Sharaf Head Quarters - Ground Floor Extension (Phase-II) Al Hilal Building, Al Garhoud, Dubai PRICING SCHEDULE / SCOPE OF WORKS

(REV.01)

IS/575 25/04/2012

Item

Description

Qty

Unit

Rate

Amount (Dhs.)

Preliminaries a Site supervision, protection, scaffolding, cleaning & Handover. 1 Item LS

66,000.00 66,000.00

B a b c d e

Enabling works Removal &Carting away of existing partitions & Doors Removal & Carting away of existing floor finishes Including screed Removal of existing ceilings Removal of existing pantry finishes including wall/floor ceiling, cabinets etc Waterproofing to the new toilet

30,084.00

Item

LS

30,084.00

Floor Finishes a New screed and allow for necessary builder's works to achieve required levels, making good, etc b Fixing of Mile Silver 600x600mm Porcelain tile -FF01 (Supplied by the Client) c Supply and fixing of new Timeless 20-3-Grey 200mmx200mm floor tiles for the toilet area.-FF03 d Allow for supply and fixing of Threshold

35,709.00

1 326

Item m2

LS 39.00

16,280.00 12,714.00

23 1

m LS

92.00

2,116.00 4,599.00

Wall Finishes (Including Glass & Gypsum partitions) a New block work to close the existing openings , new block wall including Cement , sand render / plaster 100mm Block work Plastering b Gypsum double layer dry wall partitions with Rockwool insulation. c New 10mm thick clear glass partitions d Deluxe Trade Paint Neutral 39 40YY 73/028 Fenomastic emulsion paint to the gypsum walls & Masonry walls e Ceramic wall tile (Timeless 20-8-Creamy 200x200mm) for Toilet.

82,500.00

Item

9,900.00

170 50 635 135

m2 m2 m2 m2

154.00 496.00 13.00 99.00

26,180.00 24,800.00 8,255.00 13,365.00

Skirting finishes a Porcelain to all drywall partitions and masonry walls (Allow PC rate of Dhs. 15/= per l.m) for supply of skirting tiles

7,820.00

230

34.00

7,820.00

Ceiling Finishes a 60x60cm Gypsum board ceiling with emulsion paint finish 1 LS

24,310.00 24,310.00

G a b c d e

Timber / Glass Doors (Including Ironmongery) Fixing of Existing single leafed glass doors. Fixing of Existing double leafed glass doors. Relocation of existing wooden door on corridor Supply and fixing of new white painted timber doors Existing timber doors to be repainted and repaired 8 1 1 3 4 No No No No No 1,980.00 3,960.00 1,650.00 2,833.00 1,980.00

37,869.00 15,840.00 3,960.00 1,650.00 8,499.00 7,920.00

Refixing of Pantry Unit a Refixing of the existing cabinet with all existing fittings and accessories removed from the pantry with necessary adjustments

2,200.00

LS

2,200.00

PriceSchedule(Rev.01).xlsx

1/2

Sharaf Head Quarters - Ground Floor Extension (Phase-II) Al Hilal Building, Al Garhoud, Dubai PRICING SCHEDULE / SCOPE OF WORKS (REV.01)

IS/575 25/04/2012

Item I MEP works

Description

Qty

Unit

Rate

Amount (Dhs.) 174,295.00

Electrical System. a Includes all new 600x600 fluorescent light fittings 72 nos with point wiring, 20 floor boxes, and 16 power sockets with necessary DB modifications and containment for data cabling including trunkign works to connect to existing RACK room in ground floor Plumbing and drainage b Drainage, water supply, pex pipe works for modifications, new toilets and pantry. 4 nos new WCs of which 2 nos with concealed flush system. 2 nos urinal with sensor system and 3 nos wash basins with mixers. AC works c AC modification works with addition of branch ducts with VCD to all rooms and new diffusers. New 2.5 ton ducted AC unit with ducting to break out area. New inline type extract fan with ducting to break out area and discharge to parking / loading area. Fire alarm works d Modification / Addition to smoke detectors with access door interfacing in fire alarm panel Emergency lights e Modification / Addition to emergency and exit lights

1.00

LS

50,600.00

1.00

LS

32,395.00

1.00

LS

50,600.00

1.00

LS

10,450.00

1.00

LS

8,250.00

Containment only for low current systems (supply and installed by client) f Containment for 1 nos access control door and 2 nos cctv cameras, 2 nos projectors, 4 nos speakers Vanity Counters g Supply and fixing of Black absolute vanity counter tops for Male and Female toilets

1.00

LS

3,850.00

1.00 Builder's Works for the above MEP works h Allow a builders works for the above MEP works

LS

2,750.00

1.00

LS

15,400.00

PROVISIONAL SUMS a Allow a Provisional Sum of Dhs. 25,000/= for the refixing of folding partition door with steel structure Inclusive of 15% of Main contractor's Coordination, Overhead & Profit. b Allow a Provisional Sum of Dhs. 5,000/= for the Third party ac inspection for AC Machines Inclusive of 15% of Main contractor's Coordination, Overhead & Profit. 1 PS

51,000.00 25,000.00

PS

5,000.00

c Allow a Provisional Sum of Dhs. 16,000/= for the New 3 ton ac unit with ducting in case existing ac not sufficient Inclusive of 15% of Main contractor's Coordination, Overhead & Profit. d Allow a Provisional Sum of Dhs. 5,000/= for the Additional Mile Silver 600x600 Porcelain tile Inclusive of 15% of Main contractor's Coordination, Overhead & Profit.

PS

16,000.00

PS

5,000.00

TOTAL CONTRACT PRICE (AED) EXCLUSIONS: Structured cabling system Access control system CCTV, audio, video system Maintenance of existing AC units Relocation of existing DBs or fire hose cabinets Lockers & Benches Authorities fees

511,787.00