Pankaj Nalwa

Profile of Lead Trainer Mr. Pankaj Nalwa. Industrial Experience of 16 years with well known organizations. Being from Engineering background and specialization in Tooling, done many projects of Product Development. MBA in International Business, helped in dealing with International clients according to norms and international law. Lead trainer for A.P.Q.P, Value Engineering, P.P.A.P, F.M.E.A, Product Development Practices, Tool Room Management, Practices for Good Design.

Pankaj Nalwa

Perspective

people processes products


View of Customer

View of Organization

results benefits outcomes

Pankaj Nalwa

Who are our Customers?


Most Useful
1. End Users Example: Consumer, Service User 2. Intermediate Customers Example: Retailer, Distributor, OEM

Least heard

Least Useful

3. Internal Customers Example: Manufacturing, In-plant User

Most heard

Pankaj Nalwa

Capturing Voice of the Customer

Pankaj Nalwa

Obtaining Voice of the Customer


Who is the customer? What should we measure? How do we measure? How do we use what we measure?

Pankaj Nalwa

What should we measure?


Value mismatches Good performance and satisfactory perception Technical people Owner / User Faults & Complaints Similar completed projects

Pankaj Nalwa

How do we measure?
Any structured information gathering mechanism Focus group(s) of stake holders Telephonic interviews Mail questionnaires Personal interviews User logs

Pankaj Nalwa

What is Value?

Value is a measure of Cost Effectiveness. It is the relationship between functional need(s) and the cost to meet that need. Value = (Functional) Performance / (Unit) Cost

Pankaj Nalwa

What is Good Value?

Unnecessary performance even at very low cost is wasteful and thus is a poor Value. All functional performance costs money. But not all performance is needed or even wanted. Good Value is the lowest product cost required to achieve high customer / user acceptance.

Pankaj Nalwa

Value Engineering
Value Engineering is the formal or informal attempt to assure highest value by delivering all required functions at the lowest overall cost. It is a systematic review of a project, product or process to improve performance, quality and / or life-cycle cost by an independent muti-disciplinary team of specialists. Value Engineering is not a cost cutting process that reduces project life cycle time, scope or quality.

Pankaj Nalwa

When is VE / VA study performed?

About at the 25% of design stage Preliminary line and grade inspection Preferred alternate stage

Pankaj Nalwa

Objectives of VE / VA
Improve project quality Reduce project cost Foster innovation Eliminate unnecessary and costly design elements Ensure efficient investments Develop implementation procedures

Pankaj Nalwa

Life Cycle Costing (LCC)

Economic assessment of completing design alternatives Focuses on total costs Optimizes value and improves investment (ROI) for a given project return on

Pankaj Nalwa

The Rule of Ten

Pankaj Nalwa

Reasons for unnecessary project costs


Lack of information Lack of innovation / ideas Temporary circumstances Honest wrong beliefs Changes in ownership requirements Lack of communication and specifications Outdated standards and specifications

Pankaj Nalwa

Individual Efforts
Designer Process Owner Engineers Users Project Manager

Problem
Team Effort

Solution
Pankaj Nalwa

Part 2 includes Phases in VE / VA Process and Implementation.