWP(PTW) Gen. Crane Lifting @BYWP Gen. Forklift Ops @BYWP w/Kamal Ent., RADAR Cards, Tnt#06 @BYWP Gen. Housekeeping (K/E) @BYWP Maintenance and inspection of TDU at NOV @BYWP (PT T-Card Audit RADAR, Ops, Tnt#06 & GEMS#06 @BYWP Gen. Crane Lifting @BYWP Gen. Forklift Ops @BYWP Maintenance and inspection of TDU at NOV @BYWP CHESM audit for TRS@BYWP Ops. Review, Tnt#06 @BYWP Welding, cutting, grinding at Workshop@BYWP Diesel transfer truck to rig tank @BYWP (PTW) Welding, cutting, grinding at Workshop @BYWP (PTW) Gen. Housekeeping (K/E) @BYWP w/Kamal Ent., RADAR Cards, Tnt#06 @BYWP Gen. Crane Lifting @BYWP T-Card Audit General hotwork at workshop @BYWP Diesel transfer from truck to rig tank@BYWP
Incident Desc

11/6/2013 23:00 PTW Audit 11/6/2013 23:00 PTW Audit Safety / Environmental Incidents
Incident Cat.

No safety or environmental incident Daily Operations


Report Start Date Report End Date

11/6/2013 00:00
Daily Field Est Total (Cost) Cum Field Est To Date (Cost) Daily Mud Field Est (Cost) Cum Mud Cost to Date (Cost)

11/7/2013 00:00
Drilling Hours (hr) Cum Rotating Hrs on Casing

240,763
Operations Summary

4,727,783

22,991

466,941

18.26

71.43

Continued directional drilling 12 hole section from 2812m to 2966 m. Pumped 45 bbls of hi weight - hi-vis sweep @ 2886m & 2931m.
Comments

00:00 - 05:00: Continue directionally drill 12-1/4" hole section f/2966 m. t/3000m.
Max Drill Gas Required Matls next day Avg Background Gas Head Count

0.04 Halliburton batch mixer in customs. CCTV: driller has camera for derrick,stabbing board, mud pump. STP recorder non-operational Drillers MD Totco monitor at Rig floor, Not in service. No ETA. Iron Roughneck spinners, not in service because of bad hydraulic leak. No spare seals on location. Having to use standalone spinners. Drillers rig floor communciation hands free microphone not working. No ETA. No back up flow line encoder for SLS. MD Totco flowline indicator not reading. WDI flowline sensor three weeks ETA. No ETA from SLS.

143.0

Page 1/4

Report Printed : 11/7/2013

Chevron Bangladesh Drilling Morning Report

Date: 11/6/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 18.67 Time from Spud: 18.06 Days Since Last DAFW / RI Case :

Rpt No: 20 Hours: 24.00 1,093 / 137

SBU Drilling Well Category : Drlg Well Category 1


Safety Observation Cards
Observation Typ # Rpts

Com

CVX-5, WDI-12, Other-50

67 Oil tanker was going to start but there was no signal man, the helper was sitting in the tanker.Stopped the oil tanker and told them since visibility low due to fog better to give the signal during the movement, they agreed and did so. Tenet #2 MAHBUB ALOM-2-Kamal Ent-Labour
Contact

Daily Contacts Shayne Atkins Passagon Heamtanon Randy Roberts Kitichai Leekitchakorn Mahbubur Rahman Ismail Hossain Time Log
Start Time End Time Phase Activity Dur (hr) Unsched Event? UE Time (hr) UE Ref No. Com

00:00 04:00 04:30

04:00 04:30 00:00

INTCSG2, DRILL INTCSG2, DRILL INTCSG2, DRILL

DRLDD UNITMAIN DRLDD

4.00 0.50 19.50

Continued directional drilling 12 1/4" hole section F/ 2812 m T/ 2843 m. MD. Rig service. Continued directional drilling 12-1/4" hole section F/ 2843 m T /2966 m. MD/ 2701 m. TVD. Pumped 45 bbls of hiwt / hi-vis sweep @ 2886 m. & 2931 m. Note: PU Wt = 280K, SO Wt = 205K, and RT Wt = 230K Rotation:90% Sliding: 10% Today drilled: 154 m. in 23.5 hrs, AROP 6.55 mph include connection. Drilling parameters 22K WOB. 780 GPM, 50 - 70 RPM. LITHOLOGY: Depth Interval (2800.0 2950.0m): Sand/Sandstone (Tr-85%): Claystone (15-100%): Limestone (Tr-5%): Magnet sample: 42 grams.

