I.U.
Materiales
Und
Metrado
P.U.
P.P.
Hm
301.9903
203.13
S/. 61,343.29
48
Hm
530.0000
130.35
S/. 69,085.50
49
Hm
640.9844
143.12
S/. 91,737.69
49
Motoniveladora
Hm
707.7575
155.98
S/. 110,396.01
49
Und
2.0000
34,761.00
S/. 69,522.00
49
Und
3.0000
39,045.00
S/. 117,135.00
Und
3,476.0000
11.34
S/. 39,417.84
48
Hm
2,553.7120
6.83
S/. 17,441.85
48
Hm
598.8023
50.00
S/. 29,940.12
48
Hm
162.5127
80.00
S/. 13,001.02
Hm
788.9183
87.23
S/. 68,817.34
49
Cargador retroexcavadora 62 HP 1 Yd
52
Pza
293.7600
215.00
S/. 63,158.40
56
Und
6,952.0000
4.56
S/. 31,701.12
72
228.9000
249.74
S/. 57,165.49
I.U.
Materiales
Und
Metrado
P.U.
P.P.
1. SISTEMA
OBRAS DE
CAPTACIN
Y DESARENAMIENTO
4.
EN
UTILIZACIN
EN MEDIA TENSINPRELIMINAR
EN 10-22.3 KV - TRIFASICO
6
Und
45.0000
70.00
S/. 3,150.00
Cjto
9.0000
437.30
S/. 3,935.70
Und
19.0000
318.56
S/. 6,052.64
12
Und
1.0000
14,064.71
S/. 14,064.71
12
Und
1.0000
4,500.00
S/. 4,500.00
48
Und
1.0000
19,500.00
S/. 19,500.00
48
Und
1.0000
8,100.00
S/. 8,100.00
62
Und
10.0000
1,500.00
S/. 15,000.00
5. LNEA DE CONDUCCIN A PAMPAS DE HOSPITAL, LNEA DE IMPULSIN DE CISTERNA A SAN JUAN DE LA VIRGEN Y A RESERVORIOS
DE PAMPAS DE HOSPITAL
72
10,810.8697
55.26
S/. 597,408.66
Arena Gruesa
49
Retroexcavador s/llanatas 48 HP 1 Yd
72
m3
5,212.8940
16.81
S/. 87,628.75
Hm
735.6172
87.23
S/. 64,167.89
13,472.8440
159.68
S/. 2,151,343.73
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE DISTRITOS DE CORRALES, SAN JACINTO,
PAMPAS DE HOSPITAL Y SAN JUAN DE LA VIRGEN DEL DEPARTAMENTO DE TUMBES
ADELANTO (ESPECFICO) PARA MATERIALES E INSUMOS N 02
I
Amax C .I . xS .B.P.Vx ma
I mo
F.R.
Amax
C.I.
S.B.P.V.
Ima
Imo
I.U.
=
:
:
:
:
:
:
0.99996
Adelanto (Especfico) Para Materiales e Insumos a otorgar por elemento
Coeficiente de Incidencia
Saldo Bruto Por Valorizar
ndice del elemento a la fecha de otorgar el adelanto (Enero 2010)
ndice del elemento a la fecha de otorgar del Valor Referencial (Oct. - 2009)
Indice Unificado
I.U.
ELEMENTO
C.I.
S.B.P.V.
Ima
Imo
Amax
0.061
2,141,467.44
329.61
330.43
130,305.34
49
0.182
2,141,467.44
245.60
246.98
387,569.36
Cerrajera nacional
0.015
2,660,668.51
362.62
361.52
40,031.46
48
0.023
2,660,668.51
329.61
330.43
60,233.15
49
0.026
2,660,668.51
245.60
246.98
68,790.85
52
Perfil de aluminio
0.024
2,660,668.51
307.10
303.30
64,656.09
56
0.012
2,660,668.51
581.30
582.52
31,861.15
72
0.021
2,660,668.51
333.83
339.37
54,961.93
I.U.
ELEMENTO
C.I.
S.B.P.V.
Ima
Imo
Amax
1. SISTEMA
OBRAS DE
CAPTACIN
Y DESARENAMIENTO
4.
EN
UTILIZACIN
EN MEDIA TENSINPRELIMINAR
EN 10-22.3 KV - TRIFASICO
6
0.047
281,243.71
749.57
674.25
14,695.08
12
0.066
281,243.71
269.44
270.60
18,482.51
48
0.098
281,243.71
329.61
330.43
27,493.49
62
Poste de concreto
0.053
281,243.71
380.65
379.94
14,933.77
5. LNEA DE CONDUCCIN A PAMPAS DE HOSPITAL, LNEA DE IMPULSIN DE CISTERNA A SAN JUAN DE LA VIRGEN Y A RESERVORIOS DE PAMPAS DE
HOSPITAL
72
0.335
1,782,280.80
333.83
339.37
587,317.38
Agregado grueso
0.023
3,750,290.42
434.73
434.38
86,326.18
49
0.017
3,750,290.42
245.60
246.98
63,398.71
72
0.574
3,750,290.42
333.83
339.37
2,117,525.78
Sub Total
3,768,582.23
3,768,431.48
I.G.V.
TOTAL
19.00%
716,001.98
4,484,433.46