GENERAL INDEX

Equipment:

DETAILED ENGINEERING
Order: VEC001101

Customer: ROYAL GK PTE LTD

DATE

DOCUMENT

ORDER

GENERAL INDEX

VEC001101

Nov-2012
INDEX

CUSTOMER

ROYAL GK PTE LTD

- CONTENT1

GENERAL TABLE OF CONTENTS ................................................................ 1

CONSISTENTS WITH OUR CONTINUAL PRODUCT IMPROVEMENT POLICY, GUASCOR POWER RESERVES THE RIGHT TO CHANGE ANY SPECIFICATION WITHOUT PRIOR NOTICE.

DATE

DOCUMENT

ORDER

GENERAL INDEX

VEC001101

Nov-2012
INDEX

CUSTOMER

ROYAL GK PTE LTD

GENERAL TABLE OF CONTENTS

1. Technical report
1.1. General technical report
2. Annexes
2.1. Annex 01 Fluid dynamics calculations
2.1.1. Fluid dynamics calculations
2.2. Annex 02 Pipe and Fittings
2.2.1. Material specifications
2.3. Annex 03 Civil engineering calculations (pile option)
2.3.1. My_building_piles_option_combinations_en
2.3.2. My_estudio_de_cimentacion-en
2.3.3. My_general info offices building_en
2.3.4. My_general info slabs_en
2.3.5. My_general info switchboards_en
2.3.6. My_general info_firewalls_en
2.3.7. My_nave_opcion_pilotes_cargas-en
2.4. Annex 04 Generator sets installation manual
See Generator installation manual Index
2.5. Annex 05 Advancement geotechnical study findings
2.6. Annex 06 Ventilation system
2.6.1. VEC001153 Ventilation Assembly Manual
2.6.2. General arrangement
2.6.3. 42-12-0_ENGINE ROOMS 1 Y 2. CONSTRUCTIVE SECTIONS-TECSON
Ventilation
2.7. Annex 07 - Fire detection system
2.8. Annex 08 - SCADA system
3. Construction plans
3.0. Situation and location
3.0.1. 01-01-0_Situation and location
3.1. Process diagrams and P&IDs
3.1.1. 12-01-B_Genset flow diagram
3.1.2. 13-01-B Engine cooling system P & ID diagram
3.1.3. 13-02-B Lube oil P & ID diagram

CONSISTENTS WITH OUR CONTINUAL PRODUCT IMPROVEMENT POLICY, GUASCOR POWER RESERVES THE RIGHT TO CHANGE ANY SPECIFICATION WITHOUT PRIOR NOTICE.

DATE

DOCUMENT

ORDER

GENERAL INDEX

VEC001101

Nov-2012
INDEX

CUSTOMER

ROYAL GK PTE LTD

3.1.4. 13-03-A Natural gas P & ID diagram


3.1.5. 13-04-B Engine exhaust gas P&Id diagram
3.2. Electrical single line diagrams
3.2.1. 21-01-D_MV Single line diagram - Power plant
3.2.2. 21-02-D_MV Single line diagram - Detail of head protection cells
3.2.3. 21-03-D_MV Single line diagram - Typical Genset
3.2.4. 22-01-F_LV Single line diagram.General switchboard of power plant aux
serv
3.2.5. 22-02-D_LV Single line diagram. Engine rooms switchboards
3.2.6. 22-03-D_LV Single line diagram. Workshop and Access control
switchboards and power socket
3.2.7. 24-01-F_Diagram of buried grounding grid distribution
3.2.8. 24-02-C_Grounding grid. Details
3.2.9. 25-01-C_Lighting and lightning rods location
3.2.10. 25-02-C_LV Supply network distribution
3.2.11. 25-03-C_MV Supply network distribution
3.2.12. 25-04-B_LV Supply network distribution - General services building
3.2.13. 25-11-C_Sections of Electric channels and trenches
3.2.14. 25-12-B_Lighting and lightning rods.Details
3.2.15. 26-01-D_Power and lighting installation
3.2.16. 27-01-C_Optical fiber network Lay-out
3.2.17. 27-02-D_Fire&Gas Detection.Associated communications network
3.2.18. 29-01-B_Lightning rods protection area.pdf
3.3. Lay-Out
3.3.1. 31-01-0_General Lay-out
3.3.2. 31-01.1-C_General Lay-out
3.3.3. 31-02-A_Lay-out Sections
3.3.4. 31-11-0 Lay-out genset n-1
3.3.5. 31-12-0 Lay-out genset n-2-13
3.3.6. 31-13-0 Lay-out genset n-14
3.3.7. 31-14-0 Lay-out genset n-15-26
3.3.8. 35-01-D_Fire-Gas Detection and Fire extinguishing Layout
3.3.9. 35-02-A_Engine rooms Ventilation system
3.3.10. 39-01-B_General Lay-out. Current and future
3.4. Civil engineering
3.4.1. 41-01-0_urbanization. Stakeout benchmark +0.00
3.4.2. 41-01-A_urbanization. Stakeout benchmark +0.00
3.4.3. 41-02-0_urbanization. Foundation in underground installations

CONSISTENTS WITH OUR CONTINUAL PRODUCT IMPROVEMENT POLICY, GUASCOR POWER RESERVES THE RIGHT TO CHANGE ANY SPECIFICATION WITHOUT PRIOR NOTICE.

DATE

DOCUMENT

ORDER

GENERAL INDEX

VEC001101

Nov-2012
INDEX

CUSTOMER

ROYAL GK PTE LTD

3.4.4. 41-02-A_urbanization. Foundation in underground installations


3.4.5. 41-02-B_urbanization. Foundation in underground installations
3.4.6. 41-02-C_urbanization. Foundation in underground installations
3.4.7. 41-03-0_urbanization. General sections
3.4.8. 41-03-A_urbanization. General sections
3.4.9. 41-03-B_urbanization. General sections
3.4.10. 41-04-0_urbanization. Trench and details
3.4.11. 41-04-A_urbanization. Trench and details
3.4.12. 41-04-B_urbanization. Trench and details
3.4.13. 41-05-0_foundation. Transformers, gensets and details
3.4.14. 41-05-A_foundation. Transformers, gensets and details
3.4.15. 41-05-B_foundation. Transformers, gensets and details
3.4.16. 41-06-0_foundation. Walls, rms, cells cabinet and details
3.4.17. 41-06-A_foundation. Walls, rms, cells cabinet and details
3.4.18. 41-06-B_foundation. Walls, rms, cells cabinet and details
3.4.19. 42-01-0_engine room 1. Top view, top view cover and carpentry frame
3.4.20. 42-01-A_engine room 1. Top view, top view cover and carpentry frame
3.4.21. 42-02-0_engine room 1. Front view and section
3.4.22. 42-02-A_engine room 1. Front view and section
3.4.23. 42-03-0_engine room 1. Foundation and structure (benchmark+1.00)
3.4.24. 42-04-0_engine room 1 structure (benchmark +4.00) and cover structure
3.4.25. 42-05-0_engine room 1 structure front view and section
3.4.26. 42-06-0_engine room 2. Top view,top view cover and carpentry frame
3.4.27. 42-06-A_engine room 2. Top view,top view cover and carpentry frame
3.4.28. 42-07-0_engine room 2. Front view and section
3.4.29. 42-07-A_engine room 2. Front view and section
3.4.30. 42-08-0_engine room 2. Foundation and structure (benchmark+1.00)
3.4.31. 42-09-0_engine room 2. Structure (benchmark +4.00) and cover structure
3.4.32. 42-10-0_engine room 2. Structure front view and section
3.4.33. 42-11-0_engine rooms 1 y 2.details foundation and structure
3.4.34. 42-12-0_engine rooms 1 y 2. Constructive sections
3.4.35. 42-12-A_engine rooms 1 y 2. Constructive sections
3.4.36. 42-13-0_auxiliary services building. Top view, top view cover and carpentry
frame
3.4.37. 42-13-A_auxiliary services building. Top view, top view cover and
carpentry frame
3.4.38. 42-14-0_auxiliary services building. Front view and sections
3.4.39. 42-14-A_auxiliary services building. Front view and sections

CONSISTENTS WITH OUR CONTINUAL PRODUCT IMPROVEMENT POLICY, GUASCOR POWER RESERVES THE RIGHT TO CHANGE ANY SPECIFICATION WITHOUT PRIOR NOTICE.

