Sie sind auf Seite 1von 6

A. IAF SCHEDULE OF EXCLUSIONS 1. MCC panel 2.

Power cables, trays, glands between MCC & terminal box of each drive. 3. Instrument & Control cables, trays, glands between PLC & local JB. 4. All civil works including tanks, pipes, buildings etc. 5. All underground piping, drain piping. 6. Site telecommunication system. 7. Any Air conditioning, shelter required for PLC panel. 8. Supply of chemicals, test equipment, laboratory equipments etc. 9. Complete Installation and Commissioning of the plant. 10. Service air supply and Instrument air supply as required. 11. Earthing between Metito supplied equipment/skid earth bosses 12. Lightning protection system 13. Air travel, visa fees, lodging, boarding, site conveyance for Metito Personnel during supervision of erection and commissioning. 14. Third party inspector fees, travelling, lodging, boarding & local conveyance. 15. Unloading at site and Shelter/ storage for package equipments and site security, Mobile crane at site during erection. 16. Operation and Maintenance of the plant. 17. Heat tracing, Insulation, if required. 18. Freight, Insurance, Custom duties, import taxes, Clearance charges etc. 19. Disposal of dewatered sludge and other waste water such as chemical drains etc. or any further treatment to adhere to local norms. 20. Any other item specifically not mentioned in Proposal

B. De-Chlorination Exclusions from Scope of Supply: 1. All civil works including for main plant, temporary plant, foundations, Concrete Sumps, drains, Cable trenches, supporting structure, RCC buildings, toilets, Sheds for Filters, foundation and anchor bolts, embedded parts in civil works including, puddles, insert plates, templates, liners, and shims etc. 2. All pipe work and valves to and from our termination points. 3. Monorail crane, Chain hoist and all associated structural works for the plant, mobile crane during Erection. 4. Insulation / Heat tracing if any. 5. Complete Electrical Works including DG set if any, MV/LV Switchgears, transformers, M.C.C., Power & Control Cables, Cable Trays and laying of same with local control stations. Power Supply will be made available to motor terminals. 6. Electrical control cabling including cable trays & accessories between MCC to PLC & MCC to Field Drives. 7. We have not considered PLC based control panel in base scope, as plant will be operated from DCS (Package P1 type). We have not considered instrument / control cabling with cable trays & other accessories from field junction box to DCS panel & as well from MCC to DCS. 8. UPS power supply for filed mounted instruments. 9. Earthing & bonding required for the package. We will provide earthing boss on every skid. 10. Plant illumination & lightning protection, related cabling & lighting. 11. All embedded materials like Sliding plates, puddles, templates, liners, insert plates, shims etc. 12. Instrument air supply at one point within the battery limit. 13. Laboratory equipment & apparatus with chemicals etc. 14. Unloading & storage at site. 15. Implication of HAZOP / Design review meeting. Per diem rate provided for attending HAZOP / Design review meeting. 16. Consumable / chemical for commissioning & Later for operation of plant. 17. 280 L 30057 Rev 1 14 Laffan Refinery-Phase 2 , Qatar

18. Telecommunication, PA system, etc. 19. Waste effluent disposal. 20. Supply & disposal of untreated water used for pre-commissioning, flushing, hydro testing etc. 21. Insurance, Custom duties, import taxes as applicable if any. 22. Necessary permit or statutory approvals required for the plant to adhere to local regulations if any. 23. Air travel, visa fees, lodging, boarding, site conveyance for Metito Personnel during supervision of erection and commissioning. 24. Any item not specifically mentioned as forming a part of our proposal.

C. CPI SCHEDULE OF EXCLUSIONS 1. MCC panel 2. Power cables, trays, glands between MCC & terminal box of each drive. 3. Instrument & Control cables, trays, glands between PLC & local JB. 4. All civil works including tanks, pipes, buildings etc. 5. All underground piping, drain piping. 6. Site telecommunication system. 7. Any Air conditioning, shelter required for PLC panel. 8. Supply of chemicals, test equipment, laboratory equipment etc. 9. Complete Installation and Commissioning of the plant. 10. Service air supply and Instrument air supply as required. 11. Earthling between Metito supplied equipment/skid earth bosses 12. Lightning protection system 13. Air travel, visa fees, lodging, boarding, site conveyance for Metito Personnel during supervision of erection and commissioning. 14. Third party inspector fees, travelling, lodging, boarding & local conveyance.

15. Unloading at site and Shelter/ storage for package equipments and site security, Mobile crane at site during erection. 16. Operation and Maintenance of the plant. 17. Heat tracing, Insulation, if required. 18. Freight, Insurance, Custom duties, import taxes, Clearance charges etc. 19. Disposal of dewatered sludge and other waste water such as chemical drains etc. or any further treatment to adhere to local norms. 20. Any other item specifically not mentioned in Proposal D. BIO SCHEDULE OF EXCLUSIONS 1. MCC panel 2. Power cables, trays, glands between MCC & terminal box of each drive. 3. Instrument & Control cables, trays, glands between PLC & local JB. 4. All civil works including tanks, pipes, buildings etc. 5. All underground piping, drain piping. 6. Site telecommunication system. 7. Any Air conditioning, shelter required for PLC panel. 8. Supply of chemicals, test equipments, laboratory equipments etc. 9. Complete Installation and Commissioning of the plant. 10. Service air supply and Instrument air supply as required. 11. Earthing between Metito supplied equipment/skid earth bosses 12. Lightning protection system 13. Air travel, visa fees, lodging, boarding, site conveyance for Metito Personnel during supervision of erection and commissioning. 14. Third party inspector fees, travelling, lodging, boarding & local conveyance. 15. Unloading at site and Shelter/ storage for package equipments and site security, Mobile crane at site during erection. 16. Operation and Maintenance of the plant.

17. Heat tracing, Insulation, if required. 18. Freight, Insurance, Custom duties, import taxes, Clearance charges etc. 19. Disposal of dewatered sludge and other waste water such as chemical drains etc. or any further treatment to adhere to local norms. 20. Any other item specifically not mentioned in Proposal E. SAND FILTER SCHEDULE OF EXCLUSIONS 1. MCC panel 2. Power cables, trays, glands between MCC & terminal box of each drive. 3. Instrument & Control cables, trays, glands between PLC & local JB. 4. All civil works including tanks, above ground pipes (outside package boundary), valves (outside package boundary as marked in P&ID), fasteners, buildings etc. 5. All underground piping, drain piping. 6. Site telecommunication system. 7. Any Air conditioning, shelter required for PLC panel. 8. Supply of chemicals, test equipments, laboratory equipments etc. 9. Complete Installation, Testing and Commissioning of the plant. 10. Service air supply and Instrument air supply as required. 11. Earthing between Metito supplied equipment/skid earth bosses 12. Lightning protection system 13. Air travel, visa fees, lodging, boarding, site conveyance for Metito Personnel during supervision of erection and commissioning. 14. Third party inspector fees, travelling, lodging, boarding & local conveyance. 15. Unloading at site and Shelter/ storage for package equipments and site security, Mobile crane at site during erection. 16. Operation and Maintenance of the plant. 17. Heat tracing, Insulation, if required. 18. Freight, Insurance, Custom duties, import taxes, Clearance charges etc.

19. Disposal of dewatered sludge and other waste water such as chemical drains etc. or any further treatment to adhere to local norms. 20. Any other item specifically not mentioned in Proposal. 21. Commissioning spares / consumables.

Das könnte Ihnen auch gefallen