Chevron Bangladesh Drilling Morning Report

Date: 11/8/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 20.67 Time from Spud: 20.06 Days Since Last DAFW / RI Case :
TVD End (mKB): 2,761.43

Rpt No: 22 Hours: 24.00 1,095 / 139

SBU Drilling Well Category : Drlg Well Category 1


Depth End (MD) (mKB): 3,038
Field Name Country Original Spud Date

Water Depth (m) Target Depth (MD) (mKB)

Current KB to Mud Line (m) Target Depth (TVD) (mKB)

Bibiyana
Actual Start Date

Bangladesh
Actual End Date

6/13/2013 4,410
Total AFE Amount (Cost)

7/19/2013
AFE/WBS Number

3,865.89 22,183,123

100794 Safety/Inspections
Date Safety Check Tour Des

11/8/2013 00:00 11/8/2013 00:00 11/8/2013 00:00 11/8/2013 04:00 11/8/2013 06:00 11/8/2013 06:00 11/8/2013 06:30 11/8/2013 06:30 11/8/2013 06:30 11/8/2013 10:00 11/8/2013 10:00 11/8/2013 11:00 11/8/2013 11:30 11/8/2013 12:00 11/8/2013 12:15 11/8/2013 12:15 11/8/2013 14:00 11/8/2013 14:00 11/8/2013 14:30 11/8/2013 15:00 11/8/2013 16:00 11/8/2013 17:00 11/8/2013 18:30 11/8/2013 18:30

Pre-Tour Safety Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Tour Safety Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting PTW Audit Safety Procedures Pre-Tour Safety Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting PTW Audit Rig Floor Pre-Job Meeting Safety Meeting Pre-Tour Safety Meeting Pre-Job Meeting

Night Night Night Night Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Night Night Night Night Night Night

RADAR, Ops, Tnt#08 & GEMS#08 @BYWP Gen. Crane Lifting @BYWP Gen. Forklift Ops @BYWP Welding, cutting, grinding at Workshop @BYWP(PTW) Gen. Crane Lifting @BYWP Diesel transfer @BYWP(PTW) w/Kamal Ent., RADAR Cards, Tnt#08 @BYWP Gen. Forklift Ops @BYWP Gen. Housekeeping (K/E) @BYWP Service centrifuge by NOV@BYWP (PTW) General hot work at workshop@BYWP T-Card Audit RADAR, Ops, Tnt#08 & GEMS#08 @BYWP Welding, cutting, grinding at Workshop @BYWP(PTW) Gen. Crane Lifting @BYWP Gen. Forklift Ops @BYWP Check seat and valve of mud pump 2 @ BYWP (PTW) Cleaning slug tank @ BYWP (PTW) Check valve & seat at MP-2@BYWP PPE audit at Rig floor,mud tank,de-watering unit@B Using camera at rig site @ BYWP (PTW) Ops. Review, Tnt#08 @BYWP w/Kamal Ent., RADAR Cards, Tnt#08 @BYWP Gen. Crane Lifting @BYWP Gen. Housekeeping (K/E) @BYWP T-Card Audit Cleaning mud tank@BYWP General hot work at workshop@BYWP
Incident Desc

11/8/2013 18:30 Pre-Job Meeting 11/8/2013 19:30 Safety Procedures 11/8/2013 22:00 PTW Audit 11/8/2013 22:30 PTW Audit Safety / Environmental Incidents
Incident Cat.

No safety or environmental incident

Page 1/6

Report Printed : 11/9/2013

Chevron Bangladesh Drilling Morning Report

Date: 11/8/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 20.67 Time from Spud: 20.06 Days Since Last DAFW / RI Case :

Rpt No: 22 Hours: 24.00 1,095 / 139

SBU Drilling Well Category : Drlg Well Category 1

Daily Operations
Report Start Date Report End Date

11/8/2013 00:00
Daily Field Est Total (Cost) Cum Field Est To Date (Cost) Daily Mud Field Est (Cost) Cum Mud Cost to Date (Cost)

11/9/2013 00:00
Drilling Hours (hr) Cum Rotating Hrs on Casing

215,105
Status at Reporting Time Operations Summary

5,173,558

2,595

486,016

Pumped 15bbls base oil. Continued POOH 67m to surface. Drain BOP stack. Pick up landing Jt and measure landing point. Lay out same. Rig up TRS. PJSM before RIH 9-5/8" casing. Pick up 9 5/8 casing shoe and started RIH. Lay down joint no 7. Dropped 9 5/8 casing in the hole "91m". Rig down 9 5/8" casing running equipment. Pick up and make up fishing tools and RIH. Fill up and break circulation every 15 stands. Tag top of fish @ 2540m, unsuccessful. Second attempt to Catch fish (Successful) at 2586m. POOH from 2586m with fish and continued to 2181m.
Comments

