Beruflich Dokumente
Kultur Dokumente
ADNAN NAWAZ
E-mail: adnan.nawaz@yahoo.com
Mobile: +968-97012194
OBJECTIVE:
I am looking forward to join an organization,which offers Prospects for the career
development and supportive working Environment conductive to enhance my learning
and Professional capabilities.
PROFILE:
I am OFC Splicer / supervisor with 13 years of progressive experience. Good Reputation
and Dedicated, Hardworking, Committed, Dynamic and like to take up challenges. My
key competencies are:
Excellent
Splicer
Optical
Fiber
Effective Supervisor
Expert in OTDR
WORK EXPERIENCE
Responsibilities:
Optical Fiber Cable Splicing
Fault Trace with Optical Time Domain Reflectometer (OTDR) and Remove.
ODF (Optical Fiber Distribution Frame) installation.
Optical Fiber Cable laying Between Gujranwala to Butranwali,Gujrat
Mobilink MGW to Shaheen Chowck,
Link Health Testing with Optical Time Domain Reflectometer (OTDR), Light
Source and Power Meter,Compile power budgets, bidirectional and end-toend testing of fiber links.
Remove High Loss fiber between Gujrat-Sialkot-Dasaka-Gujranwala and
Faisalabad-Toba taik Sing-Khanewal Section.
Keep upto date records of inventory,
Keep Record end to end test of spare fibers to maintain the fiber links
record.
Responsibilities:
OPGW (Optical Fiber Ground Wire) Splicing
Link Health Testing with Optical Time Domain Reflectometer (OTDR) .
Troubleshooting and Maintenance of OPGW (Optical Fiber Ground Wire)
Installation of ODF (Optical Fiber Distribution Frame ).
OPGW (Optical Fiber Ground Wire) Cable laying
Achievements:
Live line installation of OPGW (Approx. 600 KM) on 500 KV and 220 KV
substations Laid OPGW in Islamabad Rawat - Ghkkar , Islamabad to
Burhan
Burhan to Ghazi-Barotha Hydropower Station Section to Shahi Bagh Power
Station Peshawar, Gatti (Faisalabad) to Muzafar Garh.
Full coordination with team member from China, Japan and Philippine.
Responsibilities:
Team Supervision
Optical Fiber Cable Splicing.
Link Health testing with OTDR, bidirectional and end to end
Fault Troubleshooting and Maintenance
ODF (Optical Fiber Distribution Frame) installation.
Optical fiber Cable laying
Connect the clients Through GPON
Surveying the routes and sites to Produce as-built-diagrams, single line
diagrams, etc
Achievements:
EDUCATIONAL QUALIFICATION:
PROFESSIONAL TRAINING:
3 Month Optical Fiber Transmission System and Cable Jointing from
Telecom Foundation Islamabad from May 2008 to August 2007.
STRENGTHS:
Splicing Machine: Well know how to use Fujikura CSII, FSM40s, FSM50s,
FSM 60s, Parisma (China) FiTell S177, S178 and Sumitomo, siemens RXSS46999-M7-A77.
OTDR: MTS 6000,MTS 8000, Acterna,Yokogawa AQ7275, EXFO 200, EXFO
400
Installation of (Optical Fiber Distribution Frame):Wall Mount ODF ,Rack
Mount ODF
Civil work: i.e. Cable laying, Bridge attachments, Draw a single line
diagram, Maker Post installation, Hand Hole and Joint pits.
Optical Fiber Cables:12f, 24f, 36F, 48f, 72f, 96f LTE Cables (Pakistan),
18f Olex (Australia) , 2f, 12f, 24f FCI Cables (Pakistan),
Testing Equipments: OTDR (Optical Time Domain Reflectometer ) Power
Meter & Source Meter, Optic Talk Set, Visual fault locater, Cable Locater.
Joint enclosures : 3M, Azara, Madidi, Rozan Burger, WRI, Comzi,
PERSONAL DETAILS:
Father Name
National ID card #
Nationality
Date of Birth
Passport
Address
:
:
:
:
:
Muhammad Nawaz
121013-766471-3
Pakistani
February 19-1980
CF 9614711
:
House No 981-982/B Mohallah Chowk Saddiqia
:
:
Married
English, Urdu, Punjabi, Saraiki, Pashto
Marital Status
Language
REFERENCES: