20 2009-6-16 36th floor lift lobby A/C drain line is blocked with cement qebries
21
22
23
24
25
37th floor electrical room lift lobby power cable short with
26 M 31 2009-7-07
cable tray
28 M 33
29 M 34
30 M 35
31 M 36
32 M 37 2009-7-12
39th level toilet area FCU is burning smell
34
35
36
37
38
43 M 48
44 M 49 2009-7-2620th floor corridor in front of water meter room A/C valve is leaking.
47 M 52 2009-7-2736th floor no cooling after clearing the main strainer temp still 28 ˚C
49 M 54 2009-7-28 All floors trap internal level (trap cover) need to be installed.
52 M 57
7 E26 2009-7-27 10th floor, 31st floor fountain pump room wiring faulty
8 E27 2009-7-27 36th floor booster pump control panel VFD tripping
9 E28 2009-7-28 Aircraft warning light panel no. 1 is making abnormal size
6 6 2009-6-10 AHU 36-06 is not working. As per BMS AHU is "ON" mode
9
Dishwasher power supply is not installed. BMB required to
10 2009-7-05 cut the wall. M3 floor main lift lobby access door required
40 cm x 40cm
C.F floors right side sliding door is not working (Alumco) MF
11 36 2009-7-29