00:00 - 05:00: Continue to trip out the hole wet with 9 5/8" casing fish. F/2181 T/646m
Max Drill Gas Required Matls next day Avg Background Gas Head Count

147.0 Halliburton batch mixer in customs. CCTV: driller has camera for derrick,stabbing board, mud pump. STP recorder non-operational Drillers MD Totco monitor at Rig floor, Not in service. No ETA. Iron Roughneck spinners, not in service because of bad hydraulic leak. No spare seals on location. Having to use standalone spinners. Drillers rig floor communciation hands free microphone not working. No ETA. No back up flow line encoder for SLS. MD Totco flowline indicator not reading. WDI flowline sensor three weeks ETA. No ETA from SLS. Safety Observation Cards
Observation Typ # Rpts Com

CVX-3, WDI-15, Other-49

67 While fixing flexible hose on TD, some one was about to move very closely on that area. As hose vibrate it might hit him.Stopped him and told him to move in a safe place. He agreed and did so.Tenet #2 MD. AMIR HOSSAIN-WDI-Floor man
Contact

Daily Contacts Shayne Atkins Stephen Joubert Randy Roberts Kitichai Leekitchakorn Mahbubur Rahman Ismail Hossain Time Log
Start Time End Time Phase Activity Dur (hr) Unsched Event? UE Time (hr) UE Ref No. Com

00:00 01:00 02:30 03:30

01:00 02:30 03:30 06:00

INTCSG2, DRILL INTCSG2, DRILL INTCSG2, DRILL INTCSG2, DRILL

UNITRPR BHAHDL WHDWB CSGR/U

1.00 Yes 1.50 1.00 2.50

1.00 18

Trouble shoot and repair Draworks. Problem with parking break. Rack back last stand of HWT. Rack back LWD. Soft break motor stab. Lay out motor and bit. Pull W/B. Pick up wash toll and wash well head and BOP stack. Clean off the rig floor. Change out elevators and pick up landing jt and perform test run to establish landing depth. Lay out same. Rig up TRS 9 5/8" casing running equipment, including Spider elevators and 500t slips. Held Safety meeting.

Page 2/6

Report Printed : 11/9/2013

Chevron Bangladesh Drilling Morning Report

Date: 11/8/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 20.67 Time from Spud: 20.06 Days Since Last DAFW / RI Case :

Rpt No: 22 Hours: 24.00 1,095 / 139

SBU Drilling Well Category : Drlg Well Category 1

Time Log
Start Time End Time Phase Activity Dur (hr) Unsched Event? UE Time (hr) UE Ref No. Com

06:00

09:00

INTCSG2, DRILL

CSGRUN

3.00

Make up and run 9 5/8" shoe track. Test floats. Makeup 7 jts and RIH. While making up joint#7 the connection failed to pass criteria for the jam unit to accept it as good. Broke out connection and laid down joint #7. While coming down to latch onto joint#6 in rotary elevators were lowered over stump in table. TRS operator functioned wrong control on ISIS system and opened slips. Nothing functioned at this stage due to safety device built into system. When they realized they had not closed the elevators they then functioned the switch to close the elevators. The air was applied to the elevators to function them closed at the same time sent signal to slips to open as the switch had not been put back into the closed position. The slips opened at the same time as the elevators were closing and the string fell down hole. Fish lost down hole: Shoe joint, casing joint, FC joint and 5 x casing joints=91.49m

09:00 11:30 14:30 20:00

11:30 14:30 20:00 20:30

INTCSG2, DRILL INTCSG2, DRILL INTCSG2, DRILL INTCSG2, DRILL

CSGR/D BHAP/U TIH FISH

2.50 Yes 3.00 Yes 5.50 Yes 0.50 Yes

2.50 19 3.00 19 5.50 19 0.50 19

Rig down and lay out TRS 9 5/8" casing running equipment. Discuss and prepare fishing BHA. Pick up fishing BHA for fishing 9 5/8" casing. Trip in the hole with Fishing BHA Tag resistance @ 2545m. Pick up and record parameters. Attempt to screw into fish, With slow pump rate. While screwing into fish oveserved pump pressure building. At 900psi fish came free and moved down hole. Suspect the float or shoe are plugged off. Continue to trip in and tag fish @ 2586. Pick up on strign leavign 5k WOB. Rotate string left and observe string weight drop and pressure increase. Believe pin now inside box. Stop pump with 380psi trapped in string. Screwed into fish to15k of rotary torque. Picked up and pressure did not bled off. Continue to pick up until decrease drag was seen. Pressure was bled off and continued tripping out the hole. Observed 80 k overpull on first two stands. Drag came of quickly. Trip out the hole with 9 5/8" casing fish wet F/ 2586 m T/ 2181 m.
SSE

