Issue of Brief
The General or Project Manager will be responsible for issuing a Design Brief to the Team Leader. The brief must fully outline the requirements of the design or tas . The Brief should be issued using an !nternal Brief "orm #or similar$ that should be signed by both parties to demonstrate acceptance and understanding of the brief. The brief shall be ept as a record.
Detail Design
The Design Team shall underta e their designs in accordance with /best practices0 and sound ,ngineering techniques. 1erification and chec ing of any researched or supplied data or requirements must be established.
Checking Arrangements
Document chec ing for all acti'ities must be specified in the Project Plan and shall be underta en in accordance with +ompany( Project Procedure 7 +ontrol of Documents. Documents to be chec ed shall be listed and categorised as either type *& B or +. +ategory * 7 * rigorous or recorded chec on all aspects and detail of the information& underta en independently from the team that produced the information. +ategory B 7 * rigorous and recorded chec on all aspects and detail of the information& underta en by a member of the team that produced the information. +ategory + 7 * recorded chec that could be in the form of a re'iew of selected aspects of the input2output data or ser'ice carried out& eg criteria used& conclusions& presentation& output& or records2registers. The chec er can be the same person who produced the wor .
Checking of Drawings
Prior to any drawing being issued the following chec s need to be completed and documented by way of a signature on a +hec Print. The signed +hec Print should be ept as a record document. +*D Draughtsman to complete a drafting self chec . ,ngineer to complete a technical and design self chec . Bac 8chec er #)enior ,ngineer$ to sign to grant appro'al for issue of drawing. 1erification of Document +ontrol measures prior to issuing.