ABSTRACT ESTIMATE
Name of Work: Improvements to the road from Murukkodai to Uruttimedu (Via) Rayarkottai road Km: 0/0-1/0
Estimate Amount: Rs.10.05 Lakhs Sl. No QTY DESCRIPTION OF WORK
Clearing scrub jungle by uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidental charges etc. complete.Sl.No. 17(3) Earth work excavating and depositing on bank with an initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250mm loose thick each, sectioning, watering and compacting etc.., complete as per MORT & H 301305 Supply & Laying of U S Gravel including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc.., complete 173.88 K.M 0/0 - 1/0 (Side berms) Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44.00kgs of bitumen including cost and conveyance of all materials from approved quarry including the cost of bitumen which will be supplied departmentally and cost will be recovered at the rates specified in the special condition appended herewith and including conveyance bitumen to workspot handling charges for the same at both ends including labour charges for heating the bitumen to required temperature and mixing the required quantity of metal and bitumen using mini hot mix plant conveying the mix by wheel borrow including labour charges for spreading the mix to grades,lines and profile and consolidation with power roller rolling etc.,including hire,fuelcharges and running charges for mini hot mix plant,power roller and all other tools and plants employed &all incidental charges such as barricading, providing danger lights etc.,complete complying with standard specification(Payment shall be made for the finished item of work after compaction) 8.24 K.M 0/0 - 1/0 3350.38 CUM 151.33 CUM
RATE
UNIT AMOUNT
1738.80
1.90
Sqm
3304
695.52
38.80
CUM
26986
26313
27594
3622.50
Applying tack coat using 3.00kgs of 10sqm over the BT surfaces including cost of bituminous emulsion which will be supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tack coat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification no 503 MOST. Providing and laying premix carpet with seal coat type A, 20mmconsolidated thickness using IRC size machine broken HBG metal 0.18cum of 13.2mm and 0.09cum of machine crushed broken HBG metal of 11.20mm with 14.60kg of bitumen for premixing for 10sqm of premix carpet and 0.09cum 0.09cum of 6.70mm IRC size machine broken HBG metal with 9.80kgs of bitumen for sealcoat including cost and conveyance of all materials from approved quarry including the cost of bitumen which will be supplied departmentally and cost will be recovered at the rates specified in the special condition appended herewith and including conveyance bitumen to workspot handling charges for the same at both ends including labour charges for heating the bitumen to required temperature and mixing the required quantity of metal and bitumen using mini hot mix plant conveying the mix by wheel borrow including labour charges for spreading the mix to grades,lines and profile and consolidation with power roller rolling etc.,including hire,fuelcharges and running charges for mini hot mix plant,power roller and all other tools and plants employed &all incidental charges such as barricading, providing danger lights etc.,complete complying with standard specification(Payment shall be made for the finished item of work after compaction)No.509&513 of MOST.
18.51
Sqm
67045
K.M 0/0 - 1/0 Supply and fixing of size 0.90x0.15x0.15 HM stone Supply and fixing of size 1.65x0.45x0.15 KM stone Provision for Name Board Provision for Photographic charges Provision for Labour welfare fund 0.30% Provision for difference cost of materials Contigencies & SOR increase charges
TOTAL
DETAILED ESTIMATE Name of Work: Improvements to the road from Murukkodai to Uruttimedu (Via) Rayarkottai road Km: 0/0-1/0 Name of Block : Mayiladumparai Name of Panchayat :Murukkodai Estimate Amount:Rs:10.05 Lakhs. Sl. No. Description of work Scheme Year A.S.Ref : : 13th Finance Grany : 2013-14
Nos.
Quantity
Clearing scrub jungle by uprooting including all cutting charges and depositing of the 1 products and clearing as directed by the departmental officers including all incidental charges etc. complete.Sl.No. 17(3)
K.M 0/0 - 1/0 D/F Causeway @450m D/F Causeway @600m 1 -1 -1 X X X 2 2 2 1000.00 1.50 32.50 1.50 1.50 1.50
Earth work excavating and depositing on bank with an initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth 2 and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250mm loose thick each, sectioning, watering and compacting etc.., complete as per MORT & H 301-305
K.M 0/0 - 1/0 D/F Causeway @450m D/F Causeway @600m 1 -1 -1 X X X 2 2 2 1000.00 1.50 32.50 0.60 0.60 0.60 0.60 0.60 0.60 720.00 -1.08 -23.40 695.52
Supply & Laying of U S Gravel including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power 3 roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc.., complete
K.M 0/0 - 1/0 (Side berms) D/F Causeway @450m D/F Causeway @600m 1 -1 -1 X X X 2 2 2 1000.00 1.50 32.50 0.90 0.90 0.90 0.10 0.10 0.10 180.00 -0.27 -5.85 173.88
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44.00kgs of bitumen including cost and conveyance of all materials from approved quarry including the cost of bitumen which will be supplied departmentally and cost will be recovered at the rates specified in the special condition appended herewith and including conveyance bitumen to workspot handling charges for the same at both ends including labour charges for heating the bitumen to required temperature and mixing the required quantity 4 of metal and bitumen using mini hot mix plant conveying the mix by wheel borrow including labour charges for spreading the mix to grades,lines and profile and consolidation with power roller rolling etc.,including hire,fuelcharges and running charges for mini hot mix plant,power roller and all other tools and plants employed &all incidental charges such as barricading, providing danger lights etc.,complete complying with standard specification(Payment shall be made for the finished item of work after compaction)
K.M 0/0 - 1/0 Patches Patches Patches Patches Patches Patches Patches Patches Patches Patches Patches 1 1 1 1 1 1 1 1 1 1 1 1 X X X X X X X X X X X X 2 7 10 4 2 5 8 5 6 3 7 4 6.00 2.00 1.00 2.00 3.75 1.50 0.75 5.00 0.60 1.20 1.50 1.00 1.00 1.50 1.00 1.00 5.00 1.00 0.75 2.00 0.80 0.90 0.60 0.45 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.60 1.05 0.50 0.40 1.88 0.38 0.23 2.50 0.14 0.16 0.32 0.09 8.24
Applying tack coat using 3.00kgs of 10sqm over the BT surfaces including cost of bituminous emulsion which will be supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the 5 surface for laying to actual work spot handling charges for brushing cleaning and to tack coat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification no 503 MOST.
K.M 0/0 - 1/0 D/F Causeway @450m D/F Causeway @600m 1 -1 -1 X X X 1 1 1 1000.00 1.50 32.50 3.75 3.75 3.75 3750.00 -5.63 -121.88 3622.50
Providing and laying premix carpet with seal coat type A, 20mmconsolidated thickness using IRC size machine broken HBG metal 0.18cum of 13.2mm and 0.09cum of machine crushed broken HBG metal of 11.20mm with 14.60kg of bitumen for premixing for 10sqm of premix carpet and 0.09cum 0.09cum of 6.70mm IRC size machine broken HBG metal with 9.80kgs of bitumen for sealcoat including cost and conveyance of all materials from approved quarry including the cost of bitumen which will be supplied departmentally and cost will be recovered at the rates specified in the special condition appended herewith and including conveyance bitumen to workspot handling charges for the same at both 6 ends including labour charges for heating the bitumen to required temperature and mixing the required quantity of metal and bitumen using mini hot mix plant conveying the mix by wheel borrow including labour charges for spreading the mix to grades,lines and profile and consolidation with power roller rolling etc.,including hire,fuelcharges and running charges for mini hot mix plant,power roller and all other tools and plants employed &all incidental charges such as barricading, providing danger lights etc.,complete complying with standard specification(Payment shall be made for the finished item of work after compaction)No.509&513 of MOST. 1 X 1 1000.00 3.75 3750.00 KM: 0/0-1/0
D/F Causeway @450m D/F Causeway @600m -1 -1 X X 1 1 1.50 32.50 3.75 3.75 -5.63 -121.88 3622.50
7 Supply and fixing of size 0.90x0.15x0.15 HM stone 8 Supply and fixing of size 1.65x0.45x0.15 KM stone 9 Provision for Name Board 10 Provision for Photographic charges 11 Difference in cost of materials and Quality control test Charges
4Nos 1Nos LS LS LS LS
BASIC COST OF 63 MM TO 45 MM METAL ( WBM Grade III ) 14.65 190.35 218.45 34.45 24.13 0.025 M3 0.200 M3 0.725 M3 0.025 M 0.025 M s 1.00 Nature of route for conveyance metalled or
3 3
90mm IRC Metal 63mm IRC Metal 53mm IRC Metal 45mm IRC Metal 22.40mm IRC Metal Total
63mm IRC Metal 53mm IRC Metal 45mm IRC Metal 22.40 mm IRC Metal 11.20 mm IRC Metal Total
482.03 KM 0.00
Distance in KM Plains Hills
REACH
Name of quarry
Kind of metal
Cost at Quarry
Stacking Charges
Total
WBM Gr II metal WBM Gr III metal 45mm IRC metal 13.2mm IRC metal 11.2mm IRC metal 6.7mm IRC metal Gravel Sand for filling Packed bitumen Emulsion
42 42 42 42 42 42 1 10 0 0
0 0 0 0 0 0 0 0 0 0
482.03 652.24 689.00 894.00 608.00 451.00 111.00 110.00 51062.00 44628.00
247.00 247.00 247.00 247.00 247.00 247.00 7.05 70.50 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.15 3.15 3.15 3.15 3.15 3.15 3.05 3.05 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
732.18 902.39 939.15 1144.15 858.15 701.15 121.10 183.55 51062.00 44628.00
KM
REACH Name of quarry Kind of metal
0.00
Distance in KM
Rate per cubic metre Cost at Quarry Convey ance (Plain) Convey ance (Hills) Stacking Charges 20% Extra (Labour)
Total
Hills
0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
0.00
0.00
0.00
0.00
--do-0.00
0.00
0.00
0.00
0.00
0.00
--do--
0.00
0.00
0.00
0.00
0.00
--do--
0.00
0.00
0.00
0.00
0.00
--do--
0.00
0.00
0.00
0.00
0.00
Karuthamalai
Gravel
0.00
0.00
0.00
0.00
0.00
0.00
Kunnur
0.00
0.00
0.00
0.00
0.00
At P.U.Store,K.Myladumparai
Packed bitumen
51062.00
0.00
0.00
0.00
0.00
--do--
Emulsion
44628.00
0.00
0.00
0.00
0.00
KM
REACH Name of quarry Kind of metal
0.00
Distance in KM
Rate per cubic metre Cost at Quarry Convey ance (Plain) Convey ance (Hills) Stacking Charges 20% Extra (Labour)
Total
Hills
14
0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
--do--
14
0.00
0.00
0.00
0.00
0.00
--do-0.00
14
0.00
0.00
0.00
0.00
0.00
--do--
14
0.00
0.00
0.00
0.00
0.00
--do--
14
0.00
0.00
0.00
0.00
0.00
--do--
14
0.00
0.00
0.00
0.00
0.00
Karuthamalai
Gravel
14
0.00
0.00
0.00
0.00
0.00
0.00
Kunnur
0.00
0.00
0.00
0.00
0.00
At P.U.Store,K.Myladumparai
Packed bitumen
51062.00
0.00
0.00
0.00
0.00
--do--
Emulsion
44628.00
0.00
0.00
0.00
0.00
KM
REACH Name of quarry Kind of metal
0.00
Distance in KM
Rate per cubic metre Cost at Quarry Convey ance (Plain) Convey ance (Hills) Stacking Charges 20% Extra (Labour)
Total
Hills
0.00
0.00
0.00
0.00
0.00
0.00
--do--
0.00
0.00
0.00
0.00
0.00
0.00
--do-0.00
0.00
0.00
0.00
0.00
0.00
0.00
--do--
0.00
0.00
0.00
0.00
0.00
0.00
--do--
0.00
0.00
0.00
0.00
0.00
0.00
--do--
0.00
0.00
0.00
0.00
0.00
0.00
Karuthamalai
Gravel
0.00
0.00
0.00
0.00
0.00
0.00
Kunnur 0.00
0.00
0.00
0.00
0.00
0.00
0.00
At P.U.Store,K.Myladumparai
Packed bitumen
0.00
0.00
0.00
0.00
0.00
0.00
--do--
Emulsion
0.00
0.00
0.00
0.00
0.00
0.00
KM
REACH Name of quarry Kind of metal
0.00
Distance in KM
Rate per cubic metre Cost at Quarry Convey ance (Plain) Convey ance (Hills) Stacking Charges 20% Extra (Labour)
Total
Hills
0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
--do--
0.00
0.00
0.00
0.00
0.00
--do-0.00