Personnel
Company Total Headcount SSE

Chevron Weatherford Weatherford Weatherford Aker-Kvaerner Weatherford Halliburton Weatherford MI Swaco Gyrodata Inc Weatherford NOV - Fluids Services HAL - Wireline Weatherford Weatherford Chevron Smith International Weatherford Chevron Weatherford Weatherford

12 14 Rig Expat 44 Rig National 22 1 3 5 2 2 0 7 0 7 5 0 1 3 4 0 0 0 Page 2/4 Shamolima Catering Wellhead Eng LWD/MWD Cementing DD Mud Engineers Gyrodata TRS Solids Control Wireline SLS Ayun ent PetroBangla Inspection Completion/Liner hands WWT BanglaCat Bangla Industrial Report Printed : 11/7/2013

Chevron Bangladesh Drilling Morning Report

Date: 11/6/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 18.67 Time from Spud: 18.06 Days Since Last DAFW / RI Case :

Rpt No: 20 Hours: 24.00 1,093 / 137

SBU Drilling Well Category : Drlg Well Category 1


Personnel
Company Total Headcount

SSE

Chevron Weatherford Weatherford Chevron Weatherford Weatherford Mud Checks


Date Depth (MD) (mKB) Depth (TVD) (mKB)

0 11 0 0

Hunting Casing NOV Tech WWS HES

0 SPM 0 MD Totco Tech


Mud/Brine Type Sample Source Checked By YP Calc (lbf/100ft)

11/6/2013 22:00
Flow Line Temperature (C) Fluid Density (lb/gal)

2,953.0
Gel 10 sec (lbf/100ft)

NAF
Gel 10 min (lbf/100ft)

Active Pit
Gel 30 min (lbf/100ft)

164.0
Vis 3rpm Vis 6rpm

11.20
Vis 300rpm

16.0
Vis 600rpm

27.0
Funnel Viscosity (s/qt)

30.0
PV Calc (Pas)

21 0
ROC (Wet) (% by wt) (lb/lb) Retort NAF by Volume (%)

10
pH Filtration Sz (m) NAF/Water Ratio Chlorides (mg/L)

11
CaCl2 (mg/L)

50
Electric Stability (V)

79
Water Phase Salinity (mg/L)

60 313,200
Retort Water by Volume (%)

5,900
High Gravity Solids (lb/bbl) Corrected Solids (%)

259,854.00 16.03
API Filtrate (cc/30min) API Filter Cake (1/32")

630.0
Retort Solids (% by Volume) (%)

166.74
NaCl (mg/L)

18.50
HTHP Filtrate (cc/30min)

20.25
HTHP Filter Cake (1/32")

61.25 1
Visibility (km)

75.2/24.8 Weather Conditions


Wave Ht (m) Swell Ht (m) Wave Dir () Wind Spd (knots) Wind Dir P Bar (mmHg) T High (C)

3.4
T Low (C)

Support Vessels
Vessel Name Vessel Type Arrival Date Depart Date Note

Unscheduled Events
Referen ce No. Start Date End Date Event Type Unsch Maj Cat Unsch Detail Description Accountable Party Contractor

Mud Additive Amounts


Des Date Rec Consumed On Loc

Barite Cacl2 / Nacl Lime Nova Plus Novatec F Novatec S Saraline Versatrol M VG Plus VG-69 Job Supply Amounts
Supply Item Des

11/6/2013 11/6/2013 11/6/2013 11/6/2013 11/6/2013 11/6/2013 11/6/2013 11/6/2013 11/6/2013 11/6/2013
Date Received Consumed

20.0 70.0 32.0 1.0 1.0 1.0 45.0 10.0 3.0 3.0
Cum On Loc

87.0 900.0 409.0 7.0 8.0 19.0 79.0 120.0 99.0 103.0

Diesel Drill String/BHA BHA #6, Motor Build


Bit Run Drill Bit Length (m)

