Sie sind auf Seite 1von 8

New Course Content on FLNG in 2013!

FPSO & FLNG


Design & Technology - Level 2
20 - 23 May 2013, Kuala Lumpur 3rd instalment in Asia & 6th globally!

Expert Trainers:

Jean - Paul Denise


Senior Consultant, Azur Offshore Ltd FPSO / FLNG & Floaters with Subsea Production
ENSEEIHT Toulouse: Engineering Degree (Mechanical) and MSc (Fluid Mechanics) Mc Gill University: Montreal Canada, MEng ( Fluid Mechanics and Vibrations) Chartered Engineer, RINA, MIMechEng

Jean Luc Chasserot


TPA Professor BSc / MSc SUT & Cranfield Fellow Technical Director & Senior Consultant - Azur Offshore Ltd

www.petroedgeasia.net

FPSO & FLNG DESIGN & TECHNOLOGY LEVEL 2


20 - 23 May 2013, Kuala Lumpur
About the Training Course This 4 day training course will focus on the key technical questions that an FPSO and/or FLNG project team need to address as part of the overall design project. The course has been exclusively designed to equip participants with the key tools needed to find answers to these questions and to make the appropriate decisions to advance future projects. The course will cover the full spectrum of issues relating to FPSO and/or FLNG design projects which will allow technical personnel obtain a better understanding of challenges and risk areas associated with this. This course has also been recently updated 2013 to include the latest developments in FLNG technology and market developments. By attending this 4 day training course, you will be able to: Understand the floating production market by geography and their design types & characteristics Examine the key design and technology considerations for FPSO construction today Identify the critical design requirements, codes and standards which govern FPSO design Review the main functions of topside process systems, its typical production capabilities and related disciplines Understand key design considerations for Hull, Mooring, Swivels & Fluid Transfers Systems and Risers Learn Oil export and offshore offloading requirements and systems Gain an overview of FPSO design development projects and the key factors for success Review the introduction of FLNG technology and current projects in Asia and Europe Featured Case Study Discussions on: Case Study One; Processing system operations on BP FPSO Greater Plutonio Review of the Training CD every BP Operator must learn before going offshore to operate the Subsea Production Facilities and the FPSO Facilities, from Reservoir to Oil and Gas Export systems. Case Study Two; Chevron ALBA FSO; First Internal Turret in the North Sea A detailed review of the Turret system with mooring lines design & installation, Chain table & Riser connections, main deck turret piping & pigging system, fluid Swivel & back-up, leak detection system, interfaces with cargo piping and Oil & Gas export lines including Integrity Monitoring Systems. Case Study Three; The TOTAL Angola FPSO DALIA Story, operating in deep water Block 17. This course is recommended for personnel involved in FPSO projects who require specific knowledge on FPSO design and technology: Current and future Offshore Installation Managers, Conceptual Design Engineers, Development Engineers , Engineering & Integration Managers, Naval Architects, FPSO Project Managers, Process Engineers, Operations Managers What others have said about this course: A very good & comprehensive sharing. Thumbs up to both the presenter and petroEDGE. Design Engineer, Sembawang Shipyard I am glad to be one of the participants & can absorb knowledge from real experts. Engineering Analyst, PETRONAS Very effective course Senior Coordinator, INPEX Its useful and interesting training Staff Maritime, BP Migas Very good, informative & helpful E & P Lead, Lloyd's Register Technical Services Excellent video that I have never seen before PT Pertamina Hulu Energi Offshore North West Java JP is a professional trainer. I learnt much from him Senior Production Setup & Planning, Husky-CNOOC Madura Ltd Good training and presentation Naval Architect, MTE Engineering Sdn Bhd Very professional and organised great material and a wealth of experience Project Engineer, Petrofac Malaysia Both speakers are very knowledgeable in their subject. A lot of experience sharing from both speakers Manager, PETRONAS Previous participants include: Technip Geoproduction, Germanischer Lloyd GLM, Petronas Carigali, INPEX Operations Australia, MASP Engineering Services, Lam Son Joint Operating Company, Talisman Malaysia, International Energy Services, MMHE, MISC, HRM Holding Company, Murphy Sarawak, PTT Exploration & Production, Conoco Phillips Indonesia, BP MIGAS, Sarawak Shell, Anggerik Laksana, MTC Engineering, Regional Maritime University, Petrofac, Husky-CNOOC Madura, Bumi Armada, JX Nippon Oil & Gas Exploration PTT Exploration & Production Public Company Limited, PETRONAS, PT Pertamina Hulu Energi Offshore North West Java, Lloyd's Register Technical Services, Wartsila Singapore, Vietsovpetro, Sembawang Shipyard and many others

