1. Preparation for go-deviling and reparation overpassing Buzau river of the gas pipe Silistea Sendreni 1.

1. The complexity of the services STAT ! "#!$A% !A& #'( P"#%T %he pipe is #rom the category o# the pipes #or gas transport& installation' commissioning and maintenance during the arranty period a- (reliminary or!s #or the site organization' consisting o#) - (lanning the plat#orm #or the site organization - *epairing the access road to the plat#orm' "y scari#ying ' consolidation' stone layer application ' consolidation - installation o# the site panel Barrac! camp location' earthing and the electrical connection Physical dimension changing pipe road section Bentu 1709 m Dn 500 mm changing pipe road section Beilic 861 m Dn 500 mm changing air pipe crossing Buzau river 602 m Dn 500 hydro- technical or!s in the "ed o# the Buzau river #or air pipe sca##old

undercrossing o# the rail ay in the $mara point

"- %he or!s #or the site arrangement) - +leaning the or! aisle and its pic!eting - *emoval o# the #ertile soil on a ,0 cm thic!ness - per#orming manual diggings o# "oring in order to identi#y the route o# the old pipeline c- ./cavation and preparation o# trenches #or pipelines - 0e pipeline a/is plotting and its terracing ith trac!ed e/cavator

- mechanized digging - sorting the earth coating

hich

ill "ecome the "ed o# the pipeline and the pipeline

- trench #illing #or the pipes and compacting in layers

- restoring topsoil - land leveling - its rendering "y plo ing' dis!ing' #ertilizer applicationd1 installation o# ne devices and accessories-mounting o# potential soc!ets

e- +rossing #acilities to third parties) 12orizontal drilling at +3 crossing - Ballast concrete pipe at channel crossing - protective metal mounting ith spacers - end "ello s at su"travin open ditch municipal road

#- ground ater discharge #rom the position pits #or the drilling installation "y pulling the su"mersi"le pump and drain #ield g- ./ecution o# elding)' is done "y electric elding "utt

"y spin' #or the e/ecution o# sections 4dou"lets5 and "y the elding at position "oth in the ditch 4in pits o# position5 or on the "an! o# the ditch' "y placing the pipe on supports 4dust "ags' sand "ags 5 h- ./ecution o# nondestructive tests) - e/ecution o# the elds control "y radiography - e/ecution o# control ith magnetic po der i - ./ecution o# anti-corrosion insulation as made ith shrin! sleeves type +anusa at elds and adhesive tape applied at armth at the curves 6- ./ecution o# the (ressure tests ) - inside cleaning o# the pipe ith (78 - test air resistance at 6, "ar 1 test o# sealing ith air at 96 "ar:- ./ecution o# cathode protection) #itting potential inta!e' l-(roviding #inal technical documentation' materialized in developing and delivering technical "oo!s to recipient-