STEPS TO TILING A ROOF

All specifications detailed are for a single story domestic building - consult your nearest Cyclocor offices for other applications.

5. Mark out roof


Set out tiles by running rows up one gable, along the apex and eaves. Use a chalk line to mark out rest of roof to correspond with the tiles on the eaves and apex. Note: Gable overhangs not to exceed 300mm.

6. Loading of Roof 1. Tools required


Tape Measure Spirit Level Hammer
927 927 T3 T3 927 T3 927 T3

The loading of the roof must be carried out symmetrically. Tiles stacks are not to exceed 13 tiles per stack and must be positioned on alternate battens from apex to eaves.
8900 927 T3 927 T3 927 T3 927 T3 927 T3

Saw Nail Bag Angle Grinder


5530

T3

RB

2. Erect trusses
Erect trusses in strict accordance with truss manufacturers specifications for the specified Cyclocor Product. Ensure that the truss centres are consistent and in accordance with the truss layouts supplied.

RB

3. Undertile membrane
Undertile membranes are mandatory for all Cyclocor Products at all pitches.

4. Establish batten gauge (see procedure)


ROOF AREA- 68m
2

347
38 x 38 SA Battens 9 x 225 FC Fascia Boards

347

347

347

347

347

347

347

347

50

347

347

TILES

612 32 1224 200m 21m 2 Rolls

347

347

RIDGES

347

347

347

SCREWS

347

347

BATTENS TILTING FILLET UNDERLAY

50 x 76 tilting fillet

BATTEN LAYOUT
347 347 347 347

BATTEN LAYOUT

14.
347 347 347

347

347

347

347

50

347

347

347

347

347

15.
347 347 294 294 294

294

347
SA Battens

347

47

347

scia Boards

x 76 tilting fillet 7. Laying50 of tiles

9. Ridge Detail
82mm long screw Ridge Tile

Tiles to be laid out from gable end used to set out the chalk lines for the tile lines.

Marley bituminous membrane

347

347

347

347

347

347

347

347

347

50

347

347

347

2 No 38x38 Batten to make up ridge tree

347

347

347

347

347

38x38 Tiling batten

347

294

294

294

294

DRY RIDGE DETAIL


Approved sealer C ounter flashing Approved sealer A pproved sealer C ounter flashing

10 0m m M in

Flashing

10. Flashing Details 10 0m m


M in
Flashing

C ounter flashing

200m m M in

Approved sealer C ounter flashing

U nderlay

Approved sealer U nderlay C ounter flashing

A pproved sealer C ounter flashing Abutm ent flashings m ust be finished w ith a cover flashing of the sam e m aterial to avoid electrolytic corrosion. 200m m M in

10 0m m M in

Flashing

10 0m m M in

Flashing

TO P A P R O N FLA S H IN G
U nderlay

TO P A P R O N FLA S H IN G
U nderlay

B A C K G U TTE R

Abutm ent flashings m ust be finished w ith a cover flashing of the sam e m aterial to avoid electrolytic corrosion.

TO P A P R O N FLA S H IN G

TOP APRON FLASHING

TO P A P R O N FLA S H IN G

BACK GUTTER

B A C K G U TTE R

Tiles on the eaves & ridge fixed with 2No ring shank nails Tiles to be screwed in checked pattern method
Tiles on the eaves & ridge fixed with 2No ring shank nails

Approved sealer C ounter flashing Flashing dressed over first tile contour

Approved sealer C ounter flashing Flashing dressed over first tile contour

A pproved sealer C ounter flashing Preform ed noncorrodible gutter

TILE FIXING Tiles to be screwed in checked pattern method DETAILS

U nderlay Approved sealer C ounter flashing R after

U nderlay Approved sealer R after C ounter flashing Flashing dressed over first tile contour

U nderlay A pproved sealer C ounter flashing Preform ed noncorrodible gutter R after

8. Mechanical Fixing of tiles for exposure category


supplied in this catalogue for the various terrain categories.

Flashing dressed over first tile contour

Tiles to be fixed with non-corrodable ring shank nails in strict accordance with details

SID E FLA S H IN G
U nderlay R after

SID E FLA S H IN G SIDE FLASHING


U nderlay R after

S ID E G U TTE R SIDE FLASHING


U nderlay R after

16.
SID E FLA S H IN G SID E FLA S H IN G S ID E G U TTE R

17.

Das könnte Ihnen auch gefallen