0.00
0.00
0.00
0.00
0.00
--do--
0.00
0.00
0.00
0.00
0.00
--do--
0.00
0.00
0.00
0.00
0.00
--do--
0.00
0.00
0.00
0.00
0.00
Karuthamalai
Gravel
0.00
0.00
0.00
0.00
0.00
0.00
Kunnur
0.00
0.00
0.00
0.00
0.00
At P.U.Store,K.Myladumparai
Packed bitumen
51062.00
0.00
0.00
0.00
0.00
--do--
Emulsion
44628.00
0.00
0.00
0.00
0.00
KM
REACH Name of quarry Kind of metal
0.00
Distance in KM
Rate per cubic metre Cost at Quarry Convey ance (Plain) Convey ance (Hills) Stacking Charges 20% Extra (Labour)
Total
Hills
0.00
0.00
0.00
0.00
0.00
0.00
--do--
0.00
0.00
0.00
0.00
0.00
0.00
--do-0.00
0.00
0.00
0.00
0.00
0.00
0.00
--do--
0.00
0.00
0.00
0.00
0.00
0.00
--do--
0.00
0.00
0.00
0.00
0.00
0.00
--do--
0.00
0.00
0.00
0.00
0.00
0.00
Karuthamalai
Gravel
0.00
0.00
0.00
0.00
0.00
0.00
Kunnur 0.00
0.00
0.00
0.00
0.00
0.00
0.00
At P.U.Store,K.Myladumparai
Packed bitumen
51062.00
0.00
0.00
0.00
0.00
0.00
--do--
Emulsion
44628.00
0.00
0.00
0.00
0.00
0.00
Name of work : Improvements to the road from Mayiladumparai road to Ponnanpadugai. Km: 2/2-5/0
DATA SHEET
Clearingthe Scrub jungle including all labour charges for burryingng and burning etc.,
Rs Add 20% Extra for Labour in hilly areas
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 B
Rs Add 20% Extra for Labour in hilly areas
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Rs Add 20% Extra for Labour in hilly areas
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
For Km
0.00
1.00
939.15 2246.73 164.50
For Km
0.00
0.00 0.00 0.00
0.00
0.00 0.00 0.00
0.00
3350.38
0.00
0.00 Rs
Rs
3350.38
0.00
0.00
1.00
133.88 39.20
-for Km
0.00
0.00 0.00
0.00
0.00 0.00
Add 20% Extra for Labour in hilly areas Hire charges for bitumen sprayer
0.00
12.00 185.08
0.00
0.00 0.00 Rs
Rs
18.51
0.00
0.00
1.00
205.95 77.23 63.1 1245.91
-for Km
0.00
0.00 0.00 0.00 0.00 0.00
0.00
0 0.00 0 0.00
0.18 Cum 0.09 Cum 0.09 Cum 24.40 Kgs 10.00 Sqm 10.00 Sqm 10.00 Sqm 10.00 Sqm 0.00
13.2mm IRC metal 11.2 mm IRC metal 6.7 mm IRC metal Bitumen 80/100 Hire & fuel charges for P.C Hire & fuel charges for SC Labour charges for P.C Labour charges for S.C Plastic waste
1144.15 /cum 858.15 /cum 701.15 /cum 51062.00 /Mt 166.57 /10sqm 25.07 /10sqm 155.25 /10sqm 51.75 /10sqm 30.00
462.50
462.50
0 2054.69
0.00
462.50 Rs
Rs
205.47
46.25
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
KM
Rate
0.00 1.00
Per Amount
0.00 0.00
Rate Amount
0.00 0.00
Rate Amount
2.05 1.77 0.16 121.10 10.85 m3 m3 140.48 10.85 0.00 10.85 0.00 10.85 0.00 10.85 0.00 10.85
1.16 1.00
10.85
10.85
PAGE21 NAME OF WORK: Construction of Estimate Amount : Rs: COST OF MATERIALS AT SITE name of materials lead in KM cost conveyance loading unloading Cement 14 4700.00 59.20 0.00 sand for mortar 10 110.00 70.50 0.00 sand for filling 10 110.00 70.50 0.00 Rough stone 13 302.00 88.65 0.00 Bond stone 13 414.00 88.65 0.00 40mm iss metal 13 675.00 88.65 0.00 20mm iss metal 13 940.00 88.65 0.00 10-12mm metal 13 756.00 88.65 0.00 steel 14 50975.00 59.20 0.00 country bricks ( 23/4") 15 3625.00 85.00 0.00 country bricks ( 21/4") 15 2855.00 85.00 0.00 brick jelly 20 mm 15 500.00 69.50 0.00 shell lime 10 1075.00 48.50 0.00 Lime stone 10 790.00 48.50 0.00 pressed tiles 10 11220.00 79.00 0.00 Country wood scantlings 7 23800.00 33.95 0.00 --do-- scantlings 7 26180.00 33.95 0.00 6-10mm metal 13 538.00 88.65 0.00 25 mm metal 13 665.00 88.65 0.00 12 mm metal 13 608.00 88.65 0.00 6 mm metal 13 451.00 88.65 0.00 Rough stone for revetment 13 262.00 88.65 0.00 Cutstone roughly dressed 13 2970.00 88.65 0.00 Gravel 13 111.00 88.65 0.00
Sl.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
total 4759.20 180.50 180.50 390.65 502.65 763.65 1028.65 844.65 51034.20 3710.00 2940.00 569.50 1123.50 838.50 11299.00 23833.95 26213.95 626.65 753.65 696.65 539.65 350.65 3058.65 199.65
SUB DATA CEMENT MORTAR 1:1.5 0.960 MT Cost of cement 1.00 cum Cost of sand
CEMENT MORTAR 1:2 0.720 MT Cost of cement 1.00 cum Cost of sand
CEMENT MORTAR 1:3 0.480 MT Cost of cement 1.00 cum Cost of sand 1.00 cum Mixing charges
CEMENT MORTAR 1:4 0.360 MT Cost of cement 1.00 cum Cost of sand 1.00 cum Mixing charges
CEMENT MORTAR 1:5 0.288 MT Cost of cement 1.00 cum Cost of sand 1.00 cum Mixing charges
PAGE22 4759.20 /MT 180.50 /cum 37.70 /cum 1370.65 180.50 1551.15 37.70 1588.85
CEMENT MORTAR 1:6 0.240 MT Cost of cement 1.00 cum Cost of sand 1.00 cum Mixing charges
LIME MORTAR 1:2 0.5 cum Lime 1.00 cum Cost of sand 1.00 cum Grinding mortor
DATA Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B Rate / cum 36.40 Add 100% extra for narrow foundation 36.40 72.80 /cum Qty Items Rate Per Cement concrete 1:6:12 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. 9.00 4.50 1.80 17.70 14.10 cum cum nos nos nos Cost of 40mm ISS metal cement mortar 1:6 Mason II class Mazdoor I class Mazdoor II class 763.65 1322.71 261.00 183.00 165.00 /cum /cum /each /each /each 6872.85 5952.20 469.80 3239.10 2326.50 0.55 18861.00
Amount
RATE @ RS
1886.10 /cum
PAGE23
Cement concrete 1:5:10 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. 9.00 4.50 1.80 17.70 14.10 cum cum nos nos nos Cost of 40mm ISS metal cement mortar 1:5 Mason II class Mazdoor I class Mazdoor II class 763.65 1551.15 261.00 183.00 165.00 /cum /cum /each /each /each 6872.85 6980.18 469.80 3239.10 2326.50 19889.00 RATE @ RS 1988.90 /cum
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. 9.00 4.50 1.80 17.70 14.10 cum cum nos nos nos Cost of 40mm ISS metal Cost of cement mortar 1:4 Mason II class Mazdoor I class Mazdoor II class 763.65 1893.81 261.00 183.00 165.00 /cum /cum /each /each /each 6872.85 8522.15 469.80 3239.10 2326.50 0.00 21431.00
RATE @ RS
2143.10 /cum
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. 9.00 4.50 1.80 17.70 14.10 cum cum nos nos nos Cost of 40mm ISS metal Cost of cement mortar 1:3 Mason II class Mazdoor I class Mazdoor II class 763.65 2464.92 261.00 183.00 165.00 /cum /cum /each /each /each 6872.85 11092.14 469.80 3239.10 2326.50 24001.00 RATE @ RS 2400.10 /cum
PAGE24
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum 9.00 4.50 1.80 17.70 14.10 cum cum nos nos nos 20mm ISS metal Cement mortar 1:2 Mason II class Mazdoor I class Mazdoor II class 1028.65 3607.12 261.00 183.00 165.00 /cum /cum /each /each /each 9257.85 16232.04 469.80 3239.10 2326.50 31526.00 RATE @RS 3152.60 /cum
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum 9.00 4.50 1.80 17.70 14.10 cum cum nos nos nos 20mm ISS metal Cement mortar 1:3 Mason II class Mazdoor I class Mazdoor II class 1028.65 2464.92 261.00 183.00 165.00 /cum /cum /each /each /each 9257.85 11092.14 469.80 3239.10 2326.50 0.61 26386.00
RATE @RS
2638.60 /cum
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum 10.00 1.00 3.40 7.10 10.60 14.10 14.10 cum cum cum nos nos nos nos Rough stone Bond stone Cement mortar 1:5 Mason I class Mason II class Mazdoor I class Mazdoor II class 390.65 502.65 1588.85 291.00 261.00 183.00 165.00 /cum /cum /cum /each /each /each /each 3906.50 502.65 5402.09 2066.10 2766.60 2580.30 2326.50 0.26 19551.00
RATE @RS
1955.10 /cum
Random rubble masonry in cement mortar 1:4 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum 10.00 cum Rough stone 390.65 /cum 3906.50
Bond stone Cement mortar 1:4 Mason I class Mason II class Mazdoor I class Mazdoor II class
PAGE25
RATE @RS
2071.60 /cum
Random rubble masonry in clay including cost and conveyance of all materials to site and all labour charges etc complete for 10 cum 10.00 1.00 4.00 3.50 10.60 10.60 10.60 cum cum cum nos nos nos nos Rough stone Bond stone clay Mason I class Mason II class Mazdoor I class Mazdoor II class 390.65 502.65 26.00 291.00 261.00 183.00 165.00 /cum /cum /cum /each /each /each /each 3906.50 502.65 104.00 1018.50 2766.60 1939.80 1749.00 0.95 11988.00
RATE @RS
1198.80 /cum
Dry stone masonry for Retainingwall -10cum including cost and conveyance of all materials and all labour charges etc complete for 10 cum 12.00 3.50 7.10 7.10 3.50 cum nos nos nos nos Rough stone ( incl. selected headers) Mason I class Mason II class Mazdoor I class Mazdoor II class 350.65 291.00 261.00 183.00 165.00 /cum /each /each /each /each 4207.80 1018.50 1853.10 1299.30 577.50 0.80 8957.00
RATE @RS
895.70 /cum
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete -10 cum 4590 2.50 3.50 10.60 7.10 21.20 nos cum nos nos nos nos Country bricks 8 3/4" x 4 Cement mortar 1:5 Mason I class Mason II class Mazdoor I class Mazdoor II class
3/8"
x2
3/4"
RATE @RS
2863.40 /cum
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4" and conveyance of all materials to site and all labour charges etc complete 6010 2.80 3.50 7.10 7.10 14.10 nos cum nos nos nos nos Country bricks 8 3/4" x 4 Cement mortar 1:5 Mason I class Mason II class Mazdoor I class Mazdoor II class
1/4"
x2
1/4"
RATE @RS
2861.60 /cum
PAGE26
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications 1.00 cum 1.00 cum sand for filling Labour charges for filling RATE @RS 180.50 /cum 11.30 /cum 191.80 /cum 180.50 11.30 191.80
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
1.00 cum 1.00 cum 1.00 cum Gravel for filling Stacking charges Labour charges for filling RATE @RS 199.65 /cum 3.05 /cum 12.80 /cum 215.50 /cum 199.65 3.05 12.80 215.50
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
1.00 cum 1.00 cum 1.00 cum Wellgravel Stacking charges Labour charges for filling RATE @RS 113.85 /cum 98.00 /cum 3.05 /cum 12.80 /cum 98.00 3.05 12.80 113.85
Refilling the basement with excavated earth other than sand complying the Standard specification RATE @RS 12.80 /cum
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. Sub Data I Cost of MS sheets & angles for each set Weight of MS sheet B.G 10 Gauge size 90x60cm x 3.175 mm 2 3.175 x 7850/1000 = 24.924 kg/m 2 24.924 Kg/m2 x 0.54 m = 13.46 Kg. Weight of MS angle size 25 x 25 x 3 mm 3.6 x 1.1 Kg/m = 4.00 Kg 13.46 kgs Cost of MS sheet 48.00 /kg 4 kgs Cost of MS angle 48.00 /kg L.S Cutting,bending,welding,etc
PAGE27
Sub Data 2 Cost of MS sheets and angles and CW joists and casurina props - 10 Sqm 19 Nos Cost of strutting 0.12 cum 98.5 Rm Cost of MS sheet and angle silver oak Casurina props 10 to 13cm dia 859.71 /each 11880.00 /cum 19.20 /Rm 16334.49 1425.60 1891.20 3316.80 408.36 663.36
Rate per one operation for MS sheet & angle Rate per one operation for strutting Main data for one use for 10 Sqm MS sheet rate per one operation props rate per one operation Carpenter I class Mazdoor I class Fitter II class wedges periodical cleaning and painting etc
i] Rate for roof slab, lintel, beam iii] Rate for column post 98.5 Nos 0.3 Nos 0.3 Nos Casurina props 10 -13 Carpenter I class Mazdoor I class 3350.40 (-) RATE @RS iv] Centering below Ground level 50% of the above rate RATE @RS 19.20
339.00 /Sqm
283.21 /Sqm
169.50
PAGE28 Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works 1.00 MT 0.01 MT 35.00 nos Cost of steel Cost of binding wire Fitter I class 51034.20 /mt 48000.00 /mt 253.00 /each 51034.20 480.00 8855.00 60369.20 RATE @RS 60369.20 /MT 1445.85
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum cum 20mm ISSmetal 1028.65 /cum cum Cement mortar 1:2 3607.12 /cum nos Mason II class 261.00 /each nos Mazdoor I class 183.00 /each nos Mazdoor II class 165.00 /each
RATE @RS
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum cum 20mm ISSmetal 1028.65 /cum cum sand 180.50 /cum Kg cement 4.75920 /kg nos Mason II class 261.00 /each nos Mazdoor I class 183.00 /each nos Mazdoor II class 165.00 /each
RATE @RS
3606.47 /cum
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum cum 20mm ISSmetal 1028.65 /cum cum Cement mortar 1:1.5 4749.33 /cum nos Mason II class 261.00 /each nos Mazdoor I class 183.00 /each nos Mazdoor II class 165.00 /each
RATE @RS
4124.74 /cum
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum cum 20mm ISSmetal 1028.65 /cum cum sand 180.50 /cum KG Cement 4759.20 /MT nos Mason II class 261.00 /each nos Mazdoor I class 183.00 /each nos Mazdoor II class 165.00 /each