DATE

DOCUMENT

ORDER

GENERAL INDEX

VEC001101

Nov-2012
INDEX

CUSTOMER

ROYAL GK PTE LTD

3.4.40. 42-15-0_auxiliary services building. Foundation and structure


3.4.41. 42-16-0_auxiliary services building. Structure front view and sections
3.4.42. 42-16-A_auxiliary services building. Structure front view and sections
3.4.43. 42-17-0_auxiliary services building. Details foundation and structure
3.5. Metallic Structure
3.5.1. 51-01-0 Fixed support muffler
3.5.2. 51-02-0 Guided Support muffer
3.5.3. 51-03-0 Conduit Support type A
3.5.4. 51-04-0 Conduit Support type B
3.5.5. 51-05-0 Conduit Support type C
3.5.6. 51-06-0 Conduit Support type D
3.6. Piping and ducting
3.6.1. 60-01-A Lay-out of pipes
3.6.2. 60-02-A lay-out of pipes section
3.6.3. 61-01-A Lay-out of pipes Area grms
3.6.4. 61-02-A Lay-out of pipes Area Ship 1A
3.6.5. 61-03-A Lay-out of pipes Area Ship 1B
3.6.6. 61-04-A Lay-out of pipes Area Ship 2A
3.6.7. 61-05-A Lay-out of pipes Area Ship 2B
3.6.8. 62-01-A Lay-out of pipes Area air cooler exchanger typical detail
3.6.9. 62-02-A Lay-out of pipes Area Genset typical detail
3.6.10. 62-03-A Section pipes Area GRMS
3.6.11. 62-04-0 Lay-out of pipes Lube oil typical detail
3.6.12. 63-001 H1 Isometric pipe line no 001
3.6.13. 63-001 H2 Isometric pipe line no 001
3.6.14. 63-001 H3 Isometric pipe line no 001
3.6.15. 63-001 H4 Isometric pipe line no 001
3.6.16. 63-002 H1 Isometric pipe line no 002
3.6.17. 63-002 H2 Isometric pipe line no 002
3.6.18. 63-002 H3 Isometric pipe line no 002
3.6.19. 63-002 H4 Isometric pipe line no 002
3.6.20. 63-002 H4_0 Isometric pipe line no 002
3.6.21. 63-004 H1 Isometric pipe line no 004
3.6.22. 63-004 H2 Isometric pipe line no 004
3.6.23. 63-004 H3 Isometric pipe line no 004
3.6.24. 63-005 H1 Isometric pipe line no 005
3.6.25. 63-005 H2 Isometric pipe line no 005
3.6.26. 63-005 H3 Isometric pipe line no 005

CONSISTENTS WITH OUR CONTINUAL PRODUCT IMPROVEMENT POLICY, GUASCOR POWER RESERVES THE RIGHT TO CHANGE ANY SPECIFICATION WITHOUT PRIOR NOTICE.

