Beruflich Dokumente
Kultur Dokumente
INSTALLATION PROCEDURE
DOCUMENT NO. :
QP.IP-Q519-07-001
WFTB-B-001
REV
SHEET
1 of 9
CLIENT :
INSTALLATION PROCEDURE
Project
Owner
Client
Location
5
4
3
2
1
0
18/12/07
REV
DESCRIPTION
DATE
EW
TD
SRS
PREPD
CHECD
APPRD
GTS
APPRD
VI
DOCUMENT TITLE
INSTALLATION PROCEDURE
INSTALLATION HEAT EXCHANGER BETARA COMPLEX DEVELOPMENT
DOCUMENT NO.
QP.IP-Q519-07-001
WFTB-B-001
CONTENTS
SECTION
TITLE
PURPOSE
SCOPE
WORK ORGANIZATION
ATTACHMENTS
A. LIFTING ILLUSTRATION
B. LIFTING ILLUSTRATION
C. LIFTING ILLUSTRATION
REV
SHEET
DOCUMENT TITLE
INSTALLATION PROCEDURE
INSTALLATION HEAT EXCHANGER BETARA COMPLEX DEVELOPMENT
DOCUMENT NO.
QP.IP-Q519-07-001
1.
REV
WFTB-B-001
SHEET
PURPOSE
The purpose of this procedure is established methods and controls by which all
sequence of Installation Heat Exchanger up to time hand over or issuance are in
good condition.
2.
SCOPE
This procedure cover all activities related to Installation Heat Exchanger for Betara
Complex Development Project
4.
WORK ORGANIZATION
NO
1.0
1.1
1.2
1.3
1.4
1.5
2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
DESCRIPTION
Indirect Man Power
Supervisor
QC Inspector
Safety Inspector
Wacthman
Light Vehicle Drivers
Direct Man Power
Foreman
Riggers
Helper Setting Area
Welders ASME
Pipe Fitters
Grinders
Electricians/Instrument
Radiography Team
Hydrotesting Team
Operator Heavy Equipment
Operator Heavy Vehicle
UNIT
QTY
m/d
m/d
m/d
m/d
m/d
m/d
m/d
m/d
m/d
m/d
m/d
m/d
m/d
m/d
m/d
m/d
m/d
1
1
1
4
3
REMARKS
2
4
6
2
2
2
2
3
3
4
4
4.1
4.2
4.3
4.4
Foreman welding make sure and record the pipe cutting, bevelling weld
numbering on each joint, fill in the Daily Welding Report and report to QC
Inspector for completed Welding Status Report
DOCUMENT TITLE
INSTALLATION PROCEDURE
INSTALLATION HEAT EXCHANGER BETARA COMPLEX DEVELOPMENT
DOCUMENT NO.
QP.IP-Q519-07-001
5.
6.
REV
WFTB-B-001
SHEET
DESCRIPTION
UNIT
QTY
1.0
1.1
1.2
1.3
Heavy Equipment
Crawler Crane 150 Ton
Flat Bed Truck Crane 5 Ton
Flat Bed Trailler 40 Feet
unit
unit
unit
1
1
4
2.0
2.1
2.2
2.3
2.4
2.5
Light Equipment
Light Vehicle 4 WD
Welding Machine 400 600 A
Radiography Camera + Accesories
Film Process Equipment
Hydrotesting Equipment
unit
unit
unit
unit
lot
3
3
1
1
1
3.0
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.15
3.16
3.17
3.18
3.19
3.20
3.21
3.22
3.23
3.24
3.25
3.26
lot
lot
lot
lot
lot
lot
lot
lot
lot
lot
lot
lot
lot
lot
lot
lot
lot
lot
lot
lot
lot
lot
lot
lot
lot
lot
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
REMARKS
Receipt Materials
DOCUMENT TITLE
INSTALLATION PROCEDURE
INSTALLATION HEAT EXCHANGER BETARA COMPLEX DEVELOPMENT
DOCUMENT NO.
QP.IP-Q519-07-001
6.2.
REV
SHEET
designated location, accompany the truck and check the unloading of the
good.
Off Loading
Off loading will be done in the presence of' the store man and with the
assistance, if necessary of rigging personnel.
6.3.
WFTB-B-001
Location
Depend on the type of material and protection required it should be stored:
Inside in a weatherproof building. The inside storage facility shall be
designed and situated to prevent ingress of rainwater or wind and that
floor remain dry at all times. A concrete or wooden floor is preferred but
if such a floor not is provided then materials should be stored on pallets
or shelves clear of the ground.
Out side under suitable protection from the weather i.e. plastic sheeting
securely fastened or tied to prevent being blown off or torn in high winds
or rain. Material shall in principle be placed clear of the ground to avoid
contamination or corrosion from ground water and sediment. The outside
store area shall be constructed or sited in a location to avoid pounding
during rainy weather.
All sensitive equipment shall be stored in accordance with manufacturer's
recommendation.
7.
7,1.2.
7.1.3.
The shipment shall first be checked for item conformity against the
trucker's delivery bill / receipt and for damaged items or containers.
The shipment will then be checked for conformity with the
requisition/purchased order and the result of inspection put on Material
Receiving Inspection Report as shown attachment A.
The QC Engineer or his designee shall review all documentation for
conformance to the job requirements.
If discrepancies or damaged are revealed, they will be noted on the
carriers delivery bills or receipt.
Depending on the nature of any discrepancy the QC Engineer will
ascertain if a non-conformance report is required .
Storage
DOCUMENT TITLE
INSTALLATION PROCEDURE
INSTALLATION HEAT EXCHANGER BETARA COMPLEX DEVELOPMENT
DOCUMENT NO.
QP.IP-Q519-07-001
WFTB-B-001
REV
SHEET
The store man / QC Engineer shall reject material that do not comply orare damage, such material is to be marked as soon as confirmation is
completed and separated in a quarantine area.
7.1.4.
Documentation
7.2.
Copies of delivery dockets, packing list, material receipt report and any
nonconformance reports shall be forwarded to the project office for
appropriate action.
Copy of non-conformance report shall be submitted to company
DOCUMENT TITLE
INSTALLATION PROCEDURE
INSTALLATION HEAT EXCHANGER BETARA COMPLEX DEVELOPMENT
DOCUMENT NO.
QP.IP-Q519-07-001
WFTB-B-001
ATTACHMENT A
REV
SHEET
7 of 9
DOCUMENT TITLE
INSTALLATION PROCEDURE
INSTALLATION HEAT EXCHANGER BETARA COMPLEX DEVELOPMENT
DOCUMENT NO.
QP.IP-Q519-07-001
WFTB-B-001
ATTACHMENT B
REV
SHEET
8 of 9
DOCUMENT TITLE
INSTALLATION PROCEDURE
INSTALLATION HEAT EXCHANGER BETARA COMPLEX DEVELOPMENT
DOCUMENT NO.
QP.IP-Q519-07-001
WFTB-B-001
ATTACHMENT C
REV
SHEET
9 of 9