1 1 SMPN Weekly Report | 10.26.13
Nov 28 Dec 4, 2013
Prepared by:
Edmar P. Ortillano-RE
Marvin Andro T. Caparros

Reviewed by:
Francis Joseph D. Manalo-OM

Noted By:
Bernabe T. Salazar Jr.-ROM
Engineering
Design &
Development

2 2
Table of Contents
1. General Information
1.1. Photos
1.2. Basic Information
1.3. Tenants information
2. Technical reports and updates
2.1. Utilities Interruption
2.2. Utilities Consumptions
2.2.1. Daily Non-Potable Water Consumption
Monitoring
2.3. Equipment updates
2.3.1. Genset
2.3.2. AHUs
2.3.3. Cooling tower
2.3.4. Chillers
2.3.5. Elevators/Escalators repair
2.3.6. FDAS Maintenance
2.3.7. Major job done with in the week
SMPN Weekly Report | 10.26.13
Engineering
Design &
Development

3 3
Table of Contents
2.4 Lightings
2.4.1 Mall Lightings
2.4.2 Logos
2.4.2.1 SM Logos
2.4.2.2 Tenants Logos
2.5 Rest rooms
2.6 Water leaks
2.6.1 Photo of the roof
2.6.2 Weather
3. Materials Withdrawals Monitoring
3.1. Materials requested within the week
3.2. Materials withdrawn within the week
4. RFW
5. SMR
6. Issues and needs list
SMPN Weekly Report | 10.26.13
Engineering
Design &
Development

4
1. General Information
SMPN Weekly Report | 10.26.13
Engineering
Design &
Development

5
1.1. Photo and Basic Information
SMPN Weekly Report | 10.26.13
Engineering
Design &
Development

6
1.2. Basic Information
! Leasable area- 16,308.54 sq. m.
! Common area- 40,267 sq. m.
! Percentage of leasable from common area- 40.50%
SMPN Weekly Report | 10.26.13
Engineering
Design &
Development

7
1.3. Tenants information
1ota| Vacant Construcnng CIA
86 17

0

40,267 sq. m.

SMPN Weekly Report | 10.26.13
Engineering
Design &
Development

8
2. Technical Report and
Updates
SMPN Weekly Report | 10.26.13
Engineering
Design &
Development

9
2.1. Utilities interruptions
Un||nes

Status (Nov. 21-Nov 27, 2013)
Week 48

Status (Nov. 28-Dec 4, 2013)
Week 49

ower
no lnLerrupuon
no lnLerrupuon

WaLer
no lnLerrupuon

no lnLerrupuon


Cas supply
no lnLerrupuon no lnLerrupuon
LqulpmenL
breakdowns
(november 22, 2013) Alr blower pump 3 [
S1 pulled ouL by vlC1C8 conLracLor for
repalr
(november 22, 2013) Alr blower pump 3 [
S1 pulled ouL by vlC1C8 conLracLor for
repalr
numbers of AA8
0 0
SMPN Weekly Report | 10.26.13
Engineering
Design &
Development

10
2.2. Utilities Consumptions
Un||nes
Status (Nov 21-Nov 27, 2013)
Week 48
Status (Nov 28-Dec 4, 2013)
Week 49
ower 113,730kWP 120,730kWP
WaLer
(oLable and
non oLable)
1189cu.m oLable waLer for
Ceneral use
13cu.m oLable coollng Lower
use
1123cu.m oLable waLer for
Ceneral use
14cu.m oLable coollng Lower
use
Cas neL dellvery of LC
november 21, 2013-1001 kg.
november 26, 2013- 904 kg.
neL dellvery of LC
ulesel 43.81L- november 26, 2013
( Load 1esL)
43.81L- uecember 3, 2013
(no- Load 1esL)

SMPN Weekly Report | 10.26.13
Engineering
Design &
Development

11
Iac|||nes Nov 28 Nov 29 Nov 30 Dec 1

Dec 2

Dec 3 Dec 4
Coollng 1ower
49cu.m 31cu.m 40cu.m 39cu.m 70cu.m 33cu.m 41cu.m
11
(roducuon)
163cu.m 137cu.m 133cu.m 133cu.m 190cu.m 167cu.m 148cu.m
11 Make-up
waLer
(oLable
waLer)
Mall (maln
MeLer)
13cu.m 33cu.m 23cu.m 43cu.m 39cu.m 40cu.m 26cu.m
S1 ulscharge
110cu.m 103cu.m 111cu.m 114cu.m 96cu.m 91cu.m 120cu.m
2.2.1. Daily Non-Potable Water Consumption Monitoring
SMPN Weekly Report | 10.26.13
Engineering
Design &
Development