20:30

21:00

INTCSG2, DRILL

FISH

0.50 Yes

0.50 19

21:00 Personnel

00:00

INTCSG2, DRILL

TOH

3.00 Yes

3.00 19

Company

Total Headcount

Chevron Weatherford Weatherford Weatherford Aker-Kvaerner Weatherford Halliburton Weatherford MI Swaco Gyrodata Inc Weatherford NOV - Fluids Services HAL - Wireline Weatherford Page 3/6

15 17 Rig Expat 45 Rig National 22 1 3 6 2 2 0 6 Shamolima Catering Wellhead Eng LWD/MWD Cementing DD Mud Engineers Gyrodata TRS

0 Solids Control 8 Wireline 5 SLS Report Printed : 11/9/2013

Chevron Bangladesh Drilling Morning Report

Date: 11/8/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 20.67 Time from Spud: 20.06 Days Since Last DAFW / RI Case :

Rpt No: 22 Hours: 24.00 1,095 / 139

SBU Drilling Well Category : Drlg Well Category 1

Personnel
Company Total Headcount SSE

Weatherford Chevron Smith International Weatherford Chevron Weatherford Weatherford Chevron Weatherford Weatherford Chevron Weatherford Weatherford Mud Checks
Date Depth (MD) (mKB) Depth (TVD) (mKB) Mud/Brine Type

0 1 3 0 0 0 0 0 11 0

Ayun ent PetroBangla Inspection Completion/Liner hands WWT BanglaCat Bangla Industrial Hunting Casing NOV Tech WWS

0 HES 0 SPM 0 MD Totco Tech


Sample Source Fluids Vendor

11/8/2013
Flow Line Temperature (C) Vis 3rpm

3,038.0
Fluid Density (lb/gal)

2,761.43
Gel 10 sec (lbf/100ft)

NAF
Gel 10 min (lbf/100ft)

Active Pit
Gel 30 min (lbf/100ft)

MI Swaco
YP Calc (lbf/100ft)

11.20
Vis 6rpm

16.0
Vis 300rpm

28.0
Vis 600rpm

31.0
Funnel Viscosity (s/qt)

20
PV Calc (Pas)

10
pH Low Gravity Solids (lb/bbl) Chlorides (mg/L)

11
CaCl2 (mg/L)

50
Electric Stability (V)

80
Water Phase Salinity (mg/L)

69
ROC (Wet) (% by wt) (lb/lb) Retort NAF by Volume (%)

58,500
High Gravity Solids (lb/bbl) Corrected Solids (%)

269,526.00 16.28
API Filtrate (cc/30min) API Filter Cake (1/32")

620.0
Retort Solids (% by Volume) (%)

322,300
Retort Water by Volume (%)

42.85
NAF/Water Ratio NaCl (mg/L)

168.71

18.75
HTHP Filtrate (cc/30min)

19.25
HTHP Filter Cake (1/32")

62.00 1
Visibility (km)

76.3/23.7 Weather Conditions


Wave Ht (m) Swell Ht (m) Wave Dir () Wind Spd (knots) Wind Dir P Bar (mmHg) T High (C)

3.4
T Low (C)

Support Vessels
Vessel Name Vessel Type Arrival Date Depart Date Note

Unscheduled Events
Reference No. Start Date End Date Event Type Unsch Maj Cat Unsch Detail Description Accountable Party Contractor

18

11/8/2013 00:00 11/8/2013 09:00

11/8/2013 01:00

NPT

RREQ

DW HOIST

Problems with draworks parking break. Droped shoe 9 5/8" shoe track and 6 jts of casing in the hole.

Rig Contractor

Weatherford Accessories, Drilling Weatherford Casing & Tubing Running, Tubular Running
On Loc

19

NPT

FSH

OH

Rig Contractor

Mud Additive Amounts


Des Date Rec Consumed

Base Oil Df1 Job Supply Amounts


Supply Item Des

11/8/2013
Date

20.0
Received

15.0
Consumed

80.0
Cum On Loc

Diesel

11/8/2013

15,341.0

138,483.0

Page 4/6

Report Printed : 11/9/2013

Chevron Bangladesh Drilling Morning Report

Date: 11/8/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 20.67 Time from Spud: 20.06 Days Since Last DAFW / RI Case :

Rpt No: 22 Hours: 24.00 1,095 / 139

SBU Drilling Well Category : Drlg Well Category 1

Drill String/BHA BHA #7, Motor Build


Bit Run Drill Bit Length (m) IADC Bit Dull Bit Total Fluid Area (nozzles) (in) BHA ROP (m/hr)

1b
Nozzles (1/32")