Learn about our in-house training solutions and save more! Call +65 67419927 or email info@asiaedge.net
www.petroedgeasia.net

FPSO & FLNG DESIGN & TECHNOLOGY LEVEL 2


20 - 23 May 2013, Kuala Lumpur
Day ONE 08.30 Course Introduction Overall course objectives Summary of course content and planning Safety brief 09.00 Lecture L1: Floating Production Market Floating production market: presentation by geographical areas: North Sea, West Africa, North America, Brazil, Asiapacific (including Australia), etc., Arctic. Characteristics of main areas: location, environment, water depth, others Major floating production developments in each area (field names, floaters). Typical field layouts and field development requirements Lecture L2: Trends in the Floating LNG Business by DouglasWestwood Floating LNG 2012/2017 by Mike Haney Lecture L3: Floater Design and Technology Presentation of the different types of floaters: Mono-hull, Semi-submersible, Deep draught Semi-submersible, Spar, TLP, FDPSO, others. Functional requirements Field characteristics Production characteristics Operation Characteristics Topsides Storage / export facilities Constructability (and construction materials) Scheme maturity Flexibility Cost drivers Decommissioning and re-use Lunch Break TBA Lecture L4: Field Architecture with Floating Production Units and Subsea Systems; Factors driving the Field lay-out; Reservoir & Fluids, Subsea Wells trajectories, SPS & SURF Building blocks & lay-out, Choice of Floater, Mooring lay-out, choice of Risers systems, Export system & requirements for subsea WorkOver operations. Detailed System Design Analysis and Flow Assurance main issues, constrains & mitigations. Analysis of specific Fields Lay-outs in Shallow waters and Deep waters with Semi-subs FPV & FPSO/FLNG. Lecture L5: Topsides Design Introduction to Process Systems Introduction to reservoir fluids: oil, condensate, gas Reservoir data, API density Emulsion, foam, hydrates, naphtenates, wax, sulphates Presentation of the main functions of topsides processing: Oil separation Gas treatment and compression Water injection Produced water Flare Other process systems Utility systems Completed by identification of specific process requirements for a floater: Vessel motion, weather considerations, lay-out Case Study 1: Process systems operations on BP Angola FPSO Greater Plutonio Review of the training CD every BP operator must learn before going offshore, to operate the FPSO facilities and the Subsea Production facilities. (from Reservoir to oil and gas export systems with Full Processing operations & controls).Copy of CD to be provided, courtesy of BP Angola. 17.00 Q&A Session 17.30 End of Day ONE

Day TWO 08.30 Lecture L6: Topsides Design Introduction to other Disciplines Presentation of the important disciplines (besides process) regarding topsides design: Safety: health, safety and environment (fire and gas detection, active and passive protection, escape, evacuation, rescue, emergency systems, etc) Piping and layout: equipment piping, pipe racks, routing, spools, pipe supports Structures: module design, pancakes, space frames, supports Electrical: power generation (main generators, essential and emergency generators, electrical distribution) Instrumentation: integrated control and safety system (ICSS), etc Telecommunications Handling: cranes, monorails, lay-down, access Corrosion protection Accommodation

Learn about our in-house training solutions and save more! Call +65 67419927 or email info@asiaedge.net
www.petroedgeasia.net

