Sie sind auf Seite 1von 40

GE GE Oil Oil& &Gas Gas

Subsea

Enabling future value in challenging environments

1 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Agenda
Setting the Scene
Subsea Wellheads Subsea Processing Subsea Intervention

2 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

GE Oil & Gas

Setting the Scene

4 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

The Subsea Landscape


Onshore Offshore Subsea Onshore Offshore Subsea

2012 Subsea Production 9%

2020 Subsea Production 15%

Significant Growth & Technical Challenges

Deepwater

Complex Reservoirs

Reduced Cost

Improved Recovery
5 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Continuing to build our upstream portfolio


2007 / 2008 2010 2011 2012

VetcoGray
Land, Offshore, Subsea drilling & production systems

Sondex
Downhole wireline drilling technology

Wellstream
Flexible risers Flowline products

Naxys
Multi-domain monitoring

Hydril
Pressure control

Wood Group
Pressure control

Presens
Pressure temperature & flow measurement

Supporting technology development inorganically


6 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Technical challenges do not exist alone ...


Complexity Localisation
Expertise

Customer

Technical strategy must tick multiple boxes


7 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Structured Products ... Delivering Value


Product Management ... a strategy aligned for growth
- Product strategy owned by domain experts - Aligned to customer and developing needs - Offline product development & innovation - Faster development cycle - Improved product performance

Structured Products ... solution to market demands and constraints


Standardisation Modularity Structured Product

+
Standard Tree

Valve, Meter, Choke options

Standard Tree with Customer Options

Reduced risk, improved quality engineering efficiency


8 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

GE Technical Trends - Deepwater


High Riser Tension High Bending Loads High Fatigue Capacity

High Lockdown Capacity


High Casing Loads Long trip times Higher pressures

Deepwater = Big rigs, long risers, high riser tension Deep reservoirs = High casing loads

GE MS wellheads enabling deepwater operations


9 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

GE Technical Trends Improved Recovery


Hydrocarbon Recovery Rate %
Typical Subsea Well Global average

Improved Oil Recovery Target


0 10 20 30 40 50 60 70

Well Intervention

Subsea Processing

IOR /EOR

60% Target
10 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Leveraging new technology to deliver value

GE Oil & Gas

Subsea Wellheads

11 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Subsea Wellhead Evolution


1970
300 3000 FT Torque Set / Elastomer Sealing

1990
Deepwater Weight Set, All Metal to Metal

2010
Deep Well Below Mudline Tech

2012
Deep Well Custom Solution

2014
Extreme Environment

SG-5/SG-6

MS-700 MS-1

MS-800

Petrobras MS-800

Next Gen MS-2

1st to enable broad shallow water subsea drilling

No turning DP to set hangers and seals, new structural integrity

Full bore (18.5) and added metal sealing 16 & 18 Below Mudline Equipment

Less moving parts and universal design

Optimize existing Architecture for 2X performance

Over 40 Years of Technology Innovation


12 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Offshore Drilling Market Trends*

Global Market growth through 2016

Five rig operators lead technology use: Petrobras; Statoil; BP; Shell; Chevron.

Increasing demand and complexity


* Source: Quest Offshore
13 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Our Industrys Challenges


Deep Water, Deep Wells
Long trips times More casing strings Longer casing strings High pressures, High temperatures

Regulatory Changes
API Revisions (qualification, testing, materials, etc ) Planning to extreme load cases, maximum anticipated surface pressures, etc

Harsh Environments
Worst case DP vessel in Shallow Water High tension and bending for drive off conditions

Speed & Flexibility


Global Standardization Global Warehouses Broad enhancement of tougher materials, Class C Welding, etc )

14 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Conventional to FullBore Evolution


Conventional 2X the complexity with 18 & 16
HP Housing 18 Below Mudline 16 Below Mudline

Evolving from 30 day wells to 120 days


15 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Deep Well - Global Product Offering


MS-800 Structural & Fatigue
High Fatigue, Tension, Bending, Anti Rotation, Shallow Water Flow

Well Bore
18.50, 350F and multiple hanger positions

Casing Programs
Hanging Capacity, Lockdown, Sealing Locations, Tubing Hanger Profile, Flowby 18/16 Below Mudline

Industry Leading Standards


API 17D 6A, Shell , Statoil TR, DNV Fatigue Methods

16 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

GE Subsea Wellhead Technologies


Dual-Taper Lock
Optimized for bending, fatigue and lockdown No extra trip preloading required 4 MM LBS Lockdown
High pressure housing Low pressure housing
Energizing Ring

Running Tools
20 year proven designs Drill ahead Extreme capacities for increased casing loads Smart Latch