12 1/4in, SK5519, E168478

0.28
String Length (m)

1-1-WT-S-X-I-CT-TD 236.94

1.24
Max Nominal OD (in)

8.8 812.000

18/18/18/18/18
String Components

SK5519, 8" Hyperline Motor w/12"UBHS, 11-3/4" Stabilizer, NM XO Sub, 8 1/4"LWD - MFR, 8 1/4"HEL, NM XO Sub, 8" NMDC Long, XO Sub, HWDP, Drilling Jars - Hydraulic, HWDP
Comment

String/BHA Components
Item Des Len (m) Mass/Len (lb/ft)

HWDP Drilling Jars - Hydraulic HWDP XO Sub 8" NMDC Long NM XO Sub 8 1/4"HEL 8 1/4"LWD - MFR NM XO Sub 11-3/4" Stabilizer 8" Hyperline Motor w/12"UBHS Drilling Parameters
Wellbore Depth Start (MD) (mKB) TVD Start (mKB) Depth End (MD) (mKB) TVD End (mKB) Drill Time (hr)

159.41 9.68 28.05 1.10 9.22 0.91 6.90 9.02 0.91 2.47 8.99
On Btm Drl Ti Interval ROP (m/hr)

49.30 49.30

Original Hole
Cum Depth Drilled (mKB)

2,931
Cum Drilling Time (hr)

2,671.63
Flow Rate (gpm)

3,038
Weight on Bit (1000lbf)

2,761.43
RPM (rpm)

8.50
Stand Pipe Pressure (psi)

7.97
Drill Str Wt (1000lbf)

12.6 225 210

963
PU Str Wt (1000lbf) Drilling Torque

109.00
String Wt (1000lbf)

770 30
Length (m) String Length (m)

22
Slack-Off String Weight (1000lbf)

4,100.0

290 BHA #8, Fishing


Bit Run Nozzles (1/32") String Components Drill Bit

25.0

IADC Bit Dull

Bit Total Fluid Area (nozzles) (in) Max Nominal OD (in)

BHA ROP (m/hr)

------211.78 Drive Sub, Float Sub, 1x5''DP, Bumper Sub, Fishing jar, 6-1/2'' DC, HWDP
Comment

6.500

Fising for 9 5/8" casing String/BHA Components


Item Des Len (m) Mass/Len (lb/ft)

HWDP 6-1/2'' DC Fishing jar Bumper Sub 1x5''DP Float Sub Drive Sub Drilling Parameters
Wellbore Depth Start (MD) (mKB) TVD Start (mKB) Depth End (MD) (mKB) TVD End (mKB) Drill Time (hr)

168.55 28.22 2.23 1.92 9.69 0.81 0.36


On Btm Drl Ti Interval ROP (m/hr)

49.30

Original Hole
Cum Depth Drilled (mKB) PU Str Wt (1000lbf)

3,038
Cum Drilling Time (hr) Drilling Torque

2,761.43
Flow Rate (gpm) String Wt (1000lbf)

3,038
Weight on Bit (1000lbf)

2,761.43
RPM (rpm)

0.00
Stand Pipe Pressure (psi)

0.00
Drill Str Wt (1000lbf)

Slack-Off String Weight (1000lbf)

27 Casing Strings
Casing Description Set Depth (MD) (mKB) Set Depth (TVD) (mKB) Run Date

Intermediate Casing 1
Comment

1,799

1,763.31

9/25/2013

Page 5/6

Report Printed : 11/9/2013

Chevron Bangladesh Drilling Morning Report

Date: 11/8/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 20.67 Time from Spud: 20.06 Days Since Last DAFW / RI Case :

Rpt No: 22 Hours: 24.00 1,095 / 139

SBU Drilling Well Category : Drlg Well Category 1

Casing Components
Top Depth (MD) (mKB) Btm Depth (MD) (mKB) Len (m) Jts Item Des OD (in) ID (in)

Tubing Strings
Tubing Description Comment Set Depth (MD) (mKB) Set Depth (TVD) (mKB) Run Date

Tubing Components
Top (mKB) Btm (mKB) Len (m) Jts Item Des OD (in) ID (in)

BOP Test
Date Com

10/29/2013 Wellbores
Wellbore Name

Shell test BOPs and related equipment to 250/5k psi, ok, Full BOP test was done on 22 October'13.
Kick Off Depth (mKB)

Original Hole Directional Surveys


Description

35

Planned survey Survey Data


Date Description MD (mKB) Incl () Azm () TVD (mKB) VS (m) NS (m) EW (m) DLS (/30m)

Actual Surveys Survey Data


Date MD (mKB) Incl () Azm () TVD (mKB) VS (m) NS (m) EW (m) DLS (/30m)

Page 6/6

Report Printed : 11/9/2013