The Manual of BGD50m2/3 ESP

Henan Zhengzhou Boiler Environmental Protection Co., Ltd. 2010.12.10

CONTENTS 1. The principle and structure of ESP Function .............................................................3 2. Introduce the key components of electrostatic precipitator .......................................4 3. Performance parameters ...........................................................................................22 4. The information provided drawings .........................................................................24 5. Quality assurance system .........................................................................................28 6. Installation and use instructions ...............................................................................39 7. Packing and shipping solutions ................................................................................52 8. After-sales service and personnel .............................................................................53

1. The principle and structure of ESP Function

ESP mainly includes the corona electrode (cathode), collecting pole (anode) and the vibration system.. When the electrostatic precipitator power, the corona electrode and the very composition of dust in the nonuniform electric field,discharge electrode (corona pole) is negative, the dust is extremely positive, and 72kV high-voltage DC power supply for charging. When the electric field strength increased to a value, a very the corona formed around negative corona, the ionization of gas molecules to strengthen, resulting in a large number of positive and negative ions. Positive ions in the corona are neutralized by corona electrode and polar, negative ions and free electrons are transferred to the collecting pole. When the gas with the passage of dust, these negatively charged particles will continue to encounter in the campaign and was adsorbed on the particles, so that charged dust particles, Through the electric field force, the dust will soon reach the dust very gas campaign anode plate, release negative charge, the dust deposited in the board itself. Operation in the positive ion, corona district positively charged dust, moving corona electrode, the corona electrode will keep fouling, but the amount small. Collected dust to fall through the vibration device, gathered in the lower part of the discharge hopper, the gas purification. Electrostatic precipitator is composed of the body, supply unit which result in high-voltage direct current power and low voltage control components. Figure:

Smoke through the air intake box to complete the smoke box from the

Rectifier Transformer 2 Case Air 3 distribution plate 4 Insulation Cathode 5 vibration device 6 Outer shield 7 Cathode ray 8 Anode plate 9 Vibration device anode 10 Hopper 1

inlet pipe section to a small section of the proliferation of large electric field.At this time, to maintain gas flow rate, flow field uniformity is particularly important to the balance of the transition. Therefore, in order to achieve the field uniformity of air distribution on a crosssection, into the smoke box with flared gas, and in which more than two layers of air with uniform plates, while the smoke chamber on the inlet should be on the humidity, temperature, flow rate , static pressure and the monitoring of dust concentration monitoring holes. Vibration anode side row, the top row of the cathode rapping, cleaning effect, easy
3

maintenance. Used in automatic control of high-voltage thyristor rectifier units, high voltage silicon rectifier and the SCR by the automatic control system. It can be converted into high frequency alternating current to direct current and spark frequency control, according to the nature of smoke and dust at any time adjust the maximum supply voltage of electrostatic precipitator, to enable it to maintain the average voltage is slightly lower than the impending spark discharge voltage ( associated with a certain spark discharge voltage) to run. Low temperature measurement and control devices including thermostatic heating control, vibration cycle control, ash-bit instructions, high and low level alarm and automatic discharging control, access doors, security holes and chain of control cabinets to ensure the long-term safe and reliable operation of ESP . 2Introduce the key components of electrostatic precipitator Design Range. Body equipmentElectrostatic precipitator before the imports from the flange head, then head to the ESP exit flange, from the roof down to the full hopper flange within the equipment (including supporting bearing and the ESP platform ladder away from the storm ontology shed and other accessories, including the first level of zero meters to the body between the platforms platform and take the ladder). Trapezoidal enclosure with insulation outside the guard and metal components. Electrical Scope of supply: full set of high voltage and high voltage control cabinet, the entire low-voltage program-controlled cabinet; the supplier is responsible for the design of wire and cable equipment needed to provide wire and cable inventory (including the bridge), to be responsible for procurement, installation of wire and cable laying by the supplier is responsible." Ash Scope of supply: a screw conveyor, a humidifier. Body structure design. Inlet mode and outlet mode. Horizontal into the wind, the way the level of the wind, reducing drag and thus the operation of electrostatic precipitator power consumption savings. Are the wind in the form. Porous plate plus vane design, to ensure the uniformity of air distribution, slowing the unstable state of alternating pressure. Cathode and anode configuration. C480 anode plate with beam line with the electrode needle prick. Anode material for the plate material 1.2mm SPCC. This configuration is not only collecting good effect, strong vibration force transmission. The distance between the anode and cathode. An electric field using the same polar distance 440mm, two electric field and three electric field using the same polar distance 400mm. This design can effectively prevent the boiler flue gas generated by the alternating pressure gas and alternating array of smoke caused by unstable flow caused by frequent closed corona, and not because of the high voltage caused by anti-corona phenomenon. The form of vibration. Cathode and anode for the electromagnetic vibration hammer are placed at the top. This form of vibration effect is not only a good rapper, but not easy to hammer out there. Hopper design. Hopper design with 60 angle, the installation position and the High Level Wall vibrator alarm device can effectively prevent the ash bucket Fouling.
4

Insulation installation. Insulation layer with a thickness of 100mm of mineral woolKeel with models of 30 * 30 * 3 AngleOutside the guard with the color plate thickness of 0.5mm. The insulation effect, can effectively prevent condensation, and are not easily fall off. Electrical control. ESP using computer control, with a variety of control functions, and multiple automatic protection from man-made factors that lead to the abnormal operation occurs, user-friendly to use, to ensure the stable operation of highly efficient dust collector. Outer casing. ESP outer casing steel structure to withstand the internal components, insulation weight, ash load, wind load, snow load, roof live load and negative pressure. Such as Figure 1:

Picture 1.1 outer casing


G22.1
1 2 3 4 5
E
D-D 1:10
5 5
E-E 1:10
8

6 7 8 9 10
G G A

18 19 20
8

18 17 16 15

C F F

50(100)

2
8 5 50(100) 4

21
A

22 23 24 25

14

13

12

11 26

1 : 15 8

Technical Requirements 1. Installation application pad filled a gap, the gas-tight welding; 2. All components installed in the Weld, the inner gas-tight continuous welding, intermittent welding outside the interval 50; 3. No. 20 and No. 21 should be installed to the actual situation at the scene, the interception of an appropriate length of the reinforcement,In order to tighten the appropriate reinforcement. 4. Welding on the spoiler, there is interference at the site of cutting and welding the end of stick with the beam density, the gap is less than 1mm. 5. All side panels, wall panels installed on the rebar and the column must be welded to ensure the overall strength of the shell. Upper spoiler

1 : 10

1 : 10

1 : 10

Bottom plate

27
1:5
F-F 1:10

28

Wide beamAll 8

2370 Upper spoiler Side spoiler All 5

5
1 : 10 B-B 1:10
6 4 4

All

A-A
16 8

G-G 1:10

2 4 50(100)

1:5
All

All

All All All 5

5 5 50(100) All

21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

G22.1-3W G22.1-2W G22.1-1W G22.1.16 G22.1.15 G22.1.14 T16A G22.1.13 G22.1.12 G22.1.11 G22.1.10 G22.1.9 G22.1.8 T01GC G22.1.7 G22.1.6 G22.1.5 G22.1.4 G22.1.3 G22.1.2 G22.1.1

Linear clip 300300 Stretch L=9450 Stretch L=9800 Central pressure parts Column inlet Central pressure parts The handle of ladder A Internal walkway Side choke system Lower pressure parts Internal walkway Ring beam Imports of lower plate Access door Wide column (with doors)

2 10/Q235-A 2 25/Q235-A 2 25/Q235-A 4 2 4 38 2 1 2 2 1 1 2 2 Wide column (without doors) 2 Column exit 2 Roof System 1 Side of the plate 2 Side of the plate 4 Top plate 2

7.07 36.38 37.73 228.39 518.31 236.62 0.87 78.46 374.28 645.56 86.98 1251.48 574.61 99.3 2583.57 1211.44 512.13 11299.36 1492.62 1178.44 449.1

C 1 : 10 All

Bottom plate

All

All

28 27 26 25 24 23 22 21

G22.1-6W G22.1-5 G22.1-4W GB/T41-1986 GB/T5781-1986 G22.1.17 T1.1 CO-M20

Stiffener plate 120*80 Upper spoiler Connection board200200 Nuts M16 Bolt M1645 Export bottom plate frame Open buckle rigging screw

132 8/Q235-A 2 3/Q235-A 8 10/Q235-A 56 56 1 6 4

0.6 79.2 77.86 155.72 3.14 25.12 0 0 734.4 734.40 8.76 52.56 0

NO.

Code

Name

Quantity

Material

14.14 72.76 75.46 913.56 1036.62 946.48 33.06 156.92 374.28 1291.12 173.96 1251.48 574.61 198.60 2583.57 2422.88 1024.26 11299.36 2985.24 6873.76 898.20 Single Total Weight

Remarks

Henan Zhengzhou Boiler Environmental Protection Co., Ltd.


Weight Scale

CASE

36247 1:100

G22.1

Anode and the anode plate Anode plate for the C480 board, hanging on the anode vibration marked. Such as Figure 2:

Spot / All

G22.3
1:5

Bottom plate

1:3
All

The direction of B (only display board placed between the anti-board)


1:3

12
B
Anode plate row Anode plate row

2
C

13
All

14
Head and tail and the interval o f 3 row spot 3

The direction of P 1:5

C
3

15
F-F 1:2

F F
All

16

A A

B B

The direction of C (only display board placed between the anti-board)


1:3

Spot / All

17

18

A-A 1:4

All / See Technical Requirements 2

Technical Requirements 1. All bolts, nuts tightened aft er the installation of spot weld ing; 2.Pin and the lower connection p late welding rod after the insta llation, sales channel and locat ion not welding, And positioning the lower plate channel connection rod end to en d and the middle spot after inst allation; 3. Each row that connect with an vil beam vibration should have a dust collection plate will be h anging panels A grounding bar and roof beam conn ections,to ensure good grounding anode;

9
1:10

11

4. Seal plate and side spoiler n ot welding, you must first insta ll limit rake closure plate in p lace, then the implementation of the installati on.

