Beruflich Dokumente
Kultur Dokumente
KM
LEAD CHARGE
0 - 10
3
4.00
10.00-20.00
0
3.45
20 - 40
0
3.05
40 - 80
0
2.55
80-----0
2.30
TOTAL
3
TOTAL
12.00
0.00
0.00
0.00
0.00
12.00
KM
5
0
0
0
0
5
LEAD CHARGE
4.40
3.80
3.35
2.80
2.50
TOTAL
22.00
0.00
0.00
0.00
0.00
22.00
KM
10
2
0
0
0
12
LEAD CHARGE
4.40
3.80
3.35
2.80
2.50
0 - 10
10.00-20.00
20 - 40
40 - 80
80------
KM
5
0
0
0
0
TOTAL
LEAD CHARGE
7.20
6.20
5.45
4.55
4.10
For 2000 Nos
For 1000 Nos
KM
LEAD CHARGE
TOTAL
0 - 10
10
6.40
64.00
0 - 10
7.20
10.00-20.00
20 - 40
40 - 80
80-----TOTAL
10
0
0
0
20
5.50
4.85
4.05
3.65
55.00
0.00
0.00
0.00
119.00
10.00-20.00
20 - 40
40 - 80
80-----TOTAL
0
0
0
0
5
6.20
5.45
4.55
4.10
FILLING SAND
0 - 10
10.00-20.00
20 - 40
40 - 80
KM
10
10
0
0
LEAD CHARGE
6.40
5.50
4.85
4.05
TOTAL
64.00
55.00
0.00
0.00
0 - 10
10.00-20.00
20 - 40
40 - 80
KM
0
0
0
0
LEAD CHARGE
9.00
7.75
6.85
5.70
80-----TOTAL
0
20
3.65
0.00
119.00
US GRAVEL
0 - 10
10.00-20.00
20 - 40
40 - 80
80-----TOTAL
KM
3
0
0
0
0
3
LEAD CHARGE
6.40
5.50
4.85
4.05
3.65
80-----TOTAL
0
0
5.15
WELL GRAVEL
TOTAL
19.20
0.00
0.00
0.00
0.00
19.20
0 - 10
10.00-20.00
20 - 40
40 - 80
80-----TOTAL
KM
3
0
0
0
0
3
LEAD CHARGE
6.40
5.50
4.85
4.05
3.65
TOTAL
54
9.30
0.00
0.00
0.00
63.30
K JELLY
h C.Bricks table)
TOTAL
44
7.60
0.00
0.00
0.00
51.60
TILES - 2000 NOS.,
TOTAL
36.00
0.00
0.00
0.00
0.00
36
18.00
TOTAL
36.00
0.00
0.00
0.00
0.00
36
TOTAL
0.00
0
0
0.00
0
0
TOTAL
19.20
0.00
0.00
0.00
0.00
19.20
1849.1
10
4400.00
steel
39600.00
110.00
110.00
288.00
250.00
2830.00
395.00
616.00
528.00
858.00
12 mm metal
792.00
10 mm metal
583.00
10-12mm metal
687.50
6 mm metal
396.00
6-10mm metal
country bricks ( 23/4")
2900.00
489.50
2285.00
brick jelly 20 mm
400.00
shell lime
979.00
720.00
7200.00
pressed tiles
Mangalore Tiles
Ceiling Tiles
10200.00
A - Class
7055.00
AA- class
7190.00
4330.00
US
Gravel
Well
27300.00
23800.00
106.00
94.00
Loose Boulders
Lift (Req. Blasting Items)
Lead (Req. Blasting Items)
81.80
3.15
3.05
492.00
246.00
126.00
91.00
51.70
34.75
3.55
4.40
37.55
21.80
29.20
87.80
35.90
211.00
196.00
10.85
HR by wedging
HR Requring Blasting
MR DMR Requring Blasting
MR DMR Not Requring Blasting
SDR Not Requiring Blasting
E W SS20 B (HG Soil)
Lift (Not Req. Blasting Items)
Lead (Not Req. Blasting Items)
Earth work SS 20 B Machinery
Vibrating charges (PCC)
Vibrating charges (RCC)
Grinding morter(lime) (ordinary)
MIXING CHARGES(MANUAL)
Plumber -I
Plumber -II
Sand Filling (Labour)
Earth/gravel filling(Labour)
Gravel stacking
Gravel Spreading
Steel Angle / Plate
Silver Oak Scantling
Casuria Props 10-13 cm
12.20
3.05
2.78
40.00
10800.00
17.50
SL. No. 64
SL. No. 48
SL. No. 47
SL. No. 45
SL. No. 44
SL. No. 46
SL. No. 65
SL. No. 63
SL. No. 62
SL. No. 67
SL. No.66
SL. No. 87
SL. No. 101
SL. No. 102
c.morter
Binding Wire
42000.00
waterproof compound
Crude oil
36.75
20.00 Local Rate
110.00
(9.90*3)
9.90
29.70
19.95
23.10
220.50
12.00 Local Rate
63.00
78.50
(pro)
44.00
19.40
78.00
8.00
1575.00
264.00
286.00
297.00
126.00
46.00
68.00
126.00
primer (wood)
136.00
220.00
210.00
126.00
152.00 /sqm
3.15
1.05
RIDGETILES
Best mangalore tiles -A- class
Ceiling tiles 20*20*2
Ceiling tiles 20*20*2
20600.00
7055.00
16000.00
4130.00
/1000
/1000
/1000
/1000
nos
nos
nos
nos
38.00
24.00 / RM
945.00
1205.00
1310.00
10.50 / set
15.75 /100 grm
Spun Yarn
10.50
Thread Ball
3.15
55.00 /Kg
15.95 /Kg
25.00 /Kg
Clay
FireBrick
Wedges
71.80 Sqm
90.40 Sqm
54.00 KG
om 2011-2012
to 2010-2011
Local Rate
Local Rate
Local Rate
Local Rate
SL. No.167
ghways; Rate
ghways; Rate
ghways; Rate
SI. No.2
Name of materials
Lead in KM
Plain
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Cement
steel
sand for mortar
sand for filling
Rough stone
Rough stone(revet)
Cutstone roughly dressed
Bond stone
40mm iss metal
25 mm metal
20mm iss metal
12 mm metal
10 mm metal
10-12mm metal
6 mm metal
6-10mm metal
country bricks ( 23/4")
country bricks ( 21/4")
brick jelly 20 mm
shell lime
Lime stone (Slacked lime)
pressed tiles (20 x 20 x 2)
pressed tiles (23 x 23 x 2)
Mangalore Tiles (A- class)
Mangalore Tiles (AA- class)
Ceiling Tiles
Ridge tiles
Country wood planks
--do-- scantlings
US Gravel
Well Gravel
25 mm IRC Metal
12 mm IRC Metal
6 mm IRC Metal
3
3
20
20
24
24
24
24
24
24
24
24
24
24
24
24
12
12
12
5
5
5
5
5
5
5
5
5
5
3
3
24
24
24
0
0
0
Cost
Hills
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Conveyance
Plain
4400.00
39600.00
110.00
110.00
288.00
250.00
2830.00
395.00
616.00
528.00
858.00
792.00
583.00
687.50
396.00
489.50
2900.00
2285.00
400.00
979.00
720.00
7200.00
10200.00
7055.00
7190.00
4330.00
20600.00
27300.00
23800.00
106.00
94.00
550.00
739.00
374.00
100.00
200.00
300.00
12.00
12.00
119.00
119.00
138.40
138.40
138.40
138.40
138.40
138.40
138.40
138.40
138.40
138.40
138.40
138.40
63.30
63.30
51.60
22.00
22.00
18.00
18.00
36.00
36.00
36.00
36.00
22.00
22.00
19.20
19.20
138.40
138.40
138.40
1.00
1.00
1.00
Conveyance
Total
Hills
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4412.00
39612.00
229.00
229.00
426.40
388.40
2968.40
533.40
754.40
666.40
996.40
930.40
721.40
825.90
534.40
627.90
2963.30
2348.30
451.60
1001.00
742.00
7218.00
10218.00
7091.00
7226.00
4366.00
20636.00
27322.00
23822.00
125.20
113.20
688.40
877.40
512.40
101.00
201.00
301.00
1849.1 #
10
SUB DATA
A
4412.00 /MT
229.00 /cum
4235.52
229.00
4464.52
4412.00 /MT
229.00 /cum
3176.64
229.00
3405.64
3441.54
4412.00 /MT
229.00 /cum
35.90 /cum
4412.00 /MT
229.00 /cum
35.90 /cum
4412.00 /MT
229.00 /cum
Mixing charges
35.90 /cum
4412.00 /MT
229.00 /cum
1.00 cum
35.90
Mixing charges
1.00 cum
Mixing charges
3405.64
LIME
0.5 cum
1.00 cum
1.00 cum
Mixing charges
MORTAR 1:2
Lime (Slacked/stone)
Cost of sand
Grinding mortor (Ordi..)