11/6/2013

22,500.0

21,299.0

148,567.0

IADC Bit Dull

Bit Total Fluid Area (nozzles) (in)

BHA ROP (m/hr)

1a
Nozzles (1/32")

12 1/4in, SK5519, E168478


String Length (m)

0.28 1-1-NO-A-X-I-NO-DMF
Max Nominal OD (in)

1.24

8.6

18/18/18/18/18
String Components

236.70

812.000

SK5519, 8" Motor w/12" sleeve, 11-3/4" Stabilizer, NM XO Sub, 8 1/4"LWD - MFR, 8 1/4"HEL, NM XO Sub, 8" NMDC Long, XO Sub, HWDP, Drilling Jars Hydraulic, HWDP
Comment

Due to motor failure, BHA need to L/D. String/BHA Components


Item Des Len (m) Mass/Len (lb/ft)

HWDP

159.12

49.30

Page 3/4

Report Printed : 11/7/2013

Chevron Bangladesh Drilling Morning Report

Date: 11/6/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 18.67 Time from Spud: 18.06 Days Since Last DAFW / RI Case :

Rpt No: 20 Hours: 24.00 1,093 / 137

SBU Drilling Well Category : Drlg Well Category 1


String/BHA Components
Item Des

Len (m)

Mass/Len (lb/ft)

Drilling Jars - Hydraulic HWDP XO Sub 8" NMDC Long NM XO Sub 8 1/4"HEL 8 1/4"LWD - MFR NM XO Sub 11-3/4" Stabilizer 8" Motor w/12" sleeve Drilling Parameters
Wellbore Depth Start (MD) (mKB) TVD Start (mKB) Depth End (MD) (mKB) TVD End (mKB) RPM (rpm) Drill Time (hr)

9.68 27.92 1.20 9.22 0.91 6.90 9.02 0.91 2.47 9.07
On Bottom Drill Time (hr)

49.30

Interval ROP (m/hr)

Original Hole
Cum Depth Drilled (mKB)

2,812
Cum Drilling Time (hr)

2,573.28
Flow Rate (gpm)

2,966
Weight on Bit (1000lbf)

18.26
Stand Pipe Pressure (psi)

17.75
Drill Str Wt (1000lbf)

8.4 230 205

200
Pick-Up String Weight (1000lbf)

23.26
Drilling Torque

780 23.0

22
Weight of String in Air (1000lbf)

55 30

4,100.0
Slack-Off String Weight (1000lbf)

280 Casing Strings


Casing Description Comment Set Depth (MD) (mKB)

Set Depth (TVD) (mKB)

Run Date

Casing Components
Top Depth (MD) (mKB) Btm Depth (MD) (mKB) Len (m) Jts Item Des OD (in) ID (in)

Tubing Strings
Tubing Description Comment Set Depth (MD) (mKB) Run Date

Tubing Components
Top Depth (mKB) Bottom Depth (mKB) Length (m) Joints Item Description OD Nominal (in) ID (in)

BOP Test
Date Com

10/29/2013 Wellbores
Wellbore Name

Shell test BOPs and related equipment to 250/5k psi, ok, Full BOP test was done on 22 October'13.
Parent Wellbore

Original Hole Directional Surveys


Description

Original Hole
Date

Planned survey Survey Data


Date Description MD (mKB) Incl () Azm () TVD (mKB) VS (m) Date NS (m)

5/27/2013
EW (m) DLS (/30m)

Actual Surveys Survey Data


Date MD (mKB) Incl () Azm () TVD (mKB) VS (m) NS (m)

7/22/2013
EW (m) DLS (/30m)

11/6/2013 11/6/2013 11/6/2013 11/6/2013 11/6/2013

2,821.01 2,849.75 2,878.73 2,907.61 2,936.64

33.92 33.76 34.65 34.65 33.76

139.57 138.87 139.64 139.21 139.05

2,580.71 2,604.58 2,628.55 2,652.31 2,676.32

-931.74 -915.73 -899.44 -883.02 -866.71

-735.58 -747.70 -760.04 -772.52 -784.86

24.45 34.91 45.54 56.22 66.90

3.66 0.44 1.02 0.25 0.92

Page 4/4

Report Printed : 11/7/2013

Das könnte Ihnen auch gefallen