RATE @RS
4119.03 /cum
PAGE29
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm cum Cement mortar 1:3 2502.62 /cum nos Mason I class 291.00 /each nos Mazdoor I class 183.00 /each nos Mazdoor II class 165.00 /each
RATE @RS
95.32 /Sqm
PAGE30 Plastering with cement mortar 1:3 mix to 20 mm thick cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm cum Cement mortar 1:3 nos Mason I class nos Mazdoor I class nos Mazdoor II class including
RATE @RS
181.03 /Sqm
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm cum Cement mortar 1:4 1931.51 /cum nos Mason I class 291.00 /each nos Mazdoor I class 183.00 /each nos Mazdoor II class 165.00 /each
RATE @RS
Plastering with cement mortar 1:5 mix to 20 mm thick cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm cum Cement mortar 1:5 nos Mason I class nos Mazdoor I class nos Mazdoor II class
RATE @RS
160.93 /Sqm
Plastering with cement mortar 1:3 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc 0.14 1.10 0.50 1.10 cum nos nos nos Cement mortar 1:3 Mason I class Mazdoor I class Mazdoor II class 2502.62 291.00 183.00 165.00 /cum /each /each /each 350.37 320.10 91.50 181.50 943.47 RATE @RS 94.35 /Sqm
Plastering with cement mortar 1:4 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc 0.14 1.10 0.50 1.10 cum nos nos nos Cement mortar 1:4 Mason I class Mazdoor I class Mazdoor II class 1931.51 291.00 183.00 165.00 /cum /each /each /each 270.41 320.10 91.50 181.50 863.51 RATE @RS 86.35 /Sqm
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc 0.14 cum Cement mortar 1:5 1588.85 /cum 222.44
PAGE31
RATE @RS
81.55 /Sqm
PAGE32 Damp proof course in cement mortor CM1:3 - 20mm thick with water proofing compound at 5% by wt of cement 0.21 1.10 1.10 2.20 1.10 5.00 cum nos nos nos nos kg cement mortar 1:3 mix Mason I class Mason II class Mazdoor I class Mazdoor II class Crude oil 2502.62 291.00 261.00 183.00 165.00 15.00 /cum /each /each /each /each / kg 525.55 320.10 287.10 402.60 181.50 75.00 1791.85 RATE @RS 179.19 /Sqm
PAGE33 Damp proof course in cement mortor CM1:3 - 12mm thick with water proofing compound at 2 % by wt of cement 0.14 1.10 0.50 1.10 1.00 cum nos nos nos kg cement mortar 1:3 mix Mason I class Mazdoor I class Mazdoor II class water proofing compound 2502.62 291.00 183.00 165.00 30.00 /cum /each /each /each / kg 350.37 320.10 91.50 181.50 30.00 973.47 RATE @RS 97.35 /Sqm
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum 9.00 4.50 1.80 17.70 14.10 cum cum nos nos nos 10-12mm ISS metal Cement mortar 1:2 Mason II class Mazdoor I class Mazdoor II class 844.65 3607.12 261.00 183.00 165.00 /cum /cum /each /each /each 7601.85 16232.04 469.80 3239.10 2326.50 29869.29 RATE @RS 25mm Tk 2986.93 x 0.025 = 2986.93 /cum 74.67 /Sqm
Ellispattern Ist sort -20mm thick including cost and conveyance of all materials to site and all labour charges etc complete 0.24 0.117 0.50 1.10 4.30 nos mt nos nos nos 6 to 10mm chips Cost of cement Mason I class Mazdoor I class Mazdoor II class 626.65 4759.20 291.00 183.00 165.00 /cum /mt /each /each /each 150.40 556.83 145.50 201.30 709.50 1763.53 RATE @RS 176.35 /Sqm
Flooring with red cement plaster polished surface and thread lined -10 Sqm 10.00 Sqm 0.80 kg 1.10 Nos Plastering with CM 1:5 20mmthick Red Oxide Mason I class sundries RATE @RS Flooring with gravel 100mm thick -10Sqm 1.70 cum 1.10 No 0.50 No Gravel Mazdoor I Class Mazdoor II class sundries RATE @RS 199.65 cum 183.00 E 165.00 E 339.41 201.30 82.50 623.21 62.32 /Sqm 160.93 Sqm 20.00 kg 291.00 cum 1609.25 16.00 320.10 1945.35 194.54 /Sqm
Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2
PAGE34 Glazed tiles cement mortar 1:2 mix White cement Mason I class Mason II class Mazdoor I class Mazdoor II class 10.00 3607.12 18.00 291.00 261.00 183.00 165.00 /each /cum /kg /each /each /each /each 4500.00 360.71 72.00 320.10 1070.10 494.10 544.50 7361.51 RATE @RS 736.15 /Sqm
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete. 167 0.10 4.00 1.10 4.10 2.70 3.30 Nos cum kg nos nos nos nos Glazed tiles cement mortar 1:2 mix Colour cement Mason I class Mason II class Mazdoor I class Mazdoor II class 24.00 3607.12 18.00 291.00 261.00 183.00 165.00 /each /cum /kg /each /each /each /each 4008.00 360.71 72.00 320.10 1070.10 494.10 544.50 6869.51 RATE @RS 686.95 /Sqm
Floor finishing with ceromic tiles of size 20cmx20cm including cost and conveyance of all materials to site and all labour charges etc complete 250 0.21 1.10 1.10 2.20 2.20 Nos cum nos nos nos nos Ceromic tiles cement mortar 1:3 mix Mason I class Mason II class Mazdoor I class Mazdoor II class 14.00 2502.62 291.00 261.00 183.00 165.00 /each /cum /each /each /each /each 3500.00 525.55 320.10 287.10 402.60 363.00 5398.35 RATE @RS 539.84 /Sqm
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete 112 0.21 1.20 1.00 1.00 1.00 0.50 0.50 3.0 Nos cum nos no no no no Kg Kg Design colour Ceromic tiles Cement mortar 1:3 mix Mason I class Mason II class Mazdoor I class Mazdoor II class Stone cutter I class Cotton waste Colour cement Sundries RATE @RS 305x305x6mm 35.00 2502.62 291.00 261.00 183.00 165.00 224.00 10.00 18.00 LS /each /cum /each /each /each /each /each /Kg /Kg 3920.00 525.55 349.20 261.00 183.00 165.00 112.00 5.00 54.00 5574.75 557.48 /Sqm
Paving the Floor with scratch proof ceromic tiles of size 400x400x7mm including cost and conveyance of all materials to site and all labour charges etc complete
Design colour Ceromic tiles Cement mortar 1:3 mix Mason I class Mason II class Mazdoor I class Mazdoor II class Stone cutter I class Cotton waste Colour cement Sundries RATE @RS
400x400x7mm
4032.00 525.55 349.20 261.00 183.00 165.00 112.00 5.00 54.00 5686.75
PAGE35
568.68 /Sqm
Supplying & fixing of Granite slab of 20mm thick with nosing, cutting and bedding laidover in CM 1 : 2 20mm thick - 10 Sqm 10 0.21 1.10 2.00 2.20 1.10 4.0 1.60 0.50 1.10 Sqm cum nos no no no Kg no no no Granite slab 20 mm thick Cement mortar 1:2 mix Mason I class Mason II class Mazdoor I class Mazdoor II class Pointing with Colour cement Colour cement Mason II class Mazdoor I class Mazdoor II class Sundries RATE @RS 1800.00 3607.12 291.00 261.00 183.00 165.00 18.00 261.00 183.00 165.00 LS /each /cum /each /each /each /each /Kg /each /each /each 18000.00 757.50 320.10 522.00 402.60 181.50 72.00 417.60 91.50 181.50 20946.30 2094.63 /Sqm
Pointing with cement mortor 1:3 cuddapah slab & paving stone to full depth - 10 Sqm 0.01 1.60 0.50 1.10 cum nos nos nos Cement mortar 1:3 Mason II class Mazdoor I class Mazdoor II class 2502.62 261.00 183.00 165.00 /cum /each /each /each 25.03 417.60 91.50 181.50 715.63 RATE @RS 71.56 /Sqm
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm thick and pointed with cement mortar 1:3 -10 Sqm Sqm Cuddapah slabs (50mm thick) 311.00 Sqm cum cement mortar1:3 2502.62 cum cum Cement Concrete 1:6:12 1886.10 cum Sqm Pointing with CM 1:3 71.56 cum No Mason I class 291.00 cum No Mason IIclass 261.00 /each No Mazdoor I Class 183.00 /each No Mazdoor II class 165.00 /each sundries RATE @RS 761.98 /Sqm
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete for 100 Sqm 0.07 cum 1.60 nos cost of shell lime Mason II class 1123.50 /cum 261.00 /each 78.65 417.60
PAGE36
RATE @RS
10.33 /Sqm
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete 1 Sqm rate for white washing ADD 50% extra for colour pigments RATE @Rs 15.50 /Sqm 10.33 5.17 15.50
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete 1.34 0.50 0.50 0.80 Ls Kg No No No Distember Painter I Class Mazdoor I Class Mazdoor II Class Sundriries for brushes RATE @RS 65.00 196.00 183.00 165.00 LS 40.86 /Sqm /Kg /each /each /each 87.10 98.00 91.50 132.00 408.60
Priming coat for new iron with ready mixed primer of approved quality 10Sqm 1.33 kg Red Oxide 85.00 kg 113.05 0.70 No Painter-I class 196.00 /each 137.20 sundries including brushes, soaps.putty etc 0.75 251.00 RATE @RS 25.10 /Sqm Priming coat on new wood work with ready mixed primer of approved quality-10 Sqm 1.44 kg 0.70 No Ready mixed primer 110.00 kg Painter-I class 196.00 /each sundries including brushes, soaps.putty etc RATE @Rs 29.60 /Sqm 158.40 137.20 0.40 296.00
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete 2.22 Lit 1.10 nos Cost of paint 160.00 /lit Painter I class 196.00 /each sundries including brushes, soaps.putty etc 355.20 215.60 0.20 571.00
RATE @Rs 57.10 /Sqm Primer & Painting 82.20 Painting two coats over new wood works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete 2.55 Lit 1.20 nos Cost of paint 160.00 /lit Painter I class 196.00 /each sundries including brushes, soaps.putty etc RATE @Rs 64.40 /Sqm 408.00 235.20 0.80 644.00
Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
PAGE37 1.89 Lit 1.10 nos Cost of paint 160.00 /lit Painter I class 196.00 /each sundries including brushes, soaps.putty etc RATE @Rs 51.80 /Sqm 302.40 215.60 0.00 518.00
Painting two coats over old wood works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete 2.22 Lit 1.20 nos Cost of paint 160.00 /lit Painter I class 196.00 /each sundries including brushes, soaps.putty etc RATE @Rs 59.10 /Sqm 355.20 235.20 0.60 591.00
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm 0.09 1.60 0.50 1.10 cum nos nos nos Cement mortar 1:3 Mason II class Mazdoor I class Mazdoor II class 2502.62 261.00 183.00 165.00 /cum /each /each /each 225.24 417.60 91.50 181.50 915.84 RATE @RS 91.58 /Sqm
Pointing with cement mortar 1:3 flush pointing for brickwork including cost and conveyance of all materialsand all labour charges etc complete for 10 Sqm 0.06 1.60 0.50 1.10 cum nos nos nos Cement mortar 1:3 Mason II class Mazdoor I class Mazdoor II class 2502.62 261.00 183.00 165.00 /cum /each /each /each 150.16 417.60 91.50 181.50 840.76 RATE @RS 84.08 /Sqm
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm 0.04 2.20 0.50 1.10 cum nos nos nos Cement mortar 1:3 Mason II class Mazdoor I class Mazdoor II class 2502.62 261.00 183.00 165.00 /cum /each /each /each 100.10 574.20 91.50 181.50 947.30 RATE @RS 94.73 /cum
Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for 10 cum 12.80 5.00 1.80 17.70 14.10 cum cum nos nos nos Brick jelly 20mm slacked lime Mason II class Mazdoor I class Mazdoor II class 569.50 838.50 261.00 183.00 165.00 /cum /cum /each /each /each 7289.60 4192.50 469.80 3239.10 2326.50
Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and finshed with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm 0.00 189 0.12 5.80 10.00 1.10 2.10 2.20 1.10 cum nos cum kg Sqm nos nos nos nos Brick jelly lime concrete pressed tiles cement mortar 1:3 mix crude oil pointing with cement mortar 1:3 Mason I class Mason II class Mazdoor I class Mazdoor II class 1751.75 11299.00 2502.62 15.00 94.73 291.00 261.00 183.00 165.00 /cum /1000 nos /cum /kg /Sqm /each /each /each /each 0.00 2135.51 300.31 87.00 947.30 320.10 548.10 402.60 181.50 4922.42 RATE @RS 492.24 /Sqm
Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and finshed with Cement mortor 1:4 -20mm thick plastering including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm 0.80 5.80 0.22 2.20 0.50 3.20 cum kg cum nos nos nos Brick jelly lime concrete crude oil Cement mortar 1:4 Mason I class Mazdoor I class Mazdoor II class 1751.75 15.00 1931.51 291.00 183.00 165.00 /cum /kg /cum /each /each /each 1401.40 87.00 424.93 640.20 91.50 528.00 0.00 3173.03
RATE @RS
317.30 /Sqm
Honey comb brick work with class III country bricks including cost and conveyance of all materials to site and all labour charges etc complete 0.64 0.70 3.20 6.50 2.20 5.40
x1000Nos Country bricks
cement mortar 1:3 mix Mason I class Mason II class Mazdoor I class Mazdoor II class
RATE @RS
804.75 /Sqm