35.90 /cum
742.00 /cum
229.00 /cum
87.80 /cum
2117.76
229.00
2346.76
35.90
2382.66
1588.32
229.00
1817.32
35.90
1853.22
1270.66
229.00
1499.66
35.90
1535.56
1058.88
229.00
1287.88
35.90
1323.78
371.00
229.00
87.80
687.80
DATA
1
Amount
Refilling the basement with excavated earth other than sand complying the
Standard specification
RATE @RS
12.20 /cum
Collection and supply of sand and filling in to the basement including cost and
conveyance to the siteand all labour charges for filling
as per standard speecifications
1.00 cum
1.00 cum
229.00
10.85
239.85
239.85 /cum
229.00 /cum
10.85 /cum
125.20 /cum
3.05 /cum
12.20 /cum
140.45 /cum
125.20
3.05
12.20
0.00
140.45
125.20 /cum
3.05 /cum
2.78 /cum
125.2
3.05
2.78
0
131.03
RATE @RS
Collection and supply of Well gravel from appd quarry including cost
and conveyance of all materials to site including all labour charges for
filling etc.complete,
1.00 cum
1.00 cum
1.00 cum
Wellgravel
Stacking charges
Labour charges for filling
RATE @RS
128.45 /cum
113.20
3.05
12.20
0.00
128.45
113.20
3.05
2.78
0.00
119.03
119.03 /cum
Gravel (U.S)
Mazdoor I Class
Mazdoor II class
sundries
RATE @RS
113.20 /cum
3.05 /cum
12.20 /cum
Collection and supply of Well gravel from appd quarry including cost
and conveyance of all materials to site including all labour charges for
Spreading etc.complete,
1.00 cum Wellgravel
113.20 /cum
1.00 cum Stacking charges
3.05 /cum
1.00 cum Spreading charges
2.78 /cum
RATE @RS
131.03 /cum
125.20 cum
153.00 E
138.00 E
212.84
168.30
69.00
0.00
450.14
113.20 cum
153.00 E
138.00 E
192.44
168.30
69.00
0.00
429.74
45.01 /Sqm
Gravel (Well)
Mazdoor I Class
Mazdoor II class
sundries
RATE @RS
429.74 /Sqm
10
9.00
4.50
1.80
17.70
14.10
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
cum Cost of 40mm ISS metal
754.40 /cum
cum Cost of cement mortar 1:3
2346.76 /cum
nos
Mason II class
218.00 /each
nos
Mazdoor I class
153.00 /each
nos
Mazdoor II class
138.00 /each
9.00
4.50
1.80
17.70
14.10
2239.64 /cum
21.80 /cum
2261.44 /cum
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
cum Cost of 40mm ISS metal
754.40 /cum
cum Cost of cement mortar 1:4
1817.32 /cum
nos
Mason II class
218.00 /each
nos
Mazdoor I class
153.00 /each
nos
Mazdoor II class
138.00 /each
9.00
4.50
1.80
17.70
14.10
RATE @ RS
2001.38 /cum
Cement concrete 1:5:10 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
cum Cost of 40mm ISS metal
754.40 /cum
cum cement mortar 1:5
1499.66 /cum
nos
Mason II class
218.00 /each
nos
Mazdoor I class
153.00 /each
nos
Mazdoor II class
138.00 /each
9.00
4.50
1.80
17.70
14.10
RATE @ RS
1858.44 /cum
Cement concrete 1:6:12 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for 10 cum.
cum Cost of 40mm ISS metal
754.40 /cum
cum
cement mortar 1:6
1287.88 /cum
nos
Mason II class
218.00 /each
nos
Mazdoor I class
153.00 /each
nos
Mazdoor II class
138.00 /each
6789.60
10560.42
392.40
2708.10
1945.80
0.10
22396.42
RATE @ RS
Vibrated charges
10-A
11
12
13
6789.60
8177.94
392.40
2708.10
1945.80
0.00
20013.84
6789.60
6748.45
392.40
2708.10
1945.80
0.00
18584.35
6789.60
5795.46
392.40
2708.10
1945.80
0.00
17631.36
RATE @ RS
1763.14 /cum
Cement concrete 1:1.5:3mix using 20mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for bed blocks for 10 cum
14
9.00
4.50
1.80
17.70
14.10
cum
cum
nos
nos
nos
RATE @RS
15
0.45
0.17
0.07
0.34
408.00
1.88
1.08
0.08
0.43
0.36
10.00
1
1
1
1
0.45
0.17
0.07
0.34
408.00
1.88
1.08
0.08
/cum
/cum
/each
/each
/each
8967.6
20090.34
392.4
2708.1
1945.8
0.00
34104.24
3410.42 /cum
16
996.40
4464.52
218.00
153.00
138.00
306.34
149.16
35.87
77.86
1800.10
287.64
149.04
11.04
101.91
87.48
0.00
0.00
0.00
0.00
0.00
3006.43
300.64 /Sqm
296.548
158.168
37.408
77.86
1800.096
287.64
149.04
11.04
0.43 nos
0.36 nos
10.00 Sq.m
1
1
1
1
Carpenter I class
Mason I class
Cost of curing
Premoulded expansion joints
Extra conveyance of water
Hire charges for T & P
Sundries
237.00
243.00
0.00
0.00
0.00
0.00
/each
/each
10 sqm
LS
LS
LS
LS
101.91
87.48
0.00
0.00
0.00
0.00
3007.19
RATE @RS
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and
17
9.00
4.50
1.80
17.70
14.10
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for bed blocks for 10 cum
cum 20mm ISS metal
996.40 /cum
cum Cement mortar 1:2
3405.64 /cum
nos
Mason II class
218.00 /each
nos
Mazdoor I class
153.00 /each
nos
Mazdoor II class
138.00 /each
RATE @RS
18
9.00
4.50
1.80
17.70
14.10
RATE @RS
Vibrated charges
C C 1:2:4 mix
6789.60
15325.38
392.40
2708.10
1945.80
0
27161.28
2716.13 /cum
21.80 /cum
2737.93 /cum
8967.60
15325.38
392.40
2708.10
1945.80
0.31
29339.59
2933.96 /cum
Cement concrete 1:2:4 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for bed blocks for 10 cum
cum 40mm ISS metal
754.40 /cum
cum Cement mortar 1:2
3405.64 /cum
nos
Mason II class
218.00 /each
nos
Mazdoor I class
153.00 /each
nos
Mazdoor II class
138.00 /each
18 -A
19
300.72 /Sqm
Bed Block
2933.96 cum
2933.96
2.00
19-A
1 cum
0.67
Ls
20
9.00
4.50
1.80
17.70
14.10
10.00
1.00
3.40
7.10
10.60
14.10
14.10
2933.96 cum
145.00 sqm
Ls
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete for bed blocks for 10 cum
cum 20mm ISS metal
996.40 /cum
cum Cement mortar 1:3
2346.76 /cum
nos
Mason II class
218.00 /each
nos
Mazdoor I class
153.00 /each
nos
Mazdoor II class
138.00 /each
RATE @RS
21
218.00 sqm
8967.60
10560.42
392.40
2708.10
1945.80
0.00
24574.32
2457.43 /cum
RATE @RS
436.00
0.60
3370.56
2933.96
97.15
117.59
0.90
3149.60
4264.00
533.40
6300.95
1725.30
2310.80
2157.30
1945.80
0.00
19237.55
1923.75 /cum
22
10.00
1.00
3.40
7.10
10.60
14.10
cum
cum
cum
nos
nos
nos
Rough stone
Bond stone
Cement mortar 1:5
Mason I class
Mason II class
Mazdoor I class
426.40
533.40
1535.56
243.00
218.00
153.00
/cum
/cum
/cum
/each
/each
/each
4264.00
533.40
5220.89
1725.30
2310.80
2157.30
14.10 nos
Mazdoor II class
RATE @RS
10.00
1.00
4.00
3.50
10.60
10.60
10.60
cum
cum
cum
nos
nos
nos
nos
1815.75 /cum
Rough stone
Bond stone
clay (Local Rate)
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
RATE @RS
426.40
533.40
120.00
243.00
218.00
153.00
138.00
/cum
/cum
/cum
/each
/each
/each
/each
4264.00
533.40
480.00
850.50
2310.80
1621.80
1462.80
0.00
11523.30
1152.33 /cum
Dry stone masonry for Retainingwall -10cum including cost and conveyance
of all materials and all labour charges etc complete for 10 cum
24
12.00
3.50
7.10
7.10
3.50
cum
nos
nos
nos
nos
RATE @RS
388.40
243.00
218.00
153.00
138.00
/cum
/each
/each
/each
/each
4660.80
850.50
1547.80
1086.30
483.00
0.00
8628.40
125.20 cum
153.00 /each
138.00 /each
1452.32
1086.30
483.00
0.00
3021.62
862.84 /cum
Gravel
Mazdoor I Class
Mazdoor II class
sundries
RATE @RS
26
1945.80
0.05
18157.54
23
25
138.00 /each
302.16 /Sqm
Rough stone dry packing for aprons and revetments including cost and
conveyance and all labour charges etc complete
11.00
3.50
10.60
7.10
cum
nos
nos
nos
Rough stone
Wodders
Mazdoor I class
Mazdoor II class
RATE @RS
/cum
/each
/each
/each
4690.40
553.00
1621.80
979.80
0.00
7845.00
784.50 /Sqm
Removing old revetment and repacking with old stones -10 cum
27
3.50 No
10.60 No
7.10 No
Ls
Wodders
Mazdoor I Class
Mazdoor II class
Labour Charges for removing &
clearing the old stones
RATE @RS
158.00 /each
153.00 /each
138.00 /each
553.00
1621.80
979.80
50.00
0.00
3204.60
Ls
320.46 /cum
28
0.09
1.60
0.50
1.10
cum
nos
nos
nos
RATE @RS
2382.66
218.00
153.00
138.00
/cum
/each
/each
/each
214.44
348.80
76.50
151.80
0.00
791.54
79.15 /Sqm
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4"
and conveyance of all materials to site and all labour charges etc complete -10 cum
29
4590
2.50
3.50
10.60
7.10
21.20
nos
cum
nos
nos
nos
nos
Country bricks
8 3/4" x 4 3/8" x 2 3/4"
Cement mortar 1:5
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
RATE @RS
30
426.40
158.00
153.00
138.00
2963.30
1535.56
243.00
218.00
153.00
138.00
/1000nos
/cum
/each
/each
/each
/each
13601.55
3838.89
850.50
2310.80
1086.30
2925.60
0.00
24613.64
2461.36 /cum
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4"
and conveyance of all materials to site and all labour charges etc complete -100 CFT
1300
0.708
1.00
3.00
2.00
6.00
nos
cum
nos
nos
nos
nos
Country bricks
8 3/4" x 4 3/8" x 2 3/4"
Cement mortar 1:5
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
RATE @RS
Rate
For
2463.06 /cum
0.15
2463.21
/1000nos
/cum
/each
/each
/each
/each
100 CFT
3852.29
1087.17
243.00
654.00
306.00
828.00
6970.46
2463.06
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"
and conveyance of all materials to site and all labour charges etc complete
31
6010
2.80
3.50
7.10
7.10
14.10
nos
cum
nos
nos
nos
nos
Country bricks
8 3/4" x 4 1/4" x 2 1/4"
Cement mortar 1:5
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
RATE @RS
2348.30
1535.56
243.00
218.00
153.00
138.00
/1000nos
/cum
/each
/each
/each
/each
14113.28
4299.56
850.50
1547.80
1086.30
1945.80
23843.24
2384.32 /cum
Honey comb brick work with class III country bricks including cost and conveyance
of all materials to site and all labour charges etc complete 10 sqm.
