Sie sind auf Seite 1von 11

the switch for this is in URRCTRLSWITCH : RSVDBIT1_BIT22 (SRB_RESET_RL_SETUP_SWITCH) , RSVDBIT1_BIT23 ( UL_RLFAIL_RL_SETUP_SWITCH) , RSVDBIT1_BIT24 ( CS Re-establishment Switch ) , RSVDBIT1_BIT25 ( PS Re-establishment Switch

) , RSVDBIT1_BIT26 ( UE_SRB_RESET_RL_SETUP_SWITCH) and RSVDBIT1_BIT28 ( CS_RL_RESTORE_Timer_SWITCH ) By using this parameter set and some more we can reduce the CS and PS drop to a large extent , also attached is the DOC for the same.

Call Re-establishment feature in WCDMA

By using call reestablishment feature in the WCDMA we can reduce the call drop in CS and PS domain. This feature enables us to successful reestablish the call after the abnormal release indication has been sent by the RNC. In this doc study we will cover the below details: 1. Impact of Call Reestablishment on Network in NBH ,DBH and cell BBH Hour.

2. Detailed parameter description and impact analysis of call reestablishment. 3. UE Signaling analysis for CS and PS domain. 4. Further scope of improvement. 5. Suggestions required.

1.1 Impact of Call Reestablishment on Network in NBH ,DBH and cell BBH
By using call reestablishment feature in the WCDMA we can reduce the call drop in CS and PS domain. This feature enables us to successful reestablish the call after the abnormal release indication has been sent by the RNC. The re-establishment procedure allows MS to resume a connection in progress after a radio link failure, possibly in a new cell or in a new location area (re-establishment in a new location area initiates no location updating). Below trend provides the details of CSV Drop (NBH) , HS+PS Drop (DBH) and Erlang Minutes per drop (NBH) : Improvement observed in the CSV Drop and Erlang Minutes per drop.

CSV Drop Rate(NBH) 1.8 1.6 1.4 1.2

HS+PS Drop Rate(DBH)

Erlang Minutes per Drop(NBH) 800

700
E

600 r 500

D r o p r a t e

1 0.8 300 0.6 0.4 0.2 0 Low Traffic due to Diwali Holidays
Parameter changes implemented in Jaipur RNC Parameter changes implemented in Ajmer and Jodhpur RNC

l a n g

400 m
i n d r o p

200

100

The below trend provide the details of improvement observed in the cell BBH for the KPI CSV call drop rate and HS+PS Drop Rate.

CSV Drop Rate 2% 98


% o f c e l l m e e t i n g c r i t e r i a

HS+PS Drop Rate 2%

96 94 92 90 88 86 84 82 80 78 76
Parameter changes done in Jaipur RNC Parameter changes done in Ajmer and Jodhpur RNC

Axis Title

This drop rate improvement has been observed n the cell BBH level and indicates that the cell KPI has improved overall as far as the CSV and PS drop rate is considered. Beside no major impact seen on other KPIs due to this parameter changes. On the trial basis the parameter changes were firstly performed in the Jaipur RNC on 22nd Nov 2012 and in Ajmer and Jodhpur RNC the changes were implemented on 27th Nov 2012.

2.1 Detailed parameter description and impact analysis of call re-establishment

The CS call drop analysis is as shown below the basic counter responsible for the call drops are as mentioned : 1. 2. 3. 4. 5. 6. 7. 8. 9. VS.RAB.AbnormRel.CS.IuAAL2 VS.RAB.AbnormRel.CS.OLC VS.RAB.AbnormRel.CS.OM VS.RAB.AbnormRel.CS.Preempt VS.RAB.AbnormRel.CS.RF VS.RAB.AbnormRel.CS.RF.SRBReset VS.RAB.AbnormRel.CS.RF.ULSync VS.RAB.AbnormRel.CS.RF.UuNoReply VS.RAB.AbnormRel.CS.UTRANgen

From the above counter list the major pegged counters are the point no. 5 , 6 and 7.

CSV Call Drop rate(%) 0.8 0.7 D 0.6 r o 0.5 p 0.4 R a 0.3 t e 0.2 0.1 0

VS.RAB.NormRel.AMR 50000 45000 40000 R 35000 A r B e 30000 l N 25000 e o a 20000 r s m e 15000 a 10000 l 5000 0

The below graph indicates the RAB abnormal release analysis for the major pegged counters in the CS domain , it can clearly be seen that the CS Call drop rate due to SRB reset and UL sync has dipped a large volume thus impacting the overall CS call drop rate :

VS.RAB.AbnormRel.CS.RF 350 300 250 200 150 100 50 0

VS.RAB.AbnormRel.CS.RF.SRBReset

VS.RAB.AbnormRel.CS.RF.ULSync

16-Nov-12

1-Nov-12

2-Nov-12

3-Nov-12

4-Nov-12

5-Nov-12

6-Nov-12

7-Nov-12

8-Nov-12

9-Nov-12

10-Nov-12

11-Nov-12

12-Nov-12

13-Nov-12

14-Nov-12

15-Nov-12

17-Nov-12

18-Nov-12

19-Nov-12

20-Nov-12

21-Nov-12

22-Nov-12

23-Nov-12

24-Nov-12

25-Nov-12

26-Nov-12

27-Nov-12

28-Nov-12

29-Nov-12

The below graph indicates the RAB abnormal release analysis for the major pegged counters in the PS domain , it can clearly be seen that the PS Call drop rate due to SRB reset , TRB Reset and UL sync has dipped a large volume thus impacting the overall CS call drop rate :

30-Nov-12

VS.RAB.AbnormRel.PS.RF.SRBReset VS.RAB.AbnormRel.PS.RF.TRBReset 1600 P 1400 S 1200 c a 1000 l 800 l 600 d r o p 400 200 0

VS.RAB.AbnormRel.PS.RF.ULSync VS.Call.Drop.PS.Other 6000 P 5000 S 4000 c O a t l 3000 h l e r 2000 d r 1000 o p 0

3.1 UE Signaling analysis for CS and PS domain


The below signaling details indicate the 20 pre and post signaling at call drop , The CS Timer setted to 15000 ms for Enhanced Call Reestablishment, start after RNC send the RL Active CMD, stop after RNC receives cell update message.

3.1.1 CS Domain call signaling :

3.2.1 The below signaling details indicate the 20 pre and post signaling at call drop , The PS Timer setted to 30000 ms for Enhanced Call Reestablishment, start after RNC send the RL Active CMD, stop after RNC receives cell update message.

PS Domain call signaling :

3.2.3 Below is the signaling flow for the call setup details in the WCDMA mode :

The call re-establishment details are transmitted in the SIB 4 and SIB 12 after the release indication has been received a counter N313 starts which repeats it self for the times T313 value is assigned. We need to increases these timers in order to provide UE the time for re-laching and making a call re attempt for the RAB new connection.

4.1 Further scope of improvement.

In this section we will discuss the relevant further analysis and modification needed for the CS and PS call drop rate improvement 1. Further modification of counters and timers to improve the call drop rate. 2. These changes were made on the RNC level and cell level further changes need to be performed on the cell level for the in synsc and out sync parameters. 3. RSVDBIT1_BIT27 testing to be done at RNC level , in this part we need to check the pre and post changes after the RSVDBIT1_BIT27 enable and disable

5.1 Suggestions required.

Request readers for further suggestions and proposals for making further improvement in the KPIs.

Das könnte Ihnen auch gefallen