R1, 25-10-2007
R0, 20-09-2007
REV NO. & DATE
DMR
DMR
VR
VR
PREPARED BY
RV
RV
CHECKED BY
APPROVED BY
DOCUMENT No
PCPL-0626-3-406
DG SET
PAGE: 1 of 1
CONTENTS
SECTION
DOCUMENT NO.
1
2
2
PCPL-0626-3-406
PCPL-0626-3-406-01
PCPL-0626-3-406-02-1
PCPL-0626-3-406-02-2
3
4
4
4
4
4
4
4
PCPL-0626-3-406-03
PCPL-0626-3-406-04-01
PCPL-0626-3-406-04-01-1
PCPL-0626-3-406-04-02
PCPL-0626-3-406-04-02-1
PCPL-0626-3-406-04-03
PCPL-0626-3-406-04-03-1
PCPL-0626-3-406-04-04
4
4
4
4
4
4
5
6
PCPL-0626-3-406-04-05
PCPL-0626-3-406-04-05-1
PCPL-0626-3-406-04-06
PCPL-0626-3-406-04-06-1
PCPL-0626-3-406-04-07
PCPL-0626-3-406-04-07-1
PCPL-0626-3-406-05
PCPL-0626-3-406-06
TITLE
Amendment Record
Scope of Enquiry
Project Information
ITC EHS Constructional Safety
Requirements
Specific Technical Requirements
DG Set
DG Set- Data sheet
Acoustic Enclosure
Acoustic Enclosure-Data sheet
Rotary screw pump
Rotary screw pump-Data sheet.
Erection, Testing and Commissioning
of Mechanical Equipment and
Systems.
Control and Relay Panel
Control and Relay Panel-Data sheet
Battery
Battery-Data sheet
Battery Charger
Battery Charger-Data sheet
Price Schedule
Deviation Schedule
DRAWINGS
ISSUE No: R1
DATE: 25-10-2007
No. of
pages
1
1
1
9
7
11
10
1
2
1
2
4
6
11
7
4
7
5
2
1
DOCUMENT No
PCPL-0626-3-406
Sl.
No.
1
2
3
4
5
6
DG SET
AMENDMENT RECORD
DRAWING NO.
PCPL-0626-3-SK-001
PCPL-0626-3-SK-003
PCPL-0626-3-SK-005
PCPL-0626-4-SK-101
PCPL-0626-4-SK-032
PCPL-0626-4-SLD-012
REV No. of
sheets
P1
1
P0
1
P0
1
P0
1
P1
1
P1
PAGE: 1 of 1
TITLE
Energy Center Equipment Layout
HSD Day Tank Data Sheet
Flow Diagram-Fuel Oil System
Legend
Single Line Diagram-Interconnection of DGs
and Trafos
Single Line Diagram-DG Sets
DOC\DWG
Number
Revision
Date
PCPL-0626-4-406
R0
20-09-2007
DMR
PCPL-0626-3-SK-001, 32
P1
22-10-2007
DMR
PCPL-0626-4-SLD-012
P1
22-10-2007
DMR
PCPL-0626-3-SK-004
P0
25.10.2007
Deleted
DMR
PCPL-0626-4-406
R1
25.10.2007
Revision in Brief
Signature
DMR
ISSUE No: R1
DATE: 22-10-2007
DOCUMENT No
PCPL-0626-3-406
DG SET
AMENDMENT RECORD
PAGE: 2 of 1
ISSUE No: R1
DATE: 22-10-2007
DOCUMENT No
PCPL-0626-3-406-01
SECTION - 1
PAGE: 1 of 1
SCOPE OF ENQUIRY
1.0
2.0
It is not the intent to specify completely herein, all the details of design and construction
of the equipment. However, the equipment shall conform in all respects to high standards
of engineering, design and workmanship and be capable of performing in continuous
commercial operation up to vendors guarantee period in a manner acceptable to the
purchaser, who will interpret the meaning of the drawings and specifications and shall
have the right to reject any work or material which in his judgement are not in full
accordance therewith.
3.0
Bidder shall quote for all the systems covered in this specification.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-02-1
PROJECT INFORMATION
1.0
2.0
3.0
4.0
OWNER
CONSULTANT
PROJECT TITLE
LOCATION
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
15.0
16.0
b. DC Supply
SECTION - 2
PAGE: 1 of 1
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-02-2
SECTION - 2
PAGE: 1 of 9
Part - I
Introduction
1.1
1.2
It is the companys endeavor to secure a high standard of safety on our sites therefore,
contractors and sub-contractors must know their duties under common law, both for
establishments and their own employees and to conduct their business and methods of
work to confirm to the best practices.
1.3
Before the client / company allows any contracting or sub-contracting firm to carryout
work on its premises, the company insists that contractors and sub-contractors
understand their duties regarding safe practices for themselves, others and regulations
covering the type of work they will be carrying out.
1.4
In furtherance to this policy, rules herein have been devised to bring to the notice of
Contractors, and sub-contractors some of the more common hazards, and appropriate
preventive measures in connection with the erection, construction, cleaning, painting,
alteration or demolition of plant, machinery and building.
1.5
The client is confident that the observance of these rules will be no hindrance to the
progress of the work, but will assist in the avoidance of accidents.
1.6
1.7
Section 2 details general rules, which are applicable to most contractors and subcontractors.
1.8
Section 3 details specific rules, which must be followed where applicable, where a
particular type of work is to be undertaken.
1.9
All contractor Supervisors will make sure that the engineering services / Safety Manager
on company sites are notified as and when he and others (sub-contractors) are reporting
for work on that site.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-02-2
SECTION - 2
PAGE: 2 of 9
PART 2
Rules for General Operations
2.1
Access
Nothing shall be done or omitted to be done by Contractors or sub-contractors or their
employees to render unsafe or obstruct:
2.2
Any means of access to the places at which people are required to work.
2.3
2.4
Hazardous material
The contractor must inform the Safety Officer / Engineer, prior to commencement of
work of processes or materials connected with the contract work of a hazardous nature.
The contractor will have to secure storage for any such material.
2.5
2.6
2.7
Contractors and sub-contractors working on Company sites must not remove or displace
may guard, fencing or other safety equipment which is designed to protect personnel or
machine or any place where safety equipment has been provided, without the written
permission of the Safety Officer or his designated representatives.
2.8
Housekeeping
2.8.1
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-02-2
SECTION - 2
PAGE: 3 of 9
2.8.2
Special attention must be paid to potential fire hazards, trip points and equipment
left in a working period.
2.8.3
Contamination of the tobacco / food product (by drill surf, saw dust, oil, sealant,
paints and materials etc.)
2.9
Noise
Contractors and sub-contractors working on company premises or sites must obtain
permission from the safety officer / engineer if the processes being employed to carry out
that work significantly increase the ambient noise level in that area being worked.
2.10
Overhead Working
No work may be carried out above the heads of people or over gangway or roads, until
all usual precautions have been taken to ensure the safety of the person below, and until
the Safety Officer / Engineer grants permission. Each specific site of overhead working
will require consent from the Safety Officer / Engineer. This will be given after
satisfactory inspection.
Work may be carried out in the vicinity of power cables only when permission is
obtained from the Safety Officer and / or Site Engineer.
Work connected with overhead safety includes the movement of long metal objects,
machinery, jibs, masts, arms or other elevated parts.
2.11
Working at a height
All temporary structures erected by contractors or sub-contractors for the purpose of
allowing their staff to work at heights of more than 2 m. above floor level must be
constructed in accordance with the safety regulations laid down.
Metal ladders must not be used where there is any possibility of the ladder coming into
contact with electrical lines. In these places the ladders to be made of wood in good
condition.
Roof working must be properly supervised.
2.12
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-02-2
SECTION - 2
PAGE: 4 of 9
equipment to complete a contract shall be supplied by the contractor. Due provision must
be made during contract.
2.13
Plant Services
Before using plant services such as electricity, permission to do so must be obtained
from the appropriate authority, site engineer or safety officer.
2.14
Supervision
Contractors working on company premises must ensure that their staff are adequately
supervised.
2.15
2.16
As the works and services become energised a Permit to Work system will be brought
into operations and shall be adhered to strictly.
2.17
All flammable items shall be clearly marked and stored safely securely in properly
ventilated areas. Fire-fighting equipment shall be readily available adjacent to those
areas, for use in case of emergency.
2.18
All operators will be equipped and attend a Safety induction course on joining site and
shall sign to acknowledge that they have attended the course. Copies of the signed
acknowledgments will be passed to the Project safety officer.
2.19
The contractor will nominate a senior staff member who will be responsible for all
aspects of health and safety in relation to the contractors workforce on site. The person
so nominated shall hold weekly safety talks with his operators, the minutes of which
shall be passed on to the project safety officer.
2.20
A project safety committee will be formed under the direction of the project safety
officer. The nominated member of the contractors staff will be required to attend the
weekly meetings of the project safety committee.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-02-2
SECTION - 2
PAGE: 5 of 9
PART - 3
Tools
3.1
3.2
3.3
3.4
DOCUMENT No
PCPL-0626-3-406-02-2
SECTION - 2
PAGE: 6 of 9
3.6
3.7
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-02-2
SECTION - 2
PAGE: 7 of 9
PART - 4
Contractors and Sub-contractors Guidelines
4.1
4.2
4.3
Certain areas are designated hazardous (e.g. Noisy areas) - and warning signs must be
obeyed.
4.4
Where the contractors and sub-contractors work presents a potential hazard, appropriate
notices must be supplied and displayed and the area made secure as far as is reasonably
possible.
4.5
The client will not provide tools, materials, lifting or access equipment, fixing or raw
materials, unless by previous arrangements.
4.6
Any equipment brought to the site by Contractors and sub-contractors must not be used
by untrained persons, and attention is drawn to the indemnity clause of ITC orders,
which states that the contractor is liable for any consequent damage or loss to people,
equipment or buildings.
4.7
All welding, burning and grinding operations, which potentially cause fire, must be
reported to Security.
4.8
No alcohol is permitted on site and anyone deemed to be under the influence of alcohol
will be required to leave the site.
4.9
4.10
4.11
4.12
4.13
Place of work to be left in a tidy and safe condition at the end of each work period.
4.14
All injuries must be reported to the Ambulance Room or to Security beyond normal
hours. Security staffs are all trained in first-aid.
4.15
All workmen shall have valid identification cards issued by the Project Engineer.
4.16
4.17.
Only licensed wire men shall be allowed to carry out electrical work.
4.18.
Rubber gloves and rubber boots of correct voltage grade shall be used while working On
Line panels.
4.19.
Temporary supply shall be tapped from a source panel, which is properly fabricated and
permanently fixed and effectively earthed.
4.20.
Each tapping shall have ELCB of 30mA rating and shall be taken through armored
sheathed multi core cable or for distance up to 10mtr through un-armoured multi core
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-02-2
SECTION - 2
PAGE: 8 of 9
sheathed cable with inbuilt earth wire or earth wire clamped to the cable. All three phase
connection shall have double earth wire.
4.21.
4.22.
Welding set shall be properly earthed through an insulated cable to the nearest earth pit.
Welder shall use welding shield.
4.23.
Wooden ladders/godi shall not be used for working at height. Properly designated
platforms of steel with nylon wheels shall be used for working at heights as per safety
guide lines.
4.24.
Live line testers and test lamps shall not be used. Usages of multi meters with long
probes are to be followed. All lamps for temporary use shall be protective guards.
4.25.
Safety belts and retro guards shall be used to prevent works man from tripping /falling
from a height.
4.26.
Work men using drilling / grinding/cutting tools shall be used eye protection(specs)..
4.27.
4.28.
Wire cutting tools and knives etc., shall be provided with safety handles
4.29.
4.30.
Danger board to caution the passersby shall be provided wherever hazard work being
done.
4.31.
Every activity at site shall be cleared and authorized by the safety manager / project
engineer before commencement of such activity.
4.32.
All debris shall be cleared at once on hour to hour basis. Violation of norms will be
considered as breach of contract and will be liable for heavy damages.
WATER AND POWER REQUIRED FOR ERECTION.
4.33.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-02-2
SECTION - 2
PAGE: 9 of 9
PART - 5
General
It is a term of our contract with you that you and your employees and sub-contractors
you appoint shall:
a) Whilst on company premises comply with all health and safety legislation and company
health and safety regulations in force from time to time.
b) Ensure that all equipment and tools brought on to the premises will be in a safe
condition, have recently been checked and that all personnel using the equipment and
tools have been trained in their safe operations and
c) Ensure that training has been given in the safe operation of the work to be carried out
on the premises.
STORAGE
The owner will identify space for storing of contractors materials at site.
The contractor shall make temporary partition, lockable arrangements watch and ward at
his own cost and clear the store as and when required by the owners. The contractor shall
clear all debris on daily basis.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-03
1.0
SECTION - 3
PAGE: 1 of 7
GENERAL
1.1
This Section describes the scope of work under this contract and must be read in
conjunction with complementary Sections, Exclusions, Terminal Points and attached
drawings to obtain a proper interpretation of the scope. It shall be clearly understood by
Bidders that all supplies and services as required to install and commission of Standby
D.G Sets.