32
640.00
0.70
3.20
6.50
2.20
5.40
nos
cum
nos
nos
nos
nos
Country bricks
8 3/4" x 4 1/4" x 2 1/4"
cement mortar 1:3 mix
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
RATE @RS
33
2963.30
1535.56
243.00
218.00
153.00
138.00
2348.30
2382.66
243.00
218.00
153.00
138.00
/1000Nos
/cum
/each
/each
/each
/each
1502.91
1667.86
777.60
1417.00
336.60
745.20
0.00
6447.17
644.72 /Sqm
Dry Brick work using country bricks 83/4"x41/4"x23/4" including cost and
conveyance of all materials to site and all labour charges etc complete
459.00 nos
Country bricks
2963.30 /1000nos
1360.15
3.50
7.20
7.10
14.10
nos
nos
nos
nos
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
RATE @RS
243.00
218.00
153.00
138.00
/each
/each
/each
/each
850.50
1569.60
1086.30
1945.80
0.00
6812.35
681.24 /cum
Dry Brick work using country bricks 83/4"x41/4"x21/4" including cost and
conveyance of all materials to site and all labour charges etc complete
34
601.00
3.50
7.20
7.10
14.10
nos
nos
nos
nos
nos
Country bricks
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
RATE @RS
2348.30
243.00
218.00
153.00
138.00
/1000nos
/each
/each
/each
/each
1411.33
850.50
1569.60
1086.30
1945.80
0.00
6863.53
686.35 /cum
Pointing with cement mortar 1:3 flush pointing for brickwork including cost
and conveyance of all materialsand all labour charges etc complete for 10 Sqm
35
0.06
1.60
0.50
1.10
cum
nos
nos
nos
RATE @RS
2382.66
218.00
153.00
138.00
/cum
/each
/each
/each
142.96
348.80
76.50
151.80
0.00
720.06
72.01 /Sqm
36
7500
3.50
7.10
7.10
14.10
nos
nos
nos
nos
nos
Country bricks
8 3/4" x 4 1/4" x 2 1/4"
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
RATE @RS
17043.04 /cum
22.00
243.00
218.00
153.00
138.00
NO (LR)
/each
/each
/each
/each
165000.00
850.50
1547.80
1086.30
1945.80
0.00
170430.40
Damp proof course in cement mortor CM1:3 - 20mm thick with water proofing
compound at 5% by wt of cement
37
0.21
1.10
1.10
2.20
1.10
5.00
cum
nos
nos
nos
nos
kg
RATE @RS
2382.66
243.00
218.00
153.00
138.00
20.00
/cum
/each
/each
/each
/each
/ kg
500.36
267.30
239.80
336.60
151.80
100.00
0.00
1595.86
159.59 /Sqm
Damp proof course in cement mortor CM1:3 - 12mm thick with water proofing
compound at 2 % by wt of cement
38
0.14
1.10
0.50
1.10
1.00
cum
nos
nos
nos
kg
RATE @RS
39
302
0.21
2.00
1.00
1.00
2382.66
243.00
153.00
138.00
36.75
/cum
/each
/each
/each
/ kg
86.59 /Sqm
Precast Hollow Block Masonry with C.m.1:5 mix using hollow in size
of 0,40x0.10mx0.20m
for 2.56 Cum
nos
Hollow Block
15.00 each
cum CM 1:5
1535.56 each
nos
Mason ii class
218.00 each
nos
mazdoor I class
153.00 each
nos
mazdoor ii class
138.00 each
for 2.56 Cum
40
151
0.21
2.00
1.00
333.57
267.30
76.50
151.80
36.75
0.00
865.92
5579.47 /2.56
RATE @RS
2179.48 /cum
Precast Hollow Block Masonry with C.m.1:5 mix using hollow in size
of 0,40x0.20mx0.20m
for 2.56 Cum
nos
Hollow Block
24.00 each
cum CM 1:5
1535.56 each
nos
Mason ii class
218.00 each
nos
mazdoor I class
153.00 each
4530.00
322.47
436.00
153.00
138.00
0.00
5579.47
3624.00
322.47
436.00
153.00
1.00 nos
mazdoor ii class
138.00
each
41
4673.47 /2.56
RATE @RS
1825.57 /cum
Cost of steel
Cost of binding wire
Fitter I class
RATE @RS
41
39612.00 /mt
42000.00 /mt
215.00 /each
39612.00
420.00
7525.00
0.00
47557.00
47557.00 /MT
Cost of steel
Cost of binding wire
Fitter I class
RATE @RS
42
138.00
0.00
4673.47
39612.00 /mt
42000.00 /mt
211.00 /each
39612.00
420.00
7385.00
0.00
47417.00
47417.00 /MT
Supplying and erecting centering shuttering including necessary supports for plane
surface in foundation and basement and in all floors for R C C column footing
column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild
steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country
wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and
supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre
complete complying with standard specifications and as directed by departmental
officers including conveyance of all materials to site and proper centering etc complete.
Sub Data I
Cost of MS sheets & angles for each set
40.00 /kg
40.00 /kg
538.40
160.00
26.68
725.08
Sub Data 2
Cost of MS sheets and angles and CW joists and casurina props - 10 Sqm
19 Nos Cost of MS sheet and angle
Cost of strutting
0.12 cum Country wood scantlings/silver oak
98.5 Rm
Casurina props 10 to 13cm dia
725.08 /each
13776.52
10800.00 /cum
17.50 /Rm
1296.00
1723.75
3019.75
13776.52 /40
3019.75 /5
344.41
603.95
98.5
3.80
5.40
1
10
m
nos
nos
nos
L.S
L.S
344.41
259.20
344.75
237.00
153.00
200.00
1.10
/each
/each
/each
/each
/each
/each
289.62 /Sqm or
2292.21 229.22
289.62
57.92
347.54 /Sqm or
Restd to
344.41
259.20
344.75
900.60
826.20
200.00
11.00
10.00
2896.16
290.00
218.00
348.00
17.50
(-)
1723.75 /5
237.00 /each
153.00 /each
461.75
344.75
71.10
45.90
461.75
2434.41
LS
RATE @RS
iv] Centering below Ground level
50% of the above rate
for road sides
43
9.00
4.50
3.50
21.20
35.30
RATE @RS
9.00
4.50
4308.00
3.50
21.20
35.30
289.62 /2
144.81 /Sqm or
RATE @RS
44
243.44
46.56 Assume
290.00 /Sqm or
RATE @RS
R C C 1:1.5:3 mix
1.00 cum
1.00
R C C 1:1.5:3 mix
centering charges
144.81
145.00
8967.60
20090.34
763.00
3243.60
4871.40
0.00
37935.94
3793.59 /cum
45
290.00
8967.60
1030.50
19006.90
763.00
3243.60
4871.40
0.00
37883.00
3788.30 /cum
for
MAT, RAFT
1 cum
3793.59 cum
218.00 sqm
3793.594
218
0
4011.59
R C C 1:1.5:3 mix
46
1.00 cum
0
R C C 1:1.5:3 mix
centering charges
R C C 1:1.5:3 mix
47
1.00 cum
1.00
1.00 cum
1.00
for
for
3793.59 cum
0 sqm
3793.594
0
0
3793.59
3793.59 cum
218.00 sqm
3793.594
218.00
0
4011.59
G. Beam 1 cum
R C C 1:1.5:3 mix
centering charges
R C C 1:1.5:3 mix
48
for
P. Beam
PLINTH BEAM
1 cum
Column 1 cum
R C C 1:1.5:3 mix
centering charges
(T.BEAM)
3793.59 cum
290.00 sqm
3793.59
290.00
4083.59
R C C 1:1.5:3 mix
49
1.00 cum
11.12
0.40 cum
7.20
12.50
Lintel
1 cum
R C C 1:1.5:3 mix
centering charges
R C C 1:1.5:3 mix
50
for
for
3793.59 cum
290.00 sqm
3793.594
3224.80
0
7018.39
3793.59 cum
348.00 sqm
82.57
1517.44
2505.60
1032.08
0.00
5055.12
S. shade10 Rmt
R C C 1:1.5:3 mix
centering charges
Plastering c:m 1:3, 10 mm thick
R C C 1:1.5:3 mix
51
1.00 cum
8.33
for
R C C 1:1.5:3 mix
centering charges
R C C 1:1.5:3 mix
52
1.00 cum
1.00
for
1.00 cum
1.00
54
9.00
4.50
3.50
21.20
35.30
for
3793.59 cum
290.00 sqm
3793.594
2415.70
0
6209.29
3793.59 cum
218.00 sqm
3793.594
218.00
0
4011.59
3793.59 cum
290.00 sqm
3793.594
290.00
0
4083.59
B. Block 1 cum
R C C 1:1.5:3 mix
centering charges
R C C 1:1.5:3 mix
53
R. Slab 1 cum
D. Slab 1 cum
R C C 1:1.5:3 mix
centering charges
RATE @RS
R C C 1:2:4 mix
55
1.00 cum
0.00
R C C 1:2:4 mix
centering charges
for
8967.60
15325.38
763.00
3243.60
4871.40
0.00
33170.98
3317.10 /cum
MAT, RAFT1 cum
3317.10 cum
218.00 sqm
3317.10
0.00
0.44
3317.54
R C C 1:2:4 mix
56
1.00 cum
0
R C C 1:2:4 mix
centering charges
R C C 1:2:4 mix
57
1.00 cum
8.70
1.00 cum
8.66
1.00 cum
11.12
0.40 cum
7.20
12.50
Column
for
Lintel
R C C 1:2:4 mix
centering charges
R C C 1:2:4 mix
60
for
for
3317.10 cum
0 sqm
3317.10
0
0.44
3317.54
3317.10 cum
218.00 sqm
3317.10
1896.60
0.4
5214.10
G. Beam 1 cum
1 cum
R C C 1:2:4 mix
centering charges
R C C 1:2:4 mix
59
for
R C C 1:2:4 mix
centering charges
R C C 1:2:4 mix
58
forP. Beam
PLINTH BEAM
1 cum
(T.BEAM)
3317.10 cum
290.00 sqm
3317.10
2511.40
0.00
5828.50
3317.10 cum
290.00 sqm
3317.10
3224.80
0.00
6541.90
1 cum
R C C 1:2:4 mix
centering charges
Plastering c:m 1:3, 10 mm thick
3317.10 cum
348.00 sqm
82.57
1326.84
2505.60
1032.08
0.72
4865.24
RATE RS.
R C C 1:2:4 mix
61
0.40 cum
7.20
12.50
for
R C C 1:2:4 mix
centering charges
Plastering c:m 1:3, 10 mm thick
3317.10
290.00
82.57
RATE RS.
R C C 1:2:4 mix
62
1.00 cum
8.33
1.00 cum
5.00
1.00 cum
2.55
65
0.10
1.10
1.10
1.10
1 cum
for
B. Block
R C C 1:2:4 mix
centering charges
for
D. Slab
3317.10 cum
290.00 sqm
3317.10
2415.70
0
5732.80
3317.10 cum
218.00 sqm
3317.10
1090.00
0.6
4407.70
3317.10 cum
290.00 sqm
3317.098
739.50
0
4056.60
1 cum
R C C 1:2:4 mix
centering charges
R C C 1:2:4 mix
64
R. Slab
R C C 1:2:4 mix
centering charges
R C C 1:2:4 mix
63
for
1326.84
2088.00
1032.08
0.00
4446.92
1 cum
238.27
267.30
168.30
151.80
0.00
825.67
66
0.14
1.10
0.50
1.10
RATE @RS
82.57 /Sqm
Plastering with cement mortar 1:3 mix to 12mm thick including
cost and conveyance of all materials to site and all labour charges etc
cum Cement mortar 1:3
2382.66 /cum
nos
Mason I class
243.00 /each
nos
Mazdoor I class
153.00 /each
nos
Mazdoor II class
138.00 /each
333.57
267.30
76.50
151.80
829.17
RATE @RS
67
0.22
2.20
0.50
3.20
RATE @RS
524.19
534.60
76.50
441.60
0.49
1577.38
157.74 /Sqm
68
0.14
1.10
0.50
1.10
cum
nos
nos
nos
RATE @RS
69
82.92 /Sqm
1853.22
243.00
153.00
138.00
/cum
/each
/each
/each
259.45
267.30
76.50
151.80
0.03
755.08
75.51 /Sqm
407.71
534.60
0.50 nos
3.20 nos
Mazdoor I class
Mazdoor II class
RATE @RS
153.00 /each
138.00 /each
76.50
441.60
0.47
1460.88
146.09 /Sqm
70
0.14
1.10
0.50
1.10
cum
nos
nos
nos
RATE @RS
71
0.22
2.20
0.50
3.20
1535.56
243.00
153.00
138.00
/cum
/each
/each
/each
71.06 /Sqm
RATE @RS
214.98
267.30
76.50
151.80
0.00
710.58
337.82
534.60
76.50
441.60
0.00
1390.52
139.05 /Sqm
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm
ISS metal to 25mm thick including cost and conveyance of all materials to site
and all labour charges for mixing, laying, curing etc complete for 10 cum
72
9.00
4.50
1.80
17.70
14.10
cum
cum
nos
nos
nos
RATE @RS
825.90
3405.64
218.00
153.00
138.00
2780.48 /cum
/cum
/cum
/each
/each
/each
7433.10
15325.38
392.40
2708.10
1945.80
0.00
27804.78
25mm Tk
2780.48 x 0.025 =
69.51 /Sqm
69.55
Ellispattern Ist sort -20mm thick including cost and conveyance of all
materials to site and all labour charges etc complete
73
0.24
0.117
0.50
1.10
4.30
nos
mt
nos
nos
nos
6 to 10mm chips
Cost of cement
Mason I class
Mazdoor I class
Mazdoor II class
RATE @RS
627.90
4412.00
243.00
153.00
138.00
/cum
/mt
/each
/each
/each
150.70
516.20
121.50
168.30
593.40
0.00
1550.10
155.01 /Sqm
Flooring with red cement plaster polished surface and thread lined -10 Sqm
74
10.00 Sqm
0.80 kg
1.10 Nos
75
450
0.10
4.00
1.10
4.10
2.70
3.30
139.05 Sqm
110.00 kg
243.00 cum
1390.52
88.00
267.30
0.00
1745.82
174.58 /Sqm
RATE @RS
76
Ls
0.04
4455.00
344.15
92.40
267.30
893.80
413.10
455.40
0.44
6921.59
692.16 /Sqm
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality
including cost and conveyance of all materials to site and all labour charges etc
complete.
167 Nos
0.10 cum
Glazed tiles
cement mortar 1:2 mix
29.70 /each
3441.54 /cum
4959.90
344.15
4.00
1.10
4.10
2.70
3.30
kg
nos
nos
nos
nos
Colour cement
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
RATE @RS
77
3.00
250
0.21
1.10
1.10
2.20
2.20
23.10
243.00
218.00
153.00
138.00
/kg
/each
/each
/each
/each
742.61 /Sqm
RATE @RS
92.40
267.30
893.80
413.10
455.40
0.00
7426.05
69.30
4850.00
722.72
267.30
239.80
336.60
303.60
0.37
6789.69
678.97 /Sqm
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including
cost and conveyance of all materials to site and all labour charges etc complete
78
112
0.21
1.20
1.00
1.00
1.00
0.50
0.50
3.0
Nos
cum
nos
no
no
no
no
Kg
Kg
44.00
2382.66
243.00
218.00
153.00
138.00
187.00
8.00
23.10
LS
/each
/cum
/each
/each
/each
/each
/each
/Kg
/Kg
4928.00
500.36
291.60
218.00
153.00
138.00
93.50
4.00
69.30
6395.76
RATE @RS
639.58 /Sqm
Paving the Floor with scratch proof ceromic tiles of size 400x400x7mm including
cost and conveyance of all materials to site and all labour charges etc complete
79
63
0.21
1.20
1.00
Nos
cum
nos
no
78.00
2382.66
243.00
218.00
/each
/cum
/each
/each
4914.00
500.36
291.60
218.00
1.00
1.00
0.50
0.50
3.0
no
no
no
Kg
Kg
Mazdoor I class
Mazdoor II class
Stone cutter I class
Cotton waste
Colour cement
Sundries
RATE @RS
153.00
138.00
187.00
8.00
23.10
LS
/each
/each
/each
/Kg
/Kg
153.00
138.00
93.50
4.00
69.30
0.00
6381.76
638.18 /Sqm
Supplying & fixing of Granite slab of 20mm thick with nosing, cutting and bedding
laidover in CM 1 : 2 20mm thick - 10 Sqm
80
10
0.21
1.10
2.00
2.20
1.10
Sqm
cum
nos
no
no
no
4.0
1.60
0.50
1.10
Kg
no
no
no
1575.00
3441.54
243.00
218.00
153.00
138.00
23.10
218.00
153.00
138.00
LS
/1 Sqm
/cum
/each
/each
/each
/each
/Kg
/each
/each
/each
15750.00
722.72
267.30
436.00
336.60
151.80
0.00
92.40
348.80
76.50
151.80
0.00
18333.92
1833.39 /Sqm
Pointing with cement mortor 1:3 cuddapah slab & paving stone to full depth - 10 Sqm
81
0.01
1.60
0.50
1.10
cum
nos
nos
nos
RATE @RS
82
10.50
0.12
1.00
10.00
1.10
2.10
2.20
2382.66
218.00
153.00
138.00
/cum
/each
/each
/each
23.83
348.80
76.50
151.80
0.00
600.93
60.09 /Sqm
Sqm
cum
cum
cum
cum
/each
/each
3118.50
285.92
1763.14
600.93
267.30
457.80
336.60
1.10 No
Mazdoor II class
sundries
RATE @RS
0.07
1.60
0.50
2.70
cum
nos
nos
nos
698.20 /Sqm
RATE @RS
1001.00
218.00
153.00
138.00
/cum
/each
/each
/each
70.07
348.80
76.50
372.60
2.89
870.86
8.71 /Sqm
Colour washing two coats using approved colour pigments including cost
and conveyance of all materials to site and all labour charges etc complete
84
1 Sqm
8.71
4.35
13.06
13.06 /Sqm
85
1.34
0.50
0.50
0.80
Ls
Kg
No
No
No
Distember
Painter I Class
Mazdoor I Class
Mazdoor II Class
Sundriries for brushes
RATE @RS
87
151.80
0.00
6981.98
White washing two coats using shell lime including cost and conveyance of
all materials to site and all labour charges etc comoplete for 100 Sqm
83
86
138.00 /each
68.00
196.00
153.00
138.00
/Kg
/each
/each
/each
91.12
98.00
76.50
110.40
3.10
379.12
37.91 /Sqm
Priming coat for new iron with ready mixed primer of approved quality 10Sqm
1.33 kg
Red Oxide(iron)
126.00 kg
167.58
0.70 No
Painter-I class
196.00 /each
137.20
sundries including brushes, soaps.putty etc
0.00
304.78
RATE @RS
30.48 /Sqm
Priming coat on new wood work with ready mixed primer of approved quality-10 Sqm
1.44 kg
0.70 No
195.84
137.20
0.00
333.04
33.30 /Sqm
88
3.23
0.50
0.50
0.80
Ls
Kg
No
No
No
snowcem
Painter I Class
Mazdoor I Class
Mazdoor II Class
Sundriries for brushes
RATE @RS
46.00
196.00
153.00
138.00
LS
/Kg
/each
/each
/each
148.58
98.00
76.50
110.40
2.08
435.56
43.56 /Sqm
EXTERIOR EMULSION PAINT two coats with best approved quality including cost
and conveyance of all materials to site and all labour charges etc complete
89
3.00
0.50
0.50
0.80
Ls
Kg
No
No
No
RATE @RS
90
1.80
0.25
0.25
0.40
126.00
196.00
153.00
138.00
LS
/Kg
/each
/each
/each
378.00
98.00
76.50
110.40
2.20
665.10
19.95
196.00
153.00
138.00
/Kg
/each
/each
/each
35.91
49
38.25
55.20
0.4
178.76
66.51 /Sqm
RATE @RS
91
136.00 kg
196.00 /each
17.88 /Sqm
1.8
1.34
0.75
0.75
1.20
Ls
Ltr
Kg
No
No
No
92
1.8
3.00
0.75
0.75
1.20
Ls
10.00
3.00
0.50
0.50
0.80
Ls
/ Ltr
/Kg
/each
/each
/each
226.80
91.12
147.00
114.75
165.60
0.00
745.27
74.53 /Sqm
93
126.00
68.00
196.00
153.00
138.00
226.80
138.00
147.00
114.75
165.60
0.00
792.15
79.22 /Sqm
178.76
378.00
98.00
76.50
110.40
841.66
RATE @RS
94
10.00
1.34
0.50
0.50
0.80
Ls
84.17 /Sqm
Oilbound Distember two coats over priming coat with white cement.