Dry Brick work using country bricks 83/4"x41/4"x23/4" including cost and conveyance of all materials to site and all labour charges etc complete 4.59 3.50 7.20 7.10 14.10
x1000nos
Country bricks Mason I class Mason II class Mazdoor I class Mazdoor II class
PAGE39
Dry Brick work using country bricks 83/4"x41/4"x21/4" including cost and conveyance of all materials to site and all labour charges etc complete 6.01 3.50 7.20 7.10 14.10
x1000nos
Country bricks Mason I class Mason II class Mazdoor I class Mazdoor II class
RATE @RS
2882.06 /cum
Gravel backing for revetments including cost and conveyance and all labour charges etc complete - 10 cum. 11.60 cum 7.10 No 3.50 No Gravel Mazdoor I Class Mazdoor II class sundries RATE @RS 199.65 cum 183.00 /each 165.00 /each 2315.94 1299.30 577.50 0.00 4192.74
419.27 /Sqm
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete 11.00 3.50 10.60 7.10 cum nos nos nos Rough stone Wodders Mazdoor I class Mazdoor II class 350.65 189.00 183.00 165.00 /cum /each /each /each 3857.15 661.50 1939.80 1171.50 7629.95 RATE @RS 763.00 /Sqm
Removing old revetment and repacking with old stones -1 cum 3.50 No 10.60 No 7.10 No Ls Wodders Mazdoor I Class Mazdoor II class Labour Charges for removing & clearing the old stones RATE @RS 189.00 /each 183.00 /each 165.00 /each Ls 377.28 /cum 661.50 1939.80 1171.50 0.00 3772.80
Wearing Coat with CC 1 : 1.5 : 3 mix using 65% of 25mm, 25% of 12mm, and10% of 6mm IRC metal including cost of all materials and labour charges for mixing, laying, compacting and curing etc. complete. - 75mm uniform thickness 0.445 0.17 0.07 0.34 408.00 1.88 1.08 0.08 0.43 cum cum cum cum kg nos nos nos nos 25mm IRC metal 12mm IRC chips 6mm IRC chips Sand Cement Mazdoor I class Mazdoor II class Mazdoor III class Carpenter I class 753.65 696.65 539.65 180.50 4.7592 183.00 165.00 165.00 284.00 /cum /cum /cum /cum /kg /each /each /each /each 335.37 118.43 37.78 61.37 1941.75 344.04 178.20 13.20 122.12
Mason I class Cost of curing Premoulded expansion joints Extra conveyance of water Hire charges for T & P Sundries RATE @RS
PAGE40
30514.00 41800.00 10061.28 4485.24 7486.20 6568.34 59115.06 118.23 749.83 4485.24 7486.20
Overheads @ 12.5% on (a+b+c) Cost of 500 sqm = a+b+c+d Rate per sqm = (a+b+c+d)/500
Page 41 of 121
20mm thick Open-Graded Premix Carpet using Bituminous (penetration Seal Coat grade/modified bitumen) Binder Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 Unit = sqm Taking output = 1100 sqm a) 1.15 1.00 22.00 6.00 b) 2.20 2.20 Labour Mate Bitumen Sprayer Mazdoor (Unskilled) Mazdoor (Semi-Skilled) Machinery Bitumen boiler oil fired, capacity 1000 litre fitted with spray set Three wheel 80-100 kN static roller 160.00 371.00 hour hour 178.00 107.00 155.00 173.00 day day day day 204.70 107.00 3410.00 1038.00 4759.70 352.00 816.20 1168.20 Km : 0 / 0 - 1 / 0 1.078 Bitumen (S-65) @ 9.80 kg per 10 sqm Crushed stone chipping of 6.7 mm size 100 per cent passing 11.2 mm sieve and retained on 2.36 mm sieve applied @ 0.09 cum per 10 sqm Labour Machinery 41800.00 t Km : 1 / 0 - 2 / 0 45060.40 Km : 2 / 0 - 2 / 1 41800.00 45060.40
45060.40 41800.00
9.90
458.95
cum
4543.61
463.50
4588.65
468.05
4633.70
1.00 1.00
4759.70 1168.20
4759.70 1168.20
4759.70 1168.20
Overheads @ 12.5% on (a+b+c) Cost of 1100 sqm = a+b+c+d Rate per sqm = (a+b+c+d)/1100
Page 42 of 121
5.1
508.2
Overheads @ 12.5% on (a+b+c) Cost of 900 sqm = a+b+c+d Rate per sqm = (a+b+c+d)/900
Page 43 of 121
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Unit = sqm Taking output = 2700 sqm (24.3 cum) a) 0.80 18.00 2.00 b) 6.00 3.60 Labour Mate Mazdoor (Unskilled) Mazdoor (Skilled) Machinery Concrete Mixer 0.4/0.28 Cum capacity Three wheel 80-100 kN static roller 188.00 371.00 hour hour 178.00 155.00 173.00 day day day 142.40 2790.00 346.00 3278.40 1128.00 1335.60 2463.60 c) 2.70 Material Bitumen Emulsion @ 10 kg per 10 sqm Crushed stone chipping of 6.7 mm size 100 per cent passing 11.2 mm sieve and retained on 2.36 mm sieve applied @ 0.09 cum per 10 sqm Labour Machinery Km : 0 / 0 - 1 / 0 43700.00 t 117990.00
24.30
458.95
cum
11152.49
1.00 1.00
3278.40 2463.60
Overheads @ 12.5% on (a+b+c) Cost of 2700 sqm = a+b+c+d Rate per sqm = (a+b+c+d)/2700
Page 44 of 121
Rates
Kerosene & Oil
Length of Road
Starting Chainage Ending Chainage
Emulsion
Bitumen
Diesel
51062
Steel=
0.000
Hill Percentage
1.000
50 %
I
S.No
ROADS
Description of work 0.00 1.00 0.00 0.00
1 Clearing the light jungle 2 Earth work excavation SS 20A 3 Earth work excavation SS 20B 4 Collection and spreading of gritty gravel 4 Collection and spreading of Well gravel 5 WBM Grade II 6 WBM Grade III 7 Advance Patch work- 50mm tk 8 Advance Patch work- 25mm tk
1.90 36.40 38.80 151.33 97.34 1365.23 1592.17 3350.38 3555.38 129.13 129.13 0.00 0.00 10.85
9 TACK COAT over WBM 4Kg/10 sqm 10 TACK COAT over WBM 3Kg/10 sqm 11 PREMIX CARPET WITH SEAL COAT
II CD WORKS
Materials Cement & Steel Sand Metal Gravel
Plain
Hills
14 10 13 13
10 11 12 13
Rates
S.No
Description of work
10 R.C.C. 1: 2: 4 11 Fabrication of STEEL 12 Steel Centring 13 Steel Shuttering 14 Plastering CM 1:5 - 20mm Tk 15 Plastering CM 1:4- 20mm Tk 16 Plastering CM 1:4- 12mm Tk 16 Plastering CM 1:5- 12mm Tk Plastering CM 1:3- 10mm Tk 17 Gravel Filling 18 Sand Filling 19 Wearing Coat
20
60369.20 339.00 169.50 160.93 168.46 86.35 81.55 95.32 215.50 191.80 332.70 1331.30
Lead
Metal 63 - 22.4 mm
Gravel
Plain Hills
41.00 0.00
41.00 0.00
0.50 0.00
0.00
0.00 0.00
0.00 0.00
0.00
0.00
10.85
12.19
12.19
12.19
Sand
9.40 0.00
0.00
46.25
124.59
112.13
0.00
Highways Department
2011-12
S.No.
Unit
FUEL RATES
Diesel (Local Rate) Litre Litre Litre
1 2 3 4 5 6 7 8 9 10 11 12
Bitumen sprayer Man Bitumen raker Man Heat master operator Mini Hot Mix plant Operator Gunnuting plant Operator Gunnuting gun Operator Road Mazdoor Grade I Road Mazdoor Grade II Road Mazdoor Grade III Head Mazdoor Mazdoor (Skilled) Mazdoor (Unskilled)
Day Day Day Day Day Day Day Day Day Day
240.00 250.00 193.00 250.00 209.00 228.00 207.00 185.00 114.00 213.00 127.00 114.00
BITUMEN
Bitumen packed Emulsion MT MT
46300.00 47100.00
II
1 2 3 4 5 6 7 8 9 10 11 12 13
Power roller 8 - 10 ton Water sprinkler Mini Hot Mix Plant Bitumen Boiler with fuel Bitumen Sprayer Bitumen Boiler without fuel Central Mixing Plant Vibratory Roller Paver Finisher Tipper Trucks Water Hydraulic Broom Air Compressor 210 cfm
Day Day Day Day 10 Sq.m Day Day Day Day Day Kl hour hour
1112.00 Water tanker 6 kl - 1 trip per hour 1456.00 Mixall 6/10 t capacity Bitumen boiler oil fired1000 litre capacity fitted with spray set 12.00 Three wheel 80-100 kN static roller 176.00 Bitumen Sprayer per day 8432.00 4720.00 2128.00 952.00 60.00 288.00 258.00
III
1 2 3
FUEL RATES
Diesel (Local Rate) Furnace Oil Kerosene Litre Litre Litre
IV
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Rates of works
Scrub jungle Jungle clearance Earth work SS 20 A Earth work SS 20B Earth work SDR not rg blas Medium rock not req blasting Hard rock req blasting Addl one lead over 10m Addl one lift over 2m Refilling excavated earth Refilling excavated sand Spreading gravel (labour only) Stacking metal Stacking gravel Stacking sand Kilometre stone Hectametre stone Sqm Sqm Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum Cum each each
1.90 2.05 38.80 36.40 54.20 95.50 258.30 4.60 3.70 12.80 11.30 4.14 3.15 3.05 3.05 299.00 150.00
23.2 21.1 26.4
RATES OF MATERIALS
2011-12
Coimbatore Circle
Sl.No. Description
Unit
I i ii iii iv v vi vii viii ix x xi xii xiii xiv xv xvi xvii xviii xix
90mm size 75mm size 63mm size 53mm size 46.5mm size 45mm size 37.5mm size 26.5mm size 25mm size 22.4mm size 13.2mm size 11.2mm size 6.7mm size 6mm size 5.6mm size 4.75mm size & below Gravel Wellgravel Sand for filling
one cum one cum one cum one cum one cum one cum one cum one cum one cum one cum one cum one cum one cum one cum one cum one cum
293.00 328.00 423.00 514.00 689.00 689.00 703.00 665.00 665.00 965.00 894.00 608.00 451.00 451.00 451.00 400.00 111.00 98.00 110.00
1 2
Mt Mt
VI
1 2 3 4 5 6 7 8
Other Materials
Cement Sand Sand for filling Rough stone Bond stone 40mm ISS metal 20mm ISS metal Country bricks 2 3/4" Mt one cum one cum one cum one cum one cum one cum 1000 nos
2011-12
RATES FOR CONVEYANCE OF MATERIAL BY ROAD IN PLAINS FOR THE YEAR 2011-12 Broken Stone Sand Gravel 3 (one m ) 4 1.60 Mangalor Chamber e Tiles bricks, (1000Nos Flooring ,) tiles.(1000n os) 6 7 1.80 2.25
Sl.No.
Distance in Kilometre
Bitumen
1 1 2 3 a b c d e 4 5 6 7
8 0.00
Add for every extra 1 km or part thereof 0 - 10 Kms. 10 - 20 Kms. 20 - 40 Kms. 40 - 80 Kms. Above 80 Kms. Loading Charges Unloading Charges 4.85 4.20 3.70 3.10 2.80 27.95 27.95 7.05 6.05 5.35 4.50 4.05 19.15 19.15 18.60 0.00 5.95 5.10 4.50 3.80 3.40 27.50 27.50 15.80 0.00 7.90 6.85 6.05 5.05 4.55 27.50 27.50 20.95 0.00 9.90 8.35 7.55 6.30 5.70 27.50 27.50 26.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
An Adhoc extra for inter state works 12.80 L & UL Charges 0.00
Sl.No.
Distance in Kilometre
1 1 2 3 a b c d e
Bitumen
8 0.00
Add for every extra 1 km or part thereof 0 - 10 Kms. 10 - 20 Kms. 20 - 40 Kms. 40 - 80 Kms. Above 80 Kms. 9.70 8.40 7.40 6.20 5.60 14.10 12.10 10.70 9.00 8.10 11.90 10.20 9.00 7.60 6.80 15.80 13.70 12.10 10.10 9.10 19.80 16.70 15.10 12.60 11.40 0.00 0.00 0.00 0.00 0.00
IX.
Lumpsum Rates
2 Labour charges for Patch work with Bituminous Premix materials for 0.625 cum of Bituminous material.
Brushing and cleaning the surface Spreading the Bitumen for Tack coat Prmixing chips with Bitumen in the Drum mixer and laying of 0.625 m3 of metal with 44 Kg of Bitumen Levelling and tamping the Premix in the patches and pot holes rolling etc., Special tools such as wire brush Regulation of traffic Sundries such as barricading arrangements, L.S L.S
1 Earth work Compaction 2 Gravel soling 3 Soling with 150mm cube stones 4 Soling with hard gravel stones 150mm Thick 5 Sand-Gravel mix soling 6 Sand-Gravel mix 7 Water bound macadam 8 Water bound macadam 9 Water bound macadam 10 Water bound macadam 11 Bituminuous macadam 12 Bituminuous macadam 13 Bult-up spray grout 14 Asphaltic concrete 15 Premix Carpet 16 Seal Coat 17 Single coat Surface dressing 18 Two coats of Surface dressing 19 Mix seal surfacing 20 Semi dense Carpet 21 Blacktop chipping carpet with hard metal 150mm Thick 40mm to 50mm Thick 50mm to 75mm Thick 75mm Thick 100mm Thick 50mm Thick 75mm Thick 75mm Thick 40mm Thick 20mm Thick
425 Cum 425 Cum 600 Cum 650 Cum 450 Cum 950 Cum 740 Sqm 550 Sqm 450 Sqm 350 Sqm 300 Sqm 225 Sqm 225 Sqm 300 Sqm 500 Sqm 1000 Sqm 800 Sqm 550 Sqm 600 Sqm 400 Sqm 1100 Sqm
Name of work :
Starting
Scheme : NABARD RIDF Year : 2008-09
Ending 1.000
Gravel 1.50 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.00 0.00 1.00 1.00 Sand 10.40 or 0.00 0.00 0.00 10.40 or 0.00 0.00 0.00 10.40 or 0.00 0.00 0.00 10.40 or 0.00 0.00 0.00 10.40 or 0.00 0.00 0.00 9.90 or 0.00 10.00 10.00
KM
From To Working milage 0.00 Hills Plain Total 0.00 Hills Plain Total 0.00 Hills Plain Total 0.00 Hills Plain Total 0.00 Hills Plain Total 0.50 Hills Plain Total Metal 63-22.4 13.2-6.7 42.00 42.00 or or 0.00 0.00 0.00 0.00 0.00 0.00 42.00 42.00 or or 0.00 0.00 0.00 0.00 0.00 0.00 42.00 42.00 or or 0.00 0.00 0.00 0.00 0.00 0.00 42.00 42.00 or or 0.00 0.00 0.00 0.00 0.00 0.00 42.00 42.00 or or 0.00 0.00 0.00 0.00 0.00 0.00 41.50 41.50 or or 0.00 0.00 42.00 42.00 42.00 42.00
0.000
Bitumen 1.00 or 0.00 0.00 0.00 1.00 or 0.00 0.00 0.00 1.00 or 0.00 0.00 0.00 1.00 or 0.00 0.00 0.00 1.00 or 0.00 0.00 0.00 0.50 or 0.00 1.00 1.00
KM
0.00 - 0.00
KM
0.00 - 0.00
KM
0.00 - 0.00
KM
0.00 - 0.00
KM
0.00 - 0.00
KM
0.00 - 1.00
HILLS PLAINS
Name of work :
Name of Quarry
I do hereby certified that i.the distance noted herein are correct. ii.the quarry founded are correct iii.the rates shown are correct iv.the materials can be easily carried. v.the discription of variety of materials is correct.
