SAUDI ARAMCO OIL COMPANY
SECTION 15890 DuctWork
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ENGG

CERT

PMT

SUBSECTION INDEX Part 1 - General


DESCRIPTION

1.01 1.02 1.03 1.04 1.05

Description Duct Work Quality Assurance Submittals Product Delivery, Storage and Handling

DATE JOB/EWO

Part 2 - Products 2.01 2.02 Equipment Materials

REV. NO.

Part 3 - Execution 3.01 Installation

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PART 1 - GENERAL 1.01 Description A. This Section covers providing metal and non-metal ductwork as shown on the Drawings and specified herein, including, all accessories and testing required to complete the Work acceptable to Saudi Aramco Representative.

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

1.02

Duct Work A. The ductwork to be provided under this Section shall include but not limited to the supply, return, outside fresh air intake and air exhaust for the following systems and as shown on the Drawings. 1. Comfort air system. Exhaust air for Hammams, Janitors closets, Canteen. Exhaust air from hoods.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Date:

2. 3.

SECTION 15890

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

1 OF 7

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

1.03

Quality Assurance A. Reference Codes and Standards: Comply with applicable Saudi Aramco Standards, Codes and Standards as specified herein and listed in Section 15001. The manufacturer shall, upon request, furnish a certificate of inspection stating that the material has been manufactured, sampled, tested, and inspected in accordance with this specification, and has been found to meet the requirements. Inspection: Inform Saudi Aramco Representative of approved duct erection schedule so that he may observe ductwork during fabrication, and inspect all ductwork installation. Ductwork shall not be concealed in any manner prior to inspection by Saudi Aramco Representative. All ductwork shall be clear from visual imperfections, including pitting, oil canning, stains and discoloration. E. Ductwork which shows visual imperfections, including pitting, oil canning, stains and discoloration, shall be returned to the manufacturer for free replacement as long as the consignment/delivery note has not been signed by the contractors representative. Contractor will be responsible for the quality of ductwork after the consignment/delivery note is signed, and that includes damaged ducts due to mishandling, improper storing, etc.

ENGG

CERT

B.
DESCRIPTION

C.

REV. NO.

DATE JOB/EWO

D.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

1.04

Submittals Submit the following to Saudi Aramco Representative for approval: A. Shop Drawings: 1. Complete with details, Section, Elevations, Connections, etc,. Photo copies of the duct layout from the Drawings are not acceptable as a submittal. Data shall include, but not limited to: a. Overall two-line layout, dimensioned with respect to the building and connections to equipment. Equipment and duct elevations and sections as required to show clearances, methods of support, and details of installation. Distance from bottom of ducts or equipment to finished floor.
DWG. TYPE PLANT NO. INDEX DRAWING NO.

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

2.

Date:

b.

c.

SECTION 15890
SHT. NO. REV. NO.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

2 OF 7

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

CERT

d. e. f.

Dimensions of each duct section. Location of duct supports and sway bracing. Details of duct supports, including hanger locations, hanger types, connections to duct and to building, auxiliary steel, etc., manufacturers name and model number for hangers. Location and details of auxiliary equipment including: grills, registers, diffusers, extractors, volume dampers, fire dampers, access doors, turning vanes, thermometer and pressure sensing connections, smoke detectors, test openings for pilot readings, control instruments, duct drains, flexible connections, fume and exhaust hoods, etc.

DESCRIPTION

ENGG

g.

DATE JOB/EWO

B.

Coordination Drawings: 1. Contractor Shall submit reflected ceiling plans, drawn to scale, on which the following items are shown and coordinated with each other, based on input from installers of the items involved: a. b. c. Ceiling suspension assembly members. Other systems installed in same space as ducts Ceiling and wall-mounting access doors and panels required to provide access to dampers and other operating devices. Ceiling-mounting items, including lighting fixtures, diffusers, grilles, speakers, sprinklers, access panels, and special moldings.

REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

d.

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

1.05

Product Delivery, Storage and Handlings A. Refer to Section 15050 Basic Mechanical Material and Methods.

PART 2 - PRODUCTS
Date:

2.01

Equipment A. Rectangular Ductwork: 1. Ductwork shall be constructed in the sizes and configuration as shown on the Drawings. Sheet metal gauges corresponding to
DWG. TYPE PLANT NO. INDEX DRAWING NO.

