Sie sind auf Seite 1von 4

CURRICULUM VITAE

ADNAN NAWAZ
E-mail: adnan.nawaz@yahoo.com
Mobile: +968-97012194
OBJECTIVE:
I am looking forward to join an organization,which offers Prospects for the career
development and supportive working Environment conductive to enhance my learning
and Professional capabilities.
PROFILE:
I am OFC Splicer / supervisor with 13 years of progressive experience. Good Reputation
and Dedicated, Hardworking, Committed, Dynamic and like to take up challenges. My
key competencies are:
Excellent
Splicer

Optical

Fiber

Batter know of Civil work

Effective Supervisor

Expert in OTDR

Good in ODF Installing

WORK EXPERIENCE

FM CPE Technician (Jul-2013 to Present)


Huawei project for Nawras at Alkan East
Muscat, Oman
Main Responsibilities:
Link Testing between CPE to ONU (including Terminal boxes).
Optical Fiber Cable Testing with OTDR (Optical Time Domain
Reflectometer).
Fiber Link Testing with VFL (visual fault locater) and power meter.
GPON CPE devices maintenance for Enterprise Customers.
Troubleshooting and Maintenance of Optic fiber cables Remove pressure
point.

Senior Splicer (Jul 2012 to Jul 2013)


Multinet ATM Company for Mobilink LDI Project,
Toba Taik Singh, Pakistan.
Main

Responsibilities:
Optical Fiber Cable Splicing
Fault Trace with Optical Time Domain Reflectometer (OTDR) and Remove.
ODF (Optical Fiber Distribution Frame) installation.
Optical Fiber Cable laying Between Gujranwala to Butranwali,Gujrat
Mobilink MGW to Shaheen Chowck,
Link Health Testing with Optical Time Domain Reflectometer (OTDR), Light
Source and Power Meter,Compile power budgets, bidirectional and end-toend testing of fiber links.
Remove High Loss fiber between Gujrat-Sialkot-Dasaka-Gujranwala and
Faisalabad-Toba taik Sing-Khanewal Section.
Keep upto date records of inventory,

Keep Record end to end test of spare fibers to maintain the fiber links
record.

Line Man For Transmission Line (Jul-2011 to july-2012)


BLT (Beijing Lahore Traders)
Lahore, Pakistan.
Main

Responsibilities:
OPGW (Optical Fiber Ground Wire) Splicing
Link Health Testing with Optical Time Domain Reflectometer (OTDR) .
Troubleshooting and Maintenance of OPGW (Optical Fiber Ground Wire)
Installation of ODF (Optical Fiber Distribution Frame ).
OPGW (Optical Fiber Ground Wire) Cable laying

Achievements:

Live line installation of OPGW (Approx. 600 KM) on 500 KV and 220 KV
substations Laid OPGW in Islamabad Rawat - Ghkkar , Islamabad to
Burhan
Burhan to Ghazi-Barotha Hydropower Station Section to Shahi Bagh Power
Station Peshawar, Gatti (Faisalabad) to Muzafar Garh.
Full coordination with team member from China, Japan and Philippine.

Splicer (2007 to 2011)


Wateen Telecom
Layyah, (Punjab) Pakistan.
Main

Responsibilities:
Team Supervision
Optical Fiber Cable Splicing.
Link Health testing with OTDR, bidirectional and end to end
Fault Troubleshooting and Maintenance
ODF (Optical Fiber Distribution Frame) installation.
Optical fiber Cable laying
Connect the clients Through GPON
Surveying the routes and sites to Produce as-built-diagrams, single line
diagrams, etc

Achievements:

The team was the best team in O&M


Cable jointed at the appreciated time. And got 2 time bonus in 6 months.
Best in OTDR Testing.
55 km Optical Fiber cable laid in USF Project from Layyah To Choobara..

Troubleshooting breakdowns and link failures related with optical fiber


cable & system and restoring interrupted fiber link services within
minimum set time.

Producing periodic reports about the routine activities and network


performance.

Splicer (2000 to 2007)


Pakistan Telecommunication Company Ltd,
Bhakker, Pakistan.
Main Responsibilities:
Optical Fiber Cable Splicing.
Fault Trace and Remove related with optical fiber cable & system and
restoring interrupted fiber link services within minimum set time.
ODF installing.
Cable laying
OTDR, Light Source and Power Meter Testing
SDH System Maintenance

EDUCATIONAL QUALIFICATION:

Master of Arts (M.A) continued


Gomal University Dera Ismail Khan

Bachelor of Arts (B.A)


Gomal University Dera Ismail Khan

Diploma of Associate Engineer (Electrical /3year)


Tameer e Nau Collage Dera Ismail Khan

Secondary School Certificate (Science)


Board of Intermediate and Secondary Education Bannu

PROFESSIONAL TRAINING:
3 Month Optical Fiber Transmission System and Cable Jointing from
Telecom Foundation Islamabad from May 2008 to August 2007.
STRENGTHS:
Splicing Machine: Well know how to use Fujikura CSII, FSM40s, FSM50s,
FSM 60s, Parisma (China) FiTell S177, S178 and Sumitomo, siemens RXSS46999-M7-A77.
OTDR: MTS 6000,MTS 8000, Acterna,Yokogawa AQ7275, EXFO 200, EXFO
400
Installation of (Optical Fiber Distribution Frame):Wall Mount ODF ,Rack
Mount ODF
Civil work: i.e. Cable laying, Bridge attachments, Draw a single line
diagram, Maker Post installation, Hand Hole and Joint pits.
Optical Fiber Cables:12f, 24f, 36F, 48f, 72f, 96f LTE Cables (Pakistan),
18f Olex (Australia) , 2f, 12f, 24f FCI Cables (Pakistan),
Testing Equipments: OTDR (Optical Time Domain Reflectometer ) Power
Meter & Source Meter, Optic Talk Set, Visual fault locater, Cable Locater.
Joint enclosures : 3M, Azara, Madidi, Rozan Burger, WRI, Comzi,
PERSONAL DETAILS:
Father Name
National ID card #
Nationality
Date of Birth
Passport
Address

:
:
:
:
:

Muhammad Nawaz
121013-766471-3
Pakistani
February 19-1980
CF 9614711
:
House No 981-982/B Mohallah Chowk Saddiqia

:
:

Married
English, Urdu, Punjabi, Saraiki, Pashto

Dera Ismail Khan

Marital Status
Language
REFERENCES:

Will be furnished on demand

Das könnte Ihnen auch gefallen