tatus of Rectification of Defects Observed at Sky Garden Tower during Defect Liability Period as on 05/08/200

Rectified and defect


S.No.
Ref.No.
ReportingRemarks
Date by Facility Management Team at Skygarden Tower
Action by BMB notifications signed by
the client
MECHANICAL
1 M6 2009-6-10 1405 BR FCU blower is noisy

10

11

12

13

14

15

16

17
18

19

20 2009-6-16 36th floor lift lobby A/C drain line is blocked with cement qebries

21

22

23

24

25

37th floor electrical room lift lobby power cable short with
26 M 31 2009-7-07
cable tray

27 M 32 2009-7-07 37th floor fire DB MCB is fault

28 M 33

29 M 34

30 M 35

31 M 36

32 M 37 2009-7-12
39th level toilet area FCU is burning smell

33 M 38 2009-7-21 3804 upper floor BR-1 A/C is not working

34

35

36

37
38

CCF high level mechanical floor drainage pipe end cap


39 2009-7-23
support is not provided in many places

40 2009-7-23 Entrance A/C and lift lobby A/C is not working

41 M 46 2009-7-25 3618 A/c is not cooling

In unit 1306 no capacitor in FCU motor and inside the


42 M 47 2009-7-25
bedroom there is no FCU motor.

43 M 48

44 M 49 2009-7-2620th floor corridor in front of water meter room A/C valve is leaking.

45 M 50 2009-7-26 Bad smell in Ground floor ladies toilet

46 M 51 2009-7-27 Lift room A/C is tripping

47 M 52 2009-7-2736th floor no cooling after clearing the main strainer temp still 28 ˚C

48 M 53 2009-7-28 B3 and M3 level near staircase 2 fire line is leaking

49 M 54 2009-7-28 All floors trap internal level (trap cover) need to be installed.

36th level chilled water pressurisation unit not pumping


50 M 55 2009-7-29
required make up water to upper floors

51 M 56 2009-7-29 3804-Upper floor, 3801-Upper floor, 3609-Upper floor no cooling

52 M 57

53 M 58 2009-7-30 17th floor lobby floor trap cover is not installed

54 M 59 2009-8-02 214 W.C is leaking

55 M 60 2009-8-02 Ground floor garbage room PPR valve is leaking

56 M 61 2009-8-04 36th level pressurisation unit pressure very low (2 bar)


y Period as on 05/08/2009
Action by
l
us of Rectification of Defects Observed at Sky Garden Tower during Defect Rectified
Liability Period as on 05/08/2009
and
defect
S.No.
Ref.No.ReportingRemarks
Date by Facility Management Team at Skygarden Tower
Action by BMB notifications Action by
signed by the
client
ELECTRICAL
1 2009-7-23 1st floor corridor lighting is tripping

2 2009-7-23 MF floor lighting and function test failure

3 2009-7-23 CCF level left side sliding door no power supply

4 E 24 2009-7-26 3rd floor pump room DB has no power supply

5 2009-7-26 3rd floor pump room DB has no power supply

6 2009-7-26 FM 200 panel is faulty in M.2 level near staircase 2

7 E26 2009-7-27 10th floor, 31st floor fountain pump room wiring faulty

8 E27 2009-7-27 36th floor booster pump control panel VFD tripping

9 E28 2009-7-28 Aircraft warning light panel no. 1 is making abnormal size

FM 200 panel is faulty. Its 3rd time after repairing TYCo.


10 E30 2009-8-04 Always mian fire panel is going to 'Fire Mode'. Water leak in
fire line in B3 and M3 level.
atus of Rectification of Defects Observed at Sky Garden Tower during Defect Liability Period as on 05/08/2009
Rectified and defect
S.No.
Ref.No.
ReportingRemarks
Date by Facility Management Team at Skygarden Tower
Action by BMB notifications signed by Action by
the client
CIVIL/OTHER
1 1

6 6 2009-6-10 AHU 36-06 is not working. As per BMS AHU is "ON" mode

9
Dishwasher power supply is not installed. BMB required to
10 2009-7-05 cut the wall. M3 floor main lift lobby access door required
40 cm x 40cm
C.F floors right side sliding door is not working (Alumco) MF
11 36 2009-7-29
floor aluminium door handle is broken

12 37 2009-7-29 1115 washing machines is defective

13 38 2009-7-29 Retail shop temperature required for MEP works

All doors are contaminated and need to replace or termite


14 39 2009-7-29
specially 1414 and 30th floor