Sie sind auf Seite 1von 3

Muhammad Haris Waqar

PARTICULARS
Father's Name : Waqar Hafiz
Date of Birth : December 06, 1985
Address : E-50 Block-4 Gulshan-e-Iqbal, Karachi, 75300, Pakistan
FIELD OF INTEREST
Telephone : +92-21-4994321
Mobile : +92-(0)333-3261247
Communication/ Mobile
Email : hariswaqars@gmail.com, hariswaqars@hotmail.com,
Communication/
hariswaqarsi@yahoo.com
Transmission
Objective:
To work in a prestigious organization that would help me in understanding and
implementing my studies and also hone my professional skills and ultimately help me in evolving
into an adroit professional. And I am also expert in Administration and Management.

SCHOLASTICS PERSONAL STATEMENT


Qualification Year Institution Grade/GPA/Percentage
B.S in Elect 2007 Sir Syed University of Eng. And Tech. A / 2.85 / 71.14% The person who makes a success of
Intermediate 2002 Govt. Degree College Gulshan, Karachi A (79.81%) living is the one who sees his goal
Matriculation 2000 St. Judes High School A (76.11%) steadily and aims for it
unswervingly.

INTERNSHIPS
• July 2006 – August 2006: 6 weeks Internship at PTCL.

FINAL YEAR PROJECT I BELIEVE


• Reactor Building Ventilation Control System by using HMI.
“Every Thing Lies in God’s Hand”
“In the middle of every difficulty
MAJOR PROJECTS lies opportunity.”
• Variable DC Power Supply.
• Student Database System
• Security System using Turbo C
• Parking control system using microcontroller
• Digital Clock by using microcontroller

RESEARCH
• GSM security algorithms with simulation in Matlab

CERTIFICATION COURCES
• Computer hardware maintenance

SKILLS AND INTERESTS


• Proficient in Microsoft Office
• AutoCAD
• Programming in C Language
• PLC programming
• Matlab

EXTRA CURRICULAR ACTIVITIES


• Participated as a volunteer at PAF museum for earth quake victims
• Sports, Music and Traveling

WORK EXPERIENCE
ECP (Ericsson Pakistan Pvt Ltd-(Field Service Organization):

Proficient in Well Known Softwares


1- Tems Investigation Data Collection.
2- Map Info
3- Google Earth
4- TCP universal
5- Tems Investigation Route Analysis.

• From 20th Nov 07-Date to 05 Jan 09:

Ericsson is providing the Radio Frequency planning and initial optimization services to CMPAK (PAKTEL) in South (Sind &
Baluchistan) Region Phase 1 and Phase 2. I am currently working as RF engineer.
My basic responsibilities are:-

 Planning:

• Performs Technical Site Surveys for GF, RT and WM towers.

• Making Technical Site Survey Reports.

• Technical Site Surveys: After nominal cell plan designed, we do the technical site surveys for RF. In T.S.S we check the inter-
site distance, check the distance of the candidate from the nominal, check the obstacle, decide the antenna height, check
coordinates, identify the panoramic, decide the azimuths of all the three sectors, on the basis of traffic and ground reality, we
decided to approve or to reject the candidates from RF prospective.

 Optimization:

• Making cell files though GSM application.

• Making Drive Test Routes.

• Initial Tuning of Network by using TEMS investigation data collection software.

• Integration Drive Test: Conducts field measurement, check status of sites and swapping of sectors, initial tuning of sites using
TEMS investigation 8.1 and 8.1.2, & analyze drive test result using TEMS Route Analysis 8.1 and 8.1.2.

• Network Benchmarking: Conducts field measurement, monitor network performance using TEMS investigation 8.1 and
8.1.2, & analyze drive test result using TEMS Route Analysis 8.1 and 8.1.2.

• Provides Benchmarking information on coverage and network performance (of network operators) and recommend necessary
action to improve / maintain quality of service.

• Cluster Acceptance Drive Test: First we pre-drive test of the cluster and on the basis of pre-drive test, we made the
recommendation (like up tilting, down tilting, health check, sector swap, partial swap and orientation etc). After apply
recommendation, we do the post drive test of the cluster. In this way we get the end result of the cluster. Cluster acceptance
drive test perform by using TEMS investigation 8.1 and 8.1.2, & analyze drive test result using TEMS Route Analysis 8.1 and
8.1.2.
• Maintenance of the Cluster by using TEMS Investigation Software7.0, 8.0, 8.1, 8.1.2

• Good command on Drive Test.

• I have 15 Months Experience of Drive Testing.

Das könnte Ihnen auch gefallen