SECTION 15890
SHT. NO. REV. NO.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

3 OF 7

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
duct sizes and details of construction shall conform to the latest edition of SMACNA, HVAC Duct Construction Standards. 2. Duct Fittings: Rectangular Duct: all changes in duct size or elevation, tee connections, connections for grilles, registers or diffusers, transition for elbows, casings, etc. shall be fabricated in accordance with Section 2 of SMACNA HVAC Duct Construction Standards. Unless otherwise noted on the Drawing, no mitered fittings will be allowed.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DESCRIPTION

ENGG

CERT

PMT

B.

Spiral Ductwork- Double Wall Construction: 1. Circular supply ductwork in basketball court in recreation buildings shall be spiral with double wall construction. Double wall duct and fittings shall consist of a solid inner liner, a 25mm, 24kg/m3 (1inch, 1.50 lb/ft3 unless otherwise specified) layer of fiberglass insulation and a solid outer pressure shell. For 25mm (1-inch) thick insulation, the outer pressure shell diameter shall be 50mm (2 inches) larger than the inner liner. Ductwork shall be constructed in the sizes and configuration as shown on the Drawings. Sheet metal gauges corresponding to duct sizes and details of construction shall conform to the latest edition of SMACNA, HVAC Duct Construction standards. The duct system shall consist of double lipped rubber gasketed fittings that are factory fabricated. Alternative methods to join the spiral ductwork may be submitted for Saudi Aramco approval. Fiberglass insulation shall have a maximum conductivity factor (K) of 0.038 w/m.C at 24C mean ambient temperature (0.26 BTU-in/hr ft2 F at 75F mean ambient temperature). All fittings shall be factory fabricated and calibrated to manufacturers published dimensional tolerance standards. When contract documents require divided flow fittings, full body fittings shall be used as frequent as possible and to minimize the double wall saddle taps. All double wall duct and fittings shall be furnished with both an inner liner and a outer pressure shell coupling. Duct system performance shall meet SMACNAs Leakage Class 3 requirement. In the case the use of an alternate method as discussed in Para. 4 result in a less stringent leakage Class, Saudi Aramco prior approval should be obtained.
DWG. TYPE PLANT NO. INDEX DRAWING NO.

2.
DATE JOB/EWO REV. NO.

3.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

4.

CERTIFIED _ __________
DATE: ________

5.

CONSTRUCTION AGENCY
________________ DATE:

6.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

7.

Date:

8.

9.

SECTION 15890
SHT. NO. REV. NO.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

4 OF 7

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

ENGG

CERT

10.

Duct shall be SafidDouble Wall as manufactured by SAFID or approved equal.

C.

Access Doors: 1. General: Access doors are to be installed in ducts, casings, and housings as specified below. Unless otherwise noted on the Drawing, access doors are to be made of same material as ducts, casings, or housings in which they are installed. Insulate or line access door with an equal amount of insulation as required for the ductwork or housings in which they are installed. 2. Access Doors for Rectangular Ducts: a. Access doors shall be installed in ducts at each fire damper, fan, air flow measuring station, and any ductmounted instrumentation. Access doors shall be installed in the largest duct side unless this location provides poor access or is obstructed by surrounding conditions. Doors shall be furnished in accordance with SMACNA, HVAC Duct Construction Standard, Fig. 2-1 and the Drawings typical details. Access doors shall comply with section 1006(b) of 1991 Uniform Mechanical Code.

DATE JOB/EWO

DESCRIPTION

b.

REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

c.

PROJECT ENGINEER
____________ DATE

D.

Flexible Connections: 1. Duct connections to fans, joints between ferrous and non-ferrous metals for locations as shown on the Drawings shall be provided with a fire retardant, flexible connection, unless specifically noted otherwise. For indoor and outdoor service, material shall be Ventiglas, manufactured by Ventfabrics, inc. or an approved equal. Material shall consist of a heavy glass fabric, coated on both sides with neoprene. Flexible connections shall be installed with a minimum 25mm (1 inch) slack in the material. Braided copper jumpers shall be furnished around the connections to provide for continuous electrical grounding. Contractor is to attach jumpers to the ductwork in such a manner as not to bind the flexible connection.

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

2.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

3.
Date:

E.

Hangers and Support Systems: Duct hangers and support systems shall be sized and installed in accordance with SMACNA and Section-15140, Piping and Ducting Supports.
DWG. TYPE PLANT NO. INDEX DRAWING NO.

