Data Sheet Whr Parkbox 401

dependent parking For permanent use only!*


* In case of short time user (e.g. for office-, hotel-, commercial building) only possible on lower platform and only if technically adjusted, ask WHR! Or with attendant or valet parking both levels are possible for short time user. Load per platform max. 2000 kg (load per wheel 500 kg) Dimensions in cm
155
290 +3 0

min. 300 cm horizontal max. slope 10%


min.18

Please attend to restricted carand platform distance height!

70
500

305
155

315

170

min. 18

min.18

70
530 500

70

280 155

260 220 (280)

min. 18

100 585
Parklift 401 | 10.2012 | C027-4302 | Otto Whr GmbH

hydraulic power pack

Notes
1. According to the examples shown above the required height and length dimensions depend on the car size and parking direction (frontwards/reverse). 2. Clear platform width of 220 cm for car widths of 190 cm. Installation width 260 cm (forwards), installation width 280 cm (forwards and reverse parking). 3. According to ISO 3864 the oor has to be marked with 10 cm wide yellow-black stripes at a distance of 90 cm from the platform edge by the purchaser (see statics and construction requirements on page 2). 4. It is not possible to have channels or undercuts and/or concrete haunches along the oor-to-wall joints. In the event that channels or undercuts are necessary, the system width needs to be reduced or the installation width needs to be wider. 5. The manufacturer reserves the right to construction or model modications and/or alterations. Furthermore, the right to any subsequent part modication and/or variations and amendments in procedures and standards due to technical and engineering progresses in the art or due to environmental regulation changes, are also hereby reserved.

01

Otto Whr GmbH Auto-Parksysteme

lgrabenstrasse 14 71292 Friolzheim | Germany

Fon +49 [0] 7044 46 -0 Fax +49 [0] 7044 46 -149

www.woehr.de info@woehr.de

We compact parking space

Electrical datas
Item Performance Quantity Designation 1 2 by customer 1 unit by customer 1 unit electric meter Position in the feed cable 1 per power pack 1 per power pack Frequency

Installation diagram
1 Electric 2 Fuse or automatic circuit breaker 3 x16 A slow blow according to DIN VDE 0100 part 430 3 Feed line to the main switch 6 Lockable main switch

fuse or automatic circuit in the feed cable breaker 3 x16A slow blow acc. to DIN VDE 0100 p. 430 feed cable to main switch corner pit oor/ rear wall from the lead-out connection to the system

PVC control cable 5 x 1.52 from main switch to assembly

4 5

by customer as locally acc. to local power supply required regulations 3 Ph + N + PE* by customer each equipotential bonding safety lead-out connection 10 m by customer 1 unit equipotential bonding safety compliant to the DIN EN 60204 standard by customer 1 unit

11 PVC control cable 3 x1.5 2 from branch connector to unlock magnet 8 Hydraulic unit with three-phase motor, 230/400V, 50 Hz, 1.5 kW. Switching cabinet with motor, protection, wired already for installation Equipotential bonding safety lead-out connection Equipotential bonding safety from the lead-out connection to the system PVC control cable 5 x1.5 2 from assembly to branch connector

14 Unlock magnet 1 per Parklift 1 per power pack 10 Branch connector

marked main switch, above operating device lockable to prevent unauthorized switching on PVC control cable with marked strands and protective conductor 5 x 1,5 2

4 12 PVC Steuerleitung 5 x1.5 2 von Abzweigdose zum Drehtaster 13 Operating device for UP/DOWN with EMERGENCY-STOP. If possible on the left, but always outside the platforms movement range. Cables always feed in from below. (2 keys per parking place.) 5

by customer 10 m

from main switch 1 per to hydraulic power power pack pack

Items 816 are included in Whrs scope of delivery unless otherwise specied in the offer/order.

15 Cylinder valve 16 PVC control cable 3 x1.5 2 from branch connector to valve

* DIN VDE 0100 part 410 + 430 (not under permanent load) 3PH+N+PE (three-phase current) Note: Where a door is used to close the garage, the manufacturer of the door must be consulted before the electric cable is laid. The electrical components suppliedbythemanufacturer must be connected in accordance with the appropriate wiring diagram and local regulations. German VDE electrical requirements must be adhered to, in order to validate the TV tested circuit. The electrical supply to the power pack(s) must be provided prior to or during installation to enable our tters to complete their work satisfactorily and to check the correct functioning of the units. In compliance with the DIN EN 60204 standard provisions, all systems must be connected directly on site with an earthed equipotential bonding. The leadout connection must be at a 10 m distance!

Maintenance
Regular maintenance by qualied personnel can be provided by means of an Annual Service Contract.

Protection against corrosion


Independent of a maintenance workings has to be carried out acc. to Whr Cleaning and Maintenance Instruction regularly. Clean up galvanized parts and platforms of dirt and road salt as well as other pollution (corrosion danger)! Pit must be always ventilated and dearated well.

Noise protection
Basis is the German DIN 4109 Noise protection in buildings. With the following conditions required 30 dB (A) in rooms can be provided: noise protection package from our accessory insulation gure of the construction of min. Rw = 57dB walls which are bordering the parking systems must be done as single wall and deection resistant with min. m= 300 kg/m2 solid ceiling above the parking systems with min. m= 400 kg/m2 At differing constructional conditions additional sound absorbing measures are necessary. The best results are reached by separated sole plates from the construction. Increased noise protection: If increased noise protection must be provided planning has to be conrmed on a project basis by Whr (further building measures are required).

Statics and construction requirements

3,2 4

=5

, 6%

Temperature
The installation is designed to operate between +5and +40C. Atmospheric Humidity: 50% at +40C. If the local circumstances differ from the above please contact Whr.

x = 70: small and middle sized cars


155 (170)

P1
220

P2

x = 100: big sized cars e.g. BMW series 7


x

Conformity test
All our systems are checked according to EC machinery directive 2006/42/EC and EN 14010.

5 Marking according to ISO 3864

P1

P2
238

P1 = 12 kN* P2 = 4 kN

Dimensions
Parklift 401 | 10.2012 | C027-4302 | Otto Whr GmbH

All dimensions shown are minimum. Construction tolerances must be taken into consideration. All dimensions in cm.

220

Railings
If walkways are arranged directly to the side or behind the systems, railings have to be provided acc. EN ISO 13857 by client acc. to local requirements, height min. 200cm.
90

P1

P2

*all static loadings include the weight of the car

Fire safety
Each and every re safety requirement and all possible mandatory item(s) and equipment(s) (re extinguishing systems and re alarm systems, etc.) are to be provided by the customer.

Notes
In case of lower cars with spoilers, sontact Company Whr or local agent.

The Parkbox will be xed on the anchor points with heavy duty anchor bolts to a depth of approx. 1012cm. Slab thickness min. 18cm. Concrete quality according to the static requirements of the building, but for the dowel fastening we require a concrete quality of min. C20/25. Special foundations are required with asphalt oors or paving-stones.