: 224103008 : ISI Specification for packaged drinking water is IS14543:1998 and for packaged natural mineral water is IS13428:1998. : The Project is for processing and bottling of plain drinking and mineral water of 5000 bottles (one litre) per shift of 8 hrs. The total quantity of water processed and packed will be 15000 Litres/day in three shifts. : March, 2003 : Small Industries Service Institute 111 and 112, B.T. Road, Kolkata - 35 (W. B.) Phone: 577-0595, 2596, 0597 and 0598. Fax: 577-5531. E-Mail- gram-smallindben

PRODUCTION CAPACITY

MONTH AND YEAR OF PREPARATION PREPARED BY

I
NTRODUCTION

can be absorbed by human body. It is either obtained from natural resources like spring and drilled wells or it is fortified It is needless to mention that water, a artificially by blending and treating with

compound of Hydrogen and Oxygen is mineral salts. The mineral water shall be a precious natural gift which is very manufactured and packed under hygienic essential for survival of mankind conditions in properly washed and including animals. The water used for cleaned bottles in sterilised conditions. potable purposes should be free from undesirable impurities. The water

M P
ARKET available from untreated sources such as Well, Boreholes and Spring is generally Unfortunately sufficient safe potable OTENTIAL

not hygienic and safe for drinking. Thus water is not available everywhere in the it is desirable and necessary to purify country, either harmful chemical the water and supply under hygienic substances are found in the layers of conditions for human drinking purpose. earth which enter into water or it may As the name implies, the mineral water be contaminated due to pathogenic is the purified water fortified with micro-organisms. If such water is requisite amounts of minerals such as consumed, the body suffers from water Barium, Iron, Manganese, etc. which born diseases. Due to this, it has become

P ACKAGED DRINKING W ATER/MINERAL WATER

100 imperative to process and bottle safe potable water for the mankind in prevailing conditions. The demand for purified water prevailing rates in the market. becomes more during summer season. Although few companies have already entered in the bottling of safe potable water and mineralised water, but still huge gap is there in between demand and supply at all metropolitan-cities and towns. The product is widely accepted been considered as 7 years. in offices, restaurants, railway stations, airport, bus stands, hospitals and to 10 Cost of Installation and Electrification of Machinery and Equipment has been taken at the rate of 10% of the cost of Plant and Machinery. 11 Operative period of the project has 9 Construction Cost of Building, Cost of Land, Labour Charges and Cost of Plant, Machinery and Equipment have been considered as per

I
some extent even in rich house-holds. So there is good scope for establishing

S
MPLEMENTATION CHEDULE

It is expected that total time of about the units for processing and bottling 9 months will be taken from the date of plain and mineralised drinking water in approval of the scheme for complete different parts of the country. implementation. Break-up of the activities and relative time for each of

B
ASIS AND

P
RESUMPTIONS them is shown below: This project has been drawn on the Nature of Time Period

basis of following presumptions. Activity 1 Working hours per shift 2 Number of shift/day 3 Number of : Registration 300 : and its approval 3 2. SSI Provisional 1-3 months :8 1. Preparation of Project 0-1 month (in months)

Working days 3. Sanction of Loan per annum 4. Clearance from 4 Total number of : working hours 5 Working efficiency Authority/BIS etc. 6 Total period for achieving maximum capacity utilisation 7 Margin money : Third year 5. Placement Order for 4-6 months from machinery of equipment the date of 6. Installation of machin- 6-8 months commencement of production. : 25% of Capital Investment arrangement from 8 Rate of Interest of Capital : 15% per annum Electricity Board ery and equipment 7. Power connection 2-6 months : and taking permission 75% from Municipal Health 72 Pollution Control Board 2-5 months 2-5 months

P ACKAGED DRINKING W ATER/MINERAL WATER

101 8. Appointment of staff etc. 9. Trial run 10.Commencement of Production and permanent registration/marketing Quantity : 45 lakh Bottles per annum 5-8 months IS:13428:1998: Packaged Mineral Water). The details of the specification can be obtained from Bureau of Indian Standard, Manak Bhawan, 9, Bahadur 9 months Shah Zafar Marg, New Delhi 110002. onwards Production Capacity

8-9 months

T
ECHNICAL

A
SPECTS

Value

: Rs. 281.25 lakh. 50 H.P.

Processing and Bottling Raw water to be processed is

Motive Power Pollution Control

collected in tanks. A known quantity is Although this unit will not affect the pumped into the above tank where the environment, but the enterpreneurs are water is dozed with alum for coagulation advised to obtain, No Objection with heavy metals or insoluable matters. Certificate from competent authority of The water after coagulation is allowed State Pollution Control Board. They to settle for an hour. The impurities may should develop Kitchen Garden in the be removed by Reverse Osmosis factory premises to utilise waste water techniques also. The supernatant water from the plant. is taken to the chlorination tank where primary disinfection is brought about by Energy Conservation bubbling chlorine gas. The water is then Suitable measures should be adopted passed through sand filters for trapping to use appropriate amount of fuel and of undissolved impurities. The water after electricity. The promoters should sand filteration is passed through Carbon arrange periodic auditing of electrical filters for removal of odour, colour and

consumption, as the unit will be running also for dechlorination. It is then passed in three shifts. Unnecessary operation through series of micro fillers comprising of machines should be controlled to 5 micron, 1 micron and 0.4 micron filter avoid excess consumption of electricity. followed by ultraviolet disinfection Natural ventilation in production system for terminal disinfection. Packing premises may be made available to avoid is done in PET bottles of 1 litre capacity use of electrical power during day hours. through an automatic rinsing, filling, and capping machine fitted with an Ozone

F A
INANCIAL generator. The bottles after capping are shrink wrapped (Optional) and packed A. Fixed Capital in corrugated boxes of one dozen each.
i) Land and Building Amount (Rs. in lakh)

SPECTS

Quality Control and Standards


1. Land 0.5 Acres 1.00 26.00

The plain drinking water has to be


2. Total covered area required for

bottled in pet bottle as per IS


filteration, raw material

Specifications Packaged

(IS:14543:1998:
storage, packaging material

Drinking and

Water
storage, machinery, Spare