DATE

DOCUMENT

ORDER

GENERAL INDEX

VEC001101

Nov-2012
INDEX

CUSTOMER

ROYAL GK PTE LTD

3.6.27. 63-005 H4 Isometric pipe line no 005


3.6.28. 63-018 H1 Isometric pipe line no 018
3.6.29. 63-018 H3 Isometric pipe line no 018
3.6.30. 63-018 H5 Isometric pipe line no 018
3.6.31. 63-018 H8 Isometric pipe line no 018
3.6.32. 63-018-2 H1 Isometric pipe line no 018
3.6.33. 63-018-2 H2 Isometric pipe line no 018
3.6.34. 63-018-2 H3 Isometric pipe line no 018
3.6.35. 63-018-2 H4 Isometric pipe line no 018
3.6.36. 63-018-2 H5 Isometric pipe line no 018
3.6.37. 63-018-2 H6 Isometric pipe line no 018
3.6.38. 63-020 Isometric pipe line no 020
3.6.39. 63-021 H1 Isometric pipe line no 021
3.6.40. 63-021 H11 Isometric pipe line no 021
3.6.41. 63-021,1 H1 Isometric pipe line no 021,1
3.6.42. 63-021,14 H1 Isometric pipe line no 021,14
3.6.43. 63-021,15 H1 Isometric pipe line no 021,15
3.6.44. 63-021,2 H1 Isometric pipe line no 021,2
3.6.45. 63-021-1 H1 Isometric pipe line no 021,1
3.6.46. 63-021-14 H1 Isometric pipe line no 021,14
3.6.47. 63-021-15 H1 Isometric pipe line no 021,15
3.6.48. 63-021-2 H1 Isometric pipe line no 021,2
3.6.49. 63-16 H1 Isometric pipe line no 16
3.6.50. 63-16 H2 Isometric pipe line no 16
3.6.51. 63-16 H3 Isometric pipe line no 16
3.6.52. 63-16 H4 Isometric pipe line no 16
3.6.53. 63-17 H1 Isometric pipe line no 17
3.6.54. 63-17 H4 Isometric pipe line no 17
3.6.55. 63-17-2 H1 Isometric pipe line no 17
3.6.56. 63-17-2 H2 Isometric pipe line no 017
3.6.57. 63-17-2 H3 Isometric pipe line no 017
3.6.58. 63-17-2 H4 Isometric pipe line no 017
3.6.59. 63-17-2 H5 Isometric pipe line no 017
3.6.60. 64-01 Pipe Support S-001
3.6.61. 64-02 Pipe Support S-002
3.6.62. 64-03 Pipe Support S-003
3.6.63. 64-04 h2 Pipe support S-004
3.6.64. 64-04-h1-0 Pipe support S-004

CONSISTENTS WITH OUR CONTINUAL PRODUCT IMPROVEMENT POLICY, GUASCOR POWER RESERVES THE RIGHT TO CHANGE ANY SPECIFICATION WITHOUT PRIOR NOTICE.

DATE

DOCUMENT

ORDER

GENERAL INDEX

VEC001101

Nov-2012
INDEX

CUSTOMER

ROYAL GK PTE LTD

3.6.65. 64-05 Pipe support S-005


3.6.66. 64-06 Pipe support S-006
3.6.67. 64-07 Pipe support S-007
3.6.68. 64-08 Pipe support S-008
3.6.69. 64-09 Pipe support S-009
3.6.70. 64-10 Pipe support S-010
3.6.71. 64-11 Pipe support S-011
3.6.72. 64-12 Pipe Support S-012
3.6.73. 64-13 Mooring pipes
3.6.74. 65-01-0_Natural gas. General connection
4. List of materials
4.1. List of Civil engineering measurements
4.1.1. Civil work material list 00
4.1.2. Catalogues
4.1.2.1. Ach - mineral wool panels.pdf
4.1.2.2. Arcelor circular tubes_table
4.1.2.3. Arcelor european i beams
4.1.2.4. Arcelor european standard channels (upn)
4.1.2.5. Arcelor european wide flange beams (h type)
4.1.2.6. Arcelor rectangular tubes_table
4.1.2.7. Arcelor structural hollow sections
4.1.2.8. Tuyper - catalogue
4.2. Mechanical assembly
4.2.1. Engine Pipeline & fitting Material list
4.3. Electrical and control installation
4.3.1. Buried Grounding Grid Measurement
4.3.2. List of control cables MV protections
4.3.3. Measure Electrical Installations
4.3.4. Measure Genset Auxiliary Installations
4.3.5. Medium Voltage Cable List
4.3.6. Power Cable list of Low Voltage
5. AutoCAD plans
5.1. 0X_Localizacin
5.1.1. 01-01-0_Situation and location
5.2. 1X_Esquemas
5.2.1. 12-01-B_Genset flow diagram
5.2.2. 13-01-B Engine cooling system P & ID diagram
5.2.3. 13-02-B Lube oil P & ID diagram

CONSISTENTS WITH OUR CONTINUAL PRODUCT IMPROVEMENT POLICY, GUASCOR POWER RESERVES THE RIGHT TO CHANGE ANY SPECIFICATION WITHOUT PRIOR NOTICE.