LEAD STATEMENT ( Kms) Cement / Steel Rough stone, & Metal Country Bricks
Sand
Brickjelly
Lime stone
Plain
14
10
13.00
15
15
10
HILLS
10
11
12.00
xxx xxx
Rates of Labour
II
III
1 Carpenter I class 2 Carpenter II class 3 Fitter I class barbending 4 Fitter II class barbending 5 Floor polisher 6 Mason I class for BW 7 Mason II class for BW
c 1
2 3 4 5
8 Mazdoor I class 9 Mazdoor II class 10 Painter I Class 11 Painter II Class 12 Plumber I class 13 Plumber II class 14 Stone Cutter I class 15 Stone Cutter II class 16 Wodder 17 Mazdoor I cl. For roads 18 Mason I class(stone work) 19 Mason II class(stone work)
183.00 165.00 196.00 217.00 d 253.00 235.00 224.00 207.00 189.00 207.00 291.00 261.00
Concrete Vibrators 1 PCC 2 RCC Timber and Roofing materials 1 CW scantling 2 CW scantling 3 CW planks 4 CW reepers-50x25 5 CW reepers-50x12 6 Palmyrah rafter 7 Casu. poles 8 Casu. poles 9 Casu. poles 10 Casu. poles
13-15 10-13 8-10 5-8 < 4m (raft)
22.80 30.65
1 2
26180.00 27500.00 30030.00 d 26.40 19.20 37.90 25.30 19.20 14.80 12.60
1 2
1 2 3 4 5 6 7 8 9 10
II
a
Rates of Material
Bricks and Tile product 1 Country bricks ( 2 3/4" ) 2 Brick Jelly- 40 mm 3 --do-20mm 3625.00 450.00 500.00 7920.00 e 11220.00 7.55 9990.00 6360.00 4.55 2855.00 f
Metal and Iron works 1 Steel rods 2 MS plate 3 MS Angle 4 Binding wire kg kg Mt 48.00 /m2 /kg coller n 200.00 48000.00 48.00 48.00
11 12 13
7 Mosaic (Grey)25x25 8 Mosaic (Grey)20x20 9 Ceiling tiles 20x20x2 10 Country bricks ( 2 1/4" )
1 2 3
5 GI sheet 300x1.6mm/1Sqm 335.00 6 Iron works ( lab) RCC Hume Pipes & 1 900 mm dia 2 900 mm dia 2.5m 1.0m 3000.00 1040.00 16.75
1 2
2.5m 1.0m
1750.00 700.00
170.00
V
1 2 3
1 Roughstone
(masonry)
Rates of works
Clearing the site 1 Lighjungle 2 Scrub jungle 2.05 1.90
4 5 6
5 Km stone1.65 x 0.45 x 0.15m 6 Hm stone 0.75 x0.23 x0.10m 7 Guard stone 0.23x0.23 8 Cut stone roughly dressed
Dismanling
7 8
1 Brick/stone 2 Brick/stone
9 10 11 12 13 14 15 16 17 18 19 20
ISS Metal
8 40mm metal 9 20mm metal 10 12mm metal 11 10mm metal 12 6mm metal 13 Gravel 14 Well gravel 15 Sand for mortor 16 Sand for filling 17 Clay for puddle & masonry 18 Cuddapah slab 19 Cuddapah slab 20 Cuddapah slab 21 Granite slab
50mm 38/40 20/30
675.00 940.00 871.00 641.00 435.00 111.00 98.00 110.00 IV 110.00 26.00 311.00 300.00 277.00 1800.00
3 Brick/stone
4 Lime concrete 5 Cement concrete 6 RCC 7 Chipping concrete 8 Pres.tiles & WC 9 Scrapping old plaster
Electrification
456.80 /pt 340.05 /pt 358.55 /pt 127.80 /pt 200.25 /m 25.10 /m 99.90 /pt 371.15 /no
21
VI
1 2 3 4 5 6
sqm
IRC Metal
1 45 mm metal 2 25 mm metal 689.00 665.00
608.00 451.00
7 8 9
Sl.No.
Distance in Km
Cement 1 M.T
Steel 1.00MT
Country bricks
1 2 3 a b c d e
1.00 0.00
1.00 0.00
1.10 0.00
1.60 0.00
1.35 0.00
Add for every extra 1 km & part there of 0 -10 Kms 10 - 20 Kms 20 - 40 Kms 40 - 80 Kms above 80 Kms 4.40 3.80 3.35 2.80 2.55 4.40 3.80 3.35 2.80 2.55 4.85 4.20 3.70 3.10 2.80 7.05 6.05 5.35 4.50 4.05 5.95 5.10 4.50 3.80 3.40
4 5 6
Loading charges
58.50
Unloading charges 58.50 An adhoc extra for 11.65 inter state works
Transport and Delivery of 80/100 grade Bitumen and Emulsion from IOC, BPC, & HCL to Erode Dt. 20 Block Head Quarters
1 3 Chennai IOC & BPC to 20 Block Head qrs. Coimbatore IOC to 20 Block Head qrs. Rs Rs
2.80 4.15
/ Km / Mt / Km / Mt
2 4
CONVEYANCE TABLE
KM 0-10 KM I Buildings 1 Cement 2 Rough stone 3 Bond stone 4 40mm iss metal 5 20mm iss metal 6 10-12mm metal 7 6-10mm metal 8 sand for mortar 9 sand for filling 10 steel 11 country bricks 12 brick jelly 20 mm 13 shell lime 14 0.00 13 0.00 13 0.00 13 0.00 13 0.00 13 0.00 13 0.00 10 0.00 10 0.00 14 0.00 15 0.00 15 0.00 10 0.00 10 10 10 10 10 10 10 10 10 10 10 10 10 4.40 44.00 7.05 70.50 7.05 70.50 7.05 70.50 7.05 70.50 7.05 70.50 7.05 70.50 7.05 70.50 7.05 70.50 4.40 44.00 5.95 59.50 4.85 48.50 4.85 48.50 4 3 3 3 3 3 3 0 0 4 5 5 0 3.80 6.05 6.05 6.05 6.05 6.05 6.05 6.05 6.05 3.80 5.10 4.20 4.20 15.20 18.15 18.15 18.15 18.15 18.15 18.15 0.00 0.00 15.20 25.50 21.00 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 3.35 5.35 5.35 5.35 5.35 5.35 5.35 5.35 5.35 3.35 4.50 3.70 3.70 I.C KM rate amt KM KM 10-20 rate amt KM KM 20-40 rate
10 10 7 7 10 10 10 10 10 10
4.85 48.50 7.90 79.00 4.85 33.95 4.85 33.95 7.05 70.50 7.05 70.50 7.05 70.50 7.05 70.50 7.05 70.50 7.05 70.50
0 0 0 0 3 3 3 3 3 3
4.20 6.85 4.20 4.20 6.05 6.05 6.05 6.05 6.05 6.05
0.00 0.00 0.00 0.00 18.15 18.15 18.15 18.15 18.15 18.15
0 0 0 0 0 0 0 0 0 0
3.70 4.60 3.70 3.70 5.35 5.35 5.35 5.35 5.35 5.35
19 cutstone rougly dressed 13 0.00 20 25mm IRC metal 21 11.2mm IRC metal 22 6mm IRC metal 23 45mm IRC metal 13 0.00 13 0.00 13 0.00 13 0.00
Sl.No. 1
Distance in Km 2
Cement M.T 3
1 Steel 1.00MT 4
Country bricks 7
1 2 3 a b c d e
1.00 0.00
1.00 0.00
1.10 0.00
1.60 0.00
1.35 0.00
Add for every extra 1 km & part there of 0 -10 Kms 10 - 20 Kms 20 - 40 Kms 40 - 80 Kms above 80 Kms 8.80 7.60 6.70 5.60 5.10 8.80 7.60 6.70 5.60 5.10 9.70 8.40 7.40 6.20 5.60 14.10 12.10 10.70 9.00 8.10 11.90 10.20 9.00 7.60 6.80
Shell lime
Wood
10
10
xxx xxx
Wedging hard rock Medium rock blasting Drilling holes 50mm Drilling holes 40 mm
Lift Gharges Concrete Brk/stone masny Below GL Concrete Brk/stone masny Earth work Ordinary soil Gravelly soil SS 20 A Gravelly soil SS 20 b SDR MR & DMR EW addl. Lead 10mts EW addl. Lift 1mts Refilling ( Sand ) Refilling ( Earth ) Spreading gravel Stacking metal Stacking gravel Stacking sand Laying of RCC pipes 600 to 900mm dia 300 to 600mm dia up to 300 mm dia
20b
Glass tiles 0.15x0.15 --do-- 0.30x0.20 Ceramic tiles 0.20x0.20 --do-- 0.305x0.305 --do-- 0.400x0.400 Hollow block 16"x4"x8" Hollow block 16"x6"x8" Hollow block 16"x8"x8" ### Water proofing compound
Single leaf 'D' 0.90x2.00m Two leaf 'D' 1.10x2.00m Two leaf 'W' 0.90x1.20m Zinc door 0.75x1.80m
1.80 0.00
2.25 0.00
3.00 4.10
KM 20-40 amt KM
KM above 80
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0 0 0 0 0 0 0 0 0 0 0 0
2.80 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 2.80 3.80 3.10 3.10
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0 0 0 0 0 0 0 0 0 0 0 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0 0 0 0 0 0 0 0 0
3.10 5.05 3.10 3.10 4.50 4.50 4.50 4.50 4.50 4.50
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0 0 0 0 0 0 0 0 0
1.80 0.00
2.25 0.00
Gravel
13
13
46
2011-12
2011-12
/ Km / Mt / Km / Mt
2.55 4.05 4.05 4.05 4.05 4.05 4.05 4.05 4.05 2.55 3.40 2.80 2.80
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
59.20 88.65 88.65 88.65 88.65 88.65 88.65 70.50 70.50 59.20 85.00 69.50 48.50
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.80 4.55 2.80 2.80 4.05 4.05 4.05 4.05 4.05 4.05
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
48.50 79.00 33.95 33.95 88.65 88.65 88.65 88.65 88.65 88.65
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2011-12
PAGE82
NAME OF WORK:
Sl.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 7
COST OF MATERIALS AT SITE lead in KM Name of materials Plains Hills Cement 14 10 sand for mortar 10 11 sand for filling 10 11 Rough stone 13 12 Bond stone 13 12 40mm iss metal 13 12 20mm iss metal 13 12 10-12mm metal 13 12 6-10mm metal 13 12 Rough stone for revetment 13 12 Cutstone roughly dressed 13 12 steel 14 10 country bricks ( 23/4") 15 0 country bricks ( 21/4") 15 0 brick jelly 20 mm 15 0 shell lime 15 0 Lime stone 15 0 pressed tiles 10 0 Country wood planks 10 0 --do-- scantlings 10 0 Gravel 13 13 13 13 12 12
Cost 4400.00 110.00 110.00 302.00 414.00 675.00 940.00 756.00 538.00 262.00 2970.00 33500.00 3625.00 2855.00 500.00 0.00 0.00 11220.00 30030.00 26180.00 111.00 665.00 553.00
Conveyanc Conveyanc ( Plains ) ( Hills ) 59.20 70.50 70.50 88.65 88.65 88.65 88.65 88.65 88.65 88.65 88.65 59.20 85.00 85.00 69.50 69.50 69.50 48.50 48.50 48.50 88.65 88.65 88.65 88.00 153.10 153.10 165.20 165.20 165.20 165.20 165.20 165.20 165.20 165.20 88.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 177.30 165.20 165.20
Total 4547.20 333.60 333.60 555.85 667.85 928.85 1193.85 1009.85 791.85 515.85 3223.85 33647.20 3710.00 2940.00 569.50 69.50 69.50 11268.50 30078.50 26228.50 376.95 918.85 806.85 4365.31 333.60 4698.91 704.85 3273.98 333.60 3607.58
25mm iss metal SUB DATA 8 11.2mm metal CEMENT MORTAR 1:1.5 0.960 MT Cost of cement 1.00 cum Cost of sand 6mm metal CEMENT MORTAR 1:2 0.720 MT Cost of cement 1.00 cum Cost of sand 9
CEMENT MORTAR 1:3 0.480 MT Cost of cement 1.00 cum Cost of sand 1.00 cum Mixing charges Add for 20% on labour
4547.20 /MT
1636.99
PAGE83 1.00 cum 1.00 cum Cost of sand Mixing charges Add for 20% on labour 333.60 /cum 0.00 /cum 0.00 /cum 333.60 1970.59 0.00 0.00 1970.59
CEMENT MORTAR 1:5 0.288 MT Cost of cement 1.00 cum Cost of sand 1.00 cum Mixing charges Add for 20% on labour
CEMENT MORTAR 1:6 0.240 MT Cost of cement 1.00 cum Cost of sand 1.00 cum Mixing charges Add for 20% on labour
LIME MORTAR 1:2 0.5 cum Lime 1.00 cum Cost of sand 1.00 cum Grinding mortor Add for 20% on labour
DATA Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B Rate / cum 36.40 Add 100% extra for narrow foundation 36.40 72.80 Add for 20% on labour 36.40 109.20 /cum Cement concrete 1:6:12 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. 9.00 4.50 1.80 17.70 14.10 cum cum nos nos nos Cost of 40mm ISS metal cement mortar 1:6 Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 928.85 1424.93 261.00 183.00 165.00 /cum /cum /each /each /each 8359.65 6412.19 469.80 3239.10 2326.50 3017.70 0.06 23825.00
Cement concrete 1:5:10 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. 9.00 4.50 1.80 17.70 14.10 cum cum nos nos nos Cost of 40mm ISS metal cement mortar 1:5 Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 928.85 1643.19 261.00 183.00 165.00 /cum /cum /each /each /each 8359.65 7394.36 469.80 3239.10 2326.50 3017.70 0.89 24808.00
RATE @ RS
2480.80 /cum
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. 9.00 4.50 1.80 17.70 14.10 cum cum nos nos nos Cost of 40mm ISS metal Cost of cement mortar 1:4 Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 928.85 1970.59 261.00 183.00 165.00 /cum /cum /each /each /each 8359.65 8867.66 469.80 3239.10 2326.50 3017.70 0.59 26281.00
RATE @ RS
2628.10 /cum
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. 9.00 4.50 1.80 17.70 14.10 cum cum nos nos nos Cost of 40mm ISS metal Cost of cement mortar 1:3 Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 928.85 2516.26 261.00 183.00 165.00 /cum /cum /each /each /each 8359.65 11323.17 469.80 3239.10 2326.50 3017.70 0.08 28736.00
RATE @ RS
2873.60 /cum
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum 9.00 4.50 1.80 17.70 cum cum nos nos 20mm ISS metal Cement mortar 1:2 Mason II class Mazdoor I class 1193.85 3607.58 261.00 183.00 /cum /cum /each /each 10744.65 16234.11 469.80 3239.10
PAGE85 14.10 nos Mazdoor II class Add for 20% on labour 165.00 /each 2326.50 3017.70 0.14 36032.00
RATE @RS
3603.20 /cum
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum 9.00 4.50 1.80 17.70 14.10 cum cum nos nos nos 20mm ISS metal Cement mortar 1:3 Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 1193.85 2516.26 261.00 183.00 165.00 /cum /cum /each /each /each 10744.65 11323.17 469.80 3239.10 2326.50 3017.70 0.08 31121.00
RATE @RS
3112.10 /cum
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum 10.00 1.00 3.40 7.10 10.60 14.10 14.10 cum cum cum nos nos nos nos Rough stone Bond stone Cement mortar 1:5 Mason I class Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 555.85 667.85 1643.19 291.00 261.00 183.00 165.00 /cum /cum /cum /each /each /each /each 5558.50 667.85 5586.85 2066.10 2766.60 2580.30 2326.50 4869.75 0.55 26423.00
RATE @RS
2642.30 /cum
Random rubble masonry in cement mortar 1:4mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum 10.00 1.00 3.40 7.10 10.60 14.10 14.10 cum cum cum nos nos nos nos Rough stone Bond stone Cement mortar 1:4 Mason I class Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 555.85 667.85 1970.59 291.00 261.00 183.00 165.00 /cum /cum /cum /each /each /each /each 5558.50 667.85 6700.01 2066.10 2766.60 2580.30 2326.50 4869.75 0.39 27536.00
RATE @RS
2753.60 /cum
PAGE86
Random rubble masonry in clay including cost and conveyance of all materials to site and all labour charges etc complete for 10 cum 10.00 1.00 4.00 3.50 10.60 10.60 10.60 cum cum cum nos nos nos nos Rough stone Bond stone clay Mason I class Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 555.85 667.85 26.00 291.00 261.00 183.00 165.00 /cum /cum /cum /each /each /each /each 5558.50 667.85 104.00 1018.50 2766.60 1939.80 1749.00 1494.78 0.97 15300.00
