Sie sind auf Seite 1von 20

PT.

Binamandiri MuIiaraharja
Jl. R.A. Kartini 19-A, Malang - ndonesia 65111
P. +62 (341) 323990, 347474 | +852 81245775
F. +62 (341) 366490 | +852 30079161
E. account@binamandiri.com | W. www.binamandiri.com
binamandiii com
Manpower Service and SuppIy Company
License #: KEP. 538/MEN/2006
AL? CSl1lCn lC8 :
n A M L :
ENG. MECHANICAL DESIGN
PROJECT (PIPING)
INDRA KUSUMAH
Career Resume

1







Indra Kusumah
Piping Engineer


Date of Birth : April 05, 1977
Nationality : Indonesian
Religion : Moslem
Education : Mechanical Engineering ( GPA 3,06 )
University of Muhammadiyah Jakarta
Address : Jl. Trip Jamaksari Gg. Gelatik No 23.
RT/RW : 001/015. Sumur Pecung Serang ( Banten )
E-mail : indr4_k77@yahoo.co.id
HP : 0813 1136 5498
Home : ( 0254 ) 393958

Summary of Experience :

I have been working for over seven years in EPC & Petrochemical Company ( Specially
on piping ). It makes increase my skill such mention below :
- AutoCAD applications.
- Caesar II applications.
- Familiar and able to read EFD, P & ID, Plot plan drawing.
- Familiar with Code & Standard Such as ASME/ANSI, API, etc.
- Design Piping plan and Isometric drawing.
- Supervision pipe spool fabrication such as dimension & material check, visual
welding check.
- Piping erection.
- Equipment installation such as Pump, Blower, Vessel, Heat exchanger, etc.
- Hydrostatic test, pneumatic test, flushing and final reinstallation.
- Maintenance work, periodical shut down and tie-in work.
- Start up and commissioning.

Career Resume

2
Latest position as Mechanical Officer at PT. Mitsubishi Chemical Indonesia, Cilegon.
With responsibility as below :
- Vendors selection.
- Prepare Engineering, Procurement and Construction Schedule.
- Prepare Piping Installation Procedure.
- Prepare Equipment Installation Procedure.
- Prepare Job Safety Analisys
- Review Piping plan & Isometric drawing for Contruction.
- Supervision Construction activity on site.
- Controlling schedule & reporting project progress.
- Maintenance work, periodical shut down and tie-in work.
- Start up and commissioning
Alhamdulillah, all my project can be done on time and zero accident is reached.


Training/ Course :


Piping Designer at Center for Material and Technical Product ( B4T ) Bandung on behalf of
Agency for Research and Development of Industry in cooperation with PT. Rekayasa
Cakrawala Resources Subsidiary of PT. Rekayasa Industri Jakarta on October, 2009 until
December, 2009.

Caesar II course at Ap-Greid Jakarta on January, 2009 until February, 2009.
AutoCAD course at LPK Bani Saleh Bekasi on April, 2000 until August, 2000.

Languages :

Native language Bahasa Indonesia : Very Good
English : Fair

Employment History (Summary) :

PT. Mitsubishi Chemical Indonesia, Cilegon-Indonesia 2011 - 2013
PT. JGC Indonesia, Jakarta-Indonesia. 2010 - 2011
PT. Mitsubishi Chemical Indonesia, Cilegon-Indonesia 2010 - 2010
PT. Mitsubishi Chemical Engineering Indonesia, Cilegon-Indonesia 2006 - 2008
PT. Yamaha Music Manufacturing Asia, MM2100-Indonesia 2003 - 2005

Career Resume

3
Career Highlights:

1. PT. Mitsubishi Chemical Indonesia ( Petrochemical Company )
Period : Oct. 2011 - Mar.2013

1. Project : Periodical Shutdown Maintenance 2011, New IA / PA
Compressor Project , EDG Conversion Project & WWT
Stabilization Project
2. Location : Cilegon
3. Plant Owner : PT. Mitsubishi Chemical Indonesia
4. Position held : Mech. Officer ( Piping )
Responsible for :
- Vendors selection
- Prepare Engineering, Procurement and Construction Schedule.
- Prepare Piping Installation Procedure.
- Prepare Equipment Installation Procedure.
- Prepare Job Safety Analysis.
- Review Plot plan, Piping lay out & Isometric drawing for Contruction.
- Supervision Fabrication Activity on Shop.
- Supervision Construction Activity on Site.
- Controlling schedule & reporting project progress.
- Maintenance work, periodical shut down and tie-in work.
- Start up and commissioning.