DATE

DOCUMENT

ORDER

GENERAL INDEX

VEC001101

Nov-2012
INDEX

CUSTOMER

ROYAL GK PTE LTD

5.2.4. 13-03-A Natural gas P & ID diagram


5.2.5. 13-04-B Engine exhaust gas P&Id diagram
5.3. 2X_Elctricos
5.3.1. 21-01-D_MV Single line diagram - Power plant
2.327.120 21-02-D_MV Single line diagram - Detail
5.3.2. 06/12/2012 11:25
of head protection cells.dwg
5.3.3. 21-03-D_MV Single line diagram - Typical Genset
5.3.4. 22-01-F_LV Single line diagram.General switchboard of power plant aux
serv
5.3.5. 22-02-D_LV Single line diagram. Engine rooms switchboards
5.3.6. 22-03-D_LV Single line diagram. Workshop and Access control
switchboards and power socket
5.3.7. 24-01-F_Diagram of buried grounding grid distribution
5.3.8. 24-02-C_Grounding grid. Details
5.3.9. 25-01-C_Lighting and lightning rods location
5.3.10. 25-02-C_LV Supply network distribution
5.3.11. 25-03-C_MV Supply network distribution
5.3.12. 25-04-B_LV Supply network distribution - General services building
5.3.13. 25-11-C_Sections of Electric channels and trenches
5.3.14. 25-12-B_Lighting and lightning rods. Details
5.3.15. 26-01-D_Power and lighting installation
5.3.16. 27-01-C_Optical fiber network Lay-out
5.3.17. 27-02-D_Fire&Gas Detection.Associated communications network
5.3.18. 29-01-B_Lightning rods protection area
5.4. 3X_Implantacin
5.4.1. 31-01-0_General Lay-out
5.4.2. 31-01.1-C_General Lay-out
5.4.3. 31-02-A_Lay-out Sections
5.4.4. 31-11-A Lay-out genset n1
5.4.5. 31-12-A Lay-out genset n-2-13
5.4.6. 31-13-A Lay-out genset n-14
5.4.7. 31-14-A Lay-out genset n-15-26
5.4.8. 35-01-D_Fire-Gas Detection and Fire extinguishing Layout
5.4.9. 35-02-A_Engine rooms Ventilation system
5.4.10. 39-01-B_General Lay-out. Current and future arrangement
5.5. 4X_Estructura
5.5.1. 41-01-0_urbanization. Stakeout benchmark +0.00
5.5.2. 41-01-A_urbanization. Stakeout benchmark +0.00

CONSISTENTS WITH OUR CONTINUAL PRODUCT IMPROVEMENT POLICY, GUASCOR POWER RESERVES THE RIGHT TO CHANGE ANY SPECIFICATION WITHOUT PRIOR NOTICE.

DATE

DOCUMENT

ORDER

GENERAL INDEX

VEC001101

Nov-2012
INDEX

CUSTOMER

ROYAL GK PTE LTD

5.5.3. 41-02-0_urbanization. Foundation in underground installations


5.5.4. 41-02-A_urbanization. Foundation in underground installations
5.5.5. 41-02-B_urbanization. Foundation in underground installations
5.5.6. 41-02-C_urbanization. Foundation in underground installations
5.5.7. 41-03-0_urbanization. General sections
5.5.8. 41-03-A_urbanization. General sections
5.5.9. 41-03-B_urbanization. General sections
5.5.10. 41-04-0_urbanization. Trench and details
5.5.11. 41-04-A_urbanization. Trench and details
5.5.12. 41-04-B_urbanization. Trench and details
5.5.13. 41-05-0_foundation. Transformers, gensets and details
5.5.14. 41-05-A_foundation. Transformers, gensets and details
5.5.15. 41-05-B_foundation. Transformers, gensets and details
5.5.16. 41-06-0_foundation. Walls, rms, cells cabinet and details
5.5.17. 41-06-A_foundation. Walls, rms, cells cabinet and details
5.5.18. 41-06-B_foundation. Walls, rms, cells cabinet and details
5.5.19. 42-01-0_engine room 1. Top view, top view cover and carpentry frame
5.5.20. 42-01-A_engine room 1. Top view, top view cover and carpentry frame
5.5.21. 42-02-0_engine room 1. Front view and section
5.5.22. 42-02-A_engine room 1. Front view and section
5.5.23. 42-03-0_engine room 1. Foundation and structure (benchmark+1.00)
5.5.24. 42-04-0_engine room 1 structure (benchmark +4.00) and cover structure
5.5.25. 42-05-0_engine room 1 structure front view and section
5.5.26. 42-06-0_engine room 2. Top view,top view cover and carpentry frame
5.5.27. 42-06-A_engine room 2. Top view,top view cover and carpentry frame
5.5.28. 42-07-0_engine room 2. Front view and section
5.5.29. 42-07-A_engine room 2. Front view and section
5.5.30. 42-08-0_engine room 2. Foundation and structure (benchmark+1.00)
5.5.31. 42-09-0_engine room 2. Structure (benchmark +4.00) and cover structure
5.5.32. 42-10-0_engine room 2. Structure front view and section
5.5.33. 42-11-0_engine rooms 1 y 2.details foundation and structure
5.5.34. 42-12-0_engine rooms 1 y 2. Constructive sections
5.5.35. 42-12-A_engine rooms 1 y 2. Constructive sections
5.5.36. 42-13-0_auxiliary services building. Top view, top view cover and carpentry
frame
5.5.37. 42-13-A_auxiliary services building. Top view, top view cover and
carpentry frame
5.5.38. 42-14-0_auxiliary services building. Front view and sections