1.2
In keeping with the concept of turnkey contract, Bidder shall be responsible for the
design, engineering, procurement, manufacture, inspection and testing at the works of
manufacturer and/or sub-vendor, packing for shipment, forwarding, including transit
insurance, receipt at site, storage and handling at site, erection, testing, start-up &
commissioning and performance testing - all to the satisfaction of Owner or Owners
authorized representatives and in accordance with these specifications and as per good
engineering practices.
1.3
The above responsibilities of the Bidder would include but not limited to Five (5)
numbers 1000kVA Standby Diesel Generator Sets and its all associated auxiliaries as
detailed below under clause 2.0.
1.4
In the event of conflict between various sections, data sheets & drawings, then the
explanation given in Section-3 to be considered for interpretation/ implementation.
2.0
2.1
Five (5) Nos 1000kVA at 0.8 lagging power factor, 415 volts, 3 phase, 4 W, 50Hz, 1500RPM Diesel Engine driven generating set complete with AMF control panel, cabling,
earthing and one set of tools and tackles. The DG Sets shall be suitable for continuous
parallel operation with each other.
2.2
All the sketches enclosed as part of the specification are for bidding purposes only and are
suggestive. Successful Bidders shall furnish detailed design drawings for approval before
manufacture.
2.3
Diesel Engine, 4 stroke cycle, water cooled turbo charged; after cooled developing a
minimum net BHP of 1140 at the Engine output shaft (Input to the Generator) at 1500
rpm under standard reference conditions as per ISO 3046 Part-1 complete with following
accessories for each set:
2.3.1
2.3.2
2.3.3
2.3.4
Fuel oil system including Fuel pumps etc.,(Tentative fuel oil flow diagram is
detailed at PCPL-0626-3-SK-005)
2.3.5
2.3.6
Radiator.
2.3.7
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-03
2.3.8
SECTION - 3
PAGE: 2 of 7
Electronic Governor having facility for remote control of speed shall be provided.
The Governor shall have site adjustable droop characteristic (typically 1-5%).
2.3.9
One No. 24V battery and battery charger systems complete with DC starter,
Dynamo, built in voltage regulator, battery stand, etc, for each DG Set. The
Battery offered shall be suitable for a minimum of 3 consecutive starts (when
fully charged) of DG Set on cold condition, at intervals of 3 minutes
ii)
2.3.10
2.3.11
2.3.12
Safety control against low lube oil pressure and high cooling water temperature.
2.3.13
2.3.14
2.3.15
2.3.16
2.3.17
2.3.18
Exhaust system covering ducts, expansion joints, silencer insulation and necessary
supports etc. The insulation shall be of rock/mineral wool to a min. thickness of 75mm
(wool density of 150kG/m3) with wire mesh binding and AL sheet cladding. Independent
galvanised steel exhaust stack for each DG shall be supplied, as per PCB guidelines. The
Bidder shall provide necessary common structural supports for the exhaust piping
system.
2.3.19
A common lattice support structure shall be provided for the exhaust stacks. The
support structure shall be suitable for supporting exhaust stacks of five DGs of
1000kVA.
2.3.20
Support structure shall be hot dip galvanised finish self supporting complete with
ladder for maintenance, landing space, etc.
2.3.21
Civil foundation for the lattice structure support shall be carried out by
PURCHASER. However, all civil input data for the foundation design shall be furnished
by the contractor.
2.3.22
Sensors for oil pressure, high water temperature and over speed.
2.3.23
Complete piping, valves, fitting and specialties for fuel oil, lube oil, cooling water,
and intake air and exhaust system.
2.3.24
All foundation channels, bolts, anchors, shims, resilient mounting pads, Antivibration pads and other accessories as per manufacturers recommendations.
2.3.25
Four sets of operating and instruction manuals and Spare parts book
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-03
SECTION - 3
PAGE: 3 of 7
2.3.26
Complete lube oil system including initial charge of lubricating oil. The proposed
lube oil system is indicated in the enclosed Flow diagram..
2.3.27
2.3.28
Acoustic enclosures
2.3.29
Complete fuel oil system covering HSD Booster pumps day tanks, piping, valves
and fittings, etc. as per drawing no. PCPL-0626-3-SK-005.The Bidder shall size the
piping and booster pumps accordingly.
2.3.30
Fuel oil system comprising one 900 Litre capacity day tank and piping from day
tank to DG set. Typical scheme is detailed at the enclosed drawing PCPL-0626-3-SK003.
2.3.31
In addition to the individual day tanks, one common diesel tank of 500Litre
capacity complete with support structure, piping, floats, etc., to the day tanks to be
provided. This tank will act as an emergency storage tank to feed to day tanks through
gravity flow, in the event of fuel non availability due to the problems with bulk storage
pumping system.
2.3.32
The DG set shall be capable of taking a step load of 25% of its rated kW while
running at rated speed at any load from 0 to 75% without loosing speed more than 10%
of rated speed and regaining final speed within 10 sec. Further the DG set shall be
capable throwing 100% rated load when running at rated speed without causing over
speed trip device to operate.
2.4
2.4.1
Five (5) 415V, 1000kVA, 3-Phase, 50Hz alternator with all accessories as
described in Section 4 of this specification.
2.4.2
2.4.3
One (1) lot 1100 volt grade, XLPE insulated, armoured, control cables required for
DG set, Day tank & AMF panels.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-03
2.4.4
SECTION - 3
PAGE: 4 of 7
One (1) lot cable terminations, comprising gland plates, cable glands, cable lugs
etc.
2.4.5
One (1) lot earthing materials required for DG set neutral and body earthing.
Neutral earth pits shall be with 100mm dia x 3m CI pipes complete with earth chamber
and covers. The neutral earthing conductor shall be with 2R x 50 x 6 mm Cu flat per DG.
Body earthing shall be with 75 x 10mm GS flat.
2.5
Successful bidder shall be responsible for getting all statutory clearances/ approvals (like
PCB, CEIG etc.). The applicable statutory fees shall be paid by ITCL.
2.6
Typical layout of the DG Sets and sectional views are indicated on Dwg No. PCPL-06263-SK-001.
2.7
All control wiring shall be carried out using multistranded copper conductor, FRLS PVC
insulated wires of sizes as indicated at various sections.
2.8
The entire electrical control system shall be designed with fuse less system logic. For SC
protection, MCBs of suitable rating and characteristics shall be used.
2.9
Potential transformers shall be provided with primary MPCB and secondary MCB+RCCB
(30mA) protections.
2.10 Space heaters provided either in alternator or in panels shall be controlled by 50-90%
setting range humidistat and MCB protection.
2.11 All instrumentation, meters, relays, switches, etc., used shall be totally shrouded design
with finger touch proof terminations for human safety.
2.12 Automatic changeover facility from AUTO to MANUAL specified in CL 3.2 (b) of
PCPL-0626-3-406-04-1 shall be bumpless.
2.13 The response time of the AVR shall be such that on 20% voltage dip on sudden
application of the load, Generator terminal voltage shall be recovered to set voltage +
0.5% in less than 500 ms.
2.14 All the protection functions required to be provided for each DG set are shown in SLD
No. PCPL-0626-4-SLD-012. If any of the protection function is not covered in the
standard DG controller, same shall be covered by providing discrete relays. These relays
shall be located in the AMF panel.
2.15 Inter connection of utility supply and DGs is shown in the attached SLD No. PCPL0626-4-SK-032 bidder shall note that these are five synchronising breakers marked
A,B,C,D,E normally DG PCC bus is kept energized from the utility supply. It shall be
possible to select any breaker for synchronizing the DG with utility supply, for due
transfer of load from utility supply to DG and vice-versa with momentary paralleling or
synchronising any DG with any other DG for load sharing. It is not intended to operate
any DG with any other DG for load sharing. It is not intended to operate the DG(s)
continuously in parallel with the utility supply. Depending on the selected synchronising
breaker, appropriate synchronizing potential shall be selected and fed to the
synchronizing device. On attaining synchronism or after checking the dead bus condition
CB close command shall be issued to the selected breaker. Further, non availability of
any DG set or any of its control devices shall not prevent the other DG from
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-03
SECTION - 3
PAGE: 5 of 7
synchronizing with the utility. Manual check synchronizing facility through Double
Voltmeter Double Frequency meter, Synchroscope, synchronizing lamps and 3 Nos.
synchronizing selector switches also be provided..
2.16 AMF panels shall generally comply with in requirements of the enclosed specification
PCPL-0626-3-401-04-05 and also include all the items in Datasheet A3 & A4 therein.
2.17 As indicated in section-2.1 (Project Information) Purchaser will provide 48V unearthed
DC supply. In case any of the equipment offered by the Bidder required a different
voltage DC supply, same shall be derived from 48V supply by providing adequately
designed DC/DC converter power pack with protective devices on both input and output
side of the power pack. Each DG shall have a separate power pack. If common power
pack is considered, redundant power pack with decoupling diodes shall be provided.
Failure of a power pack shall be annunciated.
2.18 Only 1NO+1NC contacts of each if the incomers and bus coupler breakers of DG PCC
will be wired by the purchaser to DG.AMF panel for control/ interlocking purpose. If
more than one contact of same breaker is required for using in different circuits, contacts
multiplication shall be done using bi-stable auxiliary relays.
3.0
3.1
APPROVED MAKES.
The following makes of component are acceptable. Any other make if offered shall be
subject to PURCHASERS approval:
1. Diesel Engines
2. Generator
3. AV Mounts
GERB (Germany)
4. Electronic Governor
Woodwards
5. MCCB
7. MCB/ ELCB
9. Battery Bank
Rittal
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-03
4.0
SECTION - 3
PAGE: 6 of 7
16. Steel
Wago/ Phoenix
AMP/ Dowells
Masibus
DOCUMENTATION:
4.1
Whether explicitly mentioned or not in the various sections of this specification, Vendor
documentation shall include hard copies of as built drawings, operating and instruction
manuals, training manuals, etc., in Six sets after delivery of DG Sets to site. Vendor shall
submit DG Set overall general arrangement drawings giving plan, elevation and side
view with bill of material and makes; drawings for external terminations like bus duct
flanges and cable box chambers, major component drawings, schematic & wiring
diagrams with ferrule and terminal numbers etc., in FOUR sets for approval before start
of manufacture.
4.2
The following minimum documentation shall be furnished along with the completed bid:
4.3
Data sheets for DG set including generator and accessories as called for in Data
Sheet-B.
On award of contract the successful Bidder shall furnish the following documentation/
drawings in FOUR for approval:
Data sheets for DG set including generator and accessories as called for in Data
Sheet-B.
Earthing layout
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-03
5.0
Foundation layout
SECTION - 3
PAGE: 7 of 7
EXCLUSIONS:
5.1
Supply and installation of power cables and bus ducts from DG to DG PCC.
5.2
5.3
5.4
5.5
Bulk Diesel storage tank and its piping up to the Day tanks.
5.6
Supply and installation of earthing material other than for the DG & AMF panel.
5.7
5.8
All civil works required for the DG room, except the minor civil works like, grouting,
etc.,
6.0
6.1
7.0
7.1
DELIVERY:
The DG sets to be procured under this specification shall be supplied to site within the
period as stipulated in the forwarding letter. Bidder shall submit a bar chart for various
activities of manufacturing, testing, inspection and delivery.
PERFORMANCE GUARANTEE:
The equipment shall have a warranty of 18 months from the date of supply or 12 months
from the date of commissioning, whichever is later.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01
1.0
DG SET
SECTION - 4
PAGE: 1 of 11
GENERAL
1.1
The diesel engine shall drive the generator either directly or through a gear-box
(if required). The diesel generator shall be designed to deliver maximum power output
possible at site conditions specified in project information.
1.2
All necessary auxiliaries with adequate capacities to make the plant complete
such as fuel forwarding and injection system, lubricating oil system, governing system,
cooling water system, start-up system, intake and exhaust gas systems, fuel oil treatment
plant, if required etc., shall be provided and these shall be complete in all respects.
2.0
DIESEL ENGINE
2.1
2.2
The engine shall be of four-stroke type with either in line or V-type cylinder
arrangement.
2.3
The major moving parts such as crankshaft and connecting rods shall be of drop
forged design and shall have high degree of mechanical reliability.
2.4
The pistons shall be manufactured with heat treated steels or other equivalent
proven materials. The cylinder liners shall be of proven wear resistant materials designed
for fuel under consideration.
2.5
The cylinder head shall be of proven material. The cylinder head shall house inlet
and exhaust valves, starting air valve and fuel injector. A forced cooling arrangement
shall be provided around the exhaust valve seats and the fuel injectors.
2.6
The fuel injectors shall have easy accessibility and it should be possible to
remove them using simple methods.
2.7
The inlet and exhaust valves shall be precisely controlled via roller tappets, short
push rods and forked rocker arms.
2.8
The exhaust valves shall be made of high temperature hot corrosion resistant
material. The inlet and exhaust valves shall have hard chromium plated or equivalent
proven material stems.
2.9
Governing system
a.
The diesel engine shall be provided with an electronic type of speed governor. The
governor and the speed governing system shall be capable of controlling and
regulating the diesel engine speed in accordance with the requirements of class A1
governing as stipulated in ISO 3046 part IV.
b.
An over speed trip mechanism shall be provided to automatically shut off fuel in
case the engine speed reaches 110% of the rated speed. The speed at which the
mechanism trips the engine shall be adjustable. An engine mounted emergency stop
push button shall be provided, which when operated will trip the engine.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01
2.10
DG SET
SECTION - 4
PAGE: 2 of 11
Layout
a.The engine and generator shall be provided on a common base frame. The supply of
supporting springs, foundation bolts etc., shall be in Bidders scope.
b.