RATE @RS
1530.00 /cum
Dry stone masonry for Retainingwall -10cum including cost and conveyance of all materials and all labour charges etc complete for 10 cum 12.00 3.50 7.10 7.10 3.50 cum nos nos nos nos Rough stone ( incl. selected headers) Mason I class Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 515.85 291.00 261.00 183.00 165.00 /cum /each /each /each /each 6190.20 1018.50 1853.10 1299.30 577.50 949.68 0.72 11889.00
RATE @RS
1188.90 /cum
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete -10 cum 4590 2.50 3.50 10.60 7.10 21.20 nos cum nos nos nos nos 8 Country bricks Cement mortar 1:5 Mason I class Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour
3/4"
x4
3/8"
x2
3/4"
RATE @RS
3143.60 /cum
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4" and conveyance of all materials to site and all labour charges etc complete 6010 2.80 3.50 7.10 7.10 14.10 nos cum nos nos nos nos Country bricks Cement mortar 1:5 Mason I class Mason II class Mazdoor I class Mazdoor II class 8
3/4"
x4
1/4"
x2
1/4"
PAGE87 Add for 20% on labour 1299.48 0.79 30068.00 RATE @RS 3006.80 /cum
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications 1.00 cum 1.00 cum sand for filling Labour charges for filling Add for 20% on labour RATE @RS 333.60 /cum 11.30 /cum 333.60 11.30 5.65 350.55
350.55 /cum
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
1.00 cum 1.00 cum 1.00 cum Gravel for filling Stacking charges Labour charges for filling Add for 20% on labour RATE @RS 376.95 /cum 3.05 /cum 12.80 /cum 376.95 3.05 12.80 7.93 400.73
400.73 /cum
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
1.00 cum 1.00 cum 1.00 cum Wellgravel Stacking charges Labour charges for filling Add for 20% on labour RATE @RS 121.78 /cum 98.00 /cum 3.05 /cum 12.80 /cum 98.00 3.05 12.80 7.93 121.78
Refilling the basement with excavated earth other than sand complying the Standard specification RATE @RS 12.80 /cum Add for 20% on labour 6.40 19.20 /cum Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
PAGE88 Sub Data I Cost of MS sheets & angles for each set Weight of MS sheet B.G 10 Gauge size 90x60cm x 3.175 mm 3.175 x 7850/1000 = 24.924 kg/m2 24.924 Kg/m2 x 0.54 m2 = 13.46 Kg. Weight of MS angle size 25 x 25 x 3 mm 3.6 x 1.1 Kg/m = 4.00 Kg 13.46 kgs Cost of MS sheet 4 kgs Cost of MS angle L.S Cutting,bending,welding,etc
Sub Data 2 Cost of MS sheets and angles and CW joists and casurina props - 10 Sqm 19 Nos Cost of strutting 0.12 cum 98.5 Rm Cost of MS sheet and angle silver oak Casurina props 10 to 13cm dia 859.71 /each 10340.00 /cum 19.20 /Rm 16334.49 1240.80 1891.20 3132.00 408.36 626.40
Rate per one operation for MS sheet & angle Rate per one operation for strutting Main data for one use for 10 Sqm MS sheet rate per one operation props rate per one operation Carpenter I class Mazdoor I class Fitter II class Add for 20% on labour wedges periodical cleaning and painting etc
i] Rate for roof slab, lintel, beam ii] Rate for sunshade Add 10% above rate
iii] Rate for column post 98.5 Nos 0.3 Nos 0.3 Nos Casurina props 10 -13 Carpenter I class Mazdoor I class Add for 20% on labour 19.20 1891.20 /5 284.00 /each 183.00 /each 378.24 85.20 54.90 70.05 588.39 #VALUE!
#VALUE! -588.39
PAGE89
#VALUE!
/2
#VALUE!
RATE @RS #VALUE! /Sqm Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works 1.00 MT 0.01 mt 35.00 nos Cost of steel Cost of binding wire Fitter I class Add for 20% on labour 33647.20 /mt 48.00 /mt 253.00 /each 33647.20 0.48 8855.00 4427.50 0.82 46931.00
RATE @RS
46931.00 /MT
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum cum 20mm ISSmetal 1193.85 cum Cement mortar 1:2 3607.58 nos Mason II class 261.00 nos Mazdoor I class 183.00 nos Mazdoor II class 165.00 Add for 20% on labour
RATE @RS
Reinforced cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum cum 20mm ISSmetal 1193.85 cum sand 333.60 Kg cement 4.55 nos Mason II class 261.00 nos Mazdoor I class 183.00 nos Mazdoor II class 165.00 Add for 20% on labour
RATE @RS
4286.50 /cum
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum cum 20mm ISSmetal 1193.85 cum Cement mortar 1:1.5 4698.91 nos Mason II class 261.00 nos Mazdoor I class 183.00
PAGE90 35.30 nos Mazdoor II class Add for 20% on labour 165.00 /each 5824.50 5308.80 0.85 47817.00
RATE @RS
4781.70 /cum
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum cum 20mm ISSmetal 1193.85 cum sand 333.60 KG Cement 4547.20 nos Mason II class 261.00 nos Mazdoor I class 183.00 nos Mazdoor II class 165.00 Add for 20% on labour
RATE @RS
4776.20 /cum
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm cum Cement mortar 1:3 2516.26 nos Mason I class 291.00 nos Mazdoor I class 183.00 nos Mazdoor II class 165.00 Add for 20% on labour
RATE @RS
109.60 /Sqm
Plastering with cement mortar 1:3 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm cum Cement mortar 1:3 2516.26 nos Mason I class 291.00 nos Mazdoor I class 183.00 nos Mazdoor II class 165.00 Add for 20% on labour
RATE @RS
206.60 /Sqm
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm cum Cement mortar 1:4 1970.59 nos Mason I class 291.00 nos Mazdoor I class 183.00 nos Mazdoor II class 165.00 Add for 20% on labour
Plastering with cement mortar 1:5 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm cum Cement mortar 1:5 1643.19 nos Mason I class 291.00 nos Mazdoor I class 183.00 nos Mazdoor II class 165.00 Add for 20% on labour
RATE @RS
225.20 /Sqm
Plastering with cement mortar 1:3 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc 0.14 1.10 0.50 1.10 cum nos nos nos Cement mortar 1:3 Mason I class Mazdoor I class Mazdoor II class Add for 20% on labour 2516.26 291.00 183.00 165.00 /cum /each /each /each 352.28 320.10 91.50 181.50 118.62 0.00 1064.00
RATE @RS
106.40 /Sqm
Plastering with cement mortar 1:4 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc 0.14 1.10 0.50 1.10 cum nos nos nos Cement mortar 1:4 Mason I class Mazdoor I class Mazdoor II class Add for 20% on labour 1970.59 291.00 183.00 165.00 /cum /each /each /each 275.88 320.10 91.50 181.50 296.55 0.47 1166.00
RATE @RS
116.60 /Sqm
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc 0.14 1.10 0.50 1.10 cum nos nos nos Cement mortar 1:5 Mason I class Mazdoor I class Mazdoor II class Add for 20% on labour 1643.19 291.00 183.00 165.00 /cum /each /each /each 230.05 320.10 91.50 181.50 296.55 0.30 1120.00
RATE @RS
112.00 /Sqm
PAGE92 Damp proof course in cement mortor CM1:3 - 20mm thick with water proofing compound at 5% by wt of cement 0.21 1.10 1.10 2.20 1.10 cum nos nos nos nos cement mortar 1:3 mix Mason I class Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour Crude oil 2516.26 291.00 261.00 183.00 165.00 /cum /each /each /each /each 528.41 320.10 287.10 402.60 181.50 238.26 75.00 0.03 2033.00
5.00 kg
15.00 / kg
RATE @RS
203.30 /Sqm
Damp proof course in cement mortor CM1:3 - 12mm thick with water proofing compound at 2 % by wt of cement 0.14 1.10 0.50 1.10 cum nos nos nos cement mortar 1:3 mix Mason I class Mazdoor I class Mazdoor II class Add for 20% on labour water proofing compound 2516.26 291.00 183.00 165.00 /cum /each /each /each 352.28 320.10 91.50 181.50 118.62 30.00 0.00 1094.00
1.00 kg
30.00 / kg
RATE @RS
109.40 /Sqm
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum 9.00 4.50 1.80 17.70 14.10 cum cum nos nos nos 10-12mm ISS metal Cement mortar 1:2 Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 1009.85 3607.58 261.00 183.00 165.00 /cum /cum /each /each /each 9088.65 16234.11 469.80 3239.10 2326.50 1207.08 0.76 32566.00
Ellispattern Ist sort -20mm thick including cost and conveyance of all materials to site and all labour charges etc complete 0.24 0.117 0.50 1.10 4.30 nos mt nos nos nos 6 to 10mm chips Cost of cement Mason I class Mazdoor I class Mazdoor II class Add for 20% on labour 791.85 4547.20 291.00 183.00 165.00 /cum /mt /each /each /each 190.04 532.02 145.50 201.30 709.50 211.26
Flooring with red cement plaster polished surface and thread lined -10 Sqm 10.00 Sqm 0.80 kg 1.10 Nos Plastering with CM 1:5 20mmthick Red Oxide Mason I class Add for 20% on labour sundries RATE @RS Flooring with gravel 100mm thick -10Sqm 1.70 cum 1.10 No 0.50 No Gravel Mazdoor I Class Mazdoor II class Add for 20% on labour sundries RATE @RS 376.95 cum 183.00 E 165.00 E 640.82 201.30 82.50 56.76 0.62 982.00 225.20 Sqm 20.00 kg 291.00 cum 2252.00 16.00 320.10 64.02 0.88 2653.00
265.30 /Sqm
98.20 /Sqm
Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm 2 -10Sqm Nos Glazed tiles 10.00 cum cement mortar 1:2 mix 3607.58 kg White cement 18.00 nos Mason I class 291.00 nos Mason II class 261.00 nos Mazdoor I class 183.00 nos Mazdoor II class 165.00 Add for 20% on labour
4500.00 360.76 72.00 320.10 1070.10 494.10 544.50 485.76 0.68 7848.00
RATE @RS
784.80 /Sqm
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete. 167 0.10 4.00 1.10 4.10 2.70 3.30 Nos cum kg nos nos nos nos Glazed tiles cement mortar 1:2 mix Colour cement Mason I class Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 24.00 3607.58 18.00 291.00 261.00 183.00 165.00 /each /cum /kg /each /each /each /each 4008.00 360.76 72.00 320.10 1070.10 494.10 544.50 485.76 0.68
Floor finishing with ceromic tiles of size 20cmx20cm including cost and conveyance of all materials to site and all labour charges etc complete 250 0.21 1.10 1.10 2.20 2.20 Nos cum nos nos nos nos Ceromic tiles cement mortar 1:3 mix Mason I class Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 14.00 2516.26 291.00 261.00 183.00 165.00 /each /cum /each /each /each /each 3500.00 528.41 320.10 287.10 402.60 363.00 274.56 0.23 5676.00
RATE @RS
567.60 /Sqm
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete 112 0.21 1.20 1.00 1.00 1.00 0.50 Nos cum nos no no no no Design colour Ceromic tiles Cement mortar 1:3 mix Mason I class Mason II class Mazdoor I class Mazdoor II class Stone cutter I class Add for 20% on labour Cotton waste Colour cement Sundries RATE @RS 305x305x6mm 35.00 2516.26 291.00 261.00 183.00 165.00 224.00 /each /cum /each /each /each /each /each 3920.00 528.41 349.20 261.00 183.00 165.00 112.00 214.04 5.00 54.00 0.35 5792.00
0.50 Kg 3.0 Kg
Paving the Floor with scratch proof ceromic tiles of size 400x400x7mm including cost and conveyance of all materials to site and all labour charges etc complete 63 0.21 1.20 1.00 1.00 1.00 0.50 Nos cum nos no no no no Design colour Ceromic tiles Cement mortar 1:3 mix Mason I class Mason II class Mazdoor I class Mazdoor II class Stone cutter I class Add for 20% on labour Cotton waste Colour cement Sundries RATE @RS 400x400x7mm 64.00 2516.26 291.00 261.00 183.00 165.00 224.00 /each /cum /each /each /each /each /each 4032.00 528.41 349.20 261.00 183.00 165.00 112.00 214.04 5.00 54.00 0.35 5904.00
0.50 Kg 3.0 Kg
PAGE95 Supplying & fixing of Granite slab of 20mm thick with nosing, cutting and bedding laidover in CM 1 : 2 20mm thick - 10 Sqm 10 0.21 1.10 2.00 2.20 1.10 Sqm cum nos no no no Granite slab 20 mm thick Cement mortar 1:2 mix Mason I class Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour Pointing with Colour cement Colour cement Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour Sundries RATE @RS 1800.00 3607.58 291.00 261.00 183.00 165.00 /each /cum /each /each /each /each 18000.00 757.59 320.10 522.00 402.60 181.50 285.24 72.00 417.60 91.50 181.50 138.12 0.25 21370.00
Kg no no no
Pointing with cement mortor 1:3 cuddapah slab & paving stone to full depth - 10 Sqm 0.01 1.60 0.50 1.10 cum nos nos nos Cement mortar 1:3 Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 2516.26 261.00 183.00 165.00 /cum /each /each /each 25.16 417.60 91.50 181.50 138.12 0.12 854.00
RATE @RS
85.40 /Sqm
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm thick and pointed with cement mortar 1:3 -10 Sqm Sqm Cuddapah slabs (50mm thick) 311.00 Sqm cum cement mortar1:3 2516.26 cum cum Cement Concrete 1:6:12 2382.50 cum Sqm Pointing with CM 1:3 85.40 cum No Mason I class 291.00 cum No Mason IIclass 261.00 /each No Mazdoor I Class 183.00 /each No Mazdoor II class 165.00 /each Add for 20% on labour sundries RATE @RS 854.70 /Sqm
3265.50 301.95 2382.50 854.00 320.10 548.10 402.60 181.50 290.46 0.29 8547.00
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete for 100 Sqm 0.07 cum 1.60 nos 0.50 nos cost of shell lime Mason II class Mazdoor I class 69.50 /cum 261.00 /each 183.00 /each 4.87 417.60 91.50
PAGE96 2.70 nos Mazdoor II class Add for 20% on labour 165.00 /each 445.50 190.92 9.61 1160.00