M 1 : 40
5

The direction of C 1:10

(show only limit rake, cover p late) 1 : 40 Side spoiler L

Lower pressure parts


All / See Technical Requirements 3

Limit Rake
The direction of N 1:10

6 3
B-B 1:3

10

1.5
The direction of L 1:10

The direction of M 1:10

Head and tail and the interval of 3 row spot

18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

GB/T41-1986 GB/T5781-1986 T3-9 G22.3-7 G14.3.5 G14.3.4 G22.3-6W G22.3-5 G22.3-4 G22.3-3W G22.3-2 T3-8 G22.3.3 GB/T5781-1986 GB/T41-1986 G22.3-1W G22.3.2 G22.3.1

Nuts M6 Bolt M615 Plate limit card Anti-rocker cubicle


The lower plate connection lever The lower plate connection lever

Limit bar L=130 Limit board Limit board Pin L=60 Positioning channel Closure plate Limit Rake Bolt M1630 Nuts M16 Ground Round L=250 Anode plate row Anode vibration system

180 180 90 6 45 45 18 6 12 90 6 6 12 720 720 30 90 1


Quantity

16/Q235-A 6/Q235-A 6/Q235-A 10/Q235-A [100485.3/Q235-A 1.5/Q235-A

6/Q235-A

0 0 14.40 50.28 373.50 379.35 3.60 6.96 12.60 3.60 384.24 0.96 72.12 0 0 0.1 3.00 234.94 21144.60 4100.1 4100.10 0.16 8.38 8.3 8.43 0.2 1.16 1.05 0.04 64.04 0.16 6.01
Single

NO.

Code

Name

Material

Total Weight

Remarks

26549.31 1:120

Weight Scale

Anode system

G22.3

Figure 2.2 Anode Components


8

G22.3.2
Edge Beam
A

Edge Beam

1:2
Spot / All

1 2 3 4
A-A 1:2

B A

7
Spot / All

I The direction of B 1:8


Edge Beam 8 5 50(100)

All

The lower plate connection lever

Technical Requirements 1. Welds should be removed, may not have bumps or welding scars, removal of flash; 2. Tolerance: After installation, the plate plane is 5, the diagonal deviation is less than 5; 3. Dislocation of the error between the plates is less than%% P1.5; 4. GB/T6170-1986 high strength nuts and bolts GB/T5783-1986,On-site installation, the anode plate and the plate lifting beam connection must use torque wrench to tighten, tighten the nut edge of 135N.m,after the spot firmly tighten.

8 7 6 5 4 3 2 1

GB/T5783-1986 GB/T6170-1986 G10.3.6.2 T3.4 GB/T5781-1986 GB/T41-1986 G22.3.2.1 T3-9

Bolt M1640 Nuts M16 Plate lifting beam Pin Component Bolt M615 Nuts M6 Anode plate Plate limit card

8 8 1 2 12 12 4 6
Quantity

NO.

Code

Name

Material

0 0 23.98 23.98 0.6 1.20 0 0 52.2 208.80 0.16 0.96 Single Total Weight
Environmental Protection Co., Ltd. Cheng pot of Henan Province

234.94 1:20

Weight

Scale

Anode plate row

G22.3.2

Figure 2.3 Anode plate


G22.3.2.1
A The direction of A Show only the anode plate 3 C The direction of B Show only the anode plate 1:3

1
D

1.5 5

1.5

Technical Requirements 1. Windproof trench line is 8; 2. Anode plate by rolling, the surface should be smooth, not a tear and severe scratches, transition should be smooth rounded corners, end cut to flat and smooth, no glitches; 3. Anode plate manufacturing machinery industry standards JB/T5906-1997 should meet the requirements; 4. Anode plate peg board shall meet JB/T5911 weld quality requirements.

3 2 1

T3-14A T3-6

A lower connection plate 1 480C Template L=8000 1 Hanging board 1

4/Q235-A 1.2/SPCC 4/Q235-A

0.94 0.94 48.76 48.76 2.5 2.50


Single Total

NO.

Code

Name

Quantity

Material

Weight

Remark

52.20 1:6

Weight

Scale

Anode plate G22.3.2.1

10

Cathode and cathode ray. Cathode line is rounded thorns, hanging on the cathode oscillator cathode marked. Such as Figure 3: Cathode v dy cathode. Figure 3.1 Cathode parts diagram

11

Flue gas flow

Technical Requirements 1. All insulators need to be properly protected from welding slag splashing on it; 2. Cathode frame must be inspected by the hoisted to meet the requirements of its flatness and cathode hanging beam welding; 3. Outermost two rows of the cathode frame and the connection will prevent the pendulum pin spot,and then every two rows of the pin spot, but should pay attention not to sell anti-pendulum welded together with the rest frame and the cathode off the cathode beam hanging all removed after welding; 4. A total of 13 connecting sleeves: one each in the head and tail, one every 3 rows of welding; 5. Cathode frame painted yellow paint on the main mast to the top. 22 21 20 19 18 17 16 15 14 T4-7 T4-31 T4-16 T4.12 T4-17 3358 JC222-79 T4-18 T4.11.1 Rapping closures Nuts I Washer Bearing flange Insulator washer upper Pressure Insulator Filler L=5000
Insulator under the washer

G22.4
I 1:10

1 2

A A
4

1:2

22 21 20 19 18 17 16 15 All 5 14

12

4 5 All 5 12
F-F 1:10 1:10

5
1:2

All

12

See Technical Requirements 3


A-A

1:10(Show only electric heater)

13
H

H-H

H
E

11 10 9 8
13 12 11 10 9 8 7 6 5 4 3 2 1 G22.4-3W G22.4-2W GB/T41-1986 GB/T5781-1986 G1.4-1 G22.4-1 T4.5 T4-29 G22.4.4 G22.4.3 T4.8 G22.4.2 G22.4.1 Connection sleeve L=270 Pin L=100 Nuts M10 Blot M1040 Anti-swing frame stiffener Anti-pendulum Heater bracket Electric heater Cathode framework 12 168 18 18 9 6 36 12 84 Cathode lifting beam assembly 6 Temporary Hanging 4 Incubator 1 Cathode rapping 12

All

The direction of E 1:10

Pipe DN202.75/Q235-A 8/Q235-A

[100485.3/Q235-A [100485.3/Q235-A

All

Support Block

12 12 12 12 12 12 12 12 12

0.9 10.80 2.3 27.60 1.20 17 204.00 5/Asbestos rubber sheet 1.3 15.60 0 16/Linear Asbestos 1.25 15.00 5/Asbestos rubber sheet 2.5 30.00 23.7 284.40 90/Q235-A 125/Q235-A
5/Asbestos rubber sheet 0.1

NO.

Code

Name

Quantity

Material

0.4 4.80 0.04 6.72 0 0 20.7 186.30 59.54 357.24 0.54 19.44 0 86.22 7242.48 250.91 1505.46 3.3 13.20 7533.6 7533.60 51.75 621.00 Single Total Weight

Remarks

Weight

1:100

Scale

BC50-3 Cathode system

G22.4

12

Figure 3.2 Framework cathode


G22.4.4 1
Top
This range may not have welding slag splashing

A-A 1:3

1:3 3 32

8 2
This range may not have welding slag splashing

32 1:3 3 16/Weld length not less than 6

1:3

16

5 6

1:3

Technical Requirements 1. Cathode frame combination, the plane is 10 degrees; 2. To ensure the straightness of the corona wire, welded front line should also be applied in all corona 180 ~ 360N preload,welded wire straightness of the corona is 4.5; 3. Strengthen the pipe and horizontal pipe, the main mast welding, repair welding at the intersection; 4. All welding should be the order of welding technology welding, acupuncture needle and horizontal lines of parallel lines, as shown in enlarged Figure ; 5. Acupuncture line reserved for the length L = 50, reserved length of the amputated after welding; 6. Welding firm, to remove welding slag; 7. Cathode frame painted yellow and paint the top of the main mast to show marks.

7 6 5 4 3 2 1

T4-46 T4.22 T4-48 T4-47 G22.4.4.1 T4-45 G22.4.4-1

C Strengthen the management 2

Pipe DN253.25/Q235-A Pipe DN202.75/Q235-A Pipe DN253.25/Q235-A Pipe DN253.25/Q235-A Pipe DN403.5/Q235-A

24 3 2 8 C Strengthen the management I 2 Mainmast tube 1

Acupuncture Line C Horizontal tube C Horizontal tube I Acupuncture Line

1.9 0.89 2.9 4.2 0.69 0.8 36.84

3.80 21.36 8.70 8.40 5.52 1.60 36.84

NO.

Code

Name

Quantity

Material

Single Total

Weight

Remark

86.22 1:50

Weight Scale

Cathode framework

G22.4.4

13

Figure 3.2 cathode ray

14

2
A A

2 1

G22.4.4.1-2W G22.4.4.1-1W

NO.

Code

G22.4.4.1
A-A 2x45 Technical Requirements 1. In the cathode without any hard and fast line bend and crack the gap; 2. Acupuncture thorn in the full assurance are located on a straight line.

