Third Party Inspection for Control Panel


The Third Party Inspection for Control Panel article provides you information about control panel test and control pane inspection in manufacturing shop.

Follow Us on

Like

207

Follow Us on TPI Blog

You may need to review this article in conjunctions of following article:


Home

Inspection and Test Plan for Control Panel


General Articles Third Party Inspection Pre-Shipment Inspection Goods Inspection Vendor Inspection Inspection and Test Plan Shop Inspection Factory Acceptance Test Commodity Inspection Industrial Quality Control Industrial Inspection Approved Vendor List Plant Inspection Fix Equipment Articles Pressure Vessel Heat Exchanger Steam Boiler Storage Tank Piping System Industrial Valve Process Heater Rotary Equipment Articles Centrifugal Pump
Global TPI Services

Search This Website

This content guides you about all necessary


We Provide Pre-Shipment Inspection, Vendor Inspection and Commodity Inspection Services. Click Here for More Information

stages in the production of the Control Panels from the examination of raw material to the final inspection, preservation and packing to despatch to site. You need to take this point in account this article
Custom Search

is written for a typical Control Panel and might not be complete for special cases. This content may be useful for second party inspectors, Control Panel manufacture quality control personnel, engineering companies and purchasers as well. All Control Panel inspections and tests are carried out against the approved drawings, purchase order specifications, purchasers or company standards, and within the practices and rules of the country, state or province and any government decrees, laws, ordinance or regulation as may apply. The applicable codes and specifications for the control panel which is under construction process are: Design code Purchase order specification Purchaser's standards Approved drawings The applicable codes and standard may be based any international standards. Required Documents for Third Party Inspector Review: standards. This content is general and can be useful for all recognized Enter Your E-mail Address Enter Your First Name (optional)
We will be updating and growing this site with more and more of industrial inspection related articles. Please subscribe to our monthly newsletter so you don't miss a thing. Approved Vendor Lists Global TPI Services

Centrifugal Compressor Reciprocating Compressor Gas Turbine Steam Turbine

The list of documents normally is agreed in the Pre Inspection meeting which is hold several weeks before actual commencement of inspection work. The parties which are participated in this meeting are manufacture, purchaser and third party inspection agency representatives.

1 of 6

10/29/2012 17:03

Third Party Inspection for Control Panel

http://www.inspection-for-industry.com/third-party-inspection-for-control...

Fan and Blower Electrical Equipment Articles Induction Motor Generator Power Transformer Switchgear Gas Circuit Breaker UPS Storage Battery Power Cable Control Panel Electrical Insulator Editor About Services Contact TPI Inspection Blog Privacy Policy

Then

This already explained in the Inspection and Test Plan for Control Panel article. These are the list of documents which are normally agreed to be presented to the inspector: Control Panel Purchase Order or Contract Control Panel Manufacture Quality Control Plan Control Panel Inspection and test plan Control Panel Data Sheet Control Panel Approved drawings, (arrangements, schematics, wiring, single line) Control Panel Material Test Reports Control Panel Welding Specification Procedures (WPS) and Procedure Qualification Records(PQR) Control Panel Welders Qualifications Reports Control Panel Calibration Certificates for Test Equipment Control Panel Special procedures Control Panel Special qualifications Control Panel Preparation and Painting Procedure Control Panel Preservation, Packing and Shipping Procedure Control Panel Packing List Third Party Inspection for Control Panel-Material Inspection The first actual inspection work in the Control Panel is raw materials inspection. The original or authenticated copies of mill certificates of material normally are available at manufacturer's premises. The third party inspector examines these certificates for compliance with specifications and where appropriate, drawings. The review includes checks on: Certificate No. Heat or cast No. Chemical composition. Mechanical properties. Heat treated condition. NDE applied and results. Surface finish Then inspector witnesses the materials identification on the certificates against materials marking. It is also necessary to check with Control Panel drawing datasheet, material list and other specification as appropriate.
We Provide TPI Inspection Services in most Industrial Areas in the Globe. Click Here for More Information
Don't worry your e-mail address is totally secure. I promise to use it only to send you Inspection for Industry Newsletter .

[?]Subscribe To This Site

Visual inspection for surface finish and probable defects is done and dimensional compliance with specification need also to be controlled. When the third party inspector carried out the material inspection, then provides inspection visit report (IVR), the report contains following items: Confirmation of satisfactory document review Record of the endorsement of certification reviewed/witnessed Record of all non-conformities Record of any tests witnessed and the result

2 of 6

10/29/2012 17:03

Third Party Inspection for Control Panel

http://www.inspection-for-industry.com/third-party-inspection-for-control...

Third Party Inspection for Control Panel Construction When Control Panel raw material inspection carried out and results was satisfactory or non-conformities closed by remedial action, then Control Panel manufacture will start fabrication. The third party Inspector checks following points on control panel based on the inspection and test plan (ITP) which is already agreed between purchaser and control panel manufacture. The inspection scope is determined in the ITP, some purchasers prefer to have stringent control and assign the TPI inspector in more hold or witness points for inspection and test activities and some others prefer lesser hold or witness points and assign TPI much more in the review document. This depend to the inspection budget which purchasers assign for inspection, much more inspection will have much more costs and less risks and conversely less more inspection will have less costs but more risks. For more detail review Inspection and Test Plan for Control Panel article. There is draft ITP in this article which I believe it is the best practice for Control Panel inspection. The third party inspector checks following items in Control Panel construction process: Paint using specified colour swatch, thickness measurement, if specified Name plate control Outline dimensions, interface dimensions, bus bar dimensions and Clearances and other specified dimensions Tightness/torque of terminals Degree of protection It is necessary the results to meet drawings and applicable standards. Third Party Inspection for Control Panel General Arrangement Check The third party inspector checks that all instruments, compartments, control switches etc. are correctly rated and are correctly located, with specified labelling in accordance of approved drawings. If the third party inspector is not in hold or witness point in the project ITP for this stage, then will review control panel manufacture quality control report in his/her coming visit or in the final inspection day. Third Party Inspection for Control Panel Insulation Resistance Test Insulation resistance is measured between control circuits and earth (with sensitive devises excluded) with a 500V Megger. Similarly insulation resistance is measured in all applicable permutations for any power circuits, if these are included within the control system, with a Megger selected to the voltage calculated appropriate to the applicable specification. The test result depends to the circuit but would not be acceptable if it is less than 2 Megohms. If the third party inspector is not in hold or witness point in the project ITP for this stage, then will review control panel manufacture quality control report in his/her coming visit or in the final inspection day.