RATE @RS
11.60 /Sqm
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete 1 Sqm rate for white washing ADD 50% extra for colour pigments RATE @Rs 17.40 /Sqm 11.60 5.80 17.40
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete 1.34 0.50 0.50 0.80 Ls Kg No No No Distember Painter I Class Mazdoor I Class Mazdoor II Class Add for 20% on labour Sundriries for brushes RATE @RS 65.00 196.00 183.00 165.00 LS 47.30 /Sqm /Kg /each /each /each 87.10 98.00 91.50 132.00 64.30 0.10 473.00
Priming coat for new iron with ready mixed primer of approved quality 10Sqm 1.33 kg Red Oxide 85.00 kg 0.70 No Painter-I class 196.00 /each Add for 20% on labour sundries including brushes, soaps.putty etc RATE @RS 27.80 /Sqm
Priming coat on new wood work with ready mixed primer of approved quality-10 Sqm 1.44 kg 0.70 No Ready mixed primer 110.00 kg Painter-I class 196.00 /each Add for 20% on labour sundries including brushes, soaps.putty etc RATE @Rs 32.40 /Sqm 158.40 137.20 27.44 0.96 324.00
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete 2.22 Lit 1.10 nos Cost of paint 160.00 /lit Painter I class 196.00 /each Add for 20% on labour sundries including brushes, soaps.putty etc RATE @Rs 61.40 /Sqm 355.20 215.60 43.12 0.08 614.00
PAGE97
Painting two coats over new wood works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete 2.55 Lit 1.20 nos Cost of paint 160.00 /lit Painter I class 196.00 /each Add for 20% on labour sundries including brushes, soaps.putty etc RATE @Rs 69.10 /Sqm 408.00 235.20 47.04 0.76 691.00
Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete 1.89 Lit 1.10 nos Cost of paint 160.00 /lit Painter I class 196.00 /each Add for 20% on labour sundries including brushes, soaps.putty etc RATE @Rs 56.20 /Sqm 302.40 215.60 43.12 0.88 562.00
Painting two coats over old wood works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete 2.22 Lit 1.20 nos Cost of paint 160.00 /lit Painter I class 196.00 /each Add for 20% on labour sundries including brushes, soaps.putty etc RATE @Rs 64.00 /Sqm 355.20 235.20 47.04 2.56 640.00
Pointing the RR Masonry with cement mortar 1:3 mix including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm 0.09 1.60 0.50 1.10 cum nos nos nos Cement mortar 1:3 Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 2516.26 261.00 183.00 165.00 /cum /each /each /each 226.46 417.60 91.50 181.50 138.12 0.82 1056.00
RATE @RS
105.60 /Sqm
Pointing with cement mortar 1:3 flush pointing for brickwork including cost and conveyance of all materialsand all labour charges etc complete for 10 Sqm 0.06 1.60 0.50 1.10 cum nos nos nos Cement mortar 1:3 Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 2516.26 261.00 183.00 165.00 /cum /each /each /each 150.98 417.60 91.50 181.50 138.12
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm 0.04 2.20 0.50 1.10 cum nos nos nos Cement mortar 1:3 Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 2516.26 261.00 183.00 165.00 /cum /each /each /each 100.65 574.20 91.50 181.50 169.44 0.71 1118.00
RATE @RS
111.80 /cum
Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for 10 cum 12.80 5.00 1.80 17.70 14.10 cum cum nos nos nos Brick jelly 20mm slacked lime Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 569.50 69.50 261.00 183.00 165.00 /cum /cum /each /each /each 7289.60 347.50 469.80 3239.10 2326.50 1207.08 0.42 14880.00
RATE @RS
1488.00 /cum
Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and finshed with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm 0.80 189 0.12 5.80 10.00 1.10 2.10 2.20 1.10 cum nos cum kg Sqm nos nos nos nos Brick jelly lime concrete pressed tiles cement mortar 1:3 mix crude oil pointing with cement mortar 1:3 Mason I class Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 1488.00 11268.50 2516.26 15.00 111.80 291.00 261.00 183.00 165.00 /cum /1000 nos /cum /kg /Sqm /each /each /each /each 1190.40 2129.75 301.95 87.00 1118.00 320.10 548.10 402.60 181.50 290.46 0.14 6570.00
RATE @RS
657.00 /Sqm
Weathering course with brick jelly lime concrete using 20mm brick jelly with
PAGE99 pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and finshed with Cement mortor 1:4 -20mm thick plastering including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm 0.80 5.80 0.22 2.20 0.50 3.20 cum kg cum nos nos nos Brick jelly lime concrete crude oil Cement mortar 1:4 Mason I class Mazdoor I class Mazdoor II class Add for 20% on labour 1488.00 15.00 1970.59 291.00 183.00 165.00 /cum /kg /cum /each /each /each 1190.40 87.00 433.53 640.20 91.50 528.00 251.94 0.43 3223.00
RATE @RS
322.30 /Sqm
Honey comb brick work with class III country bricks including cost and conveyance of all materials to site and all labour charges etc complete 0.64 0.70 3.20 6.50 2.20 5.40
x1000Nos Country bricks
cement mortar 1:3 mix Mason I class Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour
RATE @RS
884.20 /Sqm
Dry Brick work using country bricks 83/4"x41/4"x23/4" including cost and conveyance of all materials to site and all labour charges etc complete 4.59 3.50 7.20 7.10 14.10
x1000nos
Country bricks Mason I class Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour
RATE @RS
2485.80 /cum
Dry Brick work using country bricks 83/4"x41/4"x21/4" including cost and conveyance of all materials to site and all labour charges etc complete 6.01 3.50 7.20 7.10 14.10
x1000nos Country bricks
Mason I class Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour
Gravel backing for revetments including cost and conveyance and all labour charges etc complete - 10 cum. 11.60 cum 7.10 No 3.50 No Gravel Mazdoor I Class Mazdoor II class Add for 20% on labour sundries RATE @RS 376.95 cum 183.00 /each 165.00 /each 4372.62 1299.30 577.50 375.36 0.22 6625.00
662.50 /Sqm
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete 11.00 3.50 10.60 7.10 cum nos nos nos Rough stone Wodders Mazdoor I class Mazdoor II class Add for 20% on labour 515.85 189.00 183.00 165.00 /cum /each /each /each 5674.35 661.50 1939.80 1171.50 754.56 0.29 10202.00
RATE @RS
1020.20 /Sqm
Drystone masonry for retainingwall including cost and conveyance and all labour charges etc complete (Statistical Inspector 214) 12.00 3.50 7.10 7.10 3.50 cum nos nos nos nos Rough stone Mason I class Mason II class Mazdoor I class Mazdoor II class Add for 20% on labour 515.85 291.00 261.00 183.00 165.00 /cum /each /each /each /each 6190.20 1018.50 1853.10 1299.30 577.50 2374.20 0.20 13313.00
RATE @RS
1331.30 /Sqm
Removing old revetment and repacking with old stones -1 cum 3.50 No 10.60 No 7.10 No Ls Wodders Mazdoor I Class Mazdoor II class Add for 20% on labour Labour Charges for removing & clearing the old stones RATE @RS 189.00 /each 183.00 /each 165.00 /each 661.50 1939.80 1171.50 754.56 2.64 4530.00
Ls 453.00 /cum
Precast Hollow Block Masonry with C.m.1:5 mix using hollow in size of 0,40x0.10mx0.20m for 2.56 Cum
PAGE101 302 0.21 2.00 1.00 1.00 nos cum nos nos nos Hollow Block CM 1:5 Mason ii class mazdoor I class mazdoor ii class Add for 20% on labour 10.00 1643.19 261.00 183.00 165.00 each each each each each 3020.00 345.07 522.00 183.00 165.00 174.00 0.93 4410.00
Precast Hollow Block Masonry with C.m.1:5 mix using hollow in size of 0,40x0.20mx0.20m for 2.56 Cum nos Hollow Block 17.00 cum CM 1:5 1643.19 nos Mason ii class 261.00 nos mazdoor I class 183.00 nos mazdoor ii class 165.00 Add for 20% on labour
Roofing with AC corrugated sheet 6mm thick including cost of " J " bolts and bitumen washer etc.complete. -10 Sqm 11.00 2.20 1.10 3.20 Sqm Nos Nos Nos AC sheets 6mm thick Fitter II class Carpenter I class Mazdoor I class Add for 20% on labour Adj. J bolt Bitumenwasher Sundries for white lead RATE @RS 120.00 235.00 284.00 183.00 /Sqm /each /each /each 1320.00 517.00 312.40 585.60 283.00 50.00 10.00 2.00 3080.00
Best tiled roofing with Mangalore tiles, including CW reepers -10Sqm 160.00 36.00 0.49 0.09 0.50 0.50 1.10 2.20 Nos m kg cum No No No No Mangalore tiles CW,reepers 50x25mm Reeper nails 50mm long Lime mortar Carpenter I class Mason IIclass Mazdoor I Class Mazdoor II class Add for 20% on labour 7.55 26.40 48.00 2607.20 284.00 261.00 183.00 165.00 /each /mtr /kg /cum /each /each /each /each 1207.20 950.40 23.52 234.65 142.00 130.50 201.30 363.00 167.36
PAGE102 Sundries including wind-ties,screws,washers etc RATE @RS 342.00 /Sqm 0.07 3420.00
Best tiled roofing with Mangalore tiles,over ceiling tiles of best quality including CW reepers -10Sqm 160.00 250.00 36.00 0.49 0.09 0.50 1.00 1.10 3.30 Nos Nos m kg cum No No Nos Nos Mangalore tiles 7.55 /each Ceiling tiles 20x20x2 cm 4.55 /each CW,reepers 50x25mm 26.40 /mtr Reeper nails 50mm long 48.00 /kg Lime mortar 2607.20 /cum Carpenter I class 284.00 /each Mason IIclass 261.00 /each Mazdoor I Class 183.00 /each Mazdoor II class 165.00 /each Add for 20% on labour Sundries including wind-ties,screws,washers etc RATE @RS 494.00 /Sqm 1207.20 1136.25 950.40 23.52 234.65 142.00 261.00 201.30 544.50 229.76 9.42 4940.00
Removing and adjusting mangalore roofing tiles ( Labour only )- 10 Sqm 0.40 No 0.50 Nos 0.30 Nos Mason IIclass Mazdoor I Class Mazdoor II class Add for 20% on labour Sundries RATE @RS 261.00 /each 183.00 /each 165.00 /each 104.40 91.50 49.50 49.08 0.48 294.00
29.40 /Sqm
Supplying & Fixing in position of Indian type Water closet 580x440mm of approved quality 1.00 0.60 0.45 0.11 1.00 0.25 1.00 1.00 no m m3 m3 no no no no Indian type water closet 100mm dia PVC pipe Sand filling Brick jelly concrete Plumber I class Plumber II class Mason I class Mazdoor I class Add for 20% on labour White Cement Cement Spun yarn 750.00 125.00 333.60 1488.00 253.00 235.00 291.00 183.00 /1 no /1m /cum /cum /each /each /each /each 750.00 75.00 150.12 163.68 253.00 58.75 291.00 183.00 157.15 18.00 27.28 2.40 0.62 2130.00
RATE @RS
2130.00 /each
Supplying and Fixing inposition of best quality make White glazed wash
PAGE103 basin of size 550x 400mm - 1 No. 1.00 1.00 0.10 0.50 1.00 No No No No No Cost of wash hand basin Plumber I class Plumber II class Mason I class Mazdoor II class Add for 20% on labour Tapering wooden plug with 38mm brass Surews Shellac Thread ball 900.00 253.00 235.00 291.00 165.00 /each /each /each /each /each 900.00 253.00 23.50 145.50 165.00 117.40 30.00 0.80 0.38 0.42 1636.00
RATE @RS
1636.00 /each
Supplying and fixing P.V.C rainwater down fall pipe of 100mm dia with necessary shoes, bends,& clamps etc., 3.00 1.00 1.00 1.00 1.00 L.S m No No No No 100 mm dia PVC pipe 100 mm dia PVC shoe 100 mm dia PVC Bend 100 mm dia GI Clamp Fitter I class Add for 20% on labour sundries for conveyance RATE @RS 125.00 30.00 30.00 9.00 253.00 L.S For 3 Rm 249.33 /Rm /Rm /each /each /each /each 375.00 30.00 30.00 9.00 253.00 50.60 0.40 748.00
PAGE104
0.445 0.17 0.07 0.34 331.20 1.88 1.08 0.08 0.43 0.36 10.00 LS LS LS LS
Wearing Coat with CC 1 : 1.5 : 3 mix using 65% of 25mm, 25% of 12mm, and10% of 6mm IRC metal including cost of all materials and labour charges for mixing, laying, compacting and curing etc. complete. - 75mm uniform thickness cum 25mm IRC metal 918.85 /cum cum 12mm IRC chips 806.85 /cum cum 6mm IRC chips 704.85 /cum cum Sand 333.60 /cum kg Cement 4.5472 /kg nos Mazdoor I class 112.00 /each nos Mazdoor II class 101.00 /each nos Mazdoor III class 101.00 /each nos Carpenter I class 284.00 /each nos Mason I class 179.00 /each Sq.m Cost of curing LS Premoulded expansion joints LS Extra conveyance of water LS Hire charges for T & P LS Add for 20% on labour Sundries LS RATE @RS 280.00 /Sqm
408.89 137.16 49.34 113.42 1506.03 210.56 109.08 8.08 122.12 64.44 25.00 25.00 10.00 10.00 0.00 0.88 2800.00
PAGE105
PAGE106
PAGE107
PAGE108
PAGE109
5.59
Mazdoor II for preparing Mazdoor II for watering Mazdoor I for packing Mazdoor II for blinding gravel
1/6 No 1 No 3 No 1/6 No
(ii)Hire Charges
Taking out put Hire charges for power roller per day Fuel charges/day 2.5 litres x
Total hire charges including fuel Total hire charges and Labour charges
79.97
Spreading Gravel and consolidation with power roller rolling excluding cost of Gravel
(i) Hire charges for Machineries
Water sprinkler including fuel charges Fuel charges / day Daily out turn Hire charges for per cum
(ii) Power roller 8-10 ton capacity
1112.00 Rs. 44.00 / litre 8 lit 1144.00 2256.00 1000 cum 2.26 720.00
3.25 litres
Hire charges for per day Fuel charges / day Daily out turn Hire charges for per cum (iii) Labour charges for spreading 100cum of gravel Mazdoor class I Labour charges per Cum Total hire charges and Labour charges per Cum