SECTION 15890
SHT. NO. REV. NO.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

5 OF 7

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

ENGG

CERT

F.

Sealants: Duct joint sealer shall be fast-setting, thixotropic paste that remains flexible after drying. Product is to be Fosters 32-14 DUCT SEALANT; United Sheet Metals DUCT-SEAL, or approved equal. Duct Connections to Equipment: Duct Connections to air conditioning equipment shall be angle reinforced, flanged connections secured by 10 mm. dia. Bolts on 305mm centers (maximum). Joints are to be gasketed with red rubber on high density neoprene and sealed air-tight. Dampers: See Specifications. Duct Insulation: Specifications. Section-15910, ductwork accessories of these

G.

DESCRIPTION

H.

I.

See

Section-15290,

Duct

Insulation

of

these

DATE JOB/EWO

2.02

Materials A. Sheet Metal: 1. Galvanized Steel Sheet: Material shall be lock forming quality (LFQ), with minimum galvanized coating of 90g per square meter for both sides of a sheet. ASTM A653/A653M and ASTM A924/A924M, Coating Designation G90. 2. For kitchen hood exhaust duct use sheet metal stainless steel 18 gauge all joints seams are to be continuously welded externally and made liquid tight as per NFPA 96 and IMC.

REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

Fasteners: 1. Steel Ductwork: Unless otherwise noted, all screwed fasteners used in galvanized ductwork shall be constructed or cadmium plated or galvanized steel. All riveted connections in galvanized ductwork must be made with 5mm. dia. Steel pop rivets or flathead, tinned iron rivets. Rivets and fasteners used in stainless steel ductwork shall be stainless steel.

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

C
Date:

Reinforcing: Reinforcing bars and angles shall be of the same material as the ducts or casing on which they are used. Galvanized surfaces damaged by welding shall be repaired with GALVANOX, or approved equal, in accordance with manufacturers written instructions. Flexible Ducting:
DWG. TYPE PLANT NO. INDEX DRAWING NO.

D.

E.

SECTION 15890
SHT. NO. REV. NO.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

6 OF 7

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

DATE JOB/EWO

DESCRIPTION

ENGG

CERT

1.

General: Provide only to join duct collar to round necks of outlets and inlets. Bends greater than 90 degree are not allowed. Length longer than 1.5m (4.9 ft) shall not be allowed. Factory fabricated assembly consisting of corrosion resistant spring steel helix, nonperforated inner liner, wrapped with nominal 25mm thick fiberglass insulation with thermal conductivity of 0.0331 W/m-K.(0.23 Btu/hr.-sq. ft. - F). Assembly sheathed in vapor barrier jacket, factory sealed at both ends of each section, where horizontal support is required, flexible duct shall be suspended with minimum 19mm side flat banding material. All connections to be sheet metal secured with 13mm wide positive locking steel straps. Flexible ducts shall be installed with minimum of R/D (Radius/Diameter) of 1.5. Flexible ductwork shall have a flame spread rating of not more than 25 and a smoke developed rating of not more than 50.

PART 3 - EXECUTION 3.01 Installation A. Install ducts in a neat and workmanlike manner at locations shown on the Drawings and approved shop drawings. If interferences occur which require changes in locations, size, or design of the ductwork, such changes are to be made only after approval by Saudi Aramco. Ducts are to be independently supported from building structure only, and not from other equipment or other equipment supports unless specifically shown on the Drawings or approved by Saudi Aramco Representative at no additional cost to Saudi Aramco. Any deviations from the Drawings and Specifications concerning duct construction, duct routing or duct support systems committed by the Contractor, without Saudi Aramco Representatives prior approval, shall be removed and replaced with approved material or methods at Contractors expense, if so directed by Saudi Aramco Representative. Exposed ductwork shall be painted. Paint Color shall be agreed upon with Saudi Aramco Representative. Damage materials and defective WORK, or non-compliance with these Specifications shall be repaired, removed and replaced as directed by Saudi Aramco Representative at no additional cost to Saudi Aramco.

REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

B.

CERTIFIED _ __________
DATE: ________

C.

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

D.

E.
Date:

- END OF SECTION -

SECTION 15890

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL &

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

COMMUNITY SUPPORT BUILDINGS RABIGH SAUDI ARABIA

K55
JOB/EWO#

VE-417361 BI-25-00002

14-Sep-07

7 OF 7