Earthing Resistance Measured Values

SUBSTATION EARTHPIT EARTING RESISTANCE


Date: - 28/05/2012
Pit No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Location

Resistance
0.42
0.44
0.39
0.51
0.35
0.41
0.36
0.31
0.24
0.51
0.47
0.41
0.32
0.36
0.52
0.49
0.57
0.43
0.39
0.28
0.32
0.33
0.46
0.37
0.49
0.53

SUBSTATION

Rating

SI. NO.

Date

S.N
o.
1
2
3
4
5
6
7

200 KVA

8/05/2012

WORKS

STATUS

Cleaning of body and insulator


Checked tightness of nuts-bolts/clamps of body
Checked tightness of Earthing nuts-bolts/clamps
Checked Neutral earthing
Checked oil level
Checked leakages
Checked condition of silica gel

OK
OK
OK
OK
OK
FOUND
REPLACE
D

Location

SITE OFFICE

Rating

500 KVA

SI. NO.

60000296

Date

17/05/2012

S.N
o.
1
2
3
4
5
6
7

WORKS

STATUS

Cleaning of body and insulator


Checked tightness of nuts-bolts/clamps of body
Checked tightness of Earthing nuts-bolts/clamps
Checked Neutral earthing
Checked oil level
Checked leakages
Checked condition of silica gel

OK
OK
OK
OK
OK
FOUND
REPLACE
D

Earthing resistance
Pit No.
1
2
3
4

Resistance
0.75
0.80
0.78
0.79

Location

BOILER

Rating

630 KVA

SI. NO.

60000297

Date

18/05/2012

S.N
o.
1
2
3
4
5
6
7

WORKS

STATUS

Cleaning of body and insulator


Checked tightness of nuts-bolts/clamps of body
Checked tightness of Earthing nuts-bolts/clamps
Checked Neutral earthing
Checked oil level
Checked leakages
Checked condition of silica gel

OK
OK
OK
OK
OK
FOUND
REPLACE
D

Earthing resistance
Pit No.
1
2
3
4

Resistance
0.85
0.92
0.94
0.96

Location

CHP

Rating

500 KVA

SI. NO.

ET - 1456

Date

18/05/2012

S.N
o.
1
2
3
4
5
6
7

WORKS

STATUS

Cleaning of body and insulator


Checked tightness of nuts-bolts/clamps of body
Checked tightness of Earthing nuts-bolts/clamps
Checked Neutral earthing
Checked oil level
Checked leakages
Checked condition of silica gel

OK
OK
OK
OK
OK
FOUND
REPLACE
D

Earthing resistance
Pit No.
1
2
3
4

Resistance
1.25
1.03
1.45
1.30

Location

O&M QUARTERS

Rating

315 KVA

SI. NO.

8438

Date

31/5/2012

Earthing resistance
Pit No.
1
2
3
4
5
6
7

Resistance
0.64
0.65
0.63
0.59
0.68
0.59
0.67

Location

LABOUR COLONY

Rating

200 KVA

SI. NO.

8439

Date

31/5/2012

Earthing resistance
Pit No.
1
2
3
4
5
6
7

Resistance
0.62
0.66
0.63
0.68
0.70
0.64
0.65

Location

Bachelor accommodation 1

Rating

200 KVA

SI. NO.

SI/200/77

Date

16/05/2012

S.N
o.
1
2
3
4
5
6
7

WORKS

STATUS

Cleaning of body and insulator


Checked tightness of nuts-bolts/clamps of body
Checked tightness of Earthing nuts-bolts/clamps
Checked Neutral earthing
Checked oil level
Checked leakages
Checked condition of silica gel

OK
OK
OK
OK
OK
FOUND
REPLACE
D

Earthing resistance
Pit No.
1
2
3
4

Resistance

Location

Bachelor accommodation 2

Rating

200 KVA

SI. NO.

Date

S.N
o.
1
2
3
4
5
6
7

15/05/12

WORKS

STATUS

Cleaning of body and insulator


Checked tightness of nuts-bolts/clamps of body
Checked tightness of Earthing nuts-bolts/clamps
Checked Neutral earthing
Checked oil level
Checked leakages
Checked condition of silica gel

OK
OK
OK
OK
OK
FOUND
REPLACE
D

Earthing resistance
Pit No.
1
2
3
4

Resistance

Location

Senior management Quarters

Rating

200 KVA

SI. NO.

Date

S.N
o.
1
2
3
4
5
6
7

8/05/2012

WORKS

STATUS

Cleaning of body and insulator


Checked tightness of nuts-bolts/clamps of body
Checked tightness of Earthing nuts-bolts/clamps
Checked Neutral earthing
Checked oil level
Checked leakages
Checked condition of silica gel

OK
OK
OK
OK
OK
FOUND
REPLACE
D

Earthing resistance
Pit No.
1
2
3
4

Resistance