FPSO & FLNG DESIGN & TECHNOLOGY LEVEL 2


20 - 23 May 2013, Kuala Lumpur
Lecture L7: Design Requirements, Codes and Standards Identification of the main requirements, rules and standards, which govern the design; Country-enforced rules and regulations Classification Societies rules and regulations Project specific documents Operating Oil & Gas Companies general specifications International Codes and Standards References. Lunch Break TBA Lecture L8: Hull Design Presentation of the main Design issues New Hull or second hand tanker conversion Main hull features Main hull systems Detail design general requirements Detail design requirements for ship areas Detail design requirements for offshore areas Lecture L9: Mooring Design Types of mooring : spread mooring, turret mooring Mooring system design(loads, layout, analysis) Mooring system components(winches & fairleads, chains, wire ropes, etc) Mooring system installation Developments for deep water Maintenance, inspection and replacement of mooring lines Lecture L10: Turret Mooring and Swivels Turret mooring : types of systems Weathervaning and mooring forces Turret position on FPSO Turret size Turret bearing system Mooring lines connection and handling Risers connection and handling Fluid control and power transfer system (swivel technology, drag chain system, etc.) Other aspects (safety, fabrication, installation and testing, operation, patents) 17.00 Q & A Session 17.30 -- End of Day TWO

Day THREE 08.30 Case Study 2: Chevron Alba FSO; First SBM internal turret in the North Sea --A detailed review of the turret system, mooring lines design and installation, Chain table & Flexible Risers connections, main deck turret piping & valves, pigging system, fluid swivel and back-up, leak Detection system, interfaces with cargo piping & Oil export + Diesel export to ANP, Integrity monitoring and Surge systems. Lecture L11: Riser Design for Floaters Different types of riser systems: Dynamic flexible risers, SCRs, Hybrid tower systems with multiple or single risers & other current solutions. History & track records Design requirements Characteristics (structural design, dimensions, fluid types, etc.) Key functional requirements and drivers (including dynamic loads) Analysis methodologies, model testing & dynamic stimulation demonstration of a design example Lecture L12: Oil Export Options and Offshore Offloading Different types of Offloading tankers Direct Offloading systems : Side by side, Tandem offloading Remote offloading systems: CALM buoy, UKOLS, STL, SAL & SALM, etc. Safety requirements during offloading Cargo offloading metering systems Shuttle tanker operations and safety track record Lunch Break TBA Case Study 3: TheTotal Angola FPSO DALIA Story, operating in deep water Block 17-1400m A review of this very large, spread moored FPSO, designed for heavy oil production. Largest Subsea Production system operating 71 subsea wells. CD/Video of the FPSO construction to be provided, courtesy of Total Angola. Update on current operations. Lecture L13: FPSO Design Development Development phases: conceptual, FEED, detail design Conceptual design : Objectives and deliverables Pre-project design or FEED : Objectives and deliverables, FEED activities

Learn about our in-house training solutions and save more! Call +65 67419927 or email info@asiaedge.net
www.petroedgeasia.net

