1. If on calibrating a bourden tube pressure gauge you found the zero indication tobe correct, but full scale indication incorrect, you would. a) Change the bourden tube. b) d!ust the pointer. c) d!ust the linearity. d) d!ust the shoulder screw. ". #uitable primary element for flow metering high pressure high temperature fluid is a) $entury tube. b) %low nozzle. c) &rifice plate. d) 'itot tube( ). *hile using thermocouple for the measurement of temperature which type of the following instrument is used a) 'otentiometric type. b) +esistance bridge type. c) Cross coil type. d) ,one of the abo-e. .. #tandard control signal for pneumatic instrument is a) / to 10 psi. b) . to "/ psi. c) ) to 10 psi. d) /." to 1./ psi 0. In case of ad!ustment of the proportional controller we only ad!ust a) %eed back rate. b) +eset time. c) 'ulse duration.

1. &ff set is the a) Inherent property of proportional action. b) Inherent property of integral action. c) Inherent property of deri-ati-e action. d) Inherent property of on 2 off control. 3. Integral action time is infinte a) Integral action is infinite. b) Integral action is zero. c) 'roportional band is zero. d) ' 4 5 is zero. 6. 'roportional action means a) Control action which -aries directly with de-iation. b) Control action which responds to sudden change in plant conditions. c) Control action which responds in-ersely with offset. d) Control action which responds directly with offset. 7.The following are the elements for the drum le-el control in a modern thermal power station. a) #ingle element alone. b) Two element alone. c) Three element alone. d) #ingle 8 three element. 1/.%or calibration of an pressure indicator, range / to "0/ kg9 m" the test e:uipment used will be a) 5ead weight tester. b) ;< tube mercurry manometer. c) ;< tube water manometer. d) Inclined tube manometer. 11.*hichof the protection is not a turbine protection. a) =ot le-el -ary<low. b) >ub oil pressure -ary<low. c) ?ial shift $< high. d) &-er speed trip. 1".If @%'< 8@ are running 8 deaerator le-el goes $ low, than a) It will trip @%' 2 only. b) It will trip @%' 2 @ only. c) It will not allow @%' 2 C to start.

d) It will trip all @%'As. 1). *hich se:uence is correct for taking any coal ele-ation in to ser-ice. a) #tart mill B open seal air $9$ B open = C B start +C feeder. b) &pen seal air $9$ Bstart mill B start +C feeder B open = C c) &pen seal air $9$ Bopen = C Bstart mill Bstart feeder. d) &pen seal air $9$ Bstart mill B open = C B start +C feeder. 1.. *hich of the following is a programming language used in '>C system a) D $ . b) CE c) >adder logic. d) $isual basic. 10. *hat is the range of current in which can in<put an gi-en to a '>C. a) .<"/ ma b) /< 1/ ma. c) /< 0 ma. d) ,one of the abo-e. 11. The chemical conditioning of bolier units is re:uired. a) To a-oid deposition. b) To a-oid corrosion. c) To a-oid deposition 8 corrosion both. d) ,one of the abo-e. 13. The &" percentage in flue gas for efficient combustion should be. a) ).0 to ../ b) . to 0 c) 1 to 3 d) 6 to 7. 16. T;+@I,F #;'F+$I#&+G I,#T+;HF,T TI&, >&C TI&, &% 5FTFCT&+# H +I T=F '&#ITI&, &% 5FTFCT&+# I, T=F CI+C>F#. The layout t.g. drg. Ci-en with the proper numbers. ( ) . marks)