The engine shall be provided with adequate number of anchor bolts, foundation
bolts and anti vibration pads, alignment shims, as stipulated by the Bidder.
c.Necessary platforms with access ladders shall be provided by Bidder around the diesel
engine for easy operation and maintenance purpose.
d.
2.11
Necessary acoustic enclosure for the complete Diesel engine generator set shall also
be provided to minimize the noise level.
Fuel System
a.High Speed Diesel Oil is proposed to be used as load carrying fuel in the diesel engine.
Actual fuel oil samples shall be collected from the purchaser and analyzed by the
Bidder prior to commencement of actual design of the equipment.
2.12
c.The intake system shall be complete with interconnection ducting between air filter and
turbocharger, nuts, bolts, flange joints and supports required for installation.
d.
The air from the air filter shall be charged into the engine cylinders by means of a
turbocharger powered by an exhaust gas driven turbine. The turbo charger bearings
shall be cooled by the engine lube oil system. Suitable acoustic insulation shall be
provided for the turbo-charger for minimizing the noise level.
e.A turbo charger-washing skid (common for both the units) with pressurising pump,
detergent tank, flexible hose pipes, etc. shall be provided by the Bidder, Bidder shall
furnish with his bid a write-up on the operational procedure of the washing skid.
2.13
The stack height shall be calculated based on the fuel and the height shall meet the
requirements of currently applicable pollution standards and regulations.
c.Suitable expansion joint shall be provided on the exhaust ducting to take care of the
expansion due to the high working fluid temperature.
d.
The complete duct including silencer shall be insulated to maintain the surface
temperature of the external cladding to within 200 C above the ambient temperature.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01
2.14
SECTION - 4
PAGE: 3 of 11
DG SET
2.15
Lubrication system:
a.The lubrication system complete with all the accessories shall ensure good distribution
of lubricating oil to all moving parts of the engine.
b.
2.16
a. The DG sets shall be designed for radiator type cooling. The bidder shall furnish the
radiator cooling scheme and the quality of water required .All accessories required
for the cooling scheme shall be supplied.
b. If the radiator requires special coolant mix for the cooling circuit, the same shall be
indicated by the Bidder.
c. Supply of the DG set shall include the first fill of coolant.
2.17
Piping
a.The design of pipe lines, pipe assemblies, pipe fittings, flanges and components, valves
and specialties and any other pressure retaining part in a piping system shall be
carried out in accordance with the applicable power codes and standard.
b.
c.While routing piping, the following requirements shall be taken into account:
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01
SECTION - 4
PAGE: 4 of 11
DG SET
i.
The piping shall be arranged to provide clearance for the removal of equipment
requiring maintenance and for easy access to valves and other piping accessories
required for operation.
ii.
iii.
Sufficient upstream and down stream lengths shall be provided for flow
measuring devices, control valves, etc.
iv.
At all the screwed valves and screwed connections on equipment, unions shall be
provided to facilitate disassembly.
v.
The hangers and supports shall be spaced in accordance with the standard
engineering practice as outlined in applicable codes and standards.
d.
3.0
3.1
ii.
iii.
3.2
Excitation System:
a. The excitation shall be of the brushless type complete with permanent magnet
generator, automatic voltage regulator field discharge system and all other
accessories.
b. The AVR shall have auto-manual mode and shall have output limiters for stator limit,
rotor limit and field current limit. The manual mode shall be completely
independent of auto mode. Automatic change over from auto to manual mode shall
be provided in case of auto mode faults.
c. The AVR and other excitation system devices shall be mounted on the AMF panel or
in a separate panel.
3.3
Enclosure:
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01
SECTION - 4
PAGE: 5 of 11
DG SET
Insulation:
a. The stator, rotor and exciter winding insulation shall be class F with temperature rise
limited to class B.
3.5
Terminal Boxes:
a. The phase side and neutral side of the generator winding shall be brought out into
two physically separate terminal boxes.
3.6
3.7
3.8
Space Heater
a. The generator shall be provided with space heater suitable for 240volts, single phase,
and 50Hz supply. Space heater shall have adequate capacity to maintain internal
temperature of machine above dew point to prevent moisture condensation during
shutdown periods.
b. The space heaters shall be humidistat controlled duly protected by 30mA ELCB.
c. The space heater supply shall be obtained from the DG-MCC.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01
3.9
SECTION - 4
PAGE: 6 of 11
DG SET
Temperature Detectors
The following RTDs shall be provided in the alternator:
a. Bearings
2 Sets
b. Windings
6 Sets
c. Core
4 Sets
4.0
4.1
5.0
5.1
6.0
One (1) set Maintenance free Battery and Battery Charger of adequate capacity
for starting duty, one set for each DG set.
ii)
One (1) set Maintenance free Battery and Battery charger of adequate capacity
for the control supply for AMF and control panel, if called for that is Datasheet /
Section-3.
iii)
All 1.1kV grade, XLPE insulated, armoured power and control cables required
for the installation.
iv)
v)
COOLING SYSTEM
The Diesel engine shall have radiator cooling system. All accessories required for
the cooling system shall be furnished.
LUBE OIL SYSTEM
The Owner will supply the lube oil at one terminal point as indicated in the above
flow diagram. All pipe work as required for the above system shall be provided complete
with pipes, fittings, flanges, gaskets, fasteners, valves, strainers, expansion joints,
flexible hoses, hangers, supports and all other accessories as applicable / as may be
required.
FUEL OIL SYSTEM
6.1
Five Nos. HSD Booster pumps- (one working and one standby) will supply the
diesel oil to the individual HSD day tanks located at an elevation of 0.5m near each
engine.
6.2
All pipe work as required for the above system shall be provided complete with
pipes, fittings, flanges, gaskets, fasteners, valves, strainers expansion joints, flexible
hoses, hangers, supports and all other accessories as applicable / as may be required.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01
7.0
7.1
DG SET
SECTION - 4
PAGE: 7 of 11
7.2
7.3
Design requirement
Storage tanks shall be designed based on the applicable codes in respect of corrosion
allowance, minimum thickness, connection and appurtenances, roof and structures,
Earthing cleats, fabrication tolerances etc. The main parameters and requirement is
indicated in the data sheet.
8.0
8.1
9.0
THERMAL INSULATION
Thermal insulation using mineral wool, shall be provided for exhaust piping and for all
other hot surfaces for personnel protection.
PAINTING
9.1
All equipment supplied under the contract shall be suitable for operation under the
climatic and operating conditions prevailing at the site. All parts and surfaces which are
subject to corrosion shall be made of such materials, and shall be provided with such
protective finishes, as are appropriate to protect the installed equipment from
deterioration or injury due to the climatic conditions or operating environment. All
electrical and auxiliary equipment shall be specially treated for tropical conditions.
9.2
Bidder shall specify the details of the painting, and special treatment for tropical
conditions, in his offer.
10.0
PERFORMANCE REQUIREMENT
The DG sets shall be capable for start up from cold condition reaching synchronous
speed and rated voltage in less than10 seconds from the start impulse. The DG set
10.1
Thereafter shall also be capable of taking the full rated load, within 30 secs. Without
undue vibration and overheating of the engine.
10.2
The maximum permissible voltage and frequency spreads of output supply for the DG
set shall be limited 10 percent and 5 percent respectively and combined voltage and
frequency fluctuation of 10 percent.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01
SECTION - 4
PAGE: 8 of 11
DG SET
10.3
Manual facilities shall be provided to start the DG set for test purposes.
10.4
The generator shall be capable of carrying an unbalanced load of 25% without injurious
heating of any part, provided the rated current is not exceeded.
10.5
The diesel engine shall be capable of operating continuously with High speed diesel oil
as available commercially.
10.6
The diesel generator shall be capable of giving a net output at specified nominal voltage
at the generator terminals after de-rating, if any.
10.7
Performance tests shall be carried out at shop floor and at site to prove the performance
for the offered equipment.
11.0
MAINTENANCE
11.1
11.2
Vendor shall provide as built drawings and operation and maintenance manuals for
complete facilities.
11.3
The Vendor shall prepare, and keep up-to-date, a complete set of As Built records of
the execution of the Works, showing the exact as built location, sizes and details of the
work as executed, with cross-references to relevant specifications and data sheets. . Two
copies shall be submitted to the Purchaser prior to the commencement of the tests.
11.4
Prior to the issue of any Taking-over certificate, the Vendor shall submit one soft copy,
one full-size original copy and six printed copies of the relevant As Built Drawings
and any further Construction Documents that may be specified by Purchaser.
11.5
The Vendor before commencement of trial run of the equipment shall submit 6 (six)
copies of the operation and maintenance manuals, in English language, containing
descriptions, illustrations, sketches, drawings, sectional drawings, sectional arrangement
view and manufacturers part numbers to enable the connections, functions, operation
and maintenance of all components of the complete plant to be easily followed and for
all parts to be easily identified to facilitate ordering of the replacement parts. Exploded
views where appropriate shall be used for clarity.
11.6
Performance curves
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01
SECTION - 4
PAGE: 9 of 11
DG SET
11.7
11.8
11.9
The Vendor shall be responsible to provide suitably qualified and experienced personnel
for the 12 month Defect Liability Period following successful completion of the trial run
period and issuance of the Taking-Over Certificate by the Purchaser. The personnel
provided by the Vendor shall be fully experienced in managing, operating and
maintaining all aspects of the plant and facilities, shall be responsible to monitor and
ensure the successful performance of the system throughout the Defect Liability Period,
and shall be responsible to ensure that the Purchasers personnel are provided with onthe-job training as may be necessary to ensure uninterrupted satisfactory performance of
the plant and facilities by the Purchasers personnel after completion of the Defect
Liability Period and issuance of the Performance Certificate. These personnel shall be
available to be deputed to the site as and when required.
11.10 The bidder shall submit separately, as a part of his technical proposal, details of the
qualifications and experience of the personnel he proposes to provide for supervision of
operation and maintenance during the defect liability period. All costs for the bidders
personnel shall be included in the bid prices. All costs for the Purchasers personnel
during this period will be borne by the Purchaser.
11.11 The above notwithstanding, the Vendor will be required to rectify any deficiencies which
are attributable to defects in the workmanship or quality of materials.
12.0
TESTING AND
MAINTENANCE
COMMISSIONING
AND
TRIAL
RUN
INCLUDING
12.1
Immediately after the erection of the equipment, the Vendor shall carry out testing and
commissioning of the equipment to demonstrate the suitability of the equipment
workmanship, and operational aspects to the requirements of the contract, to the
satisfaction of the Purchaser. This stage shall be commenced within 7 days of completion
of erection and shall precede the trial run period.
12.2
Duration of the testing & commissioning period shall not exceed 15 days. In the trial run,
the Vendor shall run the DG sets for 3 months to demonstrate satisfactory performance
to the Purchaser prior to taking over by the Purchaser.
12.3
The cost towards Vendors engineer and other operating personnel during the said period
of trial run along with cost of tools and spare parts which are required for operation and
maintenance of the equipment during the trial run period shall be borne by the Vendor
and shall be included in the Vendors price schedule.
12.4
In the event that the equipment do not satisfactorily achieve the required performance
standards during this period, the trial run period will be extended until such time as the
Vendor has satisfactorily rectified any deficiencies as may be necessary to satisfy the
performance requirements. No additional compensation will be paid to the Vendor for
such extension.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01
13.0
13.1
14.0
14.1
SECTION - 4
PAGE: 10 of 11
DG SET
SPARES
BIDDER shall furnish a list of essential spares with item wise prices for the equipment /
systems covered under this specification for three years operation of the DG set.
BIDDER shall also furnish a list of his recommended spare parts along with the item
wise prices. The prices of the essential and recommended spares will not be considered
in the bid evaluation. However, all start up spares as required during commissioning
and up to handing over of the plant to the PURCHASER shall be supplied by BIDDER
and cost of the same shall be included in the quoted price.
DOCUMENTS / DRAWINGS ALONG WITH OFFER
The bidder shall furnish the following minimum documents / drawings along with offer.
a. Description of the DG set with basic technical details
b. Data sheets for DG set including generator and accessories as called for in Data
Sheet B.
c. G.A. drawings & Catalogues.
d. Reference list of supplier make till date.
e. Essential spares list along with unit rate
15.0
15.1
15.2
A mutually agreed quality assurance plan shall be developed which provides for
inspection and certification by Purchaser at specified times during the manufacture and
fabrication of such items. All costs for independent inspection or testing will be borne by
the Vendor, and the Vendor shall be fully responsible to ensure that adequate provisions
are made in his tendered rates to cover independent inspections and testing for the
equipment and plant.
16.0
TRAINING PURCHASERS
MAINTENANCE
16.1
The Vendor shall be responsible to provide practical training in all aspects of the
operation.
16.2
Maintenance and repair of the equipment and facilities to all personnel deputed by
Purchaser who will ultimately be responsible for the operation, maintenance and repair
of the equipment and its facilities.