(Inside walls)
sqm Priming coat with white cement
17.88 /Sqm
kg
Oilbound Distember
68.00 /Kg
No
Painter I Class
196.00 /each
No
Mazdoor I Class
153.00 /each
No
Mazdoor II Class
138.00 /each
Sundriries for brushes
178.76
91.12
98.00
76.50
110.40
3.10
557.88
RATE @RS
Snowcem (Cement Paint) two coats over priming coat with white cement.
95
10.00
3.00
0.50
0.50
0.80
Ls
sqm
kg
No
No
No
RATE @RS
96
/Sqm
/Kg
/each
/each
/each
178.76
138.00
98.00
76.50
110.40
0.60
602.26
60.23 /Sqm
Cost of paint
(iron)
Painter I class
sundries including brushes, soaps.putty etc
RATE @Rs
210.00 /lit
196.00 /each
466.20
215.60
0.30
682.10
68.21 /Sqm
Painting two coats over new wood works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
2.55 Lit
1.20 nos
Cost of paint
Painter I class
sundries including brushes, soaps.putty etc
RATE @Rs
98
17.88
46.00
196.00
153.00
138.00
Painting two coats over new iron works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
2.22 Lit
1.10 nos
97
55.79 /Sqm
220.00 /lit
196.00 /each
79.68 /Sqm
Painting two coats over old iron works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
10.00 sqm Removal of Old Paint Surface from Iron work
2.95 /Sqm
1.89 Lit
Cost of paint
210.00 /lit
1.10 nos
Painter I class
196.00 /each
sundries including brushes, soaps.putty etc
RATE @Rs
561.00
235.20
0.60
796.80
64.43 /Sqm
29.50
396.90
215.60
2.30
644.30
99
Painting two coats over old wood works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
10.00 sqm Removal of Old Paint Surface from Wood work 3.15 /Sqm
2.22 Lit
Cost of paint
220.00 /lit
1.20 nos
Painter I class
196.00 /each
sundries including brushes, soaps.putty etc
RATE @Rs
31.50
488.40
235.20
0.40
755.50
75.55 /Sqm
Painting two coats by Black Oxide Enamel Paint with approved quality for BLACK BOARD
including cost and conveyance of paint and all labour charges etc complete
100
2.55 Lit
1.20 nos
126.00 /lit
196.00 /each
321.30
235.20
2.60
559.10
55.91 /Sqm
Pointing with cement mortar 1:3 to full depth of Pressed tiles using crudeoil 10% by
weight of cement including cost and conveyance of all materials to site
and all labour charges etc complete for 10 Sqm
101
0.04
2.20
0.50
1.10
cum
nos
nos
nos
2382.66
218.00
153.00
138.00
/cum
/each
/each
/each
95.31
479.60
76.50
151.80
803.21
RATE @RS
80.32 /Sqm
Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio
of 32:12.5 including cost and conveyance of all materials to site and all labour
charges for mixing , laying ,and finishing etc complete for 10 cum
102
12.80
5.00
1.80
17.70
14.10
cum
cum
nos
nos
nos
451.60
742.00
243.00
153.00
138.00
/cum
/cum
/each
/each
/each
5780.48
3710.00
437.40
2708.10
1945.80
14581.78
RATE @RS
Weathering course with brick jelly lime concrete using 20mm brick jelly with
pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and
finshed with one course of pressed tiles of size 23x23x2cm with cement
mortar 1:3 mix and pointed with the same oiled mortar including cost and
conveyance of all materials to site and all labour charges etc complete for 10 Sqm
103
0.80
189
0.12
5.80
10.00
1.10
2.10
2.20
1.10
cum
nos
cum
kg
Sqm
nos
nos
nos
nos
RATE @RS
1458.18
10218.00
2382.66
20.00
803.21
243.00
218.00
153.00
138.00
/cum
/1000 nos
/cum
/kg
/10 Sqm
/each
/each
/each
/each
RATE @RS
104
0.80
189
0.12
1.152
10.00
1.10
2.10
2.20
1.10
cum
nos
cum
kg
Sqm
nos
nos
nos
nos
4349.83
0.00
4349.83
434.98 /Sqm
1166.54
1931.20
285.92
116.00
803.21
267.30
457.80
336.60
151.80
0.00
5516.37
551.64 /Sqm
103-A
104-A
1458.18 /cum
1166.54
1931.20
285.92
42.34
803.21
267.30
457.80
336.60
151.80
0.00
5442.71
544.27 /Sqm
4276.16
0.00
4276.16
RATE @RS
Weathering course with brick jelly lime concrete using 20mm brick jelly with
pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and
finshed with Cement mortor 1:4 -20mm thick plastering including cost and
conveyance of all materials to site and all labour charges etc complete for 10 Sqm
105
0.80
5.80
0.22
2.20
0.50
3.20
cum
kg
cum
nos
nos
nos
RATE @RS
1458.18
20.00
1853.22
243.00
153.00
138.00
/cum
/kg
/cum
/each
/each
/each
1166.54
116.00
407.71
534.60
76.50
441.60
0.00
2742.95
274.30 /Sqm
Weathering course with brick jelly lime concrete using 20mm brick jelly with
pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and
finshed with one course of pressed tiles of size 20x20x2cm with cement
mortar 1:3 mix and pointed with the same oiled mortar including cost and
conveyance of all materials to site and all labour charges etc complete for 10 Sqm
106
0.80
250
0.12
5.80
10.00
1.10
2.10
2.20
1.10
cum
nos
cum
kg
Sqm
nos
nos
nos
nos
RATE @RS
106-A
427.62 /Sqm
1458.18
7218.00
2382.66
20.00
803.21
243.00
218.00
153.00
138.00
/cum
/1000 nos
/cum
/kg
/10 Sqm
/each
/each
/each
/each
538.97 /Sqm
1166.54
1804.50
285.92
116.00
803.21
267.30
457.80
336.60
151.80
0.00
5389.67
422.31 /Sqm
4223.13
0
4223.13
107
0.80
250
0.12
1.152
10.00
1.10
2.10
2.20
1.10
cum
nos
cum
kg
Sqm
nos
nos
nos
nos
RATE @RS
1458.18
7218.00
2382.66
36.75
803.21
243.00
218.00
153.00
138.00
/cum
/1000 nos
/cum
/kg
/10 Sqm
/each
/each
/each
/each
1166.54
1804.50
285.92
42.34
803.21
267.30
457.80
336.60
151.80
0.00
5316.00
531.60 /Sqm
107-A
4149.46
0.00
4149.46
RATE @RS
Weathering course with brick jelly lime concrete using 20mm brick jelly with
pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and
finshed with one course of pressed tiles of size 20x20x2cm with cement
mortar 1:3 mix and pointed with the same oiled mortar including cost and
conveyance of all materials to site and all labour charges etc complete for 10 Sqm
108
250
0.12
5.80
10.00
1.10
2.10
2.20
1.10
nos
cum
kg
Sqm
nos
nos
nos
nos
pressed tiles
cement mortar 1:3 mix
crude oil
pointing with cement mortar 1:3
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
RATE @RS
109
414.95 /Sqm
7218.00
2382.66
20.00
803.21
243.00
218.00
153.00
138.00
/1000 nos
/cum
/kg
/10 Sqm
/each
/each
/each
/each
422.31 /Sqm
Weathering course with brick jelly lime concrete using 20mm brick jelly with
1804.50
285.92
116.00
803.21
267.30
457.80
336.60
151.80
0.00
4223.13
pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and
finshed with one course of pressed tiles of size 20x20x2cm with cement
mortar 1:3 mix and pointed with the same oiled mortar including cost and
conveyance of all materials to site and all labour charges etc complete for 10 Sqm
250
0.12
1.152
10.00
1.10
2.10
2.20
1.10
nos
cum
kg
Sqm
nos
nos
nos
nos
pressed tiles
cement mortar 1:3 mix
Water Proof Compound
pointing with cement mortar 1:3
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
RATE @RS
7218.00
2382.66
36.75
803.21
243.00
218.00
153.00
138.00
/1000 nos
/cum
/kg
/10 Sqm
/each
/each
/each
/each
1804.50
285.92
42.34
803.21
267.30
457.80
336.60
151.80
0.00
4149.46
414.95 /Sqm
110
0.40 No
0.50 Nos
0.30 Nos
Mason IIclass
Mazdoor I Class
Mazdoor II class
Sundries
RATE @RS
218.00 /each
153.00 /each
138.00 /each
87.20
76.50
41.40
0.00
205.10
20.51 /Sqm
Roofing with AC corrugated sheet 6mm thick including cost of " J " bolts
and bitumen washer etc.complete. -10 Sqm