CONSISTENTS WITH OUR CONTINUAL PRODUCT IMPROVEMENT POLICY, GUASCOR POWER RESERVES THE RIGHT TO CHANGE ANY SPECIFICATION WITHOUT PRIOR NOTICE.

DATE

DOCUMENT

ORDER

GENERAL INDEX

VEC001101

Nov-2012
INDEX

CUSTOMER

ROYAL GK PTE LTD

5.5.39. 42-14-A_auxiliary services building. Front view and sections


5.5.40. 42-15-0_auxiliary services building. Foundation and structure
5.5.41. 42-16-0_auxiliary services building. Structure front view and sections
5.5.42. 42-16-A_auxiliary services building. Structure front view and sections
5.5.43. 42-17-0_auxiliary services building. Details foundation and structure
5.6. 5X_Estructura
5.6.1. 51-01-0 Fixed support muffler
5.6.2. 51-02-0 Guided Support muffer
5.6.3. 51-03-0 Conduit Support type A
5.6.4. 51-04-0 Conduit Support type B
5.6.5. 51-05-0 Conduit Support type C
5.6.6. 51-06-0 Conduit Support type D
5.7. 6X_Tuberas
5.7.1. 60-01-A Lay-out of pipes
5.7.2. 60-02-A lay-out of pipes section
5.7.3. 61-01-A Lay-out of pipes Area grms
5.7.4. 61-02-A Lay-out of pipes Area Ship 1A
5.7.5. 61-03-A Lay-out of pipes Area Ship 1B
5.7.6. 61-04-A Lay-out of pipes Area Ship 2A
5.7.7. 61-05-A Lay-out of pipes Area Ship 2B
5.7.8. 62-01-A Lay-out of pipes Area air cooler exchanger typical detail
5.7.9. 62-02-A Lay-out of pipes Area Genset typical detail
5.7.10. 62-03-A Section pipes Area GRMS
5.7.11. 62-04-0 Lay-out of pipes Lube oil typical detail
5.7.12. 63-001 H1 Isometric pipe line no 001
5.7.13. 63-001 H2 Isometric pipe line no 001
5.7.14. 63-001 H3 Isometric pipe line no 001
5.7.15. 63-001 H4 Isometric pipe line no 001
5.7.16. 63-002 H1 Isometric pipe line no 002
5.7.17. 63-002 H2 Isometric pipe line no 002
5.7.18. 63-002 H3 Isometric pipe line no 002
5.7.19. 63-002 H4 Isometric pipe line no 002
5.7.20. 63-002 H4_0 Isometric pipe line no 002
5.7.21. 63-004 H1 Isometric pipe line no 004
5.7.22. 63-004 H2 Isometric pipe line no 004
5.7.23. 63-004 H3 Isometric pipe line no 004
5.7.24. 63-005 H1 Isometric pipe line no 005
5.7.25. 63-005 H2 Isometric pipe line no 005

CONSISTENTS WITH OUR CONTINUAL PRODUCT IMPROVEMENT POLICY, GUASCOR POWER RESERVES THE RIGHT TO CHANGE ANY SPECIFICATION WITHOUT PRIOR NOTICE.