Laying well gravel
20 litres
Rs. 44.00
2 Nos.
207.00
414.00 4.14
(i)+(ii)+(iii)
10.16
Labour Charges for the area of 100 cum. Mazdoor I class 2 Nos. 207.00 Rate per Cu.m 414.00
4.14
Labour Charges for the area of 100 cum. Mazdoor I class 2 Nos. 207.00 Rate per Cu.m
Labour charges for WBM patch work - 1 cum
414.00
4.14
Picking the metal surface 2" to 3" deep In patches and cutting Removal of picked up stuff and collection of metal & gravel and conveying the same to site Brushing and cleaning the surface Levelling the materials in the patches and pot holes and tamping after blinding with water Special tools such as wire brush Regulation of traffic Sundries such as barricading arrangements, conveying water etc,. Rate per Cu.m L.S L.S L.S 2.20 2.20 0.55 L.S L.S 2.20 5.50 Maz I 1.08x1/8 207.00 27.95 Maz I 1.08x1/6 207.00 37.26
77.86
Forming embankment with earth work excavation from borrow pits and compaction by power roller 100 % Compaction
Hire charges for Machinery (i) Water sprinkler Hire charges excluding fuel charges/day Fuel charges / day Total hire charges / day Daily out turn Hire charges per cum (ii) Power roller Hire charges excluding fuel charges/day Fuel charges / day Total hire charges / day Daily out turn Hire charges per cum 425 cum
1600.00 /425
1112.00 44.00 / litre 1000 cum 2.26 720.00 44.00 / litre 8 880.00 1600.00 3.76 3.76 8 1144.00 2256.00
3.25 litres
2.5 litres
(i)+(ii)
2.26
6.02
2 Nos
207.00
414.00
4.14
6.02 + 4.14
10.16
Forming embankment with earth work excavation from borrow pits and compaction by power roller 97% Compaction
Hire charges for Machinery (i) Water srinkler Hire charges excluding fuel charges/day Fuel charges / day Total hire charges / day Daily out turn Hire charges per cum (ii) Power roller Hire charges excluding fuel charges/day Fuel charges / day Total hire charges / day Daily out turn Hire charges per cum Total hire charges for Machinery (i)+(ii) (iii) Labour charges for 100 cum Mazdoor I class Labour charges per cum
Hire and Labour charges / M3 (i)+(ii)+(iii)
1112.00 44.00 / litre 1000 cum 2.26 720.00 44.00 / litre 500 cum 3.20 2.26 + 3.20 8 880.00 1600.00 8 1144.00 2256.00
3.25 litres
2.5 litres
5.46
2 Nos
207.00
414.00 4.14
5.46
4.14
9.60
Providing and laying Granular sub-base compaction 100mm thick by power roller - Hire charges and labour charges for GSB -10 Sq.m
(i) Hire charges for Machinery Water srinkler Hire charges excluding fuel charges/day Fuel charges / day Total hire charges / day Daily out turn Hire charges per 10Sq.m Power roller Hire charges excluding fuel charges/day Fuel charges / day Total hire charges / day Daily out turn Hire charges per 10 Sq.m 950 Sq.m of 100mm thick
1600.00 /950x10
3.25 litres
1144.00 2256.00
2.26
720.00
2.5 litres
44.00 / litre
880.00 1600.00
16.84
16.84 19.10
2.26
(ii) Labour charges (for mixing 950 Sq.m) Mazdoor I class Mazdoor II class Labour charges per 10 Sq.m For spreading 100cum Mazdoor I class Labour charges for spreading 4 Nos Per 1 Cum or 10 Sq.m 59.81 + 8.28 207.00 828.00 8.28 68.09 6 Nos 24 Nos
5682.00 /950x10
207.00 185.00
19.10
68.09
87.19
Providing WBM Grade II & Grade III 75mm thick Hire charges and labour charges for WBM Gr.II & III
Hire charges for Machinery Water srinkler Hire charges excluding fuel charges/day Fuel charges / day Total hire charges / day Daily out turn Hire charges per 10Sq.m Power roller Hire charges excluding fuel charges/day Fuel charges / day Total hire charges / day Daily out turn Hire charges per 10Sq.m
Total hire charges for Machinery / 10M2
3.50 litres
2.5 litres
52.09
35.56
87.65
Labour charges (for spreading 10sq.m 75mm thick) 1.08x3/16 Nos 1.08x1/4 Nos 1.08x1/3 Nos Mazdoor I class Mazdoor II class Mazdoor III class 207.00 185.00 185.00 L.S. L.S. L.S. L.S. L.S. 41.92 49.95 66.60 1.46 1.46 1.46 1.46 1.52
a) Forming edge bunds b) Maintaining berms for traffic barricading, providing danger lights c) Watering and keeping the surface moist for 15days d) Rent for tools including baskets, sherpining, pick axes e) Sundries such as rope, waterpots Labour charges per 10 Sq.m Hire charges for Machinery and Labour charges
165.83
87.65
165.83
253.48
(i) Labour charges per 10 Sq.m (ii) Hire charges for Bitumen Sprayer per 10 sqm
Rate for Labour and Machinery per 1 Sq.m
L.S.
(i)+(ii)/10=
12.00
12.74
Mazdoor I class
207.00 185.00
(i) Labour charges per 10 Sq.m (ii) Hire charges for Bitumen Sprayer
Rate for Labour and Machinery per 1 Sq.m
L.S.
(i)+(ii)/10=
12.00
5.12
Hire charges for 10 Sq.m (ii) Power roller Hire charges excluding fuel charges/day of 8Hour Fuel charges -Diesel oil Daily out turn for PC = 500 Sq.m Hire charges for 10 Sq.m
121.78
720.00
8.00
44.00
880.00 1600.00
1600.00 x10/500
32.00
(iii) Bitumen Boiler Hire charges for bitumen boiler including fuel (Kerosene) / day Hire charges / hour Out turn per Hour = 125Kg Hire charges per kg of bitumen Bitumen for PC per 10 sqm 115.75 / 125kg 14.60 Kg x 0.876 0.876 176.00 + 25 lit x 30.00 926 115.75 926.00 / 8
12.79
Total Hire & fuel charges for PC 20mm thick -10 sqm (i)+(ii)+(iii) (i) Mini Hot mix plant (ii) Roller (iii) Bitumen Boiler Labour charges per 10 sqm 0.75 No. Mazdoor I class 166.57 + 207.00 155.25 121.78 /10 sqm 32.00 /10 sqm 12.79 /10 sqm 166.57 /10 sqm
720.00 8.00 44.00 880.00 1600.00 16.00 926 115.75 0.926 9.07
926.00 / 8 115.75 / 125kg 9.80 Kg / 10 Sq.m 16.00 /10 sqm 9.07 /10 sqm 25.07 /10 sqm Mazdoor I class 25.07 + 207.00 51.75
Total Hire & fuel charges for Sealcoat type "A" -10 sqm (i)+(ii)
Labour charges for Patch work with Bituminous Premix materials for 0.625 cum of Bituminous material.
Picking the road surface 2" to 3" deep In patches and cutting Mazd I 1.08 x 1/6 1.08 x 1/8 207.00 207.00 37.26 27.95 Removal of picked up stuff Mazd I
Brushing and cleaning the surface Spreading the Bitumen for Tack coat Prmixing chips with Bitumen in the Drum mixer and laying of 0.625 m3 of metal with 56 Kg of Bitumen Levelling and tamping the Premix in the patches and pot holes rolling etc., Special tools such as wire brush Regulation of traffic Sundries such as barricading arrangements, Labour charges for laying 0.625 m of Bituminous Material Labour charges for laying 1.00 m3 of Bituminous material 102.81
3
/ 0.625
164.50
Hire and Labour Charges 1 2 3 4 5 6 7a. 7b. 8 9 10 11 12 12b 13 14 15 16 14b 15 Soling with 150mm cube stones - 10Sq.m
Rate
Unit
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m Spreading Gravel and consolidation with power roller rolling excluding cost of Gravel Laying well gravel Laying U.S. Gravel Labour charges for WBM patch work Forming embankment with earth work Forming embankment with earth work 100 % 97 %
Compaction Compaction
5.59 / Sq.m 79.97 / Sq.m 10.16 /cum 4.14 / cum 4.14 / cum 77.86 / cum 10.16 /cum 9.60 /cum 87.19
/ 10 Sq.m
Providing and laying Granular sub-base compaction by power roller -100 mm thick Providing WBM Grade II & Grade III 75mm thick Applying Tack coat over WBM surface at 4Kg / 10 sq.m Applying Tack coat over BT surface at 3Kg / 10 sq.m Premix carpet with seal coat type A Premix carpet with seal coat type B Premix Carpet Seal coat - Type 'A' Applying Prime coat over Un primed WBM surface at 7Kg / 10 sq.m Applying Tack coat over Primed WBM surface at 2.50 Kg / 10 sq.m Seal coat - Type 'B' Labour charges for Bituminous Premix Patch work
253.48 / 10 Sq.m 12.74 / Sq.m. 5.12 / Sq.m. 398.64 / 10 Sq.m 428.90 / 10 Sq.m 321.82 / 10 Sq.m 76.82 / 10 Sq.m 13.85 / 10 Sq.m 2.24 / 10 Sq.m 107.08 / 10 Sq.m 164.50 / cum
TENDER SCHEDULE
Name of Work: Providing BT road at 9th ward Bound street in Kullappagoundanpatty. Scheme : SFC(D.P) 2012-13
Sl.No
Qty
Discription of Items
UNITS
TNSS NO
461.25
#REF!
Sqm
199.26
#REF!
Cum
103.78
#REF!
Cum
Sl.No
Qty
Discription of Items
UNITS
TNSS NO
Applying TACK COAT over WBMsurface using 4 Kg bituminous emulsion which will be supplied departmentally at section stores and 1383.75 cost which will be recovered at the rates as per the special condition appended herewith including cost and conveyance and all labour charges etc., Providing and laying PREMIX CARPET with SEAL COAT TYPE 'A' for 20mm consolidated thickness using machine crushed IRCsize 1383.75 HBG metal 0.18cum of 13.2mm and 0.09cum of 11.2mm with 14.60Kg of bitumen (60/70 grade bitumen) for premixing for 10Sqm for premix carpet etc complete., Providing and laying of US Gravel including all incidental charges etc., complete
Sqm
Sqm
66.42
Cum
Lead Particulars Bitumen , Emulsiion - PU Office Metal 90mm,63mm,53mm,45mm,22.4mm 13.2mm,11.2mm,6.7mm- KK.Patty Gravel - Thippilimedu Singnature of contractor
No of Corrections
No of Overwrittings
Sl.No
Qty
Discription of Items
UNITS
TNSS NO
COMPARATIVE STATEMENT
Name of Work: Providing BT road at 9th ward Bound street in Kullappagoundanpatty.
Scheme : SFC(D.P) 2012-13 Estimate Amount: Rs. 4.80 Lakhs
Sl. No
Qty
Description of Items
Amt
2536.88
Amt
2767.50
461.25 #REF!
5.59
199.26 #REF!
38.80
7731.00
38.00
7571.88
40.00
7970.40
103.78 #REF!
1384.89
143724.00
1394.00
144669.32
1396.00
144876.88
Applying TACK COAT over WBMsurface using 4 Kg bituminous emulsion which will be supplied departmentally at section stores 1383.75 and cost which will be recovered at the rates as per the special condition appended herewith including cost and conveyance and all labour charges etc., Providing and laying PREMIX CARPET with SEAL COAT TYPE 'A' for 20mm consolidated thickness using machine crushed IRCsize 1383.75 HBG metal 0.18cum of 13.2mm and 0.09cum of 11.2mm with 14.60Kg of bitumen (60/70 grade bitumen) for premixing for 10Sqm for premix carpet etc complete.,
31.24
43228.00
31.00
42896.25
32.00
44280.00
191.03
264338.00
191.00
264296.25
192.00
265680.00
Sl. No
6
Qty
66.42
Description of Items
Providing and laying of US Gravel including all incidental charges etc., complete
TOTAL
Estimate
206.84 13738.00 475337.00
Thiru.C.Pauldass =
475337.00
-0.07
Tmt.Shanthy =
475337.00
-0.84
The lowest tender received from the contractor Thiru.C.Pauldass was 0.07% less then the estimate rate. So , this rate may be approved