111
11.00
2.20
1.10
3.20
20.00
20.00
LS
Sqm
Nos
Nos
Nos
Nos
Nos
152.00
200.00
237.00
153.00
3.15
1.05
LS
294.63 /Sqm
/Sqm
/each
/each
/each
/each
/each
1672.00
440.00
260.70
489.60
63.00
21.00
0.00
2946.30
112
160.00
36.00
0.49
0.09
0.50
0.50
1.10
2.20
Nos
m
kg
cum
No
No
No
No
Mangalore tiles
7091.00 /1000 nos
CW,reepers 50x25mm
24.00 /mtr
Reeper nails 50mm long
38.00 /kg
Lime mortar
687.80 /cum
Carpenter I class
237.00 /each
Mason IIclass
218.00 /each
Mazdoor I Class
153.00 /each
Mazdoor II class
138.00 /each
Sundries including wind-ties,screws,washers etc
RATE @RS
112-A
16.00
160.00
170.00
51.00
51.00
0.50
1.00
1.10
3.30
112-B
1134.56
864.00
18.62
61.90
118.50
109.00
168.30
303.60
11.65
2790.13
279.01 /Sqm
Best tiled roofing with Mangalore tiles, with Ceiling Tiles including Steel Hollow Section
Nos Ridge Tiles
20636.00 /1000 nos
330.18
Nos Mangalore tiles
7091.00 /1000 nos
1134.56
Nos Ceiling tiles
4366.00 /1000 nos
742.22
/kg Steel Hollow Section 50x25mm (36 Rmt/ 51 Kg)55.00 /mtr
2805.00
kg
Labour charges
15.95 /kg
813.45
No
Carpenter I class
237.00 /each
118.50
No
Mason IIclass
218.00 /each
218.00
No
Mazdoor I Class
153.00 /each
168.30
No
Mazdoor II class
138.00 /each
455.40
Sundries including wind-ties,screws,washers etc
7.63
6793.24
RATE @RS
679.32 /Sqm
Best tiled roofing with Mangalore tiles, with Ceiling Tiles including Steel Hollow Section
16.00 Nos Ridge Tiles
20636.00 /1000 nos
330.18
160.00 Nos Mangalore tiles
7091.00 /1000 nos
1134.56
170.00 Nos
51.00 /kg
Ceiling tiles
16000.00 /1000 nos
Steel Hollow Section 50x25mm (36 Rmt/ 51 Kg)55.00 /mtr
2720.00
2805.00
51.00
0.50
1.00
1.10
3.30
kg
No
No
No
No
Labour charges
15.95
Carpenter I class
237.00
Mason IIclass
218.00
Mazdoor I Class
153.00
Mazdoor II class
138.00
Sundries including wind-ties,screws,washers etc
RATE @RS
112-C
16.00
160.00
51.00
51.00
0.50
0.50
1.10
3.30
112-D
16.00
160.00
0.50
0.50
1.10
2.20
112-E
0.50
0.50
1.10
2.20
/kg
/each
/each
/each
/each
813.45
118.50
218.00
168.30
455.40
0.00
8763.39
876.34 /Sqm
Best tiled roofing with Mangalore tiles, without Ceiling Tiles including Steel Hollow Sectio
Nos Ridge Tiles
20636.00 /1000 nos
330.18
Nos Mangalore tiles
7091.00 /1000 nos
1134.56
/kg Steel Hollow Section 50x25mm (36 Rmt/ 51 Kg)55.00 /mtr
2805.00
kg
Labour charges
15.95 /kg
813.45
No
Carpenter I class
237.00 /each
118.50
No
Mason IIclass
218.00 /each
109.00
No
Mazdoor I Class
153.00 /each
168.30
No
Mazdoor II class
138.00 /each
455.40
Sundries including wind-ties,screws,washers etc
7.54
5941.93
RATE @RS
594.19 /Sqm
Best tiled roofing with Mangalore tiles, without Ceiling Tiles, Without Steel / Wood work
Nos Ridge Tiles
20636.00 /1000 nos
330.18
Nos Mangalore tiles
7091.00 /1000 nos
1134.56
No
Carpenter I class
237.00 /each
118.50
No
Mason IIclass
218.00 /each
109.00
No
Mazdoor I Class
153.00 /each
168.30
No
Mazdoor II class
138.00 /each
303.60
Sundries including wind-ties,screws,washers etc
4.14
2168.28
RATE @RS
216.83 /Sqm
Best tiled roofing without Mangalore tiles, without Ceiling Tiles, (ONLY LABOUR) -10Sqm
No
Carpenter I class
237.00 /each
118.50
No
Mason IIclass
218.00 /each
109.00
No
Mazdoor I Class
153.00 /each
168.30
No
Mazdoor II class
138.00 /each
303.60
Sundries including wind-ties,screws,washers etc
3.00
702.40
RATE @RS
70.24 /Sqm
Best tiled roofing with Mangalore tiles,over ceiling tiles of best quality
including CW reepers -10Sqm
113
160.00
250.00
36.00
0.49
0.09
0.50
1.00
1.10
3.30
Nos
Nos
m
kg
cum
No
No
Nos
Nos
Mangalore tiles
7091.00 /1000 nos
Ceiling tiles 20x20x2 cm
4366.00 /1000 nos
CW,reepers 50x25mm
24.00 /mtr
Reeper nails 50mm long
38.00 /kg
Lime mortar
687.80 /cum
Carpenterincluding
I class wind-ties,screws,washers etc237.00 /each
Mason IIclass
218.00 /each
Mazdoor I RATE
Class @RS
153.00 /each
Mazdoor II class
138.00 /each
Sundries
1134.56
1091.50
864.00
18.62
61.90
118.50
218.00
168.30
455.40
8.80
4139.58
413.96 /Sqm
114
1.00
0.60
0.45
0.11
1.00
0.25
1.00
1.00
1.00
0.006
0.40
no
m
m3
m3
no
no
no
no
kg
mt
kg
945.00
220.50
229.00
1458.18
211.00
196.00
243.00
153.00
19.95
19.95
10.50
/1 no
/1m
/cum
/cum
/each
/each
/each
/each
/kg
/mt
/kg
945.00
132.30
103.05
160.40
211.00
49.00
243.00
153.00
19.95
0.12
4.20
0.00
2021.02
2021.02 /each
Supplying and Fixing inposition of best quality make White glazed wash
basin of size 550x 400mm - 1 No.
115
1.00
1.00
0.10
0.50
1.00
No
No
No
No
No
1310.00
211.00
196.00
243.00
138.00
/each
/each
/each
/each
/each
1310.00
211.00
19.60
121.50
138.00
6.00 Set
10.00 g
0.25 No
10.50
Set
15.75 100g
3.15 /each
0.00
63.00
1.58
0.79
0.00
1865.46
1865.46 /each
Supplying and fixing P.V.C rainwater down fall pipe of 100mm dia
with necessary shoes, bends,& clamps etc.,
116
3.00
1.00
1.00
1.00
1.00
L.S
m
No
No
No
No
220.50
63.00
78.50
12.00
211.00
L.S
/Rm
/each
/each
/each
/each
For 3 Rm
342.00 /Rm
117
661.50
63.00
78.50
12.00
211.00
0.00
1026.00
Labour charges for Fabrication and erection of steel truss using Steel 'L' angle
of size 65 x 65 x 6 mm in as per Existing Truss arrangements, the rate including
cost of welding charges base plate for New truss and conveyance of all
materials etc., complete.,
1.00 /Kg
1.00 /Kg
1.00 /Kg
15.95 /Kg
15.95
25.00 /Kg
40.00 /Kg
25.00
40.95
40.00
80.95
BLOCK
PANCHAYAT
YEAR
Sl.No
LALGUDI
PALLAPURAM
2012-2013
COST OF MATERIALS AT WORK SITE
Name of materials
Plain
1
2
3
4
5
8
9
11
12
13
14
15
16
17
19
20
21
22
28
29
30
31
Cement
steel
sand for mortar
sand for filling
Rough stone
Bond stone
40mm iss metal
20mm iss metal
12 mm metal
10 mm metal
10-12mm metal
6 mm metal
6-10mm metal
country bricks ( 23/4")
brick jelly 20 mm
shell lime
Lime stone (Slacked lime)
pressed tiles (20 x 20 x 2)
Country wood planks
--do-- scantlings
US Gravel
Well Gravel
Lead in KM
Hills
3
0
3
0
20
0
20
0
24
0
24
0
24
0
24
0
24
0
24
0
24
0
24
0
24
0
12
0
12
0
5
0
5
0
5
0
5
0
5
0
3
0
3
0
Cost
Conveyance
Hills
12.00
12.00
119.00
119.00
138.40
138.40
138.40
138.40
138.40
138.40
138.40
138.40
138.40
63.30
51.60
22.00
22.00
18.00
22.00
22.00
19.20
19.20
Total
Plain
4400.00
39600.00
110.00
110.00
288.00
395.00
616.00
858.00
792.00
583.00
687.50
396.00
489.50
2900.00
400.00
979.00
720.00
7200.00
27300.00
23800.00
106.00
94.00
MASON I CLASS
MASON II CLASS
PAINTER I CLASS
PAINTER I I CLASS
Stone cutter I class
wodder
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4412.00
39612.00
229.00
229.00
426.40
533.40
754.40
996.40
930.40
721.40
825.90
534.40
627.90
2963.30
451.60
1001.00
742.00
7218.00 0.00
27322.00
23822.00
125.20
113.20
243.00
218.00
196.00
181.00
187.00
158.00
CM 1:1
CM 1:1:5
CM 1:2
CM 1:3
CM 1:4
CM 1:5
CM 1:6
Qty of cement in Kg
1440.00
960.00
720.00
480.00
360.00
288.00
240.00
4412.00
4412.00
4412.00
4412.00
4412.00
4412.00
4412.00
Cost of cement
6353.28
4235.52
3176.64
2117.76
1588.32
1270.66
1058.88
229.00
229.00
229.00
229.00
229.00
229.00
229.00
6582.28
4464.52
3405.64
2346.76
1817.32
1499.66
1287.88
35.90
35.90
35.90
35.90
35.90
35.90
35.90
6618.18
4500.42
3441.54
2382.66
1853.22
1535.56
1323.78
Description
37.55 /CUM
RS.