DATE

DOCUMENT

ORDER

GENERAL INDEX

VEC001101

Nov-2012
INDEX

CUSTOMER

ROYAL GK PTE LTD

5.7.26. 63-005 H3 Isometric pipe line no 005


5.7.27. 63-005 H4 Isometric pipe line no 005
5.7.28. 63-018 H1 Isometric pipe line no 018
5.7.29. 63-018 H3 Isometric pipe line no 018
5.7.30. 63-018 H5 Isometric pipe line no 018
5.7.31. 63-018 H8 Isometric pipe line no 018
5.7.32. 63-018-2 H1 Isometric pipe line no 018
5.7.33. 63-018-2 H2 Isometric pipe line no 018
5.7.34. 63-018-2 H3 Isometric pipe line no 018
5.7.35. 63-018-2 H4 Isometric pipe line no 018
5.7.36. 63-018-2 H5 Isometric pipe line no 018
5.7.37. 63-018-2 H6 Isometric pipe line no 018
5.7.38. 63-020 Isometric pipe line no 020
5.7.39. 63-021 H1 Isometric pipe line no 021
5.7.40. 63-021 H11 Isometric pipe line no 021
5.7.41. 63-021,1 H1 Isometric pipe line no 021,1
5.7.42. 63-021,14 H1 Isometric pipe line no 021,14
5.7.43. 63-021,15 H1 Isometric pipe line no 021,15
5.7.44. 63-021,2 H1 Isometric pipe line no 021,2
5.7.45. 63-021-1 H1 Isometric pipe line no 021,1
5.7.46. 63-021-14 H1 Isometric pipe line no 021,14
5.7.47. 63-021-15 H1 Isometric pipe line no 021,15
5.7.48. 63-021-2 H1 Isometric pipe line no 021,2
5.7.49. 63-16 H1 Isometric pipe line no 16
5.7.50. 63-16 H2 Isometric pipe line no 16
5.7.51. 63-16 H3 Isometric pipe line no 16
5.7.52. 63-16 H4 Isometric pipe line no 16
5.7.53. 63-17 H1 Isometric pipe line no 17
5.7.54. 63-17 H4 Isometric pipe line no 17
5.7.55. 63-17-2 H1 Isometric pipe line no 17
5.7.56. 63-17-2 H2 Isometric pipe line no 017
5.7.57. 63-17-2 H3 Isometric pipe line no 017
5.7.58. 63-17-2 H4 Isometric pipe line no 017
5.7.59. 63-17-2 H5 Isometric pipe line no 017
5.7.60. 64-01 Pipe Support S-001
5.7.61. 64-02 Pipe Support S-002
5.7.62. 64-03 Pipe Support S-003
5.7.63. 64-04 h2 Pipe support S-004

CONSISTENTS WITH OUR CONTINUAL PRODUCT IMPROVEMENT POLICY, GUASCOR POWER RESERVES THE RIGHT TO CHANGE ANY SPECIFICATION WITHOUT PRIOR NOTICE.

10

DATE

DOCUMENT

ORDER

GENERAL INDEX

VEC001101

Nov-2012
INDEX

CUSTOMER

ROYAL GK PTE LTD

5.7.64. 64-04-h1-0 Pipe support S-004


5.7.65. 64-05 Pipe support S-005
5.7.66. 64-06 Pipe support S-006
5.7.67. 64-07 Pipe support S-007
5.7.68. 64-08 Pipe support S-008
5.7.69. 64-09 Pipe support S-009
5.7.70. 64-10 Pipe support S-010
5.7.71. 64-11 Pipe support S-011
5.7.72. 64-12 Pipe Support S-012
5.7.73. 64-13 Mooring pipes
5.7.74. 65-01-0_Natural gas. General connection
5.8. 8X_Equipos
5.9. 9X_Varios

CONSISTENTS WITH OUR CONTINUAL PRODUCT IMPROVEMENT POLICY, GUASCOR POWER RESERVES THE RIGHT TO CHANGE ANY SPECIFICATION WITHOUT PRIOR NOTICE.

11