HP Housing

U Ring Seal

Support Ring

Seal Energized

Concentric Wicker Profiles

36 Cam

Drill Ahead

Casing Hanger Seal Not Energized Debris Trap Area

MS Sealing
15,000psi above/7,500psi annulus 250F Integral 750K lockdown Up to ~400 installs/year @ 98% FTY

VX/VT Gasket
15,000psi rated 350F VT available if VX is damaged

H4 Connector
Up to 7.0MM Ft-Lbs bending 15,000 psi rated Standard on all VG wellheads 27 or 30 sizes
17 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Subsea Wellhead Test Facility

Houston Test Facility 20,000 ft 2

4 Environmental Chambers -100F to 800F Six-sided bunkering


Pit 3: 24 2420 72,000 gal 620 caisson

All pressure tests are conducted with 6 sided bunkering GE standard is 24 of concrete or 1-2 of steel
18 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Next Generation Subsea Wellhead

20K Pressure & 2MM LBS Lockdown

Reliable Seal Installation Automatic Lockdown

4MM LBS + 20K Casing Hanger Loads

Zero trip wear bushing

1YR X 10 Fatigue Life

Enabling higher pressures and temperature drilling

19 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

GE Oil & Gas

Subsea Processing

20 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Subsea processing

Increased Oil Recovery CAPEX reduction OPEX reduction

Subsea

Process

Power

Value creation through integration of three disciplines


21 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

A brief timeline
Evolution over 50 years of increased oil recovery subsea
600 20 years to adopt 150 Subsea boosting just reaching the 20 year mark

450 100 300 50 150 0 1980 2000 2020 0 10 20 30 40

0 1960

No . subsea trees installed [Quest]

Subsea boosting is in tree year ~1981

20 years of subsea processing in our industry, this is when it really begins


22 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

GE Subsea, Process and Power


Subsea Systems
Subsea trees & wellheads Subsea power & processing Controls Manifolds Flexible risers Flow lines Specialty connectors & pipes

Turbomachinery
Gas & steam turbines Axial, centrifugal & reciprocating compressors Pumps Control panels Industrial modules

Global Services Measurement & Control


Asset condition monitoring, control, sensing & inspection solutions Optimization & diagnostic software Transactional outage services Contractual services Conversions, modifications & upgrades Remote monitoring & diagnostics

Subsea
Solutions Drilling & Surface
Electric submersible pumps

Power & Water


Aeroderivative Gas Turbines Gas Engines Gasification Generators Heavy Duty Gas Turbines Renewable Energy Steam Turbines Water & Process Technologies

Power Conversion
Electrical motors Variable speed drives Uninterruptable power supply

Cutting edge technology solutions across the value chain


23 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Ormen Lange Pilot, Nyhamna

GE Scope: Long Stepout Power Supply Switchgear, UPS , Compressor VSD, Pump VSD, BlueC Compressor

Photo: Svein Ivarsen Norske Shell Roger 2013 GE Oil & Gas. All/ Rights Reserved
Unauthorized Reproduction Prohibited

24

Subsea Power Supply Evolution


SPEED

Alstom

ABB Offshore Systems

Troll Pilot

Nautilus

Tyrihans

Converteam
Paimpol

VetcoGray
sgard Gas Compression

Ormen Lange

Research Design Testing Engineering Qualification Products - Systems


25 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Subsea compressor evolution


Horizontal 4 bearings rigid coupling Horizontal 4 bearings flexible coupling Vertical 4 bearings rigid coupling Vertical 4 bearings flexible coupling Horizontal 3 bearings Vertical 3 bearings
0 50 100 150 200 250 300 350 400

Robustness
Reliability

Size

26 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Blue-C submerged and running


Cost-effective alternative to traditional offshore platforms
A single sealed housing to withstand extreme operating conditions A simplified mechanical configuration for reliable unattended operation

Speed & pressure range fully tested during the first 2,300 hours of operation on January 28th, 2013
27 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Next Generation Wet Gas Compression

One GE integrated team development Subsea Simplification

28 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Universal Subsea Boosting System


Paragraph title
Text Text Text Text Text Text Text Text Text Text

29 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Subsea processing a GE evolution

SmartCenter Wet gas compression

Statoil Subsea Factory illustration courtesy of Statoil

MSDC for ultra long step out Universal Subsea Boosting Station Troll C Subsea separation High P HV Penetrators Next gen. VSD Compact separation

Multiphase pump

MECON WM for 3000m

Single phase pump

ESPs

Separation.....