Cable needle Bar

Name

56 2/1Cr18Ni9Ti 0.0011 0.06 1 Cold drawn bar8/Q235-A 0.63 0.63 Single Total Quantity Material Weight

Remark

Weight

Scale

Acupuncture Line

0.69 1:1

G22.4.4.1
15

Vibration system. Anode and cathode are used at the top of the electromagnetic vibration hammer rapping, such as Figure 4: Figure 4.1 Anode rapping

16

Both ends of the continuous welding of 100 / All

G22.3.1
1:8 Anvil beam vibration Uniform plate vibration

Cutting board

All

Anode plate row

1:10

Row of the center line of anode plate 10 50(100)

3
8 All

Technical Requirements 1. All of vibration of the vertical bar is 2; 2. Electromagnetic vibration hammer rod center line and center line of coaxial 2; 3. Electromagnetic hammer rod center line center line of coaxial and magnetic hammer of not greater than 0.5mm; 4. Magnetic hammer vertical bar is not more than 1mm; 5. All the anvil beam welding and cutting boards must be firmly; welds should be removed, not a bump.

2 4 5 6 7 8 9 10
A A 1:3

10

A-A 1:3

13 12 11 7

13 12 11 10 9 8 7 6 5 4 3 2 1

GB/T93-1987 GB/T95-1985 GB/T5781-1986 T3-2 T3-1 GB/T41-1986 T3-7A T200-3 T200A T3-13 T3-12 G22.3.1.1

Galvanized flexible pad 16 450 Galvanized flat pad 16 450 Galvanized bolts M1640 90 Anode plate vibration 30 4.5/Q235-A Hyperion round anode 30 Hoop 6476 30 Galvanized nuts M16 450 Support screw 90 16/Q235-A Magnetic hammer stick 30 Electromagnetic Hammer 30 Uniform plate vibration 90 Uniform plate vibration 90 Three head of the anvil beam 30

NO.

Code

Name

Quantity

Material

0 0 0 2.1 63.00 0.2 6.00 0 0 0.5 45.00 6.2 186.00 14.6 438.00 1.1 99.00 4.0 360.00 96.77 2903.10 Single Total Weight

Remarks

Weight

4100.10 1:100

Scale

Anode vibration system

G22.3.1

17

Figure 4.2 Cathode rapping

18

G22.4.1

1 2

15
I 1:2

16 17

18 19 12

4 5 6 7 8 9 10 11
A-A 1:3 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 T3-7A GB/T93-1987 GB/T95-1985 GB/T5781-1986 GB/T93-1987 GB/T95-1985 GB/T41-1986 GB/T5781-1986 T4-10 YJF520-70 G22.4.1-1 JC222-79 G22.4.1.1 T4-9 T4-8 T200-3 T200A Support screw Galvanized flexible pad 6 Galvanized flat pad 6 Galvanized bolts M615 Galvanized flexible pad 16 Galvanized flat pad 16 Galvanized nuts M16 Galvanized bolts M1640 1 3 1 1 1 15 15 15 3 Biconical coupling sleeve 2 Shaft vibration insulating polymer 1 Cathode rod vibration 1 16 Asbestos L=3000 1 Functional Block cathode rapping 1 Cathode plate vibration 1 Hyperion round cathode 1 Hoop 5170 1 Magnetic hammer stick 1 Electromagnetic Hammer 1
Cathode ground vibration L=250

BVR-300/500V1x2.5 16/Q235-A

90/Q235-A 50/Q235-A

12 13 14

4.5/Q235-A Rubber

0 0.5 1.50 0 0 0 0 0 0 0 4.5 9.00 0 12.29 12.29 0.75 0.75 5.01 5.01 2.2 2.20 0.2 0.20 0 6.2 6.20 14.6 14.60
Single

NO.

Code

Name

Quantity

Material

Total Weight

Remarks

Weight

Scale

Cathode rapping

51.75 1:25
19

G22.4.1

Automatic control system. Top of the electromagnetic rapper works: Top of the electromagnetic vibration is a more common use of ESP's cleaning methods. It is an electromagnetic coil rapper pulsating DC input rated voltage, through the power of the input coil of the precise control of pulse number, so that the coil below the rapping hammer under the action of gravity in the electromagnetic, instantly elevated to a high degree of reservation, and then showed a free fall drop, hit the bottom of the rapper vibration rod, along the vibration rod, the vibration force transmission to the electric field inside the anode plate (also known as dust collection plate), or cathode line, the absorption lines in the anode and cathode plates loose dust falls to the hopper, to complete a vibration play cleaning process. Top of the electromagnetic vibration control cabinet control principle. Top of the electromagnetic vibration control cabinet is to control the cleaning power of ESP to play hammer MRI equipment. ESP field will be all of the anode and cathode rapper connected to the output by a certain order of the ranks of online matrix. AC frequency conversion by the isolation transformer, the output of dual-phase AC power to the control board, control board in the phase rectifier, the output of a pulse of current. The positive DC line connected to the matrix palette, negative pole to the column matrix palette. The timing by the PLC program control within the ranks of the matrix rows palette selection, column selection switch, make the connection in the matrix of the rapper have a certain order each electric work. Man-machine interface, users can program the vibration of the PLC cycle, cycles, vibration intensity, vibration and other parameters change intervals to achieve the best cleaning results. Picture 5.1 Top of the system matrix of electromagnetic vibration control block diagram.

20

21

3. Performance parameters.

No. 1 2 3 4 5 6 7 8 9 10 11 12 13

Item ESP models The effective area of ESP Processing gas flow The temperature of flue gas The total number of channels ESP The distance of same polar High of the electric field Effective field length / width Room number / field number Flue gas flow rate / residence time Dust area The resistance of ESP The air leakage rate of ESP

Unit

Contents BGD50m2/3

m2 Nm3/h
0

50 110000 160 14

mm m m/m

450 8 12/ 1/3

m/s/s m2 Pa %

0.61/19.67 2580 300 3


22

No. 14 15 16

Item ESP inlet dust concentration Design efficiency Design exit dust concentration

Unit g/m3 mg/Nm3

Contents 25 99.8 50

23

4. The information provided drawings

24

Technical characteristics
NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 TITLE
Nominal cross-sectional area of the electric field m2 Flue gas volume handled m/h3

INDICATORS 40 110000 0.84 350 30 150 99.75 6.0


Single Room 3 field

Wind farm m/s


Max temp(duration of 30min) Inlet dust concentration g/Nm3
Outlet of dust concentration mg/ Nm3

Normal operating temp 150

Design efficiency % Design pressure KPa


Number of rooms Number of farms

Field Length m Height field m

9 6.5

ESP pressure loss Pa 298 Collecting area m 2 2450 14 Number of channels Electrode spacing mm 400 Style of anode plate Corona electrode type Tubular
Fish Bone Cable + auxiliary electrode

Conveying system device configuration table NO.

1 2 3 4

TITLE TS AMOUNT ash gate valve 300*300 5 Star unloader YJD-16 5 Enmasse conveyor MS32-17.5m 1 DZ-60 Dust wetting 1

Inclined multi-tube dust collect or 27 BGD40.18 Imports of flue 26 BGD40.17 Ladder to go lower 25 BGD40.16 Concrete Support 24 BGD40.15 23 YJD-CX-16-1.1-24 Star unloader Nuts M16 22 GB41-86 Bolt M16*50 21 GB5781-86 20 GGAJ02-0.4A/72Kv Rectifier transformer High-voltage isolation switch ca binet 19 GN-72/3-2S-X Central incubator 18 BGD40.14 Central line incubators 17 BGD40.13 End of the incubator 16 BGD40.12 End into the line of incubators 15 BGD40.11 Bearing 14 BGD40.10 Manhole 13 TG0123 Outlet 12 BGD40.9 Ladder platform 11 BGD40.8 Hopper 10 BGD40.7 Anode vibration transmission TG0122 9 TG0121 Cathode vibration transmission 8 BGD40.6 Anode rapping 7 BGD40.5 Cathode 6 BGD40.4 Anode 5 BGD40.3 Cathode rapping 4 BGD40.2 Case 3 TG0120 Cathode hanging 2 BGD40.1 Inlet 1

1 1 1 1 5 72 72 3 3 2 2 3 1 1 4 1 1 3 3 3 3 1 1 3 1 12 1

Assembly
Welding parts

Assembly
Ferroconcrete

Users themselves Design Institute

Assembly

Q235 Q235
Assembly Assembly Assembly Assembly Assembly Assembly Assembly
Welding parts Welding parts Welding parts Welding parts

Assembly Assembly Assembly Assembly Assembly Assembly


Welding parts

Assembly
Welding parts

NO.

CODE

TITLE

AMOUNT MATERIAL

SI.WT

GR.WT

WEIGHT

RRMARK

25

ESP BGD40-
QUANTITY SI.WT GR.WT PROPORTION

RRMARK DRAWN GRAPHICS DATE

DATE CHECKED GRANTED 2009.5

TOTAL DIAGRAM
MATERIAL

1
DWG.NO. PRO.NO.

BGD40.0 BGD40/3-TZ-1

ASSEMBLY PARTS

26

Load form the basis of ESP


NO. Load(KN) Vertical load
t30 embedded steel produced by t he relevant specifications Welding with solid concrete beam reinforcement

A1 233 40.5 46.6

A2 233

B1 467 467 467 467 233 233

The horizontal load of X direction The horizontal load of Y direction

41.4 124 96.3

63.1 65.0 48.3 49.6 99.2 27.8

1. Load unit is kN, load, including body weight, insulation weight, wind load,ash weight, snow load and seismic loads. 2. Dynamic load factor of 1.1.

REMARKS
1. Embedded steel hook steel nails should be welded with the construction beam. 2. Graph embedded bolts should be given strictly according to the spacing of the embedded graph does not allow precise tolerance. 3. Peripherals platform width determined by the civil engineering design.

ESP BGD40-
27
Provide funding information 2
Environmental Design stage Construction Professional Protection
Specifications of drawing

1.0

PROPORTION

1:80

Equipment financing plans provide the basis

BGD40/3-TZ-2

Electrical condition table


NO. TITLE TS AMOUNT Power(kw) Drive ratio(i) AC input voltage(V) AC input current(A) DC output voltage(kV)
DC output current(mA)

Description of the conditions of electrical


1. All the requirements of operating in the motor control switch and divided into on-site control room switches. Control room set up manual and automatic adjustment of two ways. 2.Each electric heater requires the ability to open and stop individual 3.Distribution of the cathode plate vibration is continuous rapping rapping, rapping anode time control range of 0 to 0.5 hours until the equipment running, the equipment of professional practice at the scene determined in the corresponding period of vibration (press recommended design cycle , each motor is run intermittently, 40 seconds after the motor is running, stop the motor 60 to 150 seconds. 4.All low voltage distribution electrical wiring and switches are the identification and preparation of professional materials. 5.ESP need to set up a separate grounding, grounding resistance in a variety of climatic conditions should be less than 2, Manhole cover need to be flat with 4 50 connected to the grounding grid. 6.Require the inspection door on the electrostatic precipitator, and the high-pressure rectification Manhole room door, high voltage power supply control cabinet to set safety interlock, the housing should be provided around the access door \"security maintenance light\" power to prepare for maintenance purposes. 7Number of devices over a single TPC Filter configurations. DWG. 8The total power 194.72KW. NO.
Phase marker

28

29

Equipment condition table


TITLE AMOUNT 5 TS WZP-120 TL(mm) 500
temperature range ( ) devices(mm)
The length of insertion

0-500

150

Description of instrument conditions


1.The top of the incubator and cathode vibration transmission incubator temperature control on the establishment of two points selected in the filter and out-side installation of two point temperature controller. 2.The specific location of the meter into the line of professional positions by the total layout of the figure, the temperature control of the display screen in the control room instrumentation. Control requirements: When the incubator gas temperature <170 , all electric heater turned on, when the incubator air temperature>220 , all the electric heater power. 3.the instrument flange interface according to GB9116-88 Dg40/Pg2.5. 4.The number of instruments to single TPC Filter configurations. ESP BGD40/3
Provide funding information 4

DWG. NO.

BGD40/3-TZ-4

30

Equipment condition table

Overlooks the Sketch 31

Design stage Specifications of drawing

Construction Professional Environmental Protection

PROPORTION

Incoming HighCabinet voltage control cabinet

Highvoltage control cabinet

Highvoltage control cabinet

Lowvoltage control cabinet

Design stage

Construction Professional Protection

Environmental

32

Specifications of drawing

PROPORTION

33

5. Quality assurance system.

1Quality assurance system introduced. Our company has passed ISO9001 international quality guarantee system, the company provides equipment to ensure product quality, specially formulated <<celectrostatic precipitator equipment quality assurance system>>. The system shows the company through the quality assurance system of the composition, the quality of the various functional departments of the responsibility, justifies the means, the formation of functioning and effective quality assurance system. The system set forth in the request, primarily to detect and prevent equipment in the manufacturing process of actual or potential quality issues to the principles and objectives described system to control the impact of equipment manufacturers and service quality, reliability and quality of equipment implementation of all activities and quality assurance process to ensure the system's effective implementation. 1.1 Scope GB/T9001-ISO9001 Management, design, procurement, fabrication, inspection process design, financial, file, integrated management of quality systems. 1.2 Management responsibilities 1.2.1 Management policy and quality objectives 1.2.1.1 Quality Policy 1.2.1.1.1 Our company strictly enforce <<GB/T9001-ISO9001>> quality assurance system standards, improve product quality, strengthen quality supervision, so that transformation of production equipment, the transfer to the "double standard" to meet the ESP project, the first class level of need. 1.2.1.1.2 Establish the idea of serving for the owners, high-quality products with competitive markets. 1.2.1.2 Quality objectives 1.2.1.2.1 Product qualification rate reached 100%, the whole quality of products to the first grade. 1.2.1.2.2 Equipment arrives, inspection, installation, operation a success. 1.2.1.2.3 Equipment arrival information is available, accurate, and timely transfer of the owners. 1.2.2 Responsibilities 1.2.2.1 Corporate leadership A The general manager of corporate quality policy and quality system of designated establishment, improvement and implementation of the bear full responsibility; B Corporate vice president, general manager to help implement the quality policy and quality assurance system implementation; C Enterprise chief engineer in the implementation of quality policy and quality assurance system in operation, fully responsible for technically. 1.2.2.2 Responsibility for the quality of the various functional departments Production enterprises, responsibilities, and information activities carried out by all the information related to the functions given to the relevant departments and personnel responsibilities and privileges GB/T9001-ISO9001 quality assurance system accountability. 1.3 File management 1.3.1 Purpose and Scope 1.3.1.1 For information on receiving documents relating to the activities, collection, preparation, review, approve, publish, distribute, modify, archive to make provisions to ensure that all departments and personnel with timely, accurate and correct use of the latest
34

version of the file. 1.3.1.2 Used in the production of quality products, document management, the management of the file should have at least the following: ADesign documents: such as design drawings, technical specifications, design changes, general assembly drawings, and materials. BContracts and procurement documents. CQuality assurance documents. DInspection records and inspection of all parts visa. EMajor equipment and raw materials, documents and the material proof of the factory. FThe process plan, production plan, report. GOther key documents. 1.3.1.3 The establishment,approval publication of documentation, , Quality used in the production of various documents, after preparation of staffing generally superior leadership or the relevant department for approval, and unified registration, numbering and promulgation. 1.3.1.3.1 Document must be approved by the original examination and approval to change the rear prospective effect, and promptly notify the relevant departments and personnel, to prevent the use of inappropriate files. 1.3.3.2 By the Reference Room of the documents, strict implementation of document records management system, delivery of the documents requested by property owners to surrender. 1.4 Procurement Management The scope of the Company's equipment and materials procurement, the Supply Department is responsible for procurement, purchasing and implementing of foreign policy of quality and cheap, to ensure that the procurement of material to meet the requirements to safeguard the interests of users and enterprises. 1.4.1 Selection of qualified sub-suppliers Ministry of Supply with the supplier to establish a close working relationship and feedback system, and supply units from the production, technology, quality, and other aspects of study, objective evaluation and selection of suppliers, the Supply Section to establish and save the selected qualified sub-supplier of the file. 1.4.2 Procurement documents Ministry of Supply's purchase of the various sector plans, the use made of the quality system standard units in order to sub-order with the supplier, the procurement documents for examination and approval before being implemented. 1.4.3 Verification of material procurement Procurement of material for verification, or in the source at the factory when, all purchases must be marked with the manufacturer matter the name of the factory inspection certificate and the certificate shall not be used. 1.5 Process Control 1.1 The general plan of the electrostatic precipitator by Zhengzhou boiler environmental design, sub-part drawing of the General Plan and the technical requirements for manufacturing, and quality in order to achieve predetermined objectives, in all parts of the preparation of various types of technology before processing program file, the quality of products be controlled. 1.1.2 Strict implementation of standards do a good job GB/T19001-ISO9001 review the contract and other work permits. 1.1.3 Purchase equipment, materials, processing, testing and inspection standards than specifically stated, have adopted national standard and metallurgical industry standards.

1.6 Inspection and Testing Control.


35

1.6.1 Incoming Inspection and test procedures according to Manager of Industrial Materials 1.6.2 Inspection and test piece prepared by pre-test quality plan and outline of the results of careful inspection and testing for the record, collate and prepare the transfer of project files. 1.6.3 During the course of the process, the quality control personnel to monitor and control the process so that process quality to meet the requirements. 1.6.4 Inspection and test equipment according to factory inspection, test equipment management and measurement management system to ensure the reliability of measurement and test results. 1.7 Quality Records. 1.7.1 Quality records as objective evidence of quality activities, records must be true, timely, legible, fully annotated with the date of signature, and traceable. 1.7.2 Standardization of quality records required by hand custody transfer request by the owners. The outline of the purpose: According to GB, T19001-ISO9001 quality assurance requirements, establish and perfect product quality system and continuously optimize processes, improve the process, to take the principle of prevention to ensure the electrostatic precipitator equipment to provide quality products and best services. 1.8 Specific quality assurance measures 1.8.1 Procurement of materials, quality control a) For the production of raw materials from qualified sub-contractors, and provide material certificates. b) Raw materials into the production process must have passed the test, the failure to eliminate production of raw materials. c) Profiles, sheet metal surface should be no rust, no cracks, no significant effect on material properties and interlayer defects, physical and chemical special materials should be reviewed, and save records. d) Welding rod, wire and inspection certificate should be recorded. Testing personnel should be verified. 1.8.2 Production Process Control a) In strict accordance with the drawings of the process of order execution, the main components of the implementation of the first seizure, inspection and final inspection, and make a record. b) Processes occur on a substandard products may not be transferred to the next process. c) As the operation of the welder, welder must hold a certificate, all butt welds must be welded completely. d) The main components before welding groove should the weld volume and the wrong side of the gap to check the connection should be in the welding grease, rust cleaned, weld dimensions and specifications should be strictly according to pattern and process regulations. The operator should be prepared to self-test, the examiner to do special inspection, and make a record. e) Workshop on the use of the electrode type, welding equipment, welding process parameters by strictly controlled to ensure the effectiveness of the welding process. f) Profile after cutting the leakage to go to hair removal in the outside section of the assassination. On the steel plate cutting should ensure straightness, squareness. 1.8.3 Welding Inspection Control a) Press<<welded structure process specification>> to test control." b) Important bearing on the splicing components to ensure thorough and fusion welding state. c) Detection of the weld include: appearance, crack, welding slag, splatter and scale appearance. 1.8.4 Assembly test control a) Important parts of sub-parts factory before shipment to the assembled group of tests.
36

Straightness measurement, the size of population size, installation and assembly of pitch relationships, and make a record. b) Board assembly test chip hopper. Measuring height, the upper and lower mouth size, installation pitch, and make a record. c)Workshops according to process requirements do a good job matching parts and pieces of identification test group. 1.9 Rust, paint quality control a)Rust and paint removal procedures in strict accordance with the implementation process. Check the certificate should include the paint, specifications, quality and paint removal rust thickness. b) Packaging according to the process control requirements. c) Processing in the process, should strengthen the process discipline, self-test, the first seizure, inspection and final inspection, the quality of accident prevention, fail to meet the strong isolation procedures should be required to prevent the mix. d) Inspection records should be the main components. 1.10 The four aspects of product quality management. a) Product design quality: I produced drawings of the equipment in strict accordance with the relevant information provided by the user design. b) Manufacturing quality (slightly simple: control of product quality assurance by the manufacturer) c) Installation quality: I may take bids for equipment installation, commissioning (through the installation to ensure the quality of the whole machine), installed and running JCJ03-90 standard. d) Management and use of quality: the tender equipment in the contract itself, the quality of the warranty period for equipment failures, the company responsible for the free repair and replacement parts, out of contract, warranty, or improper use of lost, damage and failure, the company continues to provide good services and benefits to provide a variety of accessories. 1.11 Process Assurance Plan Our company produces electric dust collector 10 years of history, through the introduction, digestion of domestic and foreign advanced technology and constantly strengthen the process management, the company's products have reached the electrostatic precipitator of the current international advanced level. Our company attaches great importance to the production process, the process set up special department with overall responsibility for: preparation of product technology, design, management, discipline inspection, process of production of major technical problems in the work. Ensure the production of each piece of equipment is customer satisfaction, quality brand-name products. a) Designed to ensure that the material For the general structure of materials using electrostatic precipitator quality carbon structural steel; high-temperature electrostatic precipitator for the main force, heating the structural materials used 16MN steel, special requirements, the corona wire of stainless steel. b) The main force of ESP components commonly used in welding welding standards DIN8563 main seam to B, to C-level general weld, in accordance with the relevant requirements, the necessary magnetic particle testing, ultrasonic testing, "X" ray detection. c) Design and evaluation of welding Welding technology is the main force for the force weld parts, welded to the preparation of a detailed process card, its content includes process welding method, welding material, welding process parameters, treatment before welding, after welding, technical requirements. Welding Welding procedure qualification refers to the organization management, quality management, production management and other experts in the preparation of a good process documentation review, and to make corresponding welding specimens, state certified welding
37

testing agencies to test, test qualified, and through the assessment process can be used to guide the welding. d) The main components of operating instructions. We are the main components of electrostatic precipitator (such as plate, polar, roof beams, columns, end wall, side panels, etc.) of the production process to write operating instructions. It includes components for processing the sizes of materials, allowance, margin deformation, work order, use of equipment, control parameters, measurement methods. Specific guidance for each component of the production process. e) Point control key processes The production process of the key processes (such as the production of plate rolling mill production line, pole line production line, corona wire frame production line, etc.) the implementation of key process controls. In accordance with the ISO9001 quality system requirements, statutory person to person, setting parameters, regular assessment, on a regular basis assessment, so that each moment of quality parameters under control to ensure product quality and stability. 2The main production equipment and testing methods Henan Province Environmental Protection Co., Ltd.whose production base is located in Industrial Park of Zheng zhou boiler Co., Ltd in Zhengzhou, sub-urban areas, the development zone two bases, covering 500 mu, with a comprehensive range of modern production workshop. Boiler Co., Ltd. Zhengzhou is the former Ministry of Machinery of key enterprises, strong technical force, advanced equipment, anode plate production line with a C480, RS prick line production line, bag cage production line, submerged arc welding machine, membrane wall welding machine, large full cutting machine tools, 60mm large rolling machine, CNC plasma cutting machine, 1200T hydraulic press and other types of more than 200 sets of advanced equipment. 2.1 The main production equipment table The following section steel for 200mm G4035 Saw Cutting Machine

150-600mm of the section steel with a 315T Straightening Machine straight 2-6mm steel plate for unloading 6*2500 Cutting Machine 7-13mm steel plate for unloading 13-25mm steel plate for unloading 13*3100 Cutting Machine 25*3150 Cutting Machine

the complex shape of the plate material GSJ-5000 CNC cutting machine for unloading. For 3-16mm flat steel plate 16 * 2500 Flat Plane The major mechanical parts for long weld CO2+Ar The framework of the corona electrode BFZ314 porous diamond drilling for drilling holes Rolled plate with Plate mill Polar production Epipolar line

38

2.2 The main means of detection. And column alignment Wall permeability leak Correction connected with the construction based on the level of detection Pole spacing error control

6. Installation and use instructions

1. Scope 1.1 This guide is intended to install their own ESP. Technological improvements and repairs can also refer to the manual implementation. 1.2 The same type of ESP and special provisions for certain products is inconsistent with the instructions, special provisions should be implemented. 1.3 Standard reference JB/T5910-1997 ESP JB/T8536-1997 ESP technical conditions of mechanical installation JB5908-1991 The main components of ESP sampling and storage of packing and shipping specifications JB/T5906-1997 Anode plate electrostatic precipitator JB/T5909.1-4 ESP with porcelain insulators 2. Equipment custody and out of the box device 2.1 Equipment arrived at the scene, keep the following requirements: 2.1.1 A solid foundation to rational distribution of stacking space, easy shipping, operations, and prepare facilities for flood control waterlogging. 2.1.2 Product stacking process to comply with pre-installed and installation requirements, avoid multiple out of luck to prevent deformation. 2.1.3 ESP part of packing and shipping, marking, storage compliance JB/5908-1991 requirements. 2.2 Acceptance of equipment out of the box 2.2.1 Equipment out of the box, inventory, factory inspection should be the user, the construction unit must be present. 2.2.2 Acceptance conditions a. Supply inventory, packing list and other technical documents are complete. b. Equipment nameplate models, specifications, quantities consistent with the engineering design. c. Check product quality, as a result of transport, handling, storage, changes in the process of deformation and size, should be corrected, which can not repair and replacement of retirement should be given. d. Equipment manufacturers design acceptance criteria based on the drawings, the provisions of the relevant technical documents and JB/T5910-1997. 3. Preparation before construction 3.1 Installation company should be familiar with the device structure, performance, design drawings and technical documents related to the preparation of construction design documents and construction quality cards, make the construction process must be strictly quality inspection records. 3.2 By construction design requirements for site preparation, platform installation, hoisting machinery facilities, special equipment configuration and so on. 3.3 Porcelain products should meet the JB/T5909.1-4 pressure test requirements. 3.4 Equipment manufacturer for technical tests, if necessary, send representatives to
39

attend the technical guidance during construction. 4. Installation of ESP casing 4.1 ESP installation sequence: Since ESP is a large outdoor equipment, the installation site of the circumstances and conditions vary, the construction company of AI members and equipment conditions are not the same, so the construction company can provide us with the following installation sequence common with ESP selected for construction. ESP bracket has two forms of steel and reinforced concrete, installed to provide design drawings shall prevail. Installation sequence is as follows:

Preparation and pre-installed

Installing areas

Be installed

Basis

Steel bracket

Support bearing

The bottom of the beam Check the hopper

Column on the case

Case plates on the shell side

Ladders and platforms Check the cathode frame Cathode frame assembly

Framework in place and the cathode ray cathode assembly


40

Installation of cathodic rapping

Cathode hanging installation Check the cathode hanging Insulator check

Anode installation hanging Anode plate correction, pre-installed Anode plate, the anode rod assembly vibration

Anode plate in place

Anode vibration installed Inlet speakers pre-installed The wind deflector of hopper in place

Inlet speaker installation

Install inlet gas distribution plate

Outlet speakers pre-installed

Outlet speaker installation

Outlet groove boards installed

41

Cathode drive installed

Anode drive installed

Within the roof installed

Cathode insulator incubator installed The roof insulation

Outside the roof installed

Access to high-pressure

Electrical Wiring

ESP External insulation

Final inspection 4.2 Base acceptance: include concrete pillars and steel stent pre-bolt inspection, must meet the basic requirements of design drawings. The basis of tolerance ( Table 1): Table 1 Name Lengthm Deviationmm Column spacing 10 10
42

3 5

Diagonal Elevation

20 20

6 8 3

4.3 Steel frame 4.3.1 Draw the support of the plane and the contour lines cross the center line, as the measuring benchmarks. 4.3.2 Steel frame of the bearing surface elevation of the level of tolerance 3mm, the vertical degree of tolerance 5mm. 4.4 Support 4.4.1 In supporting the roof and floor, respectively, cross the center line to draw, as the measuring benchmarks. 4.4.2 Bearing in strict accordance with drawings to be seated, pay attention to one-way, two-way support the displacement direction. Prepare the provisional positioning roof supports, temporary fixed to be reliable, to be put into operation prior to the removal of the temporary location. 4.4.3 Elevation on the surface of the bearing deviation 3mm. 4.5 Bottom beam, ash bucket. 4.5.1 The end of the beam to draw all the vertical and horizontal center line, hoisting make temporary support. Variable resistance welding to take measures to end after the installation and support beams to allow contact of cushion, the gap 1mm. 4.5.2 Deviation of the end of the diagonal beams meet the requirements in Figure 1, the column bearing point elevation deviation 3mm. 1 Electric field 2 Electric field 3 Electric field 4 Electric field