3 of 6

10/29/2012 17:03

Third Party Inspection for Control Panel

http://www.inspection-for-industry.com/third-party-inspection-for-control...

Control Panel Withstand Voltage Test (Dialectric Test) Power frequency voltage of 1.5 kV is applied between control circuits and earth for 1 minute. Similarly power frequency voltage, calculated appropriate to the applicable specification, is applied to all applicable permutations for power circuits for 1 minute. The test would be acceptable if no flashover and puncture occurs during the test. Similarly if the third party inspector is not in hold or witness point in the project ITP for this stage, then will review control panel manufacture quality control report in his/her coming visit or in the final inspection day. Third Party Inspection for Control Panel Sequence Test Control circuitry is functionally tested and circuits proven by appropriate tests. The test result would be acceptable if meet approved schematic diagrams (including appropriate, recorded, as built alterations) and project philosophy Similarly if the third party inspector is not in hold or witness point in the project ITP for this stage, then will review control panel manufacture quality control report in his/her coming visit or in the final inspection day. Third Party Inspection for Control Panel Mechanical Operation Test The following mechanisms are checked for operation: Locking Interlocking systems Drawing mechanisms Opening and shutting mechanisms Interchangeability. The test would be acceptable if all mechanisms work correctly. Similarly if the third party inspector is not in hold or witness point in the project ITP for this stage, then will review control panel manufacture quality control report in his/her coming visit or in the final inspection day. Third Party Inspection for Control Panel Painting and Coating Inspection Surface preparation for painting is checked for the following points, according to specification by third party inspector: Cleaning method (Blast or scraping and wire brushing) Preparation grades Freedom from weld spatter, blow-holes and other defects Dry film thickness is checked according to specification It is necessary surface condition to be free from pin-holes, runs damage and other discontinuity.
We Provide TPI Inspection Services in most Industrial Areas in the Globe. Click Here for More Information

Similarly if the third party inspector is not in hold or witness point in the project ITP for this stage, then will review control panel manufacture quality control

4 of 6

10/29/2012 17:03

Third Party Inspection for Control Panel

http://www.inspection-for-industry.com/third-party-inspection-for-control...

report in his/her coming visit or in the final inspection day. Third Party Inspection for Control Panel Reporting: Third party inspector provides Inspection Visit Report (IVR) after each visit as well as a final report summarising the activities carried out during the Control Panel production in accordance with the contract requirements and circulated within the time limits specified in the contract. The report is in the format required by the client and clearly indicates final acceptance or rejection of the Control Panel. Third Party Inspection for Control Panel Release Note: When required by the contract or purchase order a release note is issued by third party agency and given to the manufacturer when the Control Panel have been finally accepted. Third Party Inspection for Control Panel Packing, Marking and Shipping: The following points are checked by the third party inspector: Verify that the packing materials conform to specifications and accepted practice for the mode of transport. Verify protection against humidity, abrasion, distortion and other damage. Verify shipping marks to marking instructions and record. Verify handling marks.
Like Send 207 people like this. Recommend this on Google

Related Articles: Third Party Inspection for Generator, Third Party Inspection for Bus Duct, Third Party Inspection for Power Transformer, Third Party Inspection for Power Cable, Third Party Inspection for Induction Motor, Third Party Inspection for Insulator, Third Party Inspection for Gas Circuit Breaker, Third Party Inspection for Battery Charger, Third Party Inspection for UPS Storage Battery, Third Party Inspection for Switchgear, Third Party Independent Inspection, Third Party Quality Inspection, Third Party Inspection Services, Third Party Inspection agency Other Related Articles: Industrial Inspection, Shop Inspection, Pre-Shipment Inspection, Factory Acceptance Test, Goods Inspection, Commodity Inspection, Vendor Inspection, Vendor Inspection Services, Goods Inspection Services, Commodity Inspection Services, Preshipment Inspection Services, 3rd Party Shop Inspection, Third Party Inspection for Material Stamp, Quality Control Plan, Quality Control Manuals for Contractors, Quality Control Manual, Contractor Quality Control Plan, Third Party Inspection Expediting, Industrial Quality Control, Quality Control Forms, Approved Vendor List

Return from Third Party Inspection for Control Panel to Third Party Inspection Return from Third Party Inspection to Inspection for Industry Home
Like Send 207 people like this. Recommend this on Google

New! Comments
Have your say about what you just read! Leave me a comment in the box below.

5 of 6

10/29/2012 17:03

Third Party Inspection for Control Panel

http://www.inspection-for-industry.com/third-party-inspection-for-control...

Add a comment... Comment using...


Facebook social plugin

Share this page:


What's This?

Enjoy this page? Please pay it forward. Here's how...

Inspection 4 Industry LLC Tel International: 0037257536267 Tel USA: 0013106518570

6 of 6

10/29/2012 17:03

Das könnte Ihnen auch gefallen