FPSO & FLNG DESIGN & TECHNOLOGY LEVEL 2


20 - 23 May 2013, Kuala Lumpur
Detail design : Objectives and deliverables, Detail design activities Critical subjects are addressed : Schedule and man-hours Interfaces Risk management: technical audits, technical reviews, HAZOPs, etc. Weight Control New Case Study W of S TBA if time. 17.00 Q & A Session 17.30 End of Day THREE Day FOUR Special LNG / FLNG 1 Day Session 08.30 Lecture L14 : Introduction to LNG Production on a Floater General information on LNG and LPG Gas Processing and Pre-Treatment plant Introduction to Liquefaction Thermodynamics Natural Gas pre-treatment Main liquefaction processes (nitrogen cycle, single mixed refrigerant cycle, propane pre-cooled mixed refrigerant cycle, dual mixed refrigerant cycle, cascade cycle), their advantages and disadvantages, their applicability on a floater Selection of Offshore liquefaction process Lecture L15 : LNG Storage on a Floater Main storage systems (MOSS spherical tanks, IHI and GTT prismatic tanks), containment designs and insulation techniques LNG sloshing in tanks Boil-off on LNG tankers & FLNG vessels Inspection and testing of tanks, repairs Lecture L16 : LNG Offloading LNG offloading solutions (FMC, SBM, Framo and Bluewater systems) Rigid LNG transfer systems Aerial Flexible hoses systems Tandem offloading Cryogenic pipe designs Lunch Break TBA Lecture L17 : FLNG Safety Issues Safety philosophy to be adopted for the design of an FLNG vessel Differences between Onshore and Offshore operations Main process Hazards and Event Types Specific issue of large hydrocarbon inventories: BLEVE phenomenon Description of main systems, equipment and procedures to protect against major hazards Safety reviews & Environmental Assessments. Control of Leaks & Releases. Control of Ignitions Lecture L18 : LNG Re-gasification Units Principle of LNG re-gasification Current re-gasification developments Market and applications Potential FSRU Projects Lecture L19: Review and Brief Analysis of Current Floating Gas Projects (with updates) L18 A- Shtokman FPU and onshore LNG in the Barents Sea by Gazprom & Total/Statoil L18 B- Belanak FPSO and FLNG applications by Conoco Phillips L18 C- Abadi FLNG Project by INPEX / BP MIgas, West of the Timor Sea L18 D- Prelude and Concerto Fields: currently world largest FLNG projects by Shell & partners L18 E- Petronas FLNG Project Kanowit Field offshore Bintulu, Sarawak. ++ FLNG Unit design & construction Animation by DSME 17:00 Q&A session + Presentation of Course Certificates 17:30 End of Training Course

The training course has a limited attendance for up to 25 participants only. Sessions commence at 9am on all days, with short intervals at 10.30am and 3.30pm respectively. Lunch will be provided at 12:30pm for 1.5 hours. Sessions will end at 5pm on all days.

Learn about our in-house training solutions and save more! Call +65 67419927 or email info@asiaedge.net
www.petroedgeasia.net

