PROPOSED DEVELOPMENT OF FACTORY ON LOT G21-1, PHASE 2A, SOUTHERN REGION INDUSTRIAL ESTATE 9/6, MOO 4, CHALUNG, HAATYAI,

SONGKHLA, 90110, THAILAND. 1.00 INTRODUCTION


1.1 This Preliminary Estimates No.2 is prepared based on the Architectural layout plan and development data available at the time of estimating. It must be considered very preliminary pending more detailed drawings and information. 1.2 The purpose of this report is to evaluate the development cost of the Proposed evelopment. 1.! 1.$ The site available for development measures appro"imately 2.# acres. A revise study will be prepared once further details are available.

A%2 &'N%()T 1

PROPOSED DEVELOPMENT OF FACTORY ON LOT G21-1, PHASE 2A, SOUTHERN REGION INDUSTRIAL ESTATE 9/6, MOO 4, CHALUNG, HAATYAI, SONGKHLA, 90110, THAILAND. 2.00 SCOPE OF DEVELOPMENT
2.#1The scope of development can be described as follows* i+ ii+ iii+ iv+ ! (nits of factory Type 1, 2 and ! 1 (nit double-storey office .uard house Infrastructure wor/

A%2 &'N%()T 2

PROPOSED DEVELOPMENT OF FACTORY ON LOT G21-1, PHASE 2A, SOUTHERN REGION INDUSTRIAL ESTATE 9/6, MOO 4, CHALUNG, HAATYAI, SONGKHLA, 90110, THAILAND. .00 !ASIS OF COST ESTIMATES AND ASSUMPTIONS
ue to the nature of drawings and information, we have assumed the following *!.1 Preliminaries 0e have allocated a sum of !1 of the construction cost for preliminaries to cover insurance, contractor2s mobilisation, site office, staff accommodation, etc. !.2 Earthwor/s Earthfilling to the site is not re3uired. !.! Piling Piling shall be 14#mm " 14#mm r.c pile.

!.$

Professional 5ees 0e have included a sum of 6.#1 of the construction cost to cover for professional fees payable to Pro7ect 8anager, Architect, Engineers and %urveyors. An amount of 98 4#,###.## is allocated for traveling, accommodation, lithography charges and any other reimbursable e"penses.

!.4

&ontingency 0e allocated a sum 41 of the construction cost for contingencies

PROPOSED DEVELOPMENT OF FACTORY ON LOT G21-1, PHASE 2A, SOUTHERN REGION INDUSTRIAL ESTATE 9/6, MOO 4, CHALUNG, HAATYAI, SONGKHLA, 90110, THAILAND.
A%2 &'N%()T !

.00 !ASIS OF COST ESTIMATES AND ASSUMTIONS "CONT#D$


!.: eveloper2s 8anagement and %upervision E"penses Not allowed. !.6 Advertising and Promotional E"penses Not allowed !.; 8echanical < Electrical 0or/s &ost for 8echanical and Electrical wor/s have been allowed and need to be updated by the 8 < E Engineers as the design develops. !.= The land is assumed to be free of any encumbrances.

A%2 &'N%()T $

PROPOSED DEVELOPMENT OF FACTORY ON LOT G21-1, PHASE 2A, SOUTHERN REGION INDUSTRIAL ESTATE 9/6, MOO 4, CHALUNG, HAATYAI, SONGKHLA, 90110, THAILAND. %.00 COST E&CLUSION
The following item have not been ta/en into account in this study * i. ii. iii. iv. v. vi. vii. viii. 5inance charges >rea/ing ceremony %oil Investigation %urvey Engineering Planning and %ubmission 5ee &apital &ontribution evelopment &harges and )and Premium Any other item not specifically mentioned

A%2 &'N%()T 4

PROPOSED DEVELOPMENT OF FACTORY ON LOT G21-1, PHASE 2A, SOUTHERN REGION INDUSTRIAL ESTATE 9/6, MOO 4, CHALUNG, HAATYAI, SONGKHLA, 90110, THAILAND. 6.00 CONCLUSION

TOTAL DEVELOPMENT COST

RM ',2 6,000.00

A%2 &'N%()T :