Enabling extended field life and improved hydrocarbon recovery


30 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

GE Oil & Gas

Subsea Intervention

31 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

The Recovery Opportunity

4D Seismic Horizontal/multilateral drilling Water/gas Injection/flood Artificial Lift Digitization/field management Subsea boosting Intervention

Primary Recovery

Secondary Recovery

Tertiary Recovery

Extending field life


Unlock Reservoir/Well Potential

Improved Oil Recovery from ageing assets is possible


32 GE 2012 All Rights Reserved32 2013 GE Reproduction Oil & Gas. All Rights Reserved Unauthorised Prohibited
Unauthorized Reproduction Prohibited

Subsea reservoir / well recovery


Subsea a major production growth area
14.6%

Subsea reservoirs typically have lower recovery rates

Average well age >10 years

Over 80% >5 years old

4.8%

2000

2020

X%

Subsea Production (% of Total Production)

~X-20%

Operators targeting improved reservoir recovery

More intervention intensity required subsea

~60%

Total No. of Wells Total No. of Interventions % Interventions Technical Success Rate

Onshore 964 824 85% 66%

Offshore Platform 616 236 38% 57%

Subsea 135 23 17% 96%

More production enhancing subsea intervention is needed


Sources:, GE research, Morgan Stanley (2013), WIEN. 33 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Subsea Well Intervention


Subsea intervention landscape
The vessel (work platform) The intervention well access/ control system Subsea equipment (permanent production control) Vessel profile

Vessel/Rig Types
Cat A (light) Cat B (medium) Cat C (heavy)

Subsea ROV (intervention support) Down hole tooling (i.e. logging)

Intervention Riserless wireline Coiled tubing, method and slickline wireline and (RLWI) slickline (CT) Main activities Borehole survey Wireline logging Stimulation GL Valve repair Coiled Tubing ops Well workover ESP Changeout Abandonment

Heavy operation, drilling BOP Re-drill or sidetrack Cementing Casing leak Well workover

Additional Production Generation i.e. Fracturing Production Safeguarding i.e. scale removal Production restoration i.e. gas lift valve repair Updating Reservoir Information i.e. logging

The Well Access Challenge


Increasing Depths To 3000m Open Water - Circa 2000m Becoming The Norm Increased Pressure Ratings To 15k Moving To 20k. Increased Temperature Rating To 180 Deg C Increased EHS Requirements Post Macondo
Sources:, GE research, Morgan Stanley (2013), WIEN. 34 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Enabling Technology

HAR EDP Connector


SIL 2 rated capability to safely disconnect surface & subsea packages instantly under normal operational or emergency conditions prevents environmental and equipment damage
Last line of defence break-away SAFT Jt.

Stress Joint

EDP Accumulation

HAR

EDP

LRP

35 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Enabling Technology

HAR EDP Connector


New, High Angle Release EDP Connector 10kpsi, 2,000m WD, API 17G Compliant Undergoing enhancement program Min 10 degree disconnect angle 7 3/ 8 Concentric with 2 Hydraulic couplers. Instant quick disconnect Self Aligning Available Q4 2013
Primary Lock Stroking Hydraulic Coupler Locking Dogs Dampeners

Latch ring

36 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Enabling Technology

Safety Joint
Last line of defence break-away SAFT Jt.

Joint provides protection to surface & subsea systems when unexpected loads are applied to Riser String
Stress Joint

(eg Compensation System lock up).

EDP Accumulation EDP

LRP

37 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Enabling Technology

Safety Joint
Safety Joint in Working Mode
Collet Ring Lockout Device Safety Joint Tuned Bolts

Pressure Balanced / Neutral ... avoids need for each well bore pressure to re calibrate Hand off capacity 350 kips Can be set to any breaking load using calibrated weak link bolts. During running, the device is locked to

prevent accidental separation.


Pressure Balance Piston

Available Q4 2013

38 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Enabling Technology

SIL 2 Rated CWOR


SIL 2 rated & certified safety system for CWOR Intervention Critical Functionality Surface Tree Shut In. EDP Emergency Disconnect. LRP Well Shut In Safety Joint Initiated Riser and Well Isolation Full Redundancy Subsea PLCs 2000m Water Depth Specified SIL 2 TUV Certification API 17G and Statoil TR Compliant Available Q4 2013

Post-Macondo Safer Systems are now being specified


39 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Future State 2013 to 2017


CWOR Light Well Intervention Technology

Best-in-Class Subsea Well Access Structured Product API 17G Compliant 15K psi+ 3000m 180 Deg C SIL 2 Rental Fleet Lowest Op Times

Life Of Field Service

Intervention
Solutions

Subsea Test Trees

Tubing Hanger Running & Completion Systems

Work Over Control Systems

Safe, efficient Intervention Solutions across the well lifecycle


40 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

GE Technology
Wellhead Technology
Enables harsher environments and higher temperatures and pressures

Subsea Processing

Enabling extended field life and improved hydrocarbon recovery

Intervention Systems

Enabling lower cost operations

Enabling the Subsea Field of the Future


41 2013 GE Oil & Gas. All Rights Reserved Unauthorized Reproduction Prohibited

Das könnte Ihnen auch gefallen