SUMMARY.

APPROVED B.S.R FOR THE 1ST HALF 0F 2005 IN MANNAR 01 - DEMOLISHER.

NO 1

DESCRIPTION OF WORK Brick work in Cement, demolished brick stacked and debris cleared. Brick work in lime, demolished brick stacked and debris cleared. Cadjan roofing or walling dismantled timber stacked and debris cleared. Ceiling, existing removed materials stacked and debris cleared. Cement concrete demolished, and debris cleared away.

BSR No
(Item No/Page No)

UNIT Cube m3 Cube m3 Sqr m2 Sqr m2 Cube m2 Sqr m2 Sqr Cube

RATE (2nd) 1,197.00 423.00 958.00 338.00 98.00 11.00 314.00 34.00 4,104.00 2052.00 221.00 8892.00 2964.00 319.00

1/1

2/1

3/1

4/2

5/2

Cement concrete, reinforced demolished in suspended floors reinforcement removed and debris cleared. Corrugated Sheets, Iron, Asbestoes or Aluminium Alloy removed from roof or walls and stacked. Door or Window, size up to 40 S.ft removed from existing walls and door or stacked. Doors for window, size over 40 S.ft removed - do - do -

6/2

7/3

Sqr M2

359.00 39.00

8/3

No

456.00

9/3

No

684.00

10 Door or window, sash only, up to 40 S.ft removed from existing walls and stacked. 11 Door or window, sash only, over 40 S.ft - do - do 12 Down pipes, 4" to 6" dia G.I old or decayed, removed from existing building and stacked. 13 Drains demolished and debris cleared

10/3

No

71.00

11/4

No L.ft L.m L.ft L.m

107.00 5.00 16.00 14.00 46.00

12/4 13/4

14 Fence uprooted, barbed wire rolled up and all materials stacked (length of fencing to

L.ft

22.00

01 - Demolisher Mannar

measured). 15 Floors brick paved, demolished and debris cleared away.

14/4

L.m Sqr m2

72.00 342.00 37.00

15/5

NO

DESCRIPTION OF WORK

BSR NO
(Item No/Page No)

UNIT

RATE (2nd)

16 Gate sash removed and stacked after demolishing cement concrete blocks or removing posts and separating pintols (demolishing brick work where necessary paid for separately). 17 Glass panes in doors, windows and fanlights removed and stacked. 18 Gutter, Eaves, removed and stacked from roofs of single story buildings. 19 Gutter, Eaves removed from roofs of two storeyed buildings and stracked. 20 Partitions removed and stacked at side, including making goodnes two walls and floors. 21 Lime plastering chipped and debris cleared away.

16/5

No Sq.ft m2 L.ft L.m L.ft L.m Sq.ft m2 Sqr m2 Sqr m2 Sqr M2

456.00 21.00 230.00 3.00 10.00 4.00 13.00 17.00 183.00 171.00 18.00 513.00 55.00 770.00 83.00

17/5

18/5

19/6

20/6

21/6 22 Rendering cement, chipped and debris cleared away from brick walls and floors. 23 Rendering cement, chipped and debris cleared away from cement concrete floors and walls. 24 Roofing removing tiles and timber stacking, serviceable materials and cleaning debris in single storey building. 25 Roof, removing tiles and timber stacking serviceable material and cleaning debris in two storeyed building. 26 Rubble masonry in cement, demolished rubble stacked and debris cleared away. 27 Tiles glazed demolished and debris cleared away.

22/7

23/7

24/7

Sqr M2 Sqr m2 Cube m3 Sqr m2 Sqr m2 Sqr m2

658.00 71.00 898.00 97.00 1,496.00 529.00 912.00 98.00 239.00 26.00 359.00 39.00

25/8

26/8 27/8

28 Tiles calicut or half round, removed from roof of single storey buildings and stacked. 29 Tiles calicut of half round removed from roof of two storeyed buildings and stacked.

28/9

29/9

01 - Demolisher Mannar

3 30 Water proof treatment of bitumen taken off from flat roof and debris cleared away. 31 Ceiling asbestoes removing including timber frame work, stacking serviceable materials single storey building (and debris cleared away in single). 32 Ceiling asbestos removing including timber frame work, - do - do in two storeyed building. 30/9 Sqr m2 912.00 98.00

31/10

Sqr m2

1,197.00 128.00

32/10

Sqr m2

1,436.00 154.00

NO

DESCRIPTION OF WORK

BSR NO
(Item No/Page No)

UNIT

RATE (2nd)

33 Valance/ Barge boarding removed materials stacked and debris cleared away in single storey building.

33/10

L.ft L.m

3.00 10.00

34

Valance/ Barge boarding removed - do - in 2 storeyed building.

- do 34/11

L.ft L.m

4.00 13.00

35 Cement plastering, sofit chipped and debris cleared away.

35/11

Sq.ft m2

673.00 72.00

01 - Demolisher Mannar

RATE ANALYSIS 1ST HALF OF 2005 IN MANNAR 01 - DEMOLISHER.


1 Brick work in cement, demolished brick stacked and debris cleared. Per cube 2 1/2 Days labourer Allow for scaffolding 5% Over heads Per cube Say Rs Per cube Per m3 Say Per m3 Brick work in lime, demolished brick - do - do -. Per cube 2 Days Labourer Allow for scaffolding 5% Over heads Per cube Say Per cube Per m3 Say Per m3 :Cadjan roofing or walling dismantled, timber stacked and debris cleared. Per Sqrs 1/2 1 Hour Thatcher Hour Labourer Over heads Per Sqrs Say Per Sqrs Per m2 Say per m2 Ceiling,existing,removed materials stacked and debris cleared. Per Sqrs. 1 1/2 3 Hour Carpenter Hour Labourer Allow for scaffolding 5% Over heads 14% Per square Say per sqrs 01-Demolisher Mannar 600 400 112.50 150.00 13.13 575 400 35.94 50.00 400 800.00 40.00 400 1,000.00 50.00

1,050.00 147.00 1,197.00 1,197.00 422.97 423.00

840.00 117.60 957.60 958.00 338.37 338.00

85.94 12.03 97.97 98.00 10.53 11.00

275.63 38.59 314.21 314.00

Per m2 Say Per m2 5

33.76 34.00

Cement concrete demolished, and debris cleared away. Per Sqrs (6" floor) 4 1/2 Day Day Labourers Labourer for Transporting Over heads Say per Cube Say Rs Per Sqrs Say Rs Per m2 Say per m2 :Cement concrete,reinforced,demolished in suspended floors,reinforcement removed and debris cleared. Per Sqrs. (4" floor) 6 1/2 Day Day Labourers Labourers for Transