Activity Check Survey

Unit Km

Total Quantity

Line Name: 400 Kv S/C Kolaghat - Kharagpur Tr. Line Cum. Plan for Month's Today's Progress the Month Progress Progress Till Date Balance

Date: 09.05.

90.57 260

2.219 3 1

88.351 258

2.219 2

Foundation

No.

Earthing

No.

264

17

247

17

Erection

No.

260

256

Insulator Hoisting

Stringing (Pay Out)

Km

90.57

6.529

2.177

84.05

6.52

Stringing (Final Sag)

Km

90.57

6.529

2.177

84.05

6.52

Stringing (Final Sag)

Km

90.57

6.529

2.177

84.05

6.52

FOUNDATION
Location no 21/1 are held up by Bengal Energy Ltd.

ERECTION

Balance 4 Nos. will be completed by 31.05.13 among which 83/3 is a online to

STRINGING
64/0 - 66/0 48/0 - 49/0 55/0 - 56/0 2.1 Km under court case

0.232 KM Rly. Xing block awaited .( Request submitted)

0.208 KM DVC Xing Shut down required.( Request submitte

Kolaghat end tapping connection will be completed after getting shut down of 400 Kv S/c Kolaghat - Ar

Dismentaling of 4 nos SA type tower and de stg of 2 Km Conductor will be completed after gettin

Kharagpur Tr. Line Gangs Working

Date: 09.05.2013 Under Progress Target Highlight Completio Remarks of Today n (if any) Status as of today

R 21A/0 Excavation U/P ( One Leg )

R 21B/0 Second section U/P

STRINGING BALANCE WORK FRONT

TOTAL LENGTH COMPLETED FOUNDATION ROW SPANS EFFECTED SPAN LENGTH 21/0 - 24/0 2.219 TOTAL 2.219

90.57 84.05

2.219

Railway / DVC Xing SPANS EFFECTED SPAN 48/0 - 49/0 55/0 - 56/0 LENGTH 0.232 0.208 0.44

0.44

TOTAL

0.44

Court Case 64/0 - 65/0 65/0 - 66/0 0.595 1.573 2.168

TOTAL 2.168 Shut - Down Rxt - 83A 83/0 - 84/0 - 1.693 Ext TOTAL 1.693
BALANCE WORK FRONT

1.693

6.52

UNDATION

e held up by Bengal Energy Ltd.

RECTION

y 31.05.13 among which 83/3 is a online tower.

TRINGING
2.1 Km under court case

. Xing block awaited .( Request submitted)

ing Shut down required.( Request submitted)

ng shut down of 400 Kv S/c Kolaghat - Arambag line request submitted .

m Conductor will be completed after getting the above shut down.

Activity Check Survey

Unit Km No.

Total Quantity

Line Name: 220 KV D/C Medinipur - Kharagpur Tr. Line Cum. Plan for Month's Today's Progress the Month Progress Progress Till Date Balance

Date: 0

45.475 177 181

2.01 3 4

43.465 174 177

2.01 3 4

Foundation
Earthing

No.

Erection

No.

173

170

Insulator Hoisting Stringing (Pay Out)

Km

45.475

2.01

43.465

2.01

Stringing (Final Sag)

Km

45.475

2.01

43.465

2.01

Important Factors/Points
1

Telcon has submitted the said amount (Rs. 1.14Cr.) to WBSETCL. Clearance for resump

agpur Tr. Line Gangs Working

Date: 09.05.2013 Under Progress Target Highlight Completio Remarks of Today n (if any) Status as of today

STRINGING BALANCE WORK FRONT TOTAL LENGTH COMPLETED FOUNDATION ROW SPANS EFFECTED SPAN 24/0 - 25/0 LENGTH 2.010 2.01 45.475 43.465

TOTAL 2.010 ERECTION ROW SPANS EFFECTED SPAN LENGTH

TOTAL X-ING RAILWAY TOTAL

BALANCE WORK FRONT

2.01

actors/Points

BSETCL. Clearance for resumption of work awaited from local authorities.