12
2.3. Equipment Updates
! No major work done within the week
! Genset (update/major works)
SMPN Weekly Report | 10.26.13
Generator
kunn|ng
nours
Spec|hc Grav|ty
Vo|ts
8auery 1 8auery 2
C1 120. 46 1.273 (Creen) 1.273(Creen)

23
C2 73.33 1.300(Creen) 1.300(Creen)

27
Engineering
Design &
Development

13
2.3.2. AHUs (Major works/activities)
SMPN Weekly Report | 10.26.13
AnU No. Date
CLLANING CnLCkING]1IGn1LNING
Greas|ng kemarks
lLer coll 8lower 8earlng ulley v-8elL 8reaker
AnU SGIA
AnU SGI8
nov. 28,
2013
ok ok ok ok ok ok ok n/a

AnU 8SI
AnU 9SI


uec. 3,
2013
ok ok ok ok ok ok ok n/a
AnU 7SI
AnU 3GI
uec. 4,
2013
ok ok ok ok ok ok ok n/a
! Cleaning

Engineering
Design &
Development

SMPN Weekly Report | 10.26.13 14
2.3.3. AHUs (Major works/activities)
! No major activities done within the week.
Engineering
Design &
Development

15
2.3.4. Cooling Tower
! No work done within the week

SMPN Weekly Report | 10.26.13
Engineering
Design &
Development

SMPN Weekly Report | 10.26.13 16
2.3.5. Chiller
! No work done within the week.

Engineering
Design &
Development

17
2.3.6. Elevator/Escalator
1ota|
Non -
Cperanona|
Cn-
Go|ng
kepa|rs
1arget Date
of
comp|enon
Cause kemarks
LlevaLor 3 1 1
Walung for
dellvery of
Pyundal
Lack of
Lhreshold
sprlng/Pl
board
n/a
LscalaLor 0 0 0 0 0 n/a
uumbwalLer 0 0 0 0 0 n/a
Wu Ll 0 0 0 0 0 n/a
Car Ll 0 0 0 0 0 n/a
Movlng Walk 2 0 0 0 0 n/a
SMPN Weekly Report | 10.26.13
Engineering
Design &
Development

SMPN Weekly Report | 10.26.13
18

2.3.7. Escalator

! Preventive maintenance of mall moving walk by HYUNDAI
(Dec. 3, 2013)






Engineering
Design &
Development

SMPN Weekly Report | 10.26.13 19
2.3.8. Elevator
! Preventive maintenance of mall elevator by HYUNDAI
( Dec 3, 2013)

Engineering
Design &
Development

SMPN Weekly Report | 10.26.13 20
2.3.9. Fire Alarm Detection System
! No work done within the week.
Engineering
Design &
Development

SMPN Weekly Report | 10.26.13 21
2.3. Major job done with in the week
! No major work done within the week.
Engineering
Design &
Development

SMPN Weekly Report | 10.26.13 22
2.4. Lightings
! Draining of mall emergency light battery ( November 30, 2013)
Engineering
Design &
Development

23
2.4.2. Logos
1ota| Number of Logos 1ota| number repa|red]
rep|aced ||ghts

1 0
Deta||s Locanon 1ype
# busted |amp
rep|aced
kemarks
SM Logo LnLrance Lwo LLu-Super ux 0
2.4.2. SM Logo
SMPN Weekly Report | 10.26.13
Engineering
Design &
Development

24
2.4.2.2 Tenants Logos
1ota| Number of Logos
1ota| number repa|red]
rep|aced ||ghts

71 (LenanLs logo) 0
Deta||s Locanon 1ype
# busted |amp
rep|aced
kemarks
1oLal 1enanL's
Logo
uCl & LCl LLu 0 All 1enanL
Logo are
Cperauonal
SMPN Weekly Report | 10.26.13
Engineering
Design &
Development