Hard Stiff
clay &
Hard
Gravelly
Loose
soil
boulders
MR
&
SDR not DMR not
Req.
req.
blasting blasting
MR, DMR/
req. Blasting
HR/ Req.
Blasting
HR/
wedging
Basic Rate
34.75
81.80
51.70
91.00
126.00
34.75
69.50
81.80
163.60
51.70
103.40
91.00
182.00
126.00
252.00
3.55
3.55
3.55
3.55
3.15
3.15
3.15
73.05
167.15
106.95
185.55
255.15
495.15
987.15
US
Sand
Well Gravel Gravel
Well Gravel US Gravel
Filling
Filling
Filling
Spreading Spreading
Earth
229.00
113.20
125.20
113.20
125.20
0
10.85
12.20
12.20
0.00
0.00
12.20
0
0
0
2.78
2.78
0.00
239.85
125.40 137.40
115.98
127.98
12.20
0
0
0
0.00
Lift
Total
246.00
492.00
246.00
492.00
492.00 984.00
Description
Cost of filling Material
Filling Charges
Spreading charges
Total
Stacking charges
Total
3.05
3.05
3.05
3.05
0.00
239.85
128.45
140.45
119.03
131.03
12.20
0.00
Description
40 mm ISS metal
Cement mortor 1:4
Cement mortor 1:5
Mason II class
Mazdoor I grade
Mazdoor II grade
Ls
Total for 10 cum
Rate for 1 cum
Rate
754.40
3405.64
2346.76
218.00
153.00
138.00
0
Rate
754.40
1817.32
1499.66
218.00
153.00
138.00
0
Per
Cum
Cum
Cum
Each
Each
Each
9.00
4.50
0.00
1.80
17.70
14.10
Per
Cum
Cum
Cum
Each
Each
Each
Qty
Amt
Qty
6789.60
15325.38
0.00
392.40
2708.10
1945.80
0.00
27161.28
2716.13
21.80
2737.93
9.00
0.00
4.50
1.80
17.70
14.10
40
Amt
6789.60
0.00
10560.42
392.40
2708.10
1945.80
0.00
22396.32
2239.63
21.80
2261.43
Rate
996.40
3405.64
2346.76
218.00
153.00
138.00
0
Per
Cum
Cum
Cum
Each
Each
Each
29.20
3822.79
29.20
3346.30
B.W. in CM 1:5
Amt
1300.00
3852.29
0.000
0.00
0.708
1087.17
1.00
243.00
3.00
654.00
2.00
306.00
6.00
828.00
6970.46
2674.99
2463.06
Ls
Rate for 1 cum
0.00
2674.99
0.00
2463.06
Rate
426.40
533.40
1535.56
1323.78
243.00
218.00
153.00
138.00
Rough Stone
Bond Stone
Cement mortor 1:5
Cement mortor 1:6
Mason I class
Mason II class
Mazdoor I grade
Mazdoor II grade
Ls
Rate for 10 cum
Per
Cum
Cum
Cum
Cum
Each
Each
Each
Each
Qty
RR in CM 1:5
Amt
Qty
10.00
4264.00
1.000
533.40
3.40
5220.89
0.00
0.00
7.10
1725.30
10.60
2310.80
14.10
2157.30
14.10
1945.80
0.00
18157.49
RR in CM 1:6
Amt
10.00
4264.00
1.000
533.40
0.000
0.00
3.40
4500.85
7.10
1725.30
10.60
2310.80
14.10
2157.30
14.10
1945.80
0.00
17437.45
1815.75
1743.75
Description
Cement mortor 1:3
Mason I class
Mazdoor I grade
Mazdoor II grade
Rate
2382.66
243.00
153.00
138.00
Per
Qty
Amt
Cum
Each
Each
Each
0.10
1.10
1.10
1.10
Ls
Rate for 10 Sqm
Rate for 1 Sqm
PLASTERING IN CEMENT MORTOR 1:4
Description
Cement mortor 1:4
Mason I class
Mazdoor I grade
Mazdoor II grade
Rate
1853.22
243.00
153.00
138.00
238.27
267.30
168.30
151.80
0.00
825.67
82.57
Plastering 12 mm
Qty
Amt
0.14
1.10
0.50
1.10
Thick
333.57
267.30
76.50
151.80
0.00
829.17
82.92
Pl. CM
1:3 20
Plastering 12 mm
Thick
Plastering 20 mm Thick mm TK
Per
Cum
Each
Each
Each
Qty
Amt
0.14
1.10
0.50
1.10
Ls
Rate for 10 Sqm
Rate for 1 Sqm
259.45
267.30
76.50
151.80
0.00
755.05
75.51
Qty
Amt
0.22
2.20
0.50
3.20
#####
407.71
524.19
534.60
534.60
76.50
76.50
441.60
441.60
0.00
0.00
1460.41 #####
146.04 157.69
Description
Cement mortor 1:5
Mason I class
Mazdoor I grade
Mazdoor II grade
Rate
1535.56
243.00
153.00
138.00
Per
Cum
Each
Each
Each
Ls
Rate for 10 Sqm
Rate for 1 Sqm
Plastering 12 mm
Thick
Plastering 20 mm Thick
Qty
Amt
Qty
Amt
0.14
214.98
0.22
337.82
1.10
267.30
2.20
534.60
0.50
76.50
0.50
76.50
1.10
151.80
3.20
441.60
0.00
0.00
710.58
1390.52
71.06
139.05
STEEL FABRICATION
Description
Cost of Steel
Binding wire
Fitter I class
Ls
CENTERING CHARGES
Rate
39612.00
42000.00
211.00
0.00
Per
Cum
Each
Each
Each
Qty
0.10
0.001
3.50
0.00
Amt
3961.20
42.00
738.50
0.00
Amount
145.00
218.00
290.00
290.00
Rate / Per
Sqm
Sqm
Sqm
Sqm
Description
Item of work
CC Road
Retaining wall
Deck Slab
Bed Block
Rate
Per
CC 1:2:4 20 mm
Qty
Amt
2933.93 Cum
0.00
145.00 Per
0.00 LR
1.00
0.00
0.67
0.00
Ls
Rate for 1 Cum
2933.93
0.00
97.15
117.59
0.00
3148.67
Wall Colouring
Description
Priming coat white cement
Snowcem
Painter I class
Mazdoor I grade
Mazdoor II grade
sundries
Rate
17.84
46.00
196.00
153.00
138.00
Per
Sqm
Kg
Each
Each
Each
Qty
Snowcem
Amt
Qty
0.00
0.00
3.23
148.58
0.50
98.00
0.50
76.50
0.80
110.40
2.08
Amt
10.00
3.00
0.50
0.50
0.80
178.36
138.00
98.00
76.50
110.40
0.60
435.56
601.86
43.56
60.19
Wall Colouring
Description
Shell Lime
White Cement
Mason -II class
Painter I class
Mazdoor I grade
Mazdoor II grade
sundries
Rate
1001.00
19.95
218.00
196.00
153.00
138.00
Per
Cum
Kg
Each
Each
Each
Each
White washing
Priming coat
Qty
Amt
Qty
Amt
0.07
70.07
0.00
0.00
0.000
0.00
1.800
35.91
1.60
348.80
0.000
0.00
0.00
0.00
0.25
49.00
0.50
76.50
0.25
38.25
2.70
372.60
0.40
55.20
2.88
0.00
Rate for 10
Sqm
870.85
178.36
8.71
4.35
13.06
Wall Colouring
Description
Oil Bound Distember
Rate
68.00
126.00
196.00
153.00
138.00
Per
Kg
Kg
Each
Each
Each
17.84
Oil Bound
Distember
Exterior Emulsion Paint
Qty
Amt
Qty
Amt
1.34
91.12
0.00
0.00
0.000
0.00
3.000
378.00
0.50
98.00
0.50
98.00
0.50
76.50
0.50
76.50
0.80
110.40
0.80
110.40
3.10
2.20
379.12
665.10
37.91
17.84
0.31
55.44
66.51
17.84
0.22
84.13
(-)
Rate for 1 Sqm
Painting two coats over new iron works using ready mixed enamel paint
(-)
including cost and conveyance of paint and all labour charges etc complete
2.22 Lit
1.10 nos
Cost of paint
(iron)
210.00 /lit
Painter I class
196.00 /each
sundries including brushes, soaps.putty etc
RATE @Rs
466.20
215.60
0.30
682.10
68.21 /Sqm
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm
ISS metal to 25mm thick including cost and conveyance of all materials to site
and all labour charges for mixing, laying, curing etc complete for 10 cum
9.00
4.50
1.80
17.70
14.10
cum
cum
nos
nos
nos
RATE @RS
25mm Tk
2780.48 x 0.025 =
825.90
3405.64
218.00
153.00
138.00
/cum
/cum
/each
/each
/each
7433.10
15325.38
392.40
2708.10
1945.80
0.00
27804.78
2780.48 /cum
Ls
0.04
69.51 /Sqm
69.55
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality
including cost and conveyance of all materials to site and all labour charges etc
complete.