FPSO & FLNG DESIGN & TECHNOLOGY LEVEL 2


20 - 23 May 2013, Kuala Lumpur
About Your Expert Trainers: Jean-Paul Denise, Senior Consultant with particular experience in FPSO, Floating Production Systems & FLNG.
Qualified in France in Mechanical Engineering and Fluid Mechanics, and further in Fluid Mechanics and Vibrations in Canada. Started in the Oil & Gas industry in 1975 for the French Petroleum Institute, then in England with Atkins Franlab, Principia, Foster Wheeler, seconded to BP, Fina, Total, etc., finally in France with Technip and Saipem, before joining AOL in 2012.
Detailed Professional Experience from 2000 to 2012 (main projects only) 2001 to 2012: SAIPEM s.a. Paris; Senior Technical Advisor; From October 07: Shtokman Development AG (GAZPROM/ STATOILHYDRO/ TOTAL/) Study Manager for Conceptual development of the Sthokman field (Barents Sea) with a Floating Production Unit (FPU): icebreaker shaped vessel, internal turret mooring disconnectable in ice conditions, large topsides, seakeeping tests, ice model tests. July 05 July 07: TOTAL FPSOs - Contribution to preparation of several proposals for FPSO developments: Pazflor (ex-Miocene) and Usan. January June 2005: EXXONMOBIL ERHA Project Technical audit and workshop: Review of piping design issues of Erha FPSO. July 03 - Nov. 2004: TOTAL Miocene Project Angola - Technical Advisor on Optimization study relative to development of the Miocene fields, offshore Cabinda, Angola, with FPSO vessel. Oct. 03 - June 2004: TOTAL Akpo Project Project Engineering Manager responsible for all technical aspects and FEED design endorsement, for the proposal of a large FPSO to be applied on the Akpo field, offshore Nigeria, in 1325 m water depth. Feb. - May 2004: CHEVRON TEXACO Agbami Project Project Engineering Manager responsible for all technical aspects and FEED design verification, for the proposal of a large FPSO to be applied on the Agbami field, offshore Nigeria, in 1500 m water depth. Oct. 02- July 2003: PETROBRAS P51 & P52 Project Project Engineering Manager responsible for all technical aspects of two parallel proposals for two semi-submersible production vessels to be applied offshore Brazil on the Roncador and Marlim fields, respectively. Jan. Sept. 2002: SAKHALIN ENERGY Sakhalin II Project Offshore Pipelines Area Manager responsible for all technical aspects of FEED design relative to several pipelines offshore Sakhalin island. Nov - Dec. 2001: TEXACO - Agbami Project - Technical consultant on the preparation of a bid for a Wellhead Barge to be applied in deep water (1,500 m) offshore Nigeria. Co writer / Owner of this 4 days FPSO / FLNG Level 2 Course. 2001: TECHNIP France Lead Naval Architect; Paris : TotalFinaElf AKPO Project Lead Naval Architect for the Basic Engineering of a FPSO and export buoy to be applied in deep water offshore Nigeria. Mooring ystem design, write-up of specifications, topsides lay-out, Hazid, etc... 1993 2001 Offshore Design Engineering (ODE); Technical Advisor ; London Jan.-March 2001: Confidential Client Isis Field (Tunisia) Technical adviser for the independent assessment of a FPSO project on behalf of the financing house. Audit included vessel / mooring system specification, conversion works, topsides production facilities, subsea facilities and risers. 2000-2001: PREMIER OIL Patos-Marinza Project Conceptual design of a FSU (Floating Storage Unit) and its mooring system for the storage of heavy crude at a shallow water location offshore Albania (Adriatic Sea). 2000: DORIS Development of a method for the float-out installation of two large topside decks (10,000 tonnes each) onto a novel FPSO (the OCTOPLUS concept), for application in deep waters on the West coast of Africa. ELF Angola, Girassol Technical consultant for explosion response analysis of FPSO topsides. 1999-2000 TOTALFINA, Otter & Nuggets Projects - Following merger of Total and Fina, extension of previously ongoing work on Finas Otter prospect (see below) to incorporate parallel Nuggets subsea development. Detailed technical support to both TotalFinas preproject group in Paris and project management group in Aberdeen. Supervision of the completion of FEED activities on both of these projects and support to Client for compilation of ITB documentation. Design Patents: Improvements in or relating to Turret Moored Vessels, UK and Norwegian Applications filed in Feb. 1995.Two applications on Arctic turret, references FR2008-51832 and FR2008-51833, both filed on 21 March 2008 Active trainer and contributor for various Azur lectures and courses on FPSO/Floaters since 1994 Joined Azur Offshore in 2012.

Learn about our in-house training solutions and save more! Call +65 67419927 or email info@asiaedge.net
www.petroedgeasia.net