25
2.5. Restrooms
1ota| # of
I|xture
1ota| Number
repa|red for the
week
1ota| number
of hxture that
|s not
repa|red yet
kemarks
WaLer CloseL 23 0 0
urlnal

22 0 0
Slnk

18 0 0
lloor uraln 42 0 0
lauceL 18 0 0
Wash 1ub 3 0 0
! 1ota| number of hxture repa|red dur|ng the week
SMPN Weekly Report | 10.26.13
Engineering
Design &
Development

26
2.6. Water leaks
Locanon 1ota| number
of water |eaks
as of Ian 13.
1ota| number
recnhed
1ota| number
schedu|e to be
recnhed
(0n go|ng)
kemarks
1enanL 2 0 2 Cn golng
appllcauon of
sealanL
AmllaLes 7 0 7
uepL. SLore n/a n/a n/a n/a
Common area 3 0 3
Cn golng
appllcauon of
sealanL

nC1L: l am asklng for a brlef summary of Lhe work done buL please prepare Lhe deLalls ln case you wlll be asked
SMPN Weekly Report | 10.26.13
Engineering
Design &
Development

27

2.6.1 Roof Photo

NOTE:
Roof Photo/Plan indicating locations of the leaks

SMPN Weekly Report | 10.26.13


1
Leaks indicated in the photo
under warranty by Esicor

1. Water seepage from concrete


1
1
1
Engineering
Design &
Development

2.6.2 Weather
25 SMPN Weekly Report | 10.26.13
! Note: 1he daLa above was based on AccuWeaLher.com

Nov. 28
Actua|
1emp
31 Lo
2S
n|st.
Avg.
31 Lo
22
Nov. 29
Actua|
1emp
30 Lo
24
n|st.
Avg.
31 Lo
22
Nov.30
Actua|
1emp
30 Lo
2S
n|st.
Avg.
31 Lo
22
Dec.1
Actua|
1emp
28 Lo
2S
n|st.
Avg.
30 Lo
21
Dec.2
Actua|
1emp
31 Lo
24
n|st.
Avg.
30 Lo
21
Dec. 3
Actua|
1emp
31 Lo
24
n|st.
Avg.
30 Lo
21
Dec. 4
Actua|
1emp
31 Lo
2S
n|st.
Avg.
30 Lo
21




Engineering
Design &
Development

SMPN Weekly Report | 10.26.13 29
3.1 Material Requested within the week.
MSkS #
Mater|a|
requested
1 Amount urpose kemarks
Engineering
Design &
Development

SMPN Weekly Report | 10.26.13 30
3.1 Material Withdrawn within the week.
MSkS #
Mater|a|
requested
1 Amount urpose kemarks
Engineering
Design &
Development

31
4. RFW (under TFPI)
1ota| #
acnve
kIW
Ior
SMk
Ior C
Ior
uotanon
Comp|eted Cn-Go|ng Cn-no|d Cance||ed kemarks
revlous
n/a n/a n/a n/a n/a n/a n/a n/a n/a
CurrenL
n/a n/a n/a n/a n/a n/a n/a n/a n/a
SMPN Weekly Report | 10.26.13
nC1L: SM CLn1L8 LAS lRAS ls noL accounL by 1ll, Lhus Lhe Mall don'L have any 8lW yeL
Engineering
Design &
Development

32
5. SMR and RAMON
1ota| Comp|eted Cance||ed Cutstand|ng kemarks] Status
revlous
Week

31

16

1

14


CurrenL
week

33

20


2


11

SMPN Weekly Report | 10.26.13
Engineering
Design &
Development

33
6. Issues and Needs List (not SMR)
Descr|pnon Status 1arget Date
need copy of Cerucauon
of SafeLy for mechanlcal,
LlecLrlcal and sanlLary and
plumblng as a
requlremenLs for renewal
of Annual lnspecuon
permlL
Already requesLed Lo
!8 (deslgner)

Mechanlcal cerucaLe of
safeLy already provlded
by CAMuS, for plck up on
May 14, 2013
Aprll 16, 2013
SMPN Weekly Report | 10.26.13
Engineering
Design &
Development

34 SMPN Weekly Report | 10.26.13