8mm 10 mm 15 mm 18mm 4.5.3 hopper wall to seal welding. 4.5.4 wind boards on the gray half-board installation and adjustment after installation of the anode, the anode rod arranged for the Department of vibration on the windshield under the plane and the gap should be strictly according to the drawings, to ensure freedom of thermal expansion plates, wind deflector on the hopper gap to allow on-site correction. 4.6 Aisle in the Dust. 4.6.1 installed in place when the dust in the hallway, the inflated side not welded shut, the dust in the hallway for the most part positioning row, row to be installed to adjust the anode and then welded in place. 4.7 Shell, the roof, take the stairs. 4.7.1 before installing the actual measurement of the length of each column, the preparation of the corresponding thickness of the plate, draw the center line of the measuring plane and contour. 4.7.2 Deviation of the vertical column to allow 5mm, column level tolerance 3mm, between columns size 5mm.
43

4.7.3 the end of the flat top beam is not allowed under the curve, but the torsion tolerance 5mm. 4.7.4 After installation, the shell roof ladder and platform installation part of the walk, the next one to facilitate the installation, walkway installation must be solid and reliable, and pay attention to thermal expansion. 4.8 cathode and large frame hanging 4.8.1 insulators before installation to make pressure test, required by the relevant standards, carefully installed to prevent broken pillars on the plane with the group type to allow elevation 1mm, suspenders and dust cover, porcelain center deviation 3mm. 4.8.2 Cathode framework installation, as shown in Figure 2, the electric field can be assembled or partly assembled the ground, upper, middle and lower classes are generally small frame house in the field combined. Framework of the combined requirements: a. the framework of the same small rectangular control center outperform the two difference 3mm. b. vertical beam straightness tolerance 3mm. 4.9 Anode 4.9.1 Anode hangers installed. 4.9.2 hangers and the upper small frame spacing deviation 5mm. 4.9.3 Cathode cage installed to the plate in place the framework of a single block of plate calibration, size, shape and position tolerances conform JB/T5906-1997 requirements such as calibration frame (Fig. 3), with the handling spreader (Figure 4) into the auxiliary oriented framework (Figure 5) at the same time, each child put a fixed anode board, general lifting blocks 5-6. 4.9.4 Auxiliary guide frame lifting, lifting methods such as the Ministry of the anode plate (Figure 6). 4.9.5 Anode into the anode and cathode planes flying between the small frame, in place after the correction, a very different pitch deviation 10mm. 4.9.6 ESP anode plate in the lower part of convex sets of connections are tight in the end use, the fastening bolts must be tightened, tighten the requirements for the 160Nm torque. 4.10 Cathode ray installation 4.9.4 Nng dm theo hng ph, cc phng php nng nh b tm cc dng anode (Hnh 6). 4.10.1 Tubular prick line installation, check the cathode line, installed in strict accordance with design requirements may not be reversed or inverted, circular hole at the waist and tightening torque required by plans, ensuring freedom of not very linear thermal expansion shaking, and then welded the bolts. Anode gap deviation (Table 2): Table 2 Plate length 7m Plate length 7m Cathode, anode spacing 5mm Cathode, anode spacing5mm

4.11 Cathode and anode installation of the vibration system. 4.11.1 Require the installation of drawings, The coaxial shaft vibration is less than 3mm can be installed after the vibration hammer, the vibration hammer impact anvil cold center and design center called the imitation of a point difference between the level of 3mm. Poor imitation of the vertical center of 3mm. 4.11.2 All parts of the shaft used in all welding welding T506 or T507. 4.11.3 Look for the direction of rotation, manual handling rapping shaft, inspectors are normal. The direction of power required. Check the operation to ensure normal.
44

4.12 Installed head import and distribution board. 4.12.1 According to lifting capacity, lifting import and export of assembled heads. 4.12.2 Distribution plate in strict accordance with plans in place. 4.13 Pay attention thermal expansion when install the outside top. 4.14 Installed ash bodies and other maintenance Manhole. Manhole installation process needs to pay attention to open the flexibility and sealing. 4.15 insulation and coating. 4.15.1 required by the manufacturer to determine the actual situation with the user holding institutions. 4.15.2 Coating line with JB/ZQ4000.10 requirements. 4.16 The protection board is securely installed and look beautiful. 5. The problem that should pay attention to during the installation 5.1 The installation program should be developed against welding deformation measures. 5.2 The non-leakage welding, false welding, especially in the inner parts of the weld. 5.3 strictly controlled to ensure the tightness of the shell welding, the welding joints leak attention. 5.4 It is important to ESPs efficiency and other performance that adjust the electrode distance,when Cathode and anode installing, adjustment should be carefully checked to ensure the spacing error of a very different requirements. 6.Final inspection of installation. 6.1 dismantling all temporary facilities and scaffolding, and welding. 6.2 ESP cleared within a comprehensive, does not allow any tools, debris left behind, Manhole strictly sealed. 6.3 Insulator port must be clean. 6.4 Check gear oil spaces should meet the relevant standards. 6.5 ESPs case and auxiliary equipment grounding a good grounding bolts, nuts, fastening bolts, nuts, according to construction specifications into the electrical connection to ground. 6.6 The temporary support removed and placed in specified location. 6.7 Check the cathode insulation resistance should be consistent with JB/T5909.1-4 requirements. 7. Installation and commissioning content 7.1 Acceptance of ESP need to comply with the provisions of JB/T5910-1997. 7.2 ESP debugging in accordance with the " ESP debugging framework " 7.3 Shell tightness test, inspection methods for the infiltration in the form of kerosene. 8. ESP debugging framework 8.1 Debugging content Electrostatic precipitator to achieve the desired results, must have good quality of the installation, and post-installation testing and commissioning work is essential to ensure quality of the installation means the content of their work often includes that: a. ESP inspection and test equipment components. b. Sealing test ESP. c. ESP inspection and adjustment after installation d. Check and adjust the low-voltage control loop of ESP e. Check and adjust the high-voltage control loop of ESP f. Debug of the ESPs rap device and ash transmiss device g. The test of that power of electric heater of ESP h.The test of the cold-electric load of ESP I. The test of the hot-electric load of ESP Note: On the air distribution test, field test results due to better-than-model test results, do not do it on-site air distribution adjustment test. 8.2 Preparation before commissioning the work and safety precautions
45

8.2.1 Commissioning of ESP should be responsible for implementing the installer, installers, owners, producers, user representatives and other participants, the establishment of commander and professional person in charge of the commissioning, commissioning, operation system specific (organization, command, operation volume , personnel), development of commissioning works, form problems and coordinate the implementation of the settlement, seriously record debugging problems, solutions and a variety of data, testing commissioning report after the conclusion of writing, sent to relevant departments. 8.2.2 Debugging should carefully read the instructions and the relevant technical information equipment, familiar with equipment, system design, by commissioning a project outline, methods, procedures and requirements. 8.2.3 Ready for commissioning work required in the consumption of materials, tools, grease, and equipment. Instruments are the main: a. Electrostatic voltmeter 100KV 1 piece b. Digital Multimeter 1 piece c. Pliers ammeter 1-5A 1 piece d. Megger meter 2500V500V Each piece e. Voltmeter 600V0.5 1 piece f. Debug tools commonly used electrical 1 set g. Incandescent bulbs 200V/100W2 1 sethomemade h. Insulating rod 10KV Three 1 setDischarge with I. Some signs and bar rope (provided) J. Plastic multi-core test connection a number of soft wire (Owned) k. High-energy radio (when the high-level arrangement with) 2. 8.2.4 Scheduling project staff Total commander 1 Operator 2 Inspector 2-3 People for adjustment 2-3 Electrician 2-3 Liaison 1-2 Total 10-15 8.2.5 Confirmation of several items a. With public facilities (water, compressed air, electricity, etc.) ; b. Confirm that the facilities such as power supply, fire fighting equipment; c. Confirm the main circuit insulation resistance; d. Sure control loop checks, etc. 8.2.6 Inspect, test results are recorded by the manufacturer, the company installed three parties signed valid user, need to write a summary report after commissioning by the three parties signed and filed. 8.2.7 Safety precautions should be consistent with JB6407 standards. 8.3 ESP's inspection and test equipment components. 8.3.1 Check the main insulated high-voltage network components, such as: high-voltage isolation switch, porcelain insulation suspended cathode, the cathode insulating ceramic shaft, wall bushing, etc. need to be qualified by the pressure test: The measurement of high voltage megger 2500 network, the insulation value should 1000M above. 8.3.2 Transformer high-voltage rectifier assembly debugging, check the rectifier transformer shall be exhaust gas relay. 8.3.3 Check operation of high-voltage isolation switch should be flexible, accurate and in place, with the auxiliary contact device, contact division and sensitive. 8.3.4 Check the cable head should be no oil leakage. 8.3.1 Kim tra cc thnh phn chnh ca h thng cch in cao th, chng hn nh: dao
46