FPSO & FLNG DESIGN & TECHNOLOGY LEVEL 2


20 - 23 May 2013, Kuala Lumpur
TPA Professor Jean-Luc CHASSEROT BSc . MSc - Technical Director & Senior Consultant Field development with SPS, URF & Floaters, Azur Offshore Ltd. + 5 years with construction of LNG carriers in La Ciotat & Newport News shipyards.
Started to work for the Energy Industry in 1972, after qualifying in Mechanical Engineering (BSc) & Industrial Engineering (BSc) in France. Worked on design & construction of several LNG carriers in French & US Shipyards. Returned to France in 78 to join the Comex Group /Cx Seal/Cx Industries, to move to Aberdeen & London to work in the North Sea until 98. Joined A.O.L. in Jan 83 to work in London on new Subsea field development Projects. Seconded to various Operators for; 83/ 85 BALMORAL Field for Sun Oil UK-New Semi FPV & large SPS /Template +Export Pipeline system. Involved from system design up to offshore HUC. 86 / 88 Various short involvements on Glamis, Draugen FPV for Aker/Shell, GASP R&D subsea separation, Emerald, FROY for Elf Norge, Shell Brent ESDVs, TONI SPS for Agip UK and LYELL SPS large Cluster / Intra field Flowlines & Umbilicals for tie-back to Ninian Host platform for Conoco. 89 / 94 ALBA Field for CHEVRON UK Pipeline / Subsea supervisor Northern Platform and New Floating Storage.Involved from conceptual design up to first oil start-up and trouble shooting offshore. ANP platform to FSU internal turret, pipeline bundle and provision for South subsea development. 95/ 96 SCOTT / TELFORD Subsea tie-back for Hamerada Hess / Laing Oil & Gas. Special retrofit multi riser system, including offshore work. Mid 96 /Mar 98 OTTER Field FINA UK Subsea engineering manager responsible for FEED, detail design & bids. Simple SPS to FPSO & long Tie-back. 98 / 00 Cameron France SA for ELF Angola, GIRASSOL Field, Senior Project Engineer based in Pau & Beziers looking after Hybrid riser,SPS,etc.. DALIA FEED + prequalification and evaluation of novel Drill Through Horizontal XTree, leading to major Drilling cost savings. Also worked in Houston & Singapore on the Shell Philippines MALAMPAYA Field to sort out the Field Architecture, System Design, the F.A. issues , the FEED and started Detail Design. Later on, was invited to monitored the SIT in Singapore. Mid 00 / 04 Various missions for A.O.L. in Australia / Singapore / Paris / Malaysia / Sarawak assisting clients in field development studies & training. Mid 04 / Feb 05 Senior Project Engineer / Auditor on TIOF Field studies for WOODSIDE Mauritania.in Perth & Nouakshot, up to contract award to Doris 05/06 Assisted BP Operations on GREATER PLUTONIO Field to develop the Operation Manual (on CD) level one, for large SPS/full SURF & FPSO. 06/ Feb 07-2nd mission in Pau, to assist Total Angola on DALIA field development, deep water, world largest SPS / FPSO with 71 Subsea Wells for Production, Water Injection & Gas disposal. Also worked with all Package Managers to Prepare 7 Papers for OTC Conference - May 07. Apr 07 to Sep 09; assisted Petronas Carigali trained new group of Subsea / Offshore Engineers. Assisted Petronas at the early stage of the first Gas Subsea Tie-back Pilot project to jacket platform (shallow water) & Petronas Mauritania on the Chinguetti Field FPSO replacement & the evaluation /engineering of W.O. operations using the very compact Host 4 wells system. From Jul 09, developed Malaysia operations with JV Partner, SLT International in Kuala Lumpur (FLNG bid INPEX) March10 / February 13- Organised & delivered Eight SUT Africa Branch 5 days Subsea Engineering Courses in Nigeria, Angola & Ghana. Continued with Courses Level 1 & Level 2 on FPSO Technologies, Subsea Production Systems and Subsea Control systems in Asia and UK, Canada (for Technip) & France ( for Bureau Vritas Paris). For the past 24 years, regular lecturer in Offshore and Subsea Engineering at various engineering Schools / Universities in UK and France. OTHER QUALIFICATIONS; UK S.U.T. Certified / Registered Subsea Engineer in 88 and Fellowship awarded in 92. Cranfield Institute modular MSc 87/ 88. Fellowship awarded in 96. Made TPA Total Professeurs Associs in Oct 2006 to present Lectures in Subsea / FPSO Deep W Field Developments. Specific LNG experience; Involved with the construction of 3 LNG carriers, Tellier, Ben Franklin and El Paso Southern, using the Technigaz Mark I & III insulation techniques with the S.S. primary membrane. In 2006 assisted Singapore Ship Owner IMC to evaluate LNG carrier construction in China. Visited GTT Research Centre near Paris (including a course on the GTT N0 96 double Invar barriers) and LNG carrier Provalys (for Gas de France) under construction in St Nazaire Shipyard. Also assisted IMC in discussions with SBM Offshore for the provision & operation of a new leased FSRU.

Learn about our in-house training solutions and save more! Call +65 67419927 or email info@asiaedge.net
www.petroedgeasia.net

FPSO & FLNG DESIGN & TECHNOLOGY LEVEL 2 REGISTRATION FORM


20 - 23 May 2013, Kuala Lumpur

FPSO & FLNG: DESIGN & TECHNOLOGY - LEVEL 2


Bird Price SGD 4049 Normal Price SGD 4249

Kuala Lumpur 20 - 23 May 2013 FPSO & FLNG: Design & Technology Level 2

TEAM DISCOUNTS!
PetroEdge recognises the value of learning in teams. Group bookings at the same time from the same company receive the following: 3 or more at 5% off 5 or more at 7% off 8 of more at 10% Team discounts are based on Normal Price only and are not applicable for other promotions.

PetroEdge In-house Training { } Yes, I would like to organise this training on-site and save on total course fees! For further information about On-site Training Solutions, please call +65 67419927 or email info@asiaedge.net

DELEGATE DETAILS
EGA TE DETAILS Delegate 1: Mr Mrs Ms Dr Other Telephone: Email: Job Title: Department: ----------------------------------------------Postcode: Delegate 2: Mr Mrs Ms Dr Other Telephone: Email: Telephone: Job Title: Fax: Department: Email: --Head of Department: Country: --------------------------------------Company: :---------Address:

Attention Invoice to:

4 Easy Ways to Register


Online: www.petroedgeasia.net Email: info@asiaedge.net Phone: (65) 6741 9927 Fax: (65) 67478737
Payment Methods

Please note: - indicate if you have already registered by Phone Fax Email Web - if you have not received an acknowledgement before the training course, please call us to confirm your booking. - photocopy this form to register multiple delegates.

available for up to one year from the date of issuance. No refunds will be available for cancellations or postponements. ASIA EDGE PTE LTD is not responsible for any loss or damage as a result of a substitution, alteration or cancellation/postponement of an event. ASIA EDGE PTE LTD shall assume no liability whatsoever in the event this training course is cancelled, rescheduled or postponed due to a fortuitous event, Act of God, unforeseen occurrence or any other event that renders performance of this training course impracticable or impossible. For purposes of this clause, a fortuitous event shall include, but not be limited to: war, fire, labor strike, extreme weather or other emergency. PROGRAM CHANGE POLICY: Please note that speakers and topics were confirmed at the time of publishing; however, circumstances beyond the control of the organizers may necessitate substitutions, alterations or cancellations of the speakers and/or topics. As such, ASIA EDGE PTE LTD reserves the right to alter or modify the advertised speakers and/or topics if necessary. Any substitutions or alterations will be updated on our web page as soon as possible. ASIA EDGE PTE. LTD. Company Registration No: No. 200710561C Copyright@ 2005 ASIA EDGE PTE LTD. All rights reserved. This brochure may not be copied, photocopied, reproduced, translated, or converted to any electronic or machine-readable form in whole or in part without prior written approval of ASIA EDGE PTE LTD

By Cheque/ Bank Draft: Make Payable to Asia Edge Pte. Ltd. By Direct Transfer: Please quote AE1 with the remittance advise Account Name: Asia Edge Pte. Ltd. Bank Number: 508 Account Number: 762903-001Swift Code: OCBCSGSG All bank charges to be borne by payer. Please ensure that Asia Edge Pte Ltd receive the full invoiced amount. PAYMENT POLICY: Payment is due in full at the time of registration. Full payment is mandatory for event attendance. I agree to Asia Edge Pte Ltd. payment terms CANCELLATIONS & SUBSTITUTIONS: You may substitute delegates at any time. ASIA EDGE PTE LTD does not provide refunds for cancellations. For cancellations received in writing more than seven (7) days prior to the training course you will receive a 100% credit to be used at another ASIA EDGE PTE LTD training course for up to one year from the date of issuance. For cancellations received seven (7) days or less prior to an event (including day 7), no credits will be issued. In the event that ASIA EDGE PTE LTD cancels an event, delegate payments at the date of cancellation will be credited to a future ASIA EDGE PTE LTD event. This credit will be available for up to one year from the date of issuance. In the event that ASIA EDGE PTE LTD postpones an event, delegate payments at the postponement date will be credited towards the rescheduled date. If the delegate is unable to attend the rescheduled event, the delegate will receive a 100% credit representing payments made towards a future ASIA EDGE PTE LTD event. This credit will be

Learn about our in-house training solutions and save more! Call +65 67419927 or email info@asiaedge.net
www.petroedgeasia.net

Das könnte Ihnen auch gefallen