Sie sind auf Seite 1von 3

1-(a) Name of occupier or intending occupier of the factory Mr. B K Shrivastava- Site Head INDORAMA ELEME PETROCHEMICALS LIMITED.

(b) If a firm which is not a registered company, give the number and date of registration under the registration of Business Names Act 1961 and full name and address of each partner (and attach duly certified true copy of the certificate issued under the registration of business names Act) It is a registered company INDORAMA ELEME PETROCHEMICALS LIMITED. .RV.0243, Eleme Petrochemical Company Ltd. Eleme Petrochemical Complex, Eleme, P.M.B. 5151, Port Harcourt, Rivers State, Nigeria. (c)If a registered company state here particulars of registration under the companies Act 1968(and attached duly certified true copy of certificate issued under the companies Act.. Yes it is registered, Registration number is RC121777, and the copy of registration certificate is attached. 2- Postal address and telephone number(if any) of the occupier or intending occupier . INDORAMA ELEME PETROCHEMICALS LIMITED., Eleme Petrochemical Complex, Eleme, P.M.B. 5151, Port Harcourt, Rivers State, Nigeria. Telephone No. +234 (0) 08052224082. 3- Precise location of factory if in a township, the street or plot number should be given. If outside a township, please add sufficient information to enable the factory to be easily located Eleme, East - West High way, Port Harcourt 4- Nature of work carried on or proposed to be carried on in the factory etc) Manufacturing and marketing of Polyethylene & Polypropylene resin and other petrochemical products. 5- Whether Mechanical power is used or intended to be used, and if so, its nature (e.g. electricity, diesel engine Natural Gas use for power Generation - Gas Turbines, Type: frame six, GE make, Cap-33MW 6-(a) Date and places of procurement of machines drive by mechanical power 1992 (b) Give full details of machinery, equipment, etc to be used (including operating parameters: integral safety devices (data and address of procurement of machinery driven by mechanical power Mentioned in the process write up.

(C) Give full details of all materials to be used(including chemical and proprietary names and address of procurement; Probable quality if yearly usage and any precaution advised by the manufacturer /seller and the precautionary measures you have taken to protect actual user and handlers) NGL(Natural Gas Liquid) is main raw material used for production of finished goods, there is no specific hazard, except the flammability of the chemical, Adequate and sufficient precautions has been ensured by proven Gas detectors & fire protection measures in plant & fire station. Yearly consumption- around 34556 MT NG(Natural Gas) is used as fuel in power plant. The hazardous nature of this gas and its precautionary measure is similar to NGL. Yearly consumption is around 10110 MMSCFT '(d) Give full details if any, of arrangement made for the periodic medical examination of workers(including name and address of industrial/occupational health institute employed) We have a well equipped industrial Clinic; therefore we carry out our PME ourselves on a yearly basis. 7-(a)Total number of persons employed, or intended to be employed in the factory(indicate number of adults and youths and sex of each) Employed Total-769, Male-720 & Female-49 . (b)Where persons are employed or intended to be employed, in shift, the maximum number employed or intended to be employed at any time(indicate number of adults and sex of each , . Shift employee-200, (All male) 8 -Date of occupation or intended date of occupation: 07/08/2006 9- Whether steam boilers are used or intended to be used, and if so the following particulars in respect of each boiler(including economizer and super heater). Three Boilers- Details are enclosed in attachment sheet (a) Type, description and distinctive number ... Water tube, gas fired Boilers having economizers and super heaters, Capacity-115 tons/hr each ... Nos-I-SG-IA,IB &IC, (b) Country and year ofmanufacture .... Japan ... (Mitsubishi Heavy Industries), 1993 ... (C)Date of last thorough test and examination and name and address of person who made the examination ... MARCH 2012, E J NNAJI ONWUKA- WINDER TECHNOLOGIES LIMITED 5ENEKA ROAD RUMUADU PORT HARCOURT, RIVERS STATE. (d)Maximum permissible working pressure in kg/sq.cm .. .45 . (e)Location in the factory(indicate also linear distance to the near workroom/place . . .. .. . .. . . .. Olefin plant . (f)Type of fuel to be used --Natural Gas . (g)Particulars of boiler Attendants . (If more convenient, this information can be forwarded on separate sheet of paper) 10- Do you use or intent to use any of the following? (a)Air compressor. ... Yes (b)Ropes, chains, blocks, or lifting tackle Yes . (c)Cranes, Winches, etc Yes . (d)Hoist or lifts(excluding car hoist) Yes . (e)Air receivers yes . (f)Steam receivers Yes .

Please give brief particulars and details of last thorough test and examination made and name and address of the person who made the examination Copies of the test certificates containing these details are attached . (Delete whichever is not applicable) (Continue on a separate sheet) II.Have the premises previously been used as a factory? If so please state name of previous occupier, nature of processes carried on therein and number of certificate of Registration (if known) Yes, Name:. INDORAMA ELEME PETROCHEMICALS LIMITED Name of previous Occupier: Eleme Petrochemicals Company Ltd Manufacture of polymer resins and other petrochemical products, RV.0243 - copy of certificate is attached 12. Indicate other document information submitted in support of this application (e.g. information on first aid facilities in plant provided; fire protection and in-plant fire-fighting arrangement and facilities,etc) First Aid Boxes are provided in plants, Medical centre is close to plant and within company complex, Doctors are on call duty 24 hours, Medical centre is manned round the clock by experts Nurses. All the facility is provided in the Medical centre. Details of fire protection and arrangements are given in attached write up.

B. K. Shrivastava- Site Head Name and signature of occupier Date 2012 Use also official seal/official seal __________________________________________________________________________________ WARNING:. 1. Application must be submitted at six months before commencement of actual construction of factory buildings/structures. 2. An application not satisfactorily completed may be rejected. 3.You attention drawn to section 4 of the factories Decree should any changes occur in respect of the particulars stated in the above application; the occupier must notify the factories of any changes forthwith. After completion, this form should be returned in duplicate to:The director of factories, Federal Ministry of employment' labour and productivity, Shehu Shagari way, Private Mail Bag 4 Garki Abuja, Nigeria.

Das könnte Ihnen auch gefallen