8.3.5 High-voltage silicon rectifier transformer commissioning, should be studied in the project by the power plant instructions. 8.3.6 High-voltage transformer rectifier output, such as when using high voltage power transmission cables, high-voltage cables should be the following tests: a. High-voltage cable oil strength test, one-time breakdown voltage of not less than 35KV; b. DC leakage test high voltage cable; c. Measured using the 2500V megger test before and after the cable insulation resistance; d. ESP-specific DC voltage DC cable test voltage is 2U (twice the rated voltage) for 10 minutes. If the alternative use of other specifications, power cable, its pressure and duration of the standard should be national standard "installation of electrical installations for construction and acceptance (GBJ232-82) (seventeenth chapter of electrical over test articles)" in the DC power cable pressure test standards. Test: can be divided into 0.25,0.5,0.75,1 times the test voltage step-up paragraph by paragraph, each stay a minute, record the value of leakage current measurement should be to eliminate stray current. 8.3.7 DC leakage current test of the cable as the following one of the cable insulation may be defective, defective parts should be identified and dealt with: a. Leakage current is very unstable; b. Leakage current increases sharply with the test voltage; c. Leakage current has increased over time, the phenomenon of long ting. 8.3.8 High-voltage silicon rectifier transformer control cabinet tests should be according to the Specification of the power plant. 8.3.9 ESP installed by a variety of porcelain pieces, including a highly insulated wall bushing porcelain ceramic shaft vibration, pre-installation should be the standard visual inspection, porcelain, ceramic pieces should be intact and no cracks. 8.3.10 Prior to installation of various pieces of porcelain insulation resistance should be measured and AC voltage test, shall comply with manufacturer requirements. (General: room temperature, 100KV voltage 1 minute). 8.3.11 Vibration damper on the motor, maintenance should be carried out before installation, the bearing should be required to add grease. 8.3.12 Nameplate on the heater model and parameters should be consistent with the design requirements. Before installation, visual inspection should be intact, with a 500V insulation resistance meter to measure the shaking, the resistance should be greater than 500. If resistance is less than 500, can pass low voltage dry. 8.4 ESP sealing test Filter installed, before the laying of insulation should be checked for tightness. Generally use kerosene penetration test. 8.5 ESP inspection and adjustment after installation 8.5.1 Center distance between anode inspection and adjustment: a. In addition to the ground anode block by block 100% correct, but insist on 100% of the re-examination, re-calibration; b. Cathode ray should be checked by the quality of the root, if found to be defective, should be scrapped, update; c. Check all channels, but also for inspection before and after each channel; d. In the channel, very different from the standard deviation should be consistent with JB5910: when height h 7m anode, then the anode and cathode of the maximum deviation of 5mm; when height h7m, then the anode and cathode of the maximum deviation of 10mm; e. Check the adjustment, the channel height and the horizontal direction, the framework should be based on each level of the small cathode tube outer wall to the anode side wind
47

from the outer groove flange as the detection point; f. On one side of each channel to check the direction of the height of 5-9 points, that is, the framework of the cathode of small point of each level of support tube, with the system "T"-shaped gauge testing, and make records. Failed parts should be re-adjusted or reworked; g. Make adjustments on the anode plate should be carefully slow movement, not too much force on the anode plate; h. Prohibit the use of heating method for correction. 8.5.2 To the anodic and cathodic parts of the sharp corners of the burrs, examine the electric field inside the shell than the cathode and anode exclusion, where the plate spacing is less than the level of potential sites from different pole line need to be addressed at all. 8.5.3 Row of anode plate, cathode big frame, small frame, the cathode and anode rapping various parts of the bolts should be in good condition and to make only transfer welding. 8.5.4 Hammerhead cathode, anode hammer blow with the commitment to meet the requirements anvil contact position, axes, hammers rotating flexible and reliable. 8.5.5 electric field of the foreign body removed. 8.5.6 Check the throttle motor gear motor vibration motor functioning correctly ash flexible, clean parts of the lubrication oil. 8.5.7 Regulation of the flue connection door, tailgate, Fan, ash equipment, roof, Manhole sealing well. 8.5.8 Various parts of the weld solid and reliable, error-free solder, missing solder, sealing well. 8.5.9 The porcelain and ceramic shaft clean and dry. 8.5.10 ESP grounding resistance is less than 2 ohms, electrical equipment grounding resistance is less than 0.5-1 ohms. 8.5.11 Measured with 2500 volt megger insulation resistance of high-voltage network, should be greater than 1000 megohms. 8.5.12 The case of ESP and high-voltage cables should be connected cathode rectifier transformer in good condition and tighten." 8.5.13 High-voltage isolation switch control mechanism should be flexible, location accurate. 8.5.14 Check with a 500-volt megger motor vibration motor throttle motor and cable insulation discharging situation, the insulation resistance of not less than 0.5 M. 8.5.15 Check all parts of the control wiring drawings are correct. 8.6 ESP voltage control loop checks and debugging 8.6.1 ESP line of electrical system check is complete,then,check the power transmission test systems and equipment for air load test run. 8.6.2 Check the low voltage power control equipment operation, including: alarm system testing, vibration loop checks, ash circuit inspection, heating and temperature detection circuit inspection. 8.6.3 Before the power, the cabinet and the low-voltage components of ESP disconnect from the terminal and then proceed to power low-voltage control equipment, the JIU. Power, the start of the cabinet the cabinet power switch power supply voltage meter shall have the instructions." 8.6.4 Manual or automatic start alarm system tests, the transient, delay sound, light signals should be the correct action to lift and reliable. 8.6.5 Rapping circuit inspection, the methods and requirements are as follows: a. Try: From the plate off the motor power cable, closing transmission. Manually: division and three times on and off the right contacts, the signal light plate shall meet the design requirements. Automatic control: Set a play cycle, three small circular motion sequence, the correct vibration cycle, contacts and the signal light division and should be the correct word And control tests can be adjusted in the field.
48

Process control: start a program of work of the three procedures, their implementation cycle and the logic should be correct. And in field trials and the logic of the cycle when they perform adjustable. Motor recovery after power failure test terminal. b. No-load operations: unlock the coupling, closing transmission; Manual mode: In the start, the motor direction of rotation should be consistent with the requirements of the control unit. Switch three times, measuring the value of starting current, load current value and phase unbalance current value. Automatic control mode: when the program control mode, respectively, three timing and procedures of work, the cycle with the logic of the implementation should be correct. Test accuracy, the power recovery couplings. c. Before the power , cold commissioning of the rated load operation;" Manual mode: starting current value recorded when the test run, measure three-phase current value and the maximum unbalanced current value. Approved the setting value of thermal components, division and three should be normal. Check the hammer on the anvil against the vibration point of contact to stay around the upper and lower values of the design requirements. Rotating flexible and not cards hammer, hammer can not afford, no hammer-free phenomenon. Automatic Control: The design process is given by the manufacturer, try to play three cycle process is not the correct sequence and timing disorder. Maintenance and electrical inspection is passed, a continuous vibration test run of not less than 8 hours should be normal. 8.6.6 Dumping of ash and ash circuit inspection, the methods and requirements are as follows: a. Test operation: the power before the open from the bottom of the contactor motor power wiring. Manually: switch three times, contacts and the signal, the light should move the right word. Automatic mode: the artificial linkage of the niche conditions three times, interlock should be correct. Test service restoration of motor wiring is correct; b. No-load test run: Break the ash mechanical load, transmission test switch motor. Manual mode: start the motor to determine the direction of rotation. Measuring the motor starting current and phase current value. Installation instructions should be consistent with the signal unit. Auto mode: Analog started three times, bit number, and chain should be correct. No-load trial run service restoration of normal mechanical loading; c. Transfer operations with the commissioning of ash handling machiner. Manual mode: Start measuring the value of starting current, three-phase current checking heat element current setting. Auto mode: Analog started three times, should be operating normally. As for the linkage test hot niches actual operating conditions should be in the future debugging. "Maintenance and electrical inspection is passed, switch to 8 hours continuous testing; requires rotating flexible. 8.6.7 Heater current alarm and temperature detection circuit inspection, the methods and requirements are as follows: a. Manual: Transmission measuring the current value of 30 minutes, check the heating element setting value, the signal and installation of units should be correct; b. When the heating circuit has less current alarm device, artificial removal of the loop should be any electric heater, under current alarm should be the correct action; c. Temperature control: analog division and two, contactors and signal should be the correct action, temperature control should meet the design requirements. Power later, when
49