17.0
17.1
PERSONNEL
IN
OPERATION
AND
DOCUMENT No
PCPL-0626-3-406-04-01
DG SET
SECTION - 4
PAGE: 11 of 11
be installed. The equipment shall also conform to the latest applicable Indian / British /
USA standards / or equivalent international standards. Some of the relevant standards
are: -
BS 5514/ISO 3046
VDI 2063
BS-2613:70 / IS-4722
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01-1
DG SET
DATA SHEET
SECTION - 4
PAGE: 1 of 10
DATA SHEET A1
SL #
DESCRIPTION
1.0
1.1
1.2
1.3
2.0
2.1
2.2
2.3
2.4
General
No. of DG Sets
Mode of operation
Installation
Design Considerations
Capacity (100% MCR Rating)
Over load capacity
Design ambient data for engine
a)
Ambient temp.
b)
Altitude above mean sea level
c)
Humidity
Type of fuel
2.5
Type of Engine
2.6
Engine speed
2.7
Governor type
2.8
2.9
2.10
3.0
3.1
Required
3.2
Required
3.3
Required
3.4
Required
3.5
3.6
3.7
3.8
Required
Required
Required
Required
3.9
3.10
3.11
3.12
3.13
4.0
UNI
T
VALUE
Nos
5
Continuous
Indoor
kVA
%
1000
As per ISO: 3046 / BS: 5514
C
m
%
dB
Refer Section-2
-do-doHigh Speed Diesel (HSD)as per
IS:1460
Stationary four stroke Vertical
75
Softened water
Electric
Required
Required
Required
Required
Required & to be witnessed
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01-1
SL #
DG SET
DATA SHEET
DESCRIPTION
UNI
T
VALUE
a)
5.0
6.0
6.1
6.2
6.3
6.4
6.5
SECTION - 4
PAGE: 2 of 10
6.6
6.7
6.8
6.9
Excitation System
6.10
6.10.1
6.10.2
6.11
Neutral MCCB
Rated Control Voltage for Closing Motor and
Trip Coil:
Accessories Required for Alternator
6.12
1000
415,3Phase,4 Wire
50
0.8 lag
IP23 to IEC 34.5
Class F(Temperature rise limited
to be Class B)
Class F(Temperature rise limited
to be Class B)
Class F(Temperature rise limited
to be Class B)
Self excited and self regulated /
Brushless
Ratio :1600/1-1
Metering CT: Class 0.5, 30VA
Protection CT:5P10,15VA
Ratio :1600/1-1
Class 0.5, VA burden shall be
furnished by bidder and ALF<5.
Ratio :1600/1-1
Core-1:Class PS, VKP=260V,
RCT=3.4,IMAG=105mA,STC=80k
Afor 1sec
Core-2:5P10,15VA
800A
110V AC
Two Nos
Six Nos
NA
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01-1
DG SET
DATA SHEET
SECTION - 4
PAGE: 3 of 10
DATA SHEET A2
APPLICABLE STANDARDS
IS 4691
IS 4722
IS 4728
IS 4889
IS 8183
IS 12075
TEMPERATURE
RISE
MEASURMENT
ELECTRICAL MACHINES.
ROTATING
IS 12802
IS 12824
ISO 3046
10
AIRBORNE NOISE EMITTED BY MACHINE TOOLS OPERATING CONDITIONS FOR METAL-CUTTING MACHINES
ISO 8525
11
ISO 8528
12
RECIPROCATING
INTERNAL
CONBUSTION
EXHAUST EMISSION MEASUREMENT
ISO 8978
13
IEC 60034
14
BS 5000
15
BS 5514
OF
ENGINES
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01-1
DG SET
DATA SHEET
SECTION - 4
PAGE: 4 of 10
DATA SHEET B
DATA TO BE FURNISHED ALONG WITH THE BID
SL #
DESCRIPTION
1.0
General
1.1
1.2
Nos. required.
1.3
Mode of operation
1.4
Installation
2.0
Design Condition
2.1
2.2
2.3
2.4
2.5
2.6
2.7.1
2.7.2
UNIT
VALUE
Nos
kVA
%
kWe (%)
a)
Ambient temp.
b)
c)
Humidity
Fuel
a)
Type of fuel
b)
Fuel consumption
i)
At 100%
ii)
At 75%
iii)
At 50%
Lube oil
a)
b)
c)
d)
Hrs
e)
Rs/ L
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01-1
SL #
DESCRIPTION
2.7.3
Maintenance Cost
DG SET
DATA SHEET
SECTION - 4
PAGE: 5 of 10
UNIT
a)
Rs.-------
--------Hrs
b)
Rs.-------
--------Hrs
c)
Rs.-------
--------Hrs
d)
Rs.-------
--------Hrs
2.8
Type of Engine
2.9
Engine speed
2.10
2.11
Displacement
2.12
Governor type/Make
2.13
Alternator type/Make
2.14
2.15
Noise level
2.16
2.17
2.18
2.19
2.20
2.21
2.22
3.0
Auxiliaries / Accessories
3.1
dB
3.2.1
3.2.2
3.2.3
Hrs
kW
3.3
VALUE
3.4.1
3.4.2
Yes/No
Hrs
3.5
Yes/No
3.6
Yes/No
3.7
Yes/No
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01-1
SL #
DG SET
DATA SHEET
SECTION - 4
PAGE: 6 of 10
DESCRIPTION
UNIT
VALUE
3.8
Yes/No
3.9
Insulation
Yes/No
3.10
Yes/No
3.11
Type of start-up
3.12
Yes/No
3.13
Yes/No
3.13
Yes/No
3.14
Yes/No
3.16
Yes/No
3.17
Hrs
Tests
a)
Yes/No
b)
Yes/No
c)
Noise level
Yes/No
d)
Vibration
Yes/No
4.0
4.1
5.0
5.1
5.2
5.3
5.4
5.5
Rated frequency
5.6
5.7
b)
c)
kVA
V
Amps
Hz
%
%
%
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01-1
SL #
DG SET
DATA SHEET
DESCRIPTION
SECTION - 4
PAGE: 7 of 10
UNIT
5.8
Synchronous speed
rpm
5.9
Number of phases
Nos.
a)
Nos.
b)
Nos.
5.10
5.11
5.12
100% load
b)
75% load
c)
50% load
d)
25% load
e)
5.13
5.14
6.0
Alternator Reactance
6.1
7.0
7.1
b)
8.0
Alternator losses
9.0
10.0
11.0
12.0
12.1
12.2
VALUE
kW
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01-1
SL #
DESCRIPTION
SECTION - 4
PAGE: 8 of 10
UNIT
b)
Rotor vibration
c)
Bearing vibration
13.0
Excitation System
14.0
Current Transformers
14.1
Neutral side:
14.1.1
DG SET
DATA SHEET
VALUE
Core-1
a) Ratio
b) Accuracy class
c) Burden
d) ALF
14.1.2
Core-2
a) Ratio
b) Accuracy class
c) Burden
d) ISF
14.1.3
Core-3
a) Ratio
b) Accuracy class
c) Burden
d) ISF
14.2
14.2.1
Neutral CTs
Core-1
a) Ratio
b) Accuracy class
c) Burden
d) ALF
14.2.2
Core-2
a) Ratio
b) Accuracy class
c) Burden
d) ALF
15.0
Neutral MCCB
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01-1
DG SET
DATA SHEET
SL #
DESCRIPTION
15.1
Make
15.2
Type
15.3
Rated Voltage
15.4
Rated Current
15.5
15.6
SECTION - 4
PAGE: 9 of 10
UNIT
VALUE
a)Closing motor
b)Shunt Trip
16.0
Tests
16.1
17.0
17.1
17.2
Mounting of Relays
17.3
17.4
17.5
Finish painting
External
Internal
Make of the panel
18.0
18.1
18.2
18.3
18.4
a) Protection
VA
VA
ENGINE Protection
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-01-1
SL #
DG SET
DATA SHEET
DESCRIPTION
SECTION - 4
PAGE: 10 of 10
UNIT
VALUE
GENERATOR Control
18.6.1
18.6.2
GENERATOR Protection
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-02
ACOUSTIC ENCLOSURE
SECTION - 4
PAGE: 1 of 1
1.0
SCOPE OF SUPPLY
1.1
2.0
2.1
3.0
3.1
All equipment covered under this Specification shall comply with all current statutes,
regulations and safety codes in the locality where the equipment will be installed. All
equipment shall comply in all respects with the requirements of the latest editions of
applicable Indian, American, British Codes and Standards.
4.0
SPECIFIC REQUIREMENT
4.1 The design, materials, fabrication, construction, testing and certification of the Acoustic
Enclosure shall be to applicable Standards and in compliance with the relevant statutory
requirements. The VENDOR shall supply the equipment / systems from the approved
vendors or equivalent.
4.2
The CONTRACTOR shall plan the various activities specified in the specification in
conformity with the PURCHASERS requirement and availability of the front. No extra
claim by CONTRACTOR will be entertained for non-availability of front.
4.3 CONTRACTOR shall ensure no damage to Purchasers property while executing this
contract. In the event of any damage to Purchasers property, due to CONTRACTORS
negligence the PURCHASER has to be compensated, the value of which will be
mutually discussed and agreed.
5.0
PERFORMANCE REQUIREMENTS
5.1
6.0 GUARANTEES
6.1
6.2
Should the performance test results deviate from the guaranteed value including the
tolerances stipulated by relevant Indian Standards, the VENDOR shall correct his
equipment at no cost to the PURCHASER, or have the option to reject the same.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-02-1
ACOUSTIC ENCLOSURE
DATA SHEET
SECTION - 4
PAGE: 1 of 2
DATA SHEET-A
1
Enclosure application
Outdoor/Indoor
2
3
4
5
Enclosure panels.
Roof type
Access door(s)
Enclosure over all dimensions (desired)
Detachable type
Taper both sides
Swing with pad locking feature
Length
*
Width
*
Height
*
7.1
Motor
7.2
7.3
10
10.
Voltage/Ampere/ Frequency
Bird screen Etc.
External M.S sheet panel Thickness
(Corrugated)
Internal G.S sheet panel. Thickness
(Corrugated)
Insulation material.
Insulation density
1
10.
Insulation thickness
8
9
mm
mm
mm
HP
*
*
Required
14 SWG
24 SWG
Mineral wool
*
mm
mm
2
Internal lighting
11
12
13
14
15
16
17
Nos
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-02-1
ACOUSTIC ENCLOSURE
DATA SHEET
SECTION - 4
PAGE: 2 of 2
DATA SHEET B
Bidders shall fill in the Data Sheet-B and return with their bids.
SL# Description
1
Enclosure application
2
3
4
5
Enclosure panels.
Roof type
Access door(s)
Enclosure over all dimensions (desired)
7.1
Motor
7.2
Voltage/Ampere/ Frequency
7.3
8
9
10
11
12
13
14
14.
1
15
16
17
18
Unit
Values
mm
mm
mm
HP
mm
mm
mm
mm
Painting - External
Painting - Internal
Openings on the panels.
Enclosure fixing to the floor.
No. of DG Sets to be housed in one
enclosure
Internal lighting details
Nos
ONE
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-03
SECTION - 4
PAGE: 1 of 1
1.0
.1
.2
The rotary screw pump shall consist of casing and rotor coupled to the driver directly or
through a reduction gearing.
.3
The screw pumps shall have rotors with opposed screws to eliminate end thrusts.
.4
The shaft shall be finished to close tolerance at the rotor, coupling and bearing diameters.
The rotor shall be firmly keyed to the shaft. The shaft shall be of sufficient size to resist
the deflection.
.5
The bearings shall be of external type. The bearings shall be of an anti-friction, heavyduty type, capable of taking the pump.
.6
Stuffing boxes shall be so designed that they can be repacked without removing any part
other than the gland.
.7
Suction and discharge connections shall be flanged if the size is 65mm or above. The
flanges shall be integral with the casing and they shall be drilled to specified standards. If
the connection size is less then 65mm, it shall be of screwed connection.
.8
The base plate shall be in one piece and it shall be made of cast iron or welded steel.
Suitable holes shall be provided for grouting and so located that the base can be grouted
in place without disturbing the pump and motor.
.9
A spring loaded relief valve shall be provided on the discharge side, set just above the
required pressure to protect each pump against excessive pressure.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-03-1
SECTION - 4
PAGE: 1 of 2
DATA SHEET A
Sl.
No.
Particulars
Units
Parameters
1.0
Designation
HSD
2.0
Number required
2 Nos
Refer fuel oil system flow diagram
PCPL-0626-3-SK-005
3.0
Service
4.0
Location
Outdoor
Liquid Data
5.0
6.0
Capacity
7.0
8.0
Suction Pressure
Rotor type
10.0
Yes
11.0
Bearing Location
12.0
Material
13.0
Casing
14.0
Rotor
15.0
Shaft
16.0
Base Plate
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-03-1
SECTION - 4
PAGE: 2 of 2
DATA SHEET B
Bidders shall fill in the Data Sheet-B and return with their bids.
Sl.
No.
Particulars
1.0
Designation
2.0
Number required
3.0
Service
4.0
Location
Units
Parameters
Liquid Data
5.0
6.0
Capacity
7.0
8.0
Suction Pressure
Design and Construction
Features
9.0
Rotor type
10.0
11.0
Bearing Location
12.0
Material
13.0
Casing
14.0
Rotor
15.0
Shaft
16.0
Base Plate
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-04
1.0
Scope of Work
This specification covers the unloading of equipment and materials from Trailers/ Truck
etc, transportation of the material to storage yard/shed/erection location, erection testing
and commissioning of Mechanical equipment/systems covered under this specification.
The scope of work shall include, but not limited to the items indicated herein under 16.0.
Bidder shall quote unit rates also for the items identified therein.
2.0
Information Furnished.
The information given to Bidder in this specification is for guidance. It is therefore;
imperative that Bidder shall obtain and examine for himself all the required data,
information and particulars required for the satisfactory execution of the work under this
enquiry. The submission of tender by the Bidder implies that he has fully read the
specifications and has made himself aware of the scope and the specifications for the
work to be performed and local conditions and other features. The owner shall not,
therefore, after acceptance of the tender, pay any extra charges for any reason whatever.
3.0
4.0
5.0
Time Schedule
5.1 The work shall be executed strictly as per time schedule, which will be mutually discussed
and
agreed. The Bidder shall quote a firm price for the contract period with a grace
period of three (3) months. The period of work includes the time required for
mobilization as well as testing, rectifications, if any retesting and completion in all
respects to the entire satisfaction of the Engineer/ Owner.
5.2 A joint programme of execution of work will be prepared by the Engineer / Owner and
contractor.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-04
5.3 Weekly construction programme will be drawn up by the Engineer / Owner jointly with the
contractor based on required programme. The contractor shall strictly adhere to these
targets/
programme by deploying adequate personnel and construction tools and
tackle in good time to achieve the targets set out in the weekly programmes / targets.
5.4 Contractor shall give every day a report on categories of labour and equipment deployed
along with
the progress of work done on previous day in the proforma prescribed by
the Engineer / Owner.
6.0
Drawings
Construction drawings will be issued to the successful contractor. The contractor shall
submit two prints each of the construction drawings marked up with as built changes.
7.0
8.0
Site Clearance
The contractor shall take care of cleaning the working site from time to time for easy
access to job site and also from safety point of view.
9.0
Power Supply
a. The cost towards supply of power payable to the Owner shall as decided by owner.
Which shall be deducted from the running account bills. The energy meter shall be
maintained in good working condition. In case of any out of order, the energy
consumption will be assessed by the Engineer / Owner and his decision will be
binding on the contractor.
b. Owner however, does not guarantee the supply of water and power and these do not
relieve the contractor of his responsibility of the timely completion of various works
as stipulated. As such, adequate number of diesel operated machinery such as
welding sets, pumps etc., shall be provided by the contractor as an alternative
arrangement.
10.0
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-04
11.0
11.1
The contractor shall put up temporary structures as required by him for his office,
fabrication shop and construction stores only in the area allocated to him on the project
site by owner.
11.2
No person except the authorized watchman shall be allowed to stay in the plant area /
contractors area after completion of the days job without prior written permission from
Engineer / Owner.
11.3
Safety Measures
11.3.1 Owners safety procedures/regulations shall be followed by the contractor and his
employees during execution of the work under this contract.
11.3.2 Contractor will be responsible for the safety of his personnel and property as well as the
safety of personnel and property of the owner.
12.0
Insurance
Bidder shall provide all necessary insurance for all their personnel and third party
liability insurance.
13.0
14.0
Contractors personnel
Contractor shall provide qualified and experienced personnel for erection of equipment
covered by this contract including dedicated planning team at site and safety officers.
15.0
Responsibilities of Contractor
The contractors responsibility also covers coordination of all the works involved, site
mobilization and de-mobilization.
16.0
16.1
Diesel Engine Sets and its associated auxiliary equipment/system including Air Intake
duct, Exhaust duct, Insulation etc.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-04
16.2
Fuel Oil day tanks and its associated piping work, valves, fittings, instruments etc.
16.3
Acoustic enclosures.
16.4
Lube Oil piping and its associated valves, fitting and instrumentation.
16.5
HSD Booster pump and its associated piping, valves, fitting, instrumentation etc.
16.6
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-05
SECTION - 4
PAGE: 1 of 6
1.0
SCOPE
1.1
2.0
2.1
2.2
Supply items which are bought out by the VENDOR shall be procured from
approved manufacturers acceptable to the PURCHASER/ENGINEER.
3.0
CONSTRUCTIONAL FEATURES
3.1
Control Panels shall be sheet steel enclosed and shall be dust, weather and vermin
proof providing an enclosure degree of protection of IP 54 for indoor use and IP 55 for
outdoor use. Sheet steel used shall be cold rolled and at least 2.0mm thick and properly
braced to prevent wobbling.
3.2
Control Panels shall be provided with hinged door(s) with locking arrangement
and suitable channels shall be provided for floor mounting.
3.3
The top surface must be suitable for lifting the panel and lifting eyes shall be
fitted. Adequate strengtheners must be incorporated and longer panels (over 2000mm,
depending on the panel structure) shall have a lifting beam fitted across the whole length
of the panel.
3.4
All doors, removable covers and plates shall be gasketted all round with neoprene
gaskets. All accessible live connections shall be shrouded and it shall be possible to
change individual switches, MCBs without danger of contact with live metal.
Component access shall be front and rear, unless front access only has been agreed.
3.5
Door locks shall be key operated to open. The doors shall lock itself on closure.
Preferred lock is flush T type. Safety interlock switches to be fitted to all doors of
sections that are not intended to permit access to non-electrical personnel. Note that
standard micro switches are not permitted to be used for door interlock switches.
3.6
All live parts shall be provided with at least phase to phase and phase to earth
clearances in air of 25 mm and 20 mm respectively.
3.7
Adequate interior cabling space and suitable removable cable gland plate shall be
provided. Necessary number of cable glands shall be supplied and fitted on to this gland
plate. Cable glands shall be screwed-on single compression type and made of brass.
3.8
All sheet steel work shall be degreased, pickled, phosphated and then applied two
coats of zinc chromate primer and two final coats of synthetic enamel paint, both for
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-05
SECTION - 4
PAGE: 2 of 6
inside and outside, of colour as specified. For chemical/corrosive areas epoxy paint shall
be used wherever specified.
3.9
Fans and Filters to be fitted if the static heat dissipation inside the panel is
insufficient to keep components below critical temperature level. It is preferred that
panels are sized to preclude the fitting of fans.
3.10
Fans to be wired to a terminal block so that a single volt free contact can be used
to inhibit all fan operation during gas discharge from panel fire detection system.
3.11
Double tone siren to be fitted to provide separate warning signal for starting of
plant in automatic mode and to announce plant faults.
3.12
3.13
3.14
The installation of smoke detectors if required will be inside the top of panel.
Therefore, clear areas must be provided.
4.0
MCBs
4.1
MCBs shall be hand operated, air break, heavy duty, quick make, quick break
type conforming to applicable standards.
4.2
4.3
5.0
CONTROL SUPPLY
5.1
All AC control equipment shall be suitable for operation on 110V AC, 1 phase,
50 Hz, centre tap earthed system (i.e., 415/55-0-55V Transformer). This supply may be
obtained from 415V main supply shall be protected on the primary side by MPCB/
MCCB and by MCB on secondary side.
5.2
Basic control supply, if required shall be suitable for 110V AC. DC control
supply shall be derived from battery charger system specified under Section-3 & Data
sheets
6.0
6.1
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-05
SECTION - 4
PAGE: 3 of 6
7.0
RELAYS
7.1
Necessary auxiliary relays for alarm, as required shall be mounted inside the
panel. Relays shall be equipped with hand reset, positive action operation indicator.
7.2
Auxiliary relays shall be rated to operate satisfactorily between 80% and 110% of
the rated voltage.
7.3
Each relay shall be provided with at least two potential free contacts for the
PURCHASERs use.
7.4
8.0
8.1
Control and selector switches shall be of the rotary type provided with properly
designated escutcheon plates clearly marked to show the operating positions. Control
switches shall have momentary contacts, spring return to centre, with pistol grip handle.
Selector switches shall have stay put contacts with oval handles. The number of contacts
and their operation in each switch shall be as indicated in control schematic the switches
shall be rated for minimum 10A at 110V AC. The breaker control switch shall be
provided with sequence interlocking device and with 2N/O NAC and 2N/C NAT
contacts to use in the interlocking circuit.
9.0
INDICATING LAMPS
9.1
Indicating lamps shall be of multiple LED type and low watt consumption.
Lamps shall be provided with built in transformers/resistors.
10.0
SPACE HEATER
10.1
Strip type space heaters of adequate capacity shall be provided inside each panel.
Heaters shall be complete with a single-pole MCB with overload and short circuit
protection on phase side, a link on the neutral and a humidistat to cut off the heater at RH
55.
11.0
11.1
Control panel shall be provided with a 110V, 1 phase, 50 Hz, 40W incandescent
lighting fixture with 15Watts power saver bulb for interior illumination controlled by a
door limit switch and 110 V, 1 phase, 5 Amp, 2pin and earth Reyrolle type receptacle.
12.0
12.1
Control panel shall be supplied completely wired, ready for the PURCHASERs
external connections at the terminal blocks. All control and auxiliary wiring shall be
carried out with 650V grade, FRLS PVC insulated, flexible multi stranded Cu
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-05
SECTION - 4
PAGE: 4 of 6
conductors. Power circuits shall be wired with flexible multi stranded copper conductors
of adequate sizes to suit the rated circuit current. The minimum size shall be 4sq.mm.
Control, alarm and indication circuits shall be wired with flexible multi stranded copper
conductors of sizes not smaller than 1.5 sq.mm.
12.2
12.3
Clearance between terminal blocks and gland plate and between two rows of
terminal blocks shall be minimum of 200 mm, if two or more rows are required.
Terminals for AC & DC circuits with different voltages have to be grouped and
separated by barriers. No live surfaces shall be exposed (covers or recessed terminals
shall be provided).
12.4
Power circuits and control circuits must not be mixed - their components shall be
separated by means of layouts and barriers.
12.5
Wiring for controls and power shall be kept separate as far as is practicable.
12.6
All cable ends to be separately terminated with the appropriately sized and
shaped crimps. As far as practicable, crimps will be of the compression type (as opposed
to the soldered type) being fitted using the correct crimping tool.
12.7
If terminal blocks of the spring clamp technology are being used the cable ends
shall be prepared by removing correct length of insulation and terminating the exposed
copper conductor into terminal block ensuring that no bare copper conductor is exposed
outside the terminal block.
12.8
12.9
The number of wires put through trunking inside the panel must not exceed the
maximum number permitted by regulation of manufacturers.
12.10
Wires inside trunking must be arranged in a tidy manner with cable ties and must
be firmly supported so that they do not fall out when the cover is removed. Adequate
spare capacity of at least 10% available space must be left within each trunking for future
expansion, if any.
12.11
Unless requested otherwise cable colour shall comply with relevant Indian
Standard Specifications which is summarised in the following table
DUTY
COLOUR
Control Ckt.(AC)
Red
Interlocking Ckt.
Orange
Control Ckt.(DC)
Blue
Earth Ckt.
Green/Yellow
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-05
Black
3 Ph Power Ckt.
Red/Yellow/Blue
SECTION - 4
PAGE: 5 of 6
13.0
EARTHING
13.1
Main Busbar: One main copper busbar each of size as specified shall be
provided. The busbar shall be indelibly marked with green and yellow to identify it as
earth busbar (stripes or dots).
13.2
Earth Lead: Earth terminal of control gear components mounted inside the panel
shall be connected to main earth busbar by means of earth leads of adequate sizes.
VENDOR shall submit calculations for the same.
13.3
Earth connections: For termination on to main earth bus bar lug and stud type
terminals shall be used with adequate number of pre-drilled holes of appropriate sizes.
Insulated wires used for earthing shall be of green or yellow colour.
13.4
Main earth stud: 2 Nos. of main earth studs one at each end shall be braced or
welded to the structure of panel. It must withstand the short circuit current specified.
13.5
Auxiliary Earth Rails: Auxiliary Earth Rails (e.g., component mounting DIN
rails) can be used under the following conditions:
a) They are directly connected to main earth bar via a suitably sized earth lead
b) Internal earthing and bonding must only be done on main earth busbar.
c) Signal terminations for outgoing/incoming to be mounted on such rails.
13.6
Earth Terminals: All earth terminals shall be green or yellow colour or provided
with earth symbol for easy identification.
14.0
14.1
EMC compliance for panels housing sensitive electronic equipment like VFDs
and PLCs shall be provided by means of additional shielding to panel, with high
conductivity copper sheets. Earth leads for EMC purposes shall be of flexible copper
braids. Cross bonding between different parts of panel is allowed to ensure equi-potential
within the panel. Any source of interference like transformers and chokes mounted in
panel shall have an EMC enclosure. The panel shall be designed for EMC compatibility.
15.0
SAFETY CIRCUITS
15.1
The function of these circuits is to effect for safe disconnection of power to those
Plant parts which give rise to danger. This shall include emergency stop device, safety
interlocks, high temperature of windings etc. High speed trip relays shall be used for
operation of protection indicated above.
15.2
Emergency push buttons provided in the panel shall be wired to a high speed trip
relay and provided with contacts for tripping all the plant at once.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-05
SECTION - 4
PAGE: 6 of 6
16.0
16.1
Every equipment mounted in the panel shall be provided with individual labels
with equipment designation/rating. In addition, the panel shall be provided on the front
with a non-rusting label engraved with the designation of the panel as furnished by the
PURCHASER.
16.2
17.0
17.1
18.0
18.1
Acceptance and routine tests for all supply equipment/component parts shall be
carried out as per the relevant standards for the respective equipment. These test reports
shall be submitted to the PURCHASER before despatch of the equipment.
18.2
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-05-1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
SECTION - 4
PAGE: 1 of 11
Material
Size
Outside
Inside
632 of IS 5
Glossy White
b) Type of paint
1.9
2.0
2.1
2.2
2.3
2.4
Supply voltage
Power devices, motor drives, etc
Control voltage :
Space heater / lighting supply voltage
Power socket outlet
3.0
Terminal blocks
3.1
Wiring details
4.0
2.5 Sq. mm
Potential circuits
1.5 Sq. mm
Type of conductor
Material
Copper
Size
50 x 6 mm
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-05-1
SECTION - 4
PAGE: 2 of 11
DATA SHEET A2
APPLICABLE STANDARDS
1
IS 4237
IS 8623
IS 8828
STARTERS
IS 8544
IS 6875
RELAYS
IS 3231
IS 11353
DEGREE OF PROTECTION
IS 2147
IS 3072
10
IS 3202
11
IS 6005
12
IS 5082
13
CONTACTORS
IS 2959
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-05-1
SECTION - 4
PAGE: 3 of 11
ENGINE - Control
Engine fuel solenoid control
Engine pre-glow control
Engine starter control
Oil pressure monitoring
Water temperature monitoring
Battery voltage monitoring
Speed monitoring with over speed protection
ENGINE Protection
Over speed
High/ Low Oil pressure
High/ Low coolant temperature
Start Failure
Battery voltage
GENERATOR Control
Auto Synchronisation with multiple generators and mains
Manual synchronisation facility with manual voltage and speed adjustments.
Dead bus closing logic
Base load control for optimum fuel efficiency
kW Droop control both for auto and manual
Load sharing feature for all the five units
Engine speed control based on load bias
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-05-1
SECTION - 4
PAGE: 4 of 11
DATA SHEET-A4
A
1
2
3
4
B
1
2
3
4
5
6
7
8
C
1
2
3
D
1
2
3
4
5
6
7
8
E
1
2
3
4
5
6
7
8
9
10
F
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-05-1
1.
2
3
G
1
2
3
SECTION - 4
PAGE: 5 of 11
One set facia annunciator with adequate number of windows for all Electrical and Mechanical
fault of the DG set
Acknowledge ,Test and Reset Push buttons
DC Hooter & AC Bell (For annunciating Dc supply fail)
GENERAL
Green indicating lamp for "GRID power available"
Bell operated on 48V DC and accept, reset & test push buttons, 48V DC relay/contactor for
"GRID Fail" annunciation.
Small wiring, RCBO/ MCBs, Space heaters, Panel illumination lamps, etc.,
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-05-1
SECTION - 4
PAGE: 6 of 11
DATA SHEET B
PANELS CONSTRUCTION
SL #
1
2
3
4
5
6
7
8
9
10
11
12
13
Item
Panels Designations
Make and country of manufacture
Type of construction:
a)
Simplex / Duplex / Desk-cum-panel
b)
To be matched with existing panels
Type of sheet steel ( Hot rolled / cold rolled)
Thickness of sheet steel
Front
Back
Sides
Paint treatment and colour shades (external &
internal)
Weight of each panel section
Dimension of each panel section
(width x depth x height)
Mimic bus, material & colour
Space required for installation of all panels
Length
Width
Height
General Arrangement drawing attached to
(a) Individual Panel section
(b) Overall arrangement of complete panels showing
floor space
Largest package for transport
Weight
Dimension
Instruments, Components, etc, transported mounted
on panels or separately packed.
Unit
Value
Yes /
No
mm
mm
mm
Kg
mm
mm
mm
mm
Yes/
No
Kg
mm
Bidder to fill in the Data Sheet B and submit with his bid.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-05-1
SECTION - 4
PAGE: 7 of 11
GENERAL
SL #
1
2
3
4
5
6
7
8
9
10
11
Sl #
1
2
3
4
5
6
7
8
9
Item
Cable glands included
Special interconnecting Cables if required, include
Special tools & devices for maintenance included.
(attached list)
Testing facility for static systems included:
Spares
List of recommended spares for normal maintenance
for a period of 5 years furnished. (Attached list)
DRAWINGS / LITERATURE
Following submitted:
Components list of each panel.
Block / Circuit diagrams of control interlock
schemes
Technical and descriptive literature of all the
components supplied
Tests
All test certificates as specified shall be furnished
Deviations
All the deviations from the specifications submitted
separately. Compliance will be taken for granted if
the deviation is not specifically mentioned.
Unit
Value
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Item
Make
Type designation
Nominal voltage & % variation
Contacts, Head Reset / Self reset
No. of pairs of contacts
a) Make contacts
b) Break contacts
Speed of operation of relay
Pick up / drop off ratio
Burden of Relay
a) Contact Rating (Continuous)
b) Voltages
c) Making Current & duration
d) Breaking current:
i) Resistive
ii) Inductive, 0.3 P.F.
iii)Inductive, L=10m sec/40m sec
R
Value
V+%
m-sec
VA
A
Volts
A, AC / DC
A
A, AC
A, DC
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-05-1
10
SL#
1
2
3
4
5
6
7
8
9
SL#
1
2
3
4
5
SECTION - 4
PAGE: 8 of 11
Yes / No
Unit
Value
V+%
m sec
m sec
m sec
A
V
A, AC /DC
A
A, AC
A, DC
Yes / No
CONTROL SWITCHES
Item
Unit
Make & Front Dimensions
Type of switch ( Stay put/ Spring returns /
Spring return with sequence/discrepancy
Type of handle ( Pistol grip/Spade or T /
Knob/Ball handle)
Contact development type No. As per data sheet
A3
Integral Escutcheon plate or circuit label
provided
Yes / No
Value
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-05-1
6
7
8
SL#
1
2
3
4
5
6
7
SL#
1
2
3
4
Contact Rating:
i)
Continuous current
j)
Voltages
k)
Making current & duration
l)
Breaking current :
i) Resistive
ii) Inductive, 0.3 P.F.
iii) Inductive,
L=10m sec/40m sec
R
Elec. Life Expectancy based on 120 switching
operation cycles per hour.
Detail literature furnished
PUSH BUTTONS
Item
Make
Actuator type:
a) Momentary / maintained
b) Shrouded to prevent inadvertent
operation
Whether integral engraved inscription plates
provided
Type and No. of NO /NC contacts
Contact Rating:
m)
Continuous current
n)
Voltages
o)
Making current & duration
p)
Breaking current :
i) Resistive
ii) Inductive, 0.3 P.F.
iii) Inductive,
L=10m sec/40m sec
R
Elec. Life Expectancy based on 300 switching
operation cycles per hour
Detail literature furnished
Item
Type
Ratings:
a) Voltage
b) Wattage
Series resistors are provided
Series resistors
A
Volts
A, AC /DC
A
A, AC
A, DC
No. of
operations
Yes / No
Unit
Value
Yes / No
Yes / No
A
V
A, AC /DC
A
A, AC
A, DC
No. of
operations
Yes / No
INDICATING LAMPS
Unit
Value
Watts
SECTION - 4
PAGE: 9 of 11
Value
V
W
Yes / No
Ohms
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-05-1
5
SL#
1
2
3
4
5
6
7
8
SL#
1
2
3
4
5
6
7
8
9
10
11
12
SL#
1
2
3
Hrs
Unit
Value
V%
Yes / No
A
m sec
Yes / No
INDICATING METERS
Unit
Item
Make
Type of movement
Type of designation
CT/VT Sec. current / Volt
Burden:
a) Current coil
b) Voltage coil
Details of shunt, if any
c) Rated current
d) Rated voltage drop
Accuracy class & standard
Total deflection angle
Total Scale length
Overall dimensions (front)
Suitable for specified reference operating
conditions
Detail literature furnished
SECTION - 4
PAGE: 10 of 11
Value
A, V
VA
VA
A
V
Degrees
mm
mm
Yes / No
Yes / No
ENERGY METERS
Item
Unit
Make
Type of measurements ( 3 phase, 3 wire
unbalanced power / 3 ph.4 wire unbalanced
power)
Measuring range in primary watts
Value
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-05-1
4
5
6
7
8
9
10
11
12
SL#
1
2
3
4
5
6
7
8
9
10
CT ratio
VT ratio
Accuracy & Standard to which meter conforms
Burden:
a) Current coil
b) Voltage coil
No, of digits in the meter
Impulse contact for remote summation or
printing provided.
Details of impulse contacts
c) Impulse frequency
d) Duration
e) Contact rating
Mounting details & testing facilities.
Literature with connection diagram furnished
A/A
V/V
VA
VA
Yes / No
No. per sec.
m sec
W, V
Yes / No
RECORDING METERS
Unit
Item
Make
Type, designation
Range of parameter to be recorded
Range of basic movement (In case of transducer
operated relays)
Accuracy & Standard to which the meter
conforms
Range of speed available
Required Auxiliary supply & variation
No. of hours of spring reserve in case of
auxiliary supply failure
Burden:
a) Current coil
b) Voltage coil
Detailed literature giving mounting, type of case,
etc. furnished.
SECTION - 4
PAGE: 11 of 11
Value
V+%
Hrs
VA
VA
Yes / No.
Note: Bidder to note that the above items and quantity. specified form only a guidance. Vender
shall develop detailed schematic and wiring diagrams, to meet the various
control/Interlock requirements specified and finalize the B.O.Q. for the Control panel.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-06
BATTERY
SECTION - 4
PAGE: 1 of 7
1.0 SCOPE
1.1.
This specification covers requirements of stationary lead acid storage battery complete
with battery racks inter cell and inter tier connectors and all other accessories.
1.2.
In case of conflict between any section or clause of this specification and Data Sheet-A,
the requirements of Data Sheet-A shall govern
The design, manufacture and performance of equipment shall comply with all currently
applicable statutes, regulations and safety codes in the locality where the equipment will
be installed. Nothing in this specification shall be construed to relieve VENDOR of this
responsibility.
2.2.
The equipment shall conform to the latest edition of standards mentioned in Data SheetA.
3.0 TYPE
3.1.
The battery offered shall preferably be one of the following types as mentioned in Data
sheet A.
i. Sealed Lead Acid Battery
ii. Nickel Cadmium Battery
GENERAL
4.1.1. The equipment offered shall be complete with all parts that are necessary or usual for the
efficient operation of the equipment, whether specifically mentioned or not
4.2.
4.2.1. The sealed batteries shall be a starved electrolyte type with electrolyte immobilised in a
micro porous material to allow recombining of generated oxygen internally. The battery
shall be completely explosion resistant. Shall tolerate freezing and shall not allow gases
to escape during normal charging conditions. The battery shall not require any watering
and be maintenance free.
4.2.2. Plante' Positive Plates
The plante' positive plate shall be cast solid in pure lead in one piece and shall have
adequate mechanical strength. It shall be electrochemically formed and shall be capable
of operating under normal working condition with out buckling or cracking. Welding
together of small size lead castings or fully formed plates to form larger sizes will not be
accepted.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-06
BATTERY
SECTION - 4
PAGE: 2 of 7
4.2.3. Tubular Positive plate shall consist of suitable bar with spines cast of suitably alloyed
lead to give adequate mechanical strength. Porous, acid resistant and oxidation resistant
tubes shall be inserted one over each spine. After insertion, the tubes shall be adequately
filled and packed with active material before their lower ends are closed by a common
bar. The construction and material of the tubes shall be such as to reduce loss of active
material and to withstand normal internal stresses developed during service.
4.3.
4.3.1. The pasted positive plates shall consist of either pure lead, low antimonial lead alloy or
lead calcium positive grids; having double separation with a mineral wool retainer mat or
any other suitable material placed against the surface of the positive plates, for good
service life.
4.4.
NEGATIVE PLATES
The negative plates shall normally be of the box type. End negative plates, if of box type
may be of the half pasted type. Pasted plates shall have adequate mechanical strength and
shall be so designed that the active material is maintained in intimate contact with the
grid under normal working conditions.
4.5.
CONTAINERS
The containers shall be made of plastics, or fibre reinforced plastics (FRP). The container
shall be spill proof and leak proof, explosion resistant and increased safety type
enclosure.
4.6.
VENT PLUG
The vent plug shall be for safety pressure vent and of self resealing type. The Vendor
shall indicate the vent pressure value.
4.7.
SEPARATORS
The plate separators shall consist of a micro porous matrix, which shall serve as the
mobiliser for the electrolyte. The battery separator shall maintain the electrical insulation
between the plates and shall allow the electrolyte to permeate freely. The VENDOR shall
indicate the material of the separator.
4.8.
4.9.
ELECTROLYTE
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-06
SECTION - 4
PAGE: 3 of 7
BATTERY
The electrolyte shall be battery grade sulfuric acid conforming to latest editions of
relevant standards. The sealed battery shall be transported with the electrolyte
immobilized and fully charged.
4.10.
NICKEL-CADMIUM BATTERY
4.10.1. The battery container and lid shall be alkali resistant no-aging material with high impact
strength. It shall have smooth sides except for receptacles., hold down br, vent tubes,
name plate, latches and polarity marking.
4.10.2. The cell container shall be of high strength alkali resistant material either nickel plated
mild steel/ stainless steel or non-porous plastic as specified in Data Sheet-A
4.10.3. The connector covers shall be of hard PVC to prevent external short circuiting.
4.10.4. The venting device shall be of anti splash type and shall allow the gases to escape freely
and shall effectively prevent the electrolyte from coming out . Provisions shall be made
for drawing electrolytes samples, checking and topping of the electrolyte.
4.10.5. The electrolyte used shall be a solution of potassium hydroxide in distilled water or demineralised made up to the specific gravity at 27O C.
4.10.6. Cell Designation.
Vented Nickel-Cadmium prismatic rechargeable cells shall be designated by letter K
followed by second letter:
T
4.10.7. The group of three letters shall be then followed by a group of figures indicating Amphour capacity. Cells in plastic material shall be marked with letter 'P'.
4.10.8. Separators used for the cells shall be porous alkali resistant and high insulating capacity
to avoid shorting on leakage of the current between the plates of opposite polarity. The
separator shall be dimensionally stable with out deformation at the room temperature.
4.11.
ACCESSORIES
The battery shall be complete with accessories and devices, including but not limited to
the following:
i. Battery racks
ii. Porcelain insulators, rubber pads etc.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-06
SECTION - 4
PAGE: 4 of 7
BATTERY
iii. Set of inter cell, inter-tier and inter bank connectors as required for the complete
installation.
iv. Electrolyte for first filling +10% extra in plastic bottles or drums, for Ni-Cd
battery.
v. Accessories for testing and maintenance.
a.
One - -3, 0, +3 volts Dc voltmeter with suitable leads for measuring cell
voltage.
b.
c.
One - Filler hole thermometer fitted with plug and cap and having specific
gravity correction scale.
d.
e.
Two sets - Funnels or siphon hydrometer and plastic jugs for topping up.
f.
Two Graduated plastic level test tube for electrolyte level checking.
g.
h.
i.
j.
One set Terminals and cable boxes with glands for connecting cable as
required.
k.
Spare connectors
l.
m.
n.
o.
p.
One set - Cell topping up apparatus (for large sizes of NI-CD cells)
VENDOR shall list the items.
q.
Unless otherwise specified the battery shall be complete with battery racks and
preferably mounted in single tier arrangement. VENDOR shall furnish dimensioned
drawings of the battery layout for purchasers APPROVAL. For smaller units, utilising
sealed-in type of batteries, mounting of the battery in the same sheet metal cubicle as the
associated equipment, for instance battery charger, will also be acceptable.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-06
5.2.
BATTERY
SECTION - 4
PAGE: 5 of 7
BATTERY RACKS
Battery racks shall be constructed from good quality teakwood and painted with two
coats of approved alkali resisting paint. The construction of the racks unless otherwise
mentioned in Data Sheet-A shall be suitable for fixing to a flat concrete floor. The racks
shall be rigid, freestanding type and free from warp and twist. The completed racks shall
be suitable for being bolted end to end to form a continuous row. Insulators shall be
provided below the legs of the stands.
5.3.
VENTILATION
THE bidder shall INDICATE IN THE TENDER REQUIREMENTS OF
VENTILATION IN THE BATTERY ROOM. The battery shall operate satisfactorily
over the entire range of temperature indicated in Data Sheet without affecting its normal
life. BIDDER shall indicate the percentage reduction in battery capacity at the lowest
temperature compared to that tat standard temperature of 27O C. If any special ventilation
requirements are necessary, the same shall be indicated.
6.0 CAPACITY
The standard ampere-hour capacity at ten hour rate of discharge of the battery has been
based on the requirements of loads mentioned in Data Sheet-A and the minimum
ambient temperature specified. BIDDER SHALL Guarantee that the capacity of the
battery offered by him is adequate for the duty specified (all loads being co-incident
from the instant of supply failure even at the minimum ambient temperature specified in
Data Sheet-A). For lead acid battery it may be assumed that the battery is fully charged
to 2.15 V at the start of the cycle and is discharged to a voltage of 1.75 V/cell at the end
of the cycle. For Ni-Cd battery each cell at start is considered charged to 1.28 V and the
cell end voltage after discharge to be 1.1. or 1.05 V as mentioned in Data Sheet-A
7.0 CHARGING
7.1.
The proposed method of charging of the battery is indicated in the Data Sheet A.
7.2.
BIDDER shall state whether an equalising charge is recommended for the battery. If so,
the equalising charging voltage, current, duration and the interval between the
equalising charging shall be specified in Data Sheet-B. BIDDER SHALL also indicate
the requirements for boost charging.
8.0 LIFE
The BIDDER shall quote in his offer the guaranteed life of the battery when operating
under the conditions specified
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-06
BATTERY
SECTION - 4
PAGE: 6 of 7
9.0 TESTS
9.1.
All tests shall be conducted as per the relevant standards. Tests shall include following
Type & acceptance tests:
i. Type Tests: Copy of report on type test performed at MANUFACTURERS works
shall be submitted with the bill.
ii. Acceptance Test: Performed at site after installation and commissioning of the
battery. All tests shall be witnessed by the PURCHASERS representative. Details of
tests to be performed are given below:
10.0
10.1.
TYPE TESTS
Type tests shall comprise o the following:
a. Visual inspection
b. Dimensional check
c. Capacity tests
d. Retention of charge test
e. Ampere-hour and watt-hour efficiency tests.
f. Endurance test
g. Life cycle test
10.2.
Type tests shall be conducted on a minimum of one sample cell typical and identical
with the cells forming the complete battery offered. However, the test cell shall not be
one of the cells offered in the battery offered.
10.3.
In applications where the first momentary discharge stated in Data Sheet-A is high and
lasts for several minutes a high discharge test shall be conducted, in addition to the
above tests, as a type test. This test shall ensure that at the end of the high discharge rate
duty, end cell voltage does not fall below 1.6 V for lead acid and 1.1/1.05 V for Ni-Cd
and the temperature rise of electrolyte shall be within 10O C.
11.0
ACCEPTANCE TESTS
Acceptance tests shall be conducted at site on completion of installation and
commissioning and immediately prior to putting the battery in service. These tests shall
comprise of:
a. Visual inspection
b. Dimensional check
c. Capacity test
d. Test for voltage during discharge
e. Storage test
f. Insulation resistance
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-06
12.0
SECTION - 4
PAGE: 7 of 7
BATTERY
TEST REPORTS
A copy of routine and type test results shall be submitted for approval before the dispatch
of batteries. Specified number of bound copies of complete test results shall be furnished
with the batteries.
13.0
SPARE PARTS
BIDDER shall include the following items in his recommended list of spares along with
item wise unit prices:
g.
h.
i.
j.
k.
l.
m.
14.0
IDENTIFICATION
Each cell shall be marked in a permanent manner to indicate the following information:
n.
o.
p.
q.
r.
s.
15.0
Cell number
Type of positive plate
AH capacity at 10 hour rate (lead Acid) and 8 hour rate (Nickel-Cadmium).
Type of container
MANUFACTURERS name
Month and year of manufacture.
16.0
TRANSPORT
The Ni-Cd battery shall be transported without electrolyte in preferably dry charged
condition. The electrolyte shall be supplied separately in non-returnable containers.
The sealed lead acid battery shall be transported with the electrolyte immobilized, sealed
and fully charged.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-06-1
BATTERY
DATA SHEET
SECTION - 4
PAGE: 1 of 4
DATA SHEET A1
Sl. NO.
1
2
Quantity/Application
3
4
5
6
7
8
10
11
12
13
14
15
16
17
18
19
20
21
22
DESCRIPTION
Type of Battery
REQUIREMENT
Sealed Lead Acid Plante /
Tubular
i) One No. of 24 V Battery for
engine starter system for each
DG Set
One per DG set
12 Nos for 24 V Battery
Max 45OC-Min 08C(Ref
Section-2)
NA
NA
24 V
* Refer CL 2.3.9 of Section 3
*
*
*
NA
2.15V / 1.75V
*
*
*
NA
NIL
Rack
No
Float and Boost
Data by bidder.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-06-1
BATTERY
DATA SHEET
SECTION - 4
PAGE: 2 of 4
DATA SHEET A2
APPLICABLE STANDARD
Sl. NO.
DESCRIPTION
1
Sealed lead acid
Nickel Cadmium
2
Water for storage battery
3
Synthetic separator for lead acid batteries
STANDARD
IS-8320, 1652
IS-12956
IS-6071
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-06-1
BATTERY
DATA SHEET
DATA SHEET B
Sl. NO.
DESCRIPTION
1.0
a) Manufacturers Name
b) Type of battery
2.0
Standards to which battery is manufactured
3.0
Capacity
3.1
At 27 Deg. C
3.1.1
Initial
3.1.2
Rated
3.1.3
End of life
3.2
Rated capacity at minimum
Ambient temperature
3.3
Rated capacity at maximum ambient temp.
3.4
Capacity at high discharge rate 27Deg. C
3.4.1
5 minutes
3.4.2
30 minutes
3.4.3
45 minutes
3.4.4
1 hour
3.4.5
2 hour
3.4.6
3 hour
3.4.7
4 hour
3.4.8
5 hour
3.4.9
6 hour
3.4.10 7 hour
3.4.11 8 hour
3.4.12 9 hour
3.5
Maximum Momentary current 1 minute
3.6
Expected life of battery
4.0
Recommended charging rate
4.1
Float charging Voltage/
current
4.2
Trickle charging Voltage/
Current
4.3
Boost charging Voltage/
Current
4.4
Equalizing charge
a) Voltage/current
b) Duration
c) Interval between successive equalising
charges
5.0
Expected fault level at bus due to battery
6.1
Total resistance of battery
6.2
Resistance of inter cell Connectors
7.1
AH efficiency at rated load
SECTION - 4
PAGE: 3 of 4
UNIT
DETAILS
Ah
Ah
Ah
Ah
Ah
Ah
Ah
Ah
Ah
Ah
Ah
Ah
Ah
Ah
Ah
Ah
Ah
Ah
Amps
Years
V
A
V
A
V/A
Min.
Hrs.
kVA
Ohms
Ohms
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-06-1
BATTERY
DATA SHEET
SECTION - 4
PAGE: 4 of 4
DATA SHEET B
7.2
8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
9.0
9.1
9.2
10.0
10.1
10.2
11.0
12.0
12.1
12.2
13.0
14.0
15.0
Pocket /
Sintered
YES/NO
YES/NO
mm
mm
Kg
Kg
Yes/no
M3
kW
Yes/no
Yes/no
Yes/no
Bidders shall fill in the Data Sheet-B and return with their bids.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-07
BATTERY CHARGER
SECTION - 4
PAGE: 1 of 7
1.0
SCOPE
1.1
2.0
2.1
The design, manufacture and performance of equipment shall comply with all currently
applicable statutes, regulations and safety codes in the locality where the equipment will
be installed. Nothing in this specification shall be construed to relieve VENDOR of this
responsibility.
2.2
Unless otherwise specified, equipment shall conform to the latest applicable standards as
mentioned in Data Sheet-A2.
3.0
TYPE
3.1
The battery charger shall be static type preferably composed of silicon controlled
rectifiers (SCRs) connected in three-phase full wave bridge circuit. Transducer control
may be offered as an alternative for large sets if SCRs are not feasible.
3.2
The rectifier transformer shall be indoor dry type, double wound with adequate number
of primary and secondary taps.
4.0
RATING
4.1
b)
4.2
The boost charger shall be designed for supplying the boost charging current of the
battery.
4.3
4.4
5.0
5.1
Cubicle accessories and wiring shall conform to the requirements as stated in the
following clauses and in the companion specification for Control Cabinets.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-07
6.0
SECTION - 4
PAGE: 2 of 7
BATTERY CHARGER
ACCESSORIES
Each battery charger shall include the following:
6.1
One (1) set - silicon controlled rectifiers connected in three phase full wave bridge circuit
with ripple filtering device.
6.2
One (1) set - double wound dry type main transformer of suitable rating with adequate
primary and secondary taps for the charger output voltage control.
6.3
6.4
One (1) set - automatic voltage regulator unit (for float chargers) with manual/auto
control switch.
6.5
One (1) set - coarse and fine control knobs for manual control.
6.6
One (1) - selector switch for modes of charging i.e. float charging/boost charging. This
shall be as indicated in the diagram referred to in Data Sheet-A.
6.7
One (1) - off load tap changing switch for changing the primary taps of the transformer.
6.8
One (1) - D.C. voltmeter with MCB and selector switch for measuring the output
voltage.
6.9
6.10
One (1) TPN incoming MCCB unit on A.C. side of each charger along with SC, OL &
EF releases and alarm contacts.
6.11
One (1) DP MCCB on D.C. output side of each charger with SC, OL, EF and alarm
contacts.
6.12
One (1) - centre zero ammeter with shunt for battery circuit.
6.13
Two (2) sets - silicon diodes arranged in series for connection between the end cell tap
on the battery and the positive bus of charger output.
6.14
One (1) - cubicle space heater with control switch and MCB suitable for 240V AC 50
Hz. single phase supply.
6.15
6.16
Two (2) - On - Off switch with MCB for items 6.14 and 6.15.
6.17
7.0
7.1
Three (3) cluster LED type indicating lamps on the AC supply of the charger.
7.2
One (1) cluster LED type indicating lamp on the DC output side.
7.3
Two (2) AC under voltage relays connected across phases on the AC supply side with
alarm contacts for annunciator.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-07
SECTION - 4
PAGE: 3 of 7
BATTERY CHARGER
7.4
Thermal overload elements on each phase of the AC contactor on the supply side with
alarm contacts for remote annunciator.
8.0
PERFORMANCE
8.1
The automatic constant voltage regulator shall regulate the DC voltage within 1% of the
set value from no load to full load under the supply voltage and frequency fluctuations of
+/- 10% and +/- 5% respectively.
8.2
The float charger shall have built-in current limiting feature to drop the output voltage on
currents more than 110% of the rated current.
8.3
Suitable ripple filtering circuits shall be provided to give a smooth DC output. The ripple
content shall be limited to less than +/- 5% on resistive load.
9.0
DCDB:
9.1
Battery charger shall include a DCDB for distribution of DC supply to various essential
loads. DCDB shall be provided with MCCB for incomer & outgoing control. The
detailed feeder ratings shall be as detailed at Data Sheet A
9.2
9.2.1
Switchgear shall be designed in such a way that all component equipment operate
satisfactorily without exceeding their respective maximum permissible temperature rises
under temperature conditions prevailing within the switchgear cubicles. Reference
ambient temperature outside the switchgear cubicles is specified in Data Sheet A.
9.2.2
Ventilating louvers are generally not preferred. If ventilating louvers are considered
essential by the Vendor, these may be provided. However, all ventilating louvers shall be
of G.I or non-ferrous metal and shall be provided with fine-screened meshes to prevent
entry of Vermin.
9.2.3
Switchgear shall be provided with two bus bars. Bus bars shall be uniform cross section
throughout the length of the switchgear and up to the incoming terminals of feeder
circuit breaker/switch.
9.2.4
Except when otherwise noted in Data Sheet-A all bus bars shall be made of high
conductivity aluminium.
9.3
All bus bars, bus taps and joints shall be using self adhesive PVC tape.
9.3.1
Positive and negative bus bars shall be completely segregated from each other by sheet
steel partition.
9.3.2
Bus bars shall be adequately supported and braced to withstand the stresses due to the
specified short circuit currents of the associated switchgear. Bus bar supports shall be
made of Hylam sheets, moulded plastic material or permali wood.
9.3.3
Separate supports shall be provided for bus bar of each polarity. If a common support is
provided for both the bus bars, anti-tracking barriers shall be provided.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-07
SECTION - 4
PAGE: 4 of 7
BATTERY CHARGER
9.3.4
Bus bar joints shall be of the bolted type complete with Belleville washer. Bus bars shall
be thoroughly cleaned at the joint locations and suitable contact grease shall be applied
just before making a joint.
10.0
10.1
Incomer and outgoing feeder control shall be with MCCB's of suitable rating as specified
in Data Sheet-A. Moulded case circuit breakers shall comply with the requirements of
the specification.
11.0
11.1
Miniature circuit breakers shall be provided in all control circuits in place of HRC fuses.
MCB's shall be suitable for DC application and shall comply with the requirements of
the specification.
12.0
12.1
12.2
Adequately rated for the purpose intended (minimum acceptable rating is 10A)
12.3
13.0
13.1
Electrical indicating instruments shall be of the taut band type with 110-mm square dial
and 240 deg scale.
13.2
Indicating instruments shall have provision for zero adjustment from outside the cover.
13.3
Instrument dials shall be parallax free with black numerals on white background dial.
14.0
INDICATING LAMPS
Indicating lamps shall be:
14.1
14.2
Provided with translucent lamp covers of colours Red, Green and Amber as
specified in Data Sheet-A Control wiring diagrams
15.0
PUSH BUTTONS
Push buttons shall be:
15.1
Of the momentary contact, push to actuator type, rated to carry 6A at 220V D.C.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-07
SECTION - 4
PAGE: 5 of 7
BATTERY CHARGER
15.2
15.3
15.4
15.5
15.6
15.7
Emergency stop push button shall be of the lockable type in the pushed position and
shall be shrouded to prevent accidental contact by operating personnal.
16.0
SPACE HEATERS
Space heaters shall be:
16.1
16.2
Provided with rotary type ON-OFF switches, double pole MCBs with overload and
short circuit releases on the main side.
16.3
Provided with humidistat to control the space heater, in order to maintain switchgear
interior at a temperature 5 deg c above the ambient.
17.0
CABLE TERMINATIONS
17.1
Suitable compression type of brass cable glands mounted on a removable gland plate
shall be provided to support all power and control cables entering the switchgear. Cable
glands shall incorporate built-in facilities for earthing the wire armour of cables.
17.2
All cable cores shall be adequately supported at regular intervals inside the cable alleys
by means of suitable, rubber or PVC lined clamps, up to the respective terminal blocks.
17.3
Necessary crimping type of cable lugs for connecting the individual cores to the
respective terminals shall be provided.
18.0
INTERNAL WIRING
18.1
All wiring inside the switchgear shall be carried out with 650/1100V grade, FRLS, PVC
insulated, stranded Copper conductor wires. Minimum size of conductor for power
circuits is 6 sq. mm Copper. Control circuits shall be wired with copper conductor wires
of at least 2.5 sq. mm size.
18.2
18.3
All wires forming part of a tripping circuit shall be provided with an additional red
ferrule marked T.
18.4
Spare auxiliary contacts of all equipment forming part of the switchgear shall be wired
up to the terminal blocks.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-07
SECTION - 4
PAGE: 6 of 7
BATTERY CHARGER
18.5
All wiring for equipment supplied by the Purchaser for which Vendor has to provide
cutouts (where indicated in the Data Sheets) shall be provided up to the terminal blocks.
18.6
18.7
All wiring shall be terminated on to terminal blocks using crimping type of lugs.
19.0
TERMINAL BLOCKS
19.1
All terminal blocks (both for power and control circuits) shall be of the 650V grade stud
type, comprising finely threaded pairs of brass studs of at least 6 mm diameter, links
between each pair of studs, washers, nuts and lock nuts. The studs shall be securely
locked within the mounting base to prevent its turning. Insulated barriers shall be
provided between adjacent terminals.
19.2
All terminals for circuits with voltage exceeding 125V shall be shrouded. Terminal
blocks shall be grouped and suitably segregated depending on circuit voltage. Different
voltage groups of terminal blocks shall be segregated.
19.3
Terminal blocks shall be adequately rated to carry the current of the associated circuit.
Minimum rating of the terminal block shall be 10A
19.4
Provision shall be made to insert terminal labels between two successive insulating
barriers.
19.5
19.6
19.7
Terminal blocks for CT secondary lead wires shall be provided with short-circuiting
links and earthing facilities.
19.8
Terminal blocks shall be arranged with at least 100-mm clearance between two rows of
terminal blocks.
20.0
LABELS
20.1
20.2
20.3
Labels shall be properly fixed, with provision to prevent distortion due to expansion.
20.4
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-07
BATTERY CHARGER
SECTION - 4
PAGE: 7 of 7
21.0
EARTHING
21.1
The switchgear shall be provided with an earth bus bar running along the entire length of
the board provided with stud hole at either ends to connect purchasers earth bus.
Material and size of the earth bus bar shall be as specified in Data Sheet-A.
21.2
21.3
Positive connection between all the frames of equipment mounted in the switchboard and
earth bus bar shall be provided by using insulated copper wires/bare bus bars of cross
section equal to that of the bus bar or equal to half the size of circuit load current
carrying conductor.
21.4
All instrument and relay metallic cases shall be connected to the earth bus bar using
650/1100V grade FRLS PVC insulated 2.5 sq. mm stranded, tinned copper earthing
conductor.
22.0
TESTS
22.1
FACTORY TESTS
All type and routine tests as listed in applicable standards shall be carried out at
MANUFACTURERs works.
22.2
ACCEPTANCE TEST
Routine tests as per applicable standards will also be carried out on the assembled unit at
site.
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-07-1
BATTERY CHARGER
DATA SHEET
SECTION - 4
PAGE: 1 of 5
1.GENERAL PARTICULARS
DATA SHEET A1
1.1
1.2
Designation
Quantity/Application
1.3
1.4
1.5
1.6
1.7
Composite
24 V
Indoor
45OC
FLOOR
IP 52
2.1
2.2
Emergency
2.3
Continuous
1.8
1.9
1.10
1.11
1.12
1.13
LOAD2. DC BUS
1.14
Top
Glands
GS
75 x 10mm
632 of IS-5
Glossy White
No, to be furnished by Vendor
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-07-1
PERFORMANCE4.
3. AC SYSTEM DATA
3.1
3.2
BATTERY CHARGER
DATA SHEET
SECTION - 4
PAGE: 2 of 5
Supply:
Volts
Phase
Frequency
415V
3 4wire
50Hz
Voltage
Frequency
+ /- 10%
+ /- 5%
36 MVA
Effectively
earthed
Yes
Required
240V
Yes
+ /- 2%
+ /- 3%
0.9
Variation in supply
3.3
3.4
3.5
3.6
3.7
4.1
4.2
4.3
4.4
* Data by bidder
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-07-1
BATTERY CHARGER
DATA SHEET
SECTION - 4
PAGE: 3 of 5
DATA SHEET A2
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
APPLICABLE STANDARDS
Switchgear general requirements
IS : 4237
AC circuit breakers
IS : 2516
Factory built assemblies of SW. Gear and control gear IS : 8623
for voltages up to and including 1000V AC & 1200V
DC.
Air break switches
IS : 4064
Miniature circuit breakers
IS : 8828
Contactors
IS : 2959
Starters
IS : 8544
Control switches / push buttons
IS : 6875
Current transformers
IS : 2705
Voltage transformers
IS : 3156
Relays
IS : 3231
Indicating instruments
IS : 1248
Arrangement for busbars main connections and
IS : 5578
accessories
IS: 11353
AC electricity meters
IS : 8530
Degree of protection
IS : 2147
The performance of AC control gear equipment rated
up to 600V for use on high prospective fault current
system
Code of practice for installation and maintenance of
IS : 10118
switchgear
Climate proofing of electrical equipment
-Code of practice for phosphating iron & steel
IS : 6005
BS : 3189
Wrought aluminium & aluminium alloys for electrical IS : 5082
purposes
Control transformer for switchgear and control gear
IS : 12021
for voltage not exceeding 1000V AC
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-07-1
BATTERY CHARGER
DATA SHEET
SECTION - 4
PAGE: 4 of 5
DATA SHEET - B
Bidders shall fill in the Data Sheet-B and return with their bids.
SL.
1
2
3
4
5
6
7
DESCRIPTION
Manufacturers name
Indoor/outdoor application
Thickness of sheet steel
Degree of protection provided (as per IS:2147 or
equivalent)
Bill of material for the various equipment giving
make, type, ratings etc., enclosed
Colour of finish paint
Outside
Inside
Bus bars for power devices (when applicable)
UNIT
mm
Yes/no
a) Material
8
9
10
11
12
13
14
15
16
17.1
17.2
b) Conductor- Solid/Stranded
AC input power rating of charger
a) Float mode +DC loads
b) Boost mode + DC loads
Regulation of charger
Hormonics generated by charger (THD)
Ripple content in the output
PF of the charger at rated DC load &boost charging
Efficiency of charger
Float charging transformer data
a) Type
b) Rating
Boost charging transformer data
a) Type
b) Rating
List of indications provided on charger
a)
b)
c)
DETAILS
(Insulated/Bare)
A
Cu/A1
mm2
KW
KW
%
%
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-04-07-1
SL.
18
19
20
21
BATTERY CHARGER
DATA SHEET
DESCRIPTION
UNIT
SECTION - 4
PAGE: 5 of 5
DETAILS
mm
mm
mm
Kgs.
ISSUE No: R1
DATE: 25-10-2007
1.0
2.1
2.2
2.4
Acoustic Enclosures
as per specifications
AMF panel as per
specification
Battery & battery
Charger System as
per specifications
i) 24 V DC system
for Starter
2.6
2.7
2.8
2.9
2.10
2.11
No
No
Set
Set
Lot
Set
Lot
Lot
ISSUE No: R1
DATE: 25-10-2007
QTY.
5
2.0
2.5
SECTION - 5
PAGE: 1 of 2
PRICE SCHEDULE
UNIT
DESCRIPTION
SL #
DOCUMENT No
PCPL-0626-3-406-05
2.13
M
No
No
*
1
1
Set
2.15
2.16
2.17
2.18
2.19
2.20
3.0
3.1
RATE ONLY
Remote Radiator
4.0
Spares
Set
2.14
Vertical 14" CL B
QTY.
Horizontal piping
10", CL B
SL #
2.12
SECTION - 5
PAGE: 2 of 2
PRICE SCHEDULE
UNIT
DESCRIPTION
DOCUMENT No
PCPL-0626-3-406-05
NOTE:
1. BIDDERS to indicate the exact requirement of spares with suggested quantity for trouble
free operation for 3 years.
2. * Bidder to quantify the Items/ Set
ISSUE No: R1
DATE: 25-10-2007
DOCUMENT No
PCPL-0626-3-406-06
#
Section
Remarks
SECTION - 6
PAGE : 1 of 1
DEVIATION SCHEDULE
Doc. No.
Cl.No.
Deviation
Reason/
Justification
Note: Bidders shall furnish the list of deviations if any with reasons / justification as per
the above format. In the absence of such a deviation it shall be construed that the Bidder
fully complies with the enquiry specification.
ISSUE No: R1
DATE: 25-10-2007