2. PT. JGC Indonesia ( EPC Company in Oil & Gas Field )
Period : Nov. 2010 - Sept. 2011

1. Project : NOLI Project
2. Location : MM2100 Cibitung
3. Plant Owner : PT. JX Nippon Oil Lubricant Indonesia
4. Position held : Ass. Lead Engineer
Responsible for :
- Execution of Design Engineering Work, of which piping section is in charge for
the project.
- Implementation of the project quality plan in the section work under taken, in
Career Resume

4
accordance with the specified procedures.
- Preparation of Piping Engineering Execution Plan.
- Reconfirmation of design inputs.
- Control of sectional design engineering work input data.
- Design change control.
- Control of technical data exchanged between piping section and other sections,
Vendors, Subcontractors or Client.
- General control of sharing design engineering work, and coordination between
other Department and Piping Dept.
- Planning and implementation of internal engineering audit, participation of
correction action meeting, review and maintain the meeting result records, in the
case where corrective action is pointed by engineering audit.
- Follow-up corrective action to the design documents in the case where corrective
action is pointed out in the engineering audit.
- Delegation during absence of Piping Lead, I will sign on all documents and will
take responsibility on behalf of Piping Dept.Manager.


3. PT. Mitsubishi Chemical Indonesia ( Petrochemical Company )
Period : Mar. 2010 - Nov. 2010

1. Project : WWT Stabilization Project
2. Location : Cilegon
3. Plant Owner : PT. Mitsubishi Chemical Indonesia
4. Position held : Mech. Officer ( Piping )
Responsible for :
- Vendors selection
- Prepare Engineering, Procurement and Construction Schedule.
- Prepare Piping Installation Procedure
- Prepare Equipment Installation Procedure
- Prepare Job Safety Analysis
- Review Plot plan, Piping plan & Isometric drawing for Contruction.
- Supervision Fabrication Activity on Shop.
- Supervision Construction Activity on Site
- Controlling schedule & reporting project progress
- Maintenance work, periodical shut down and tie-in work.
Career Resume

5
- Start up and commissioning.

4. PT. Mitsubishi Chemical Engineering Indonesia ( EPC Company in Petrochemical
Field )
Period : Mar. 2006 - Dec. 2008

1. Project : Natural Gas Project, WWT Capacity up Project & Periodical
Shutdown Maintenance 2008
2. Location : Cilegon
3. Plant Owner : PT. Mitsubishi Chemical Indonesia
4. Position held : Mech. Staff
Responsible for :
- Prepare Piping Installation Procedure.
- Prepare Equipment Installation Procedure.
- Prepare Job Safety Analysis.
- Supervision Construction Activity on Site.
- Design Piping plan and Isometric drawing.
- Supervision pipe spool fabrication such as dimension & material check, visual
welding check.
- Piping erection.
- Equipment installation such as Pump, Blower, Vessel, Heat exchanger, etc.
- Hydrostatic test, pneumatic test, flushing, blowing and final reinstallation.
- Maintenance work, periodical shut down and tie-in work.
- Start up and commissioning.

5. PT. Yamaha Music Manufacturing Asia ( Electronic Company )
Period : Sept. 2003 - Sept. 2005
Employer : PT. Yamaha Music Manufacturing Asia

1. Position held : Production Engineering Staff

Responsible for :
- Trial new model / product.
- Research & Development for running product
- Localization spare part & material.
- Prepare specification process for production process.
- Issued Engineering Change Notice.
- Prepare Bill Of Material for new model / product.
Career Resume

6
- Vendors selection.

The curriculum vitae is made according with reality and suitable with the fact.

Sincerely yours


Indra Kusumah. ST




LETTER OF FAMILY PERMIT


The undersigned

Name : Ns. Dian Mustika Rini S.Kep
Spouse : Wife
Nationality : Indonesian
Address : J l. Trip J amaksari Gg Gelatik No. 23 RT/RW : 001 / 015
Sumur Pecung Serang Banten ( 42118 )


Hereby inform that

Name : Indra Kusumah. ST
Religion : Moslem
Place & Date of Birth : Cilegon, April 05, 1977
Spouse : Husband
Nationality : Indonesian
Address : J l. Trip J amaksari Gg Gelatik No. 23 RT/RW : 001 / 015
Sumur Pecung Serang Banten ( 42118 )

Permitted to my husband to join with KNPC/ OSSC as Eng. Mech Design Project (
Piping ). As per term and condition that is agreed by both of side (My Husband & KNPC
/OSSC ).


Best Regards

Ns. Dian Mustika Rini S.Kep

Das könnte Ihnen auch gefallen