the temperature rises to upper setting value should be able to automatically stop the heating when the temperature dropped to minimum setting value should be able to automatic heating device. 8.6.8 Debugging in the implementation of low-voltage control loop when the light manufacturing test instructions. 8.7 ESP pressure control loop check and commissioning 8.7.1 High-voltage silicon rectifier transformer control circuit operation test. Disconnect the rectifier transformer low voltage side of the connection of the case, for local and remote sub-closing test, simulation of gas, flow, temperature limit protection trip drive, level, temperature, alarm and security even jump, air chain and other pilot projects , the lights, signals, audio should be correct. 8.7.2 Pressure control loop commissioning include: closed-loop control plug-in and open their own load debug device for setting the limit parameters. 8.7.3 High-voltage silicon rectifier transformer control circuit before the check in debug a. Check the installation diagram at the internal and external wiring should be correct; b. Cell components and discrete components of the inspection should meet the requirements of the relevant regulations; c. The adjustment button should be in the starting position. 8.7.4 High-voltage silicon rectifier transformer control circuit debugging, debugging should outline procedures and requirements, the general loop and closed loop two separate steps. 8.7.5 High-voltage silicon rectifier transformer open-loop control circuit debugging methods and requirements are as follows: a. Open-loop simulation test can be carried out stations or control cabinet, device control plug-in all sectors of the static measurement of adjustable parameters. Conducted in the control cabinet, it should disconnect all the wiring the main circuit rectifier transformers, access two 200V, 100W incandescent bulbs false load; b. Experimental methods in detail instructions to press the power plant. 8.7.6 High-voltage silicon rectifier transformer control circuit of the closed-loop testing method and requirements, combined with the power plant to use instructions. 8.8 ESP cathode rapping, anode rapping, rapping the distribution board (if any) and adjust the drive ash body parts" 8.8.1 Purpose To ensure safe operation of the ESP line of the cathode, anode plate and the air distribution plate vibration device and ash body during installation and commissioning of ESP machine, you must run a separate debug them to check the vibration part of the work. 8.8.2 Preparation: a. Transmission device is not installed before the installation of the vibration of the fighting has been rapping and rapping hammer shaft must be a comprehensive examination; b. All parts of the burrs and weld spatter shall be cleaned; c. For mounting dimensions should be consistent with design requirements d. Hands should be able to move the rotation axis of vibration; e. For the anode vibration, impact hammer should hit the center of 4mm iron rod at the anvil, hammer, angle between two adjacent vibration pattern should be consistent with the requirements; Check gearbox oil level and oil plugs. Check the rapping shaft seal situation. Close contact with all the bolts and nuts, and welding fixed. f. Cathode pin wheel vibration and anastomosis to the right; Bushing insulation should be cleaned to remove debris. g. Air distribution rapping rapping can be very terms of reference. 8.8.3 Commissioning
50

8.8.3.1 Anode rapping: a. Anode vibration motor must run in non-load two hours, then check for abnormal heating phenomenon, vibration and noise, and elimination;" b. An overall test to check whether the phenomenon of being stuck, and elimination; c. When testing the direction of rotation by vibration, does not allow reverse rotation; d. Start the anode shaft, when the motor reaches full speed after the stop button by accident, such as the shaft does not go a week, then the above method can be started once and check the correct operation after continuous electrical closing notice; e. First of all required test switch to one hour, then stop, conduct a comprehensive inspection,if no abnormal phenomenon, that the installation of qualified. 8.8.3.2 Cathode rapping Commissioning shall comply with the provisions of Article 8.3.1. 8.8.3.3 Air distribution plate vibration Reference to Article 8.8.3.1. 8.8.3.4 Ash system Reference to Article 8.8.3.1. 8.8.3.5 End of the work a. Disconnect all electrical power to all, closed local switch; b. Rapping shaft piercing the hole must be kept tight; c. Clear the debris left by the time the test run. 8.8.3.6 Security measures a. All motors must be of professional personnel to operate the motor; b. Shall not be adjusted and maintenance when the machine is running; c. ESP internal check in the need for adequate lighting; d. Adequate supplies for fire fighting. 8.9 Commissioning of ESP electric heater power 8.9.1 Electric heater electric heater before installation to be checked on the nameplate of the model and parameters are consistent with the design requirements, and the voltage test and insulation resistance measurement. AC voltage test is 2000V, the insulation resistance 500. 8.9.2 If the time interval from installation to use the longer, the rated voltage should be, before shaking the insulation resistance test about whether the standards. 8.9.3 Open the electric heater to check: a. Whether the open circuit condition or not.; b. Heating rate conditions; c. Whether temperature control is accurate or not. 8.9.4 The test of heating by the thermostat automatically controlled must be normal before the actual conduct of smoke. 8.10 Cold electric field and smoke-free load of ESP debugging. 8.10.1 High-voltage thyristor equipment in the no-load performance tuning pass before proceeding to the cold, smoke-free electric field (hereinafter referred to as the cold air field) load test. 8.10.2 Cold air field commissioning sequence, should be put into low-voltage operation control device (especially heating circuit) prior inspection and approval and then put into high-pressure system debugging. 8.10.3 High-voltage silicon rectifier device debugging with an empty field before the load, low-voltage operation control system should be met;

51

7. Packing and shipping solutions

1All goods delivered by the supplier to comply with "GB191-73" signage packaging storage and transportation requirements. By (79) Electrical Union No. 1029 and the Andean countries, the requirements for competent authorities for long-distance transport numerous handling, loading and unloading of the solid packing can not cause the box is damaged during transport, equipment and spare parts loss. Respectively, according to the characteristics and needs equipment with moisture, rust and corrosion protection measures to ensure that the goods without any damage and corrosion in the case of safe arrival of the contract equipment installation site. Product packaging before, the supplier is responsible to clean up by the Ministry of sets, leaving foreign bodies, and to ensure that parts are complete. 2Supply companies within the box and tie the loose parts in the assembly drawing of the part number, part number clearly marked. 3For the side two sides of each package, and with the paint will not fade to a clearly visible mark Chinese characters printed the following: 1Contract number; 2Destination station; 3Receiving unit name; 4Device name, unit number, drawing number; 5Case No. / part number; 6GW / NW (kg); 7Volume (length width height, expressed in millimeters). Where the weight of two tons or more than two tons of cargo, the side of the box used to transport the tag and lanyard patterns indicate the weight and location to facilitate loading and unloading. According to the characteristics of the goods, loading and transportation of the different requirements should be clearly printed on the box, "light up", "Do not inverted" and "rain" and so forth. 4Material for the side to bare metal label or directly on the device itself specify the contents of the above. Bulky goods, the goods should have enough support or packaging dunnage to meet the requirements of rail transport. 5 Within each package, including the parts with the name, quantity, unit number, drawing number of the detailed packing list. Purchased package of the quality of manufactured products within the certificate, technical notes (if any) each. Two copies of packing list mailing each other. 6Sporadic variety of equipment and components used loose packaging intact, into the smallest pieces of sound within the box, and ship the vehicle as much as possible to reduce transportation costs. 7Grid format or a similar box and packaging, only used to hold other items was not subject to theft or damage of equipment or water and parts." 8 All with groove tubes and tube port with a protective cover or other means appropriate protection. 9The need to ensure accurate assembly of the goods processing surface bright and clean, the processing surface is excellent, durable protective coating (not paint) before installation to prevent rust and damage. 10 Supply-side delivery of technical data used for long distance transportation, multiple handling, rain and moisture-proof packaging. Each package of technical information on which the following:
52

(1) Contract number; (2) The receiving unit name; (3) the destination station; (4) Gross weight; (5) Box number / number. Information on each package containing a detailed list of technical information in duplicate, indicating the number of technical information, document item number, name and number of pages. 11Demand-side response to repeated use of the dedicated rail boxes, packing planes, etc., arrive in the inventory of parts, within 1 month after the return of the supplier.

8After-sales service and personnel

1Staff training programs We will send experienced engineers to design and operation of dust on the buyer free of charge for training. 1.1. Target Audience Buyer system use, maintenance and repair personnel. 1.2. Training purposes 1.2.1. To participate in training personnel to master the dust, and the supporting equipment and systems for the correct operation to ensure the safe operation of equipment. 1.2.2. To carry out routine maintenance and filter equipment maintenance, deal with the general filter failure. 1.2.3. Of dust have some understanding of knowledge and understanding. 1.3. Training 1.3.1. To explain the basics of dust. 1.3.2. Details of the structure of our ESP, mechanical properties and characteristics of special explanation for the product model. 1.3.3. Combined with our ESP, about the correct methods of operation and notes and may cause accidents and harm. 1.3.4. Explain the dust and causes of common faults and troubleshooting. 1.3.5. Filter on the user visiting the site to explain learning. 1.4. Training arrangements: the provision of training programs by the company, the buyer confirmed implementation. 1.4.1. Theoretical training Training Location: ESP site similar products. Training time: three days. Approach: to send an experienced design engineers and operating engineers dust lectures. 1.4.2. Practical operation of the training Training Location: existing users filter site. Training time: seven days. Training: on-site attendant to explain the combination of operations and field. 1.5. Training costs Free training, free of training fees and training materials fees, other costs borne by the buyer. 2. Technical Service commitment 2.1. After the signing of the contract of ESP, the company Jipai designers and filter design sector technology convergence.
53

2.2 For free during the installation of experienced Engineering and technical personnel 1-2 for site Representative,to carry out technical tests and installation guide; also in time to install the various problems arising in the course. 2.3. Filter debugging, the engineers in our company will take part in commissioning filter to ensure good operation of the boiler condition. 2.4. Within half a month after delivery, the engineers in our company guide the party to run operations. 3Service assurance measures All our supply the products to implement the provisions. ESP warranty period is 12 months. We implement the "110" service system. After receiving your notice, sales and service center receiving the user notification within 24 hours,we start to leave Zhengzhou. We pay a return visit on telephone within 48 hours after dealing with the problems. ESP itself lifetime warranty (except overhaul). More than warranty problems, we still provide onsite service free, the user only bear the cost of materials." We implement "person in charge of the project quality system." After the signing of the contract, from product manufacturing, storage, delivery to installation, commissioning, be responsible for, the whole process of service, improve project quality. We implement "system of regular visits to the user." Users of our company, products using the first six months of a return visit once a month. Quarterly return visit in two years time, solve problems for users; and establish the appropriate user profile, to facilitate communication with the users. Holidays (including New Year) on duty as usual, so that quality service is reflected in every day 365 days a year. Arrange transportation. For this filter, after the goods arrive at the scene the demand side, both sides need to send people to inventory, if there is losses and loss during transport by our companywe will undertake responsibility. Our company offer customers the supply of spare parts; the implementation of one-stop service for users, in addition to supply, transport agent, but also to provide users with high quality installation services.

54

Das könnte Ihnen auch gefallen