167
0.10
4.00
1.10
4.10
2.70
3.30
Nos
cum
kg
nos
nos
nos
nos
Glazed tiles
cement mortar 1:2 mix
Colour cement
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
RATE @RS
29.70
3441.54
23.10
243.00
218.00
153.00
138.00
/each
/cum
/kg
/each
/each
/each
/each
4959.90
344.15
92.40
267.30
893.80
413.10
455.40
0.00
7426.05
742.61 /Sqm
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including
cost and conveyance of all materials to site and all labour charges etc complete
112
0.21
1.20
1.00
1.00
1.00
0.50
0.50
3.0
Nos
cum
nos
no
no
no
no
Kg
Kg
639.62 /Sqm
/each
/cum
/each
/each
/each
/each
/each
/Kg
/Kg
4928.00
500.36
291.60
218.00
153.00
138.00
93.50
4.00
69.30
0.45
6396.21
Pointing with cement mortar 1:3 to full depth of Pressed tiles using crudeoil 10% by
weight of cement including cost and conveyance of all materials to site
and all labour charges etc complete for 10 Sqm
0.04
2.20
0.50
1.10
cum
nos
nos
nos
RATE @RS
2382.66
218.00
153.00
138.00
/cum
/each
/each
/each
95.31
479.60
76.50
151.80
0.02
803.23
/cum
/cum
/each
/each
/each
5780.48
3710.00
437.40
2708.10
1945.80
0.00
14581.78
80.32 /Sqm
Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio
of 32:12.5 including cost and conveyance of all materials to site and all labour
charges for mixing , laying ,and finishing etc complete for 10 cum
12.80
5.00
1.80
17.70
14.10
cum
cum
nos
nos
nos
451.60
742.00
243.00
153.00
138.00
nos
cum
kg
Sqm
nos
nos
nos
nos
pressed tiles
cement mortar 1:3 mix
Water Proof Compound
pointing with cement mortar 1:3
Mason I class
Mason II class
Mazdoor I class
Mazdoor II class
RATE @RS
7218.00
2382.66
36.75
803.23
243.00
218.00
153.00
138.00
/1000 nos
/cum
/kg
/10 Sqm
/each
/each
/each
/each
414.95 /Sqm
Painting two coats over old iron works using ready mixed enamel paint
including cost and conveyance of paint and all labour charges etc complete
10.00 sqm
Removal of Old Paint Surface from Iron work
2.95 /Sqm
1.89 Lit
Cost of paint
210.00 /lit
1.1 nos
Painter I class
196 /each
sundries including brushes, soaps.putty etc
RATE @Rs
1804.50
285.92
42.34
803.23
267.30
457.80
336.60
151.80
0.00
4149.48
64.43 /Sqm
29.50
396.90
215.60
2.30
644.3
Note:- W.P. co
10
RBMRS 2012 - 13
SCHEME
100000
DETAILED ESTIMATE
Details of work
Sl. No
1
No
Content
1 x
22/7x(5.70)2/4
25.51
1x
22/7x(5.10)2/4
20.42
1x
22/7x(5.10)2/4
1x
18.80
0.60
11.28
1x
18.80
1.10
20.68
Colum
1x
1.00
7.50
30.00
2x
0.25
0.30
or
sqm @Rs
Dismaltling the Existing RCC Cover Slab Including cost of all cover slab.
Tank Cover Slab Bottom
1x
1 22/7x(5.10)2/4
1 x
1 0.45
0.45
Deduct Manhole Cover
or
cum @Rs
Plastering with cement mortar 1:3 mix to 12 mm thick including cost and
conveyance of all materials to site and all labour charges etc, complete .
Tank Inner
2x22/7x2.55
1 x
1
Tank Outer
1 x
2.68
20.42
0.60
247.43
2.55 /sqm
0.15
0.15
631
3.06
0.03
3.03
2083.00 /sqm
6311
3.45
55.27
2x22/7x2.85
3.45
61.77
0.15
1 x
2x22/7x2.85
1 x
22/7x(5.70)2/4
25.51
1x
22/7x(5.10)2/4
20.42
1x
22/7x(5.10)2/4
1x
18.80
0.60
11.28
1x
18.80
1.10
20.68
Colum
1x
1.00
7.50
30.00
2x
0.25
0.30
sqm @Rs
Total
61.77
247.43
D.
3.03
3
B.
55.27
247.43
2
L.
Clean removal of cement Plaster from walls including all labour charges etc,
complete .
Tank Inner
2x22/7x2.55
1 x
1
3.45
Tank Outer
2x22/7x2.85
1 x
1
3.45
Tank slab Side
2x22/7x2.85
1 x
1
0.15
2.68
20.42
0.60
247.43
82.92 /sqm
20516
Supplying and erecting shuttering including necessary support for plance surface in
Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for
floors for RCC column footings columns plinth beam and connecterd with foundations
grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs,
using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles
of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10
cm size x 6.5 cms size spaced at abour 90 cms center to center and supported cauanna
props of 10 cm to 13 cms spaced at 75 cms to center to center etc., complete complying
with standard specification and as directed (SI - 155)
1x
20.41
22/7x(5.10)2
sqm @Rs
20.41
290.00 /sqm
5919
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced
cement Concrete works as per the design given including cost of steel and binding wire in
all floors etc complete complying with Standard (MS rods or RTS rods) which will be
supplied departmentally at section stores and cost will be recovered at issue rate. The
binding wire shall be supplied by the Contractor.
0.30
0.30
sqm @Rs
14225
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced
cement Concrete works as per the design given including cost of steel and binding wire in
all floors etc complete complying with Standard (MS rods or RTS rods) which will be
supplied departmentally at section stores and cost will be recovered at issue rate. The
binding wire shall be supplied by the Contractor.
1x
1 x
1
1
22/7x(5.10)2/4
0.45
0.45
3.03
7
47417.00 /sqm
Cum @Rs
0.15
0.15
3.06
0.03
3.03
3788.30 /sqm
Colour washing two coats with Exterior emlusion paint using approved quality
paints including cost of all materials & labour charges etc, complete.
2x22/7x2.85
1 x
1
3.45
Tank Outer
2x22/7x2.85
1 x
1
0.15
Tank slab Side
Beam at roof Level
1x
1
18.80
0.60
Tie beam at middle
1x
1
18.80
1.10
Colum
1x
4
1.00
7.50
Deduct tow beam joint
2x
4
0.25
0.30
1 x
1 22/7x(5.70)2/4
Tank bottom slab outer
22/7x(5.40)2
1 x
1
Tank Cover slab top
1 x
1 0.45
0.45
Deduct Manhole Cover
11477
61.77
2.68
11.28
20.68
30.00
0.60
25.51
22.89
0.20
174.01
sqm @Rs
174.01
84.13 /sqm
14639
White washing two coats using shell lime including cost and conveyance of all
materials to site and all labour charges etc comoplete
Tank Inner
Tank Bottom slab Bottom
Tank Bottom Floor Slab
Deduct Manhole Cover
1
1
1
-1
x
x
x
x
1
1
1
1
2x22/7x2.55
22/7x(5.10)2/4
22/7x(5.10)2/4
0.45
0.45
55.27
20.42
20.42
0.20
3.45
95.91
sqm @Rs
95.91
9
1 x
27.11
Providing G.I. Specials & Pipe
G.I. Pipe
Gun. Gate Valve
1
2
11
12
13
14
15
10
16
835
Painting two coats with ready mixed paint for new iron work including cost of all
materials to site and all labour charges etc complete.
Inlet G.I. Pipe
Add extra for Ladder
10
8.71 /sqm
7.10
sqm @Rs
12.00 Rm @
0.30 %(Apprx..)
0.16
3.41
23.70
27.11
64.43 /sqm
189.00 /Rm
1200.00 /No
1747
2268
2400
LS
5000
2000
7000
3000
1000
LS
300
LS
732
TOTAL
100000
Details of work
4
4
4
1
1
95.68 sqm
Painting twocoats over old iron works using ready
mixed enamel paint exposed surface of the
2 reservor including cost and conveyance etc
Inlet Pipe
Distribution
Ladder
Crass
9.66 sqm
3
4
5
6
1
2
2
30
1.00
1.00
1.05
12.25
6.12
66.51
0.20
0.20
0.20
0.20
64.43
5.4
2.65
2.65
330
1.95
8.90
5.40
9.80
0.30
CONTEN
AMOUNT
TS
21.6
10.6
11.13
40.41
11.94
95.68
6364
1.78
2.16
3.92
1.8
9.66
622
1000
2500
250
264
11000
4
4
4
1
1
160.29 sqm
Painting twocoats over old iron works using
ready mixed enamel paint exposed surface of
the reservor including cost and conveyance
2 etc complete.
Inlet Pipe
Distribution
Drain pipe
6.52 sqm
3
4
5
6
CONTEN
TS
1.20
1.06
1.06
8.64
17.27
66.51
1
1
2
0.20
0.20
0.20
64.43
7.1
3.3
3.3
2.75
3.9
34.08
13.99
21.12
23.75
67.35
160.29
11.00
7.00
7.30
2.2
1.4
2.92
6.52
AMOUNT
10661
420
1000
2500
250
169
15000
Details of work
6
1
6
6
1
1
243.09 sqm
6.65 sqm
3
4
5
6
1
1
1
1.56
1.35
1.50
1.5
21.98
10.52
66.51
0.30
0.30
0.20
64.43
NION
1000
ASUREMENTS
CONTEN
AMOUNT
TS
7.35
7.35
2.90
2.90
3.50
3.35
68.8
9.92
26.1
26.1
76.93
35.24
243.09
16168
10.50
7.00
7.00
3.15
2.1
1.4
6.65
428
1000
3000
250
154
21000