Sie sind auf Seite 1von 2

1(2)

MAHER M. ODTALLAH
OBJECTIVE
Looking for a better and challenging position where I can gain and practice knowledge and skills for the benefit of company and customers.

PERSONAL DATA:
Present Address: Madinah, KSA, Tele: +966 1 270 4244

Mobile: +966 5 53 32 0256 E-mail: mahermo@yahoo.com Birth Date: 15th of November 1975. Sex: Male. Marital Status: Married father. Citizenship: Jordanian.

EDUCATIONAL BACKGROUND:
A. School: Al-Nomow School in Amman; graduated in 1993. GPA: 86.9%. B. University: Applied Science University in Amman; attended in 1993. Graduate in 1998. B.Sc. Electrical Engineering (Electronics and Communications) C. Special Training Programs: 1. Risk Management Course by PMI (12.5 PDU) Sep-05. 2. Project Management Course by E-Consulting (21 PDU) Nov-06. 3. VectaStar level 2 training Apr-10.

EMPLOYMENT EXPERIENCE:
Cambridge Broadband Networks / April 2010 to present Pre-sales consultant and technical support Engineer - Responsible for all technical inquiry and planning of VectaStar networks in the Middle East and North Africa region. The planning process consists of hub allocation, sector coverage analysis, RF planning, link budget, terminal homing, load analysis and interference analysis. - Conduct presentation about VectaStar equipment ranging from introduction to detailed technical. Motorola / July 2007 to March 2010 MW Planning Engineer, Mobily Northern Network - Responsible for all planning, designing, upgrading, routing, termination and optimization of all Mobily microwave links in Northern region (Madinah, Yanbu, Qassim, Hail and Tabouk). - Responsible for all microwave equipment stock, installed and dismantled of all Mobily projects (from L+0 till L+5, 3GL1 and 3GL3 materials.) all are Ericsson equipment PDH, SDH and hybrid. - Responsible for all technical proposals and all line-of-sight survey. - Major projects: o L+3, L+4 & L+5: A total of 886 extra E1s (672 new links & 281 upgrades) o 3G: A total of 1668 E1s (278 sites & 534 upgrades) o Re-routing core traffic from rented fiber to Mobilys fiber (26 STM-1). ACES Co. Ltd. / May 2001 to July 2007 Project Manager, Microwave Projects (P-COM, Harris, NEC, and Marconi) - Leading the survey teams by understanding the requirements, giving technical direction, controlling the schedule, maintaining a certain level of quality of readings and coordination. - Design and propose network layout with primary responsibility for collecting capacity requirements, identifying non line of sight or late scheduled sites and propose re-routing to maximize the number of on-air sites at all times.

Maher M. Odtallah (11 years experience in Project Management and Microwave Planning)

2(2) Engineering each microwave link to achieve optimum performance by maximizing the fade margin, minimizing interference and installation cost while keeping five nines link availability. Presenting the design package with bill of quantities. Engineer the Project Implementation Plan by coordinating with stakeholder to reach a basic understanding and approved plan, matching equipment delivery and civil schedule with resource availably and customer requirements, conducting risk analysis with tentative countermeasures, identifying slag and following stakeholder in a shy endeavor to predict any scope creep or schedule variance. Supervising sorting and labeling of microwave equipments, analyzing and reporting of designed/required/shipped/installed/damaged inventory and scheduling the shipments. Manage the implementation of the microwave links. Maintain Mobily microwave network in Jizan and Najran for two years by deploying 24 hours support teams, conducting preventive maintenance, analyzing incident and presenting and implementing corrective recommendations which lead to achieving Mobilys Service Level Agreement and increase the KBI.

Telecom Engineer, STC C&I project - Gather circuit work order and supervise its implementation. - Design cable ampacity and circuit breaker rating for a generic 3x3 shelter. Presenting the calculation to the customer for approval. - Lead the process of equipping two 3x3 shelter for STC by presenting design package including electrical, HVAC, lighting calculation and floor plan dimensions, purchasing, installation, testing and commissioning and PAT. Lucent Technologies / January 1999 to March 2001 Telecom Engineer, Microwave Projects - Troubleshooting microwave links using fault isolation and corrective action. - Populating a 3x3 shelter. - Preparing BTS Installation Manual which shows the installation teams the BTS configuration needed, antennas height, orientation and tilt, feeder, jumper and duplexer layout, power rating and connection, A-bis routing and usage. - Act as main point of contact between my department (site engineering) and implementation departments to coordinate the process of issuing CWO and report our design progress.

ADDITIONAL INFORMATION: A. Personal Qualifications:

1. Computer Skills: Programming Languages (C, Assembly, BASIC & HTML). Operating Systems (DOS, Windows (3.11, 95, 98, XP & NT). Packages (MS Project, MS Word, MS Excel, MS Access, PathLoss & MapInfo). Programming Fujitsu MB90670 Microcontroller. Good experience using Internet and Intranet. 2. Active personality and good communication skills. 3. Good in team work. B. Languages: Spoken and written Arabic and English.

REFERENCES:
References are available upon request.

Maher M. Odtallah (11 years experience in Project Management and Microwave Planning)

Das könnte Ihnen auch gefallen