Foundations
over Piles
The complete range of Tensar literature consists of:
• Tensar Geosynthetics in Civil Engineering A guide to the products
and their applications
• Ground Stabilisation Reinforcing unbound layers
in roads and trafficked areas Constructing over weak ground
• Tensar Structural Solutions Bridge Abutments - Retaining Walls -
Steep Slopes without settlement
• Foundations over Piles Constructing over weak ground
without settlement
• Basal Reinforcement Constructing embankments over
Small pile caps being cast prior to constructing the Load Transfer Platform. weak ground
• Railways Reinforcing ballast and sub-base layers under railway track

Construction • Asphalt Pavements Reinforcing asphalt layers


in roads and trafficked areas
Once the supporting piles/VCCs have been installed the layer of fill between the bottom two grids, is the only • Erosion Controlling erosion on soil and rock slopes
simple construction process involves the inclusion of 2 deviation from standard embankment placement and
or 3 layers of Tensar biaxial grids in the granular layers compaction operations. Overlapping, or tying, of
above the supports. Dead weight compaction of the adjacent grids provides the continuity required.
cushion layer of fill under the bottom grid, and the Your local distributor is:

Tensar International Limited Tel: +44 (0)1254 262431


New Wellington Street Fax: +44 (0)1254 266868
A grid layer is placed. The design thickness of granular fill is placed, spread and compacted. Blackburn BB2 4PJ E-mail: info@tensar.co.uk
United Kingdom www.tensar-international.com

Second Severn Crossing, UK


The Toll Plaza area for the Second Severn Crossing in the same, whereas stress measured at subgrade level
the UK was built over compressible soils supported on between the VCCs is almost zero. These results show
vibro concrete columns (VCCs). Load from the how well the design assumptions have been realised in Q 05288 EMS 86463
embankment and pavement above was transmitted to practice. The LTP has performed as a stiff raft, BS EN ISO 9001:2000 BS EN ISO 14001:2004

the VCCs using a Tensar biaxial grid reinforced load transmitting loads from the pavement and ©Copyright Tensar International Limited
Printed April 2006 Issue 7, 79010035
transfer platform (LTP). The graphs summarise the embankment directly to the VCCs using the excellent
The information in this brochure is supplied by Tensar International free of charge. Tensar
performance from monitoring this LTP. Settlement load spreading capability of a granular layer reinforced International do not assume any duty of care to you or any third party. No liability for negligence
above the VCCs and mid-way between them is almost with Tensar biaxial geogrids. (other than for death and personal injury) can arise from any use of or reliance on the information
in this brochure or use of any Tensar International product mentioned. Tensar International will
not be liable if this brochure contains any misrepresentation or misstatement. Determination of
the suitability for any project of the information and any Tensar International product mentioned in
it must be made by your engineer or other professional advisor who has full knowledge of the
project. You, together with any such engineer or advisor, must assume all risk of loss and damage
of any kind arising from use of the information or any product of Tensar International other than
the risk of death and personal injury. If you or any third party subsequently purchases a product
referred to in this brochure or any other Tensar International product the entire terms of the
contract of purchase and the entire obligation of Tensar International relating to the product or
arising from its use shall be as set out in Tensar International's Standard Conditions in force at the
time of purchase, a copy of which may be requested from Tensar International.

Second Severn Crossing Load transfer platform performance. Details of LTP at Second Severn Crossing.
Tensar Technology -
Load Transfer Mechanisms Examples of Load Transfer Mechanisms
proven practical solutions The inclusion of Tensar biaxial grids within granular itself must be loaded by either additional fill or a and their applications
2 and the know-how to layers has been shown to increase the angle of load concrete slab to ensure that the arch is permanently
distribution considerably in comparison with the locked in compression. Load Transfer Platform
get them built unreinforced condition. The grids interlock with the fill As the embankment height increases the lateral forces
to mobilise the maximum shear strength of the within the embankment increase and these must be
Based on the unique properties of Tensar granular layer and enhance arching. resisted by reinforcement to prevent the forces being
geogrids, Tensar Technology is widely imposed on the vertical piles. Raking piles can be used
adopted for ground stabilisation and soil
reinforcement problems, delivering real
Load Transfer Platform as an alternative although for some types of pile, e.g.
vibro concrete columns, this may be impractical.
savings in cost and time. We can help you An LTP is designed such that all the overlying
apply Tensar Technology to improve the
embankment load is transferred directly to the pile
bottom line on your project. Tensioned Membrane
heads via a reinforced granular layer. This layer acts as a
series of inverted pedestals above the pile heads which A tensioned membrane is designed such that the
join together to provide a continuously supported area. embankment fill is supported directly by the geotextile
Cut-away view of embankment supported over a Load Transfer Platform.
The geogrid within the granular layer supports fill spanning between the piles. This load is transferred
beneath the pedestals and confines the granular into the piles by tension in the geotextile. Arching Embankment support over soft ground where only minimal settlements can Highway construction adjacent to a rigid railway structure (UK).
be tolerated.

Construction over weak ground without settlement material, thereby resisting dilation and effectively
increasing its shear strength - see figure 1.
within the fill results in some reduction in vertical
stress applied to the geotextile compared to the full
embankment height. There is no special requirement
Engineers often need to construct embankments in fill reinforced with multiple layers of Tensar biaxial The fill material below the theoretical arch must be for fill properties - see figure 2.
areas where settlement cannot be tolerated. This is grids. An alternative design, using Tensar Basetex, can permanently supported by the grids while the arch
especially true when the serviceability of adjacent be employed to accommodate poorer quality fill.
structures would be compromised by anything other
Tensar LTPs have also been successfully used below
than minimal settlement. The engineer, therefore,
concrete ground floor slabs in order to avoid designing
needs to design a foundation that will provide a firm
the slabs to span between piles.
support without the consequential settlements and
consolidation of underlying soils. When settlement restrictions dictate that a deep
foundation solution is required to support an
Using a Load Transfer Platform avoids the delay
embankment or ground-bearing slab, a Tensar LTP:
required for consolidation settlement as a result of Embankment support over soft ground where time for consolidation is either Motorway toll booth plaza constructed on a Tensar LTP - the alternative to
not available or can not be reliably determined. surcharge avoiding uncertainty of predicting consolidation period (UK).
placing embankment fill over soft, compressible soils. ■ Avoids the delay required for consolidation settlement
The Tensar Load Transfer Platform (LTP) distributes
■ Avoids the need for concrete rafts,or ground beams
embankment loads efficiently onto a series of piles or
vibro concrete columns (VCCs) which bear on firmer ■ Is a proven, reliable solution
strata below. This avoids the cost of using a concrete ■ Can be used under ground-bearing slabs to avoid or
Figure 1: Load Transfer platform mechanism. Figure 2: Tensioned membrane mechanism.
raft or ground beams. Usually the most economic minimise bending
solution is to form the LTP from good quality granular ■ Is rapid and economical to install

Void trial
The effectiveness of interlock was demonstrated in a The granular/geogrid composite created a mattress
trial carried out at the University of Wales in Cardiff to which spanned 3m at strains well below failure for
investigate short term void spanning. Two layers of several days. If this construction is calculated as a
For details of Tensar workshops visit www.tensar-international.com

geogrid were installed in a 600mm thick granular layer tensioned membrane, the granular mattress should Support of concrete ground floor slabs over soft ground. Building of supermarket (UK).
over sand contained within a 3m diameter wall. After have collapsed very quickly. (This trial is described
construction the sand foundation was removed. more fully in Properties and Performance of Tensar
Biaxial Grids.) Tensioned Membrane
Installing pile caps (Holland). Geogrid installation. Placing a fill layer.
Basetex high-strength knitted geotextiles provide the membrane spanning between the piles. This approach
necessary load/strain properties when the basal is used, for example, when there is insufficient
reinforcement is designed to act as a tensioned granular fill available to form the LTP layer.
Tensar International Support Services
Tensar International’s experienced engineers are
available to provide clients, consultants and contractors
with design and construction support. Designs are
carried out using sophisticated software developed in-
house.

The services offered range from a free of charge


4
application suggestion to a full design and supply
service. No liability in negligence or responsibility of
any kind is accepted by Tensar International for any
Tensar International provides a Free Application Suggestion service
project where Tensar products are not used. using in-house software. These include full installation guidelines. Views of the void trial before removing support. Inside void. Reinforced soil embankment constructed over piles using Tensar Basetex Basetex tensioned membrane - an alternative approach to the LTP.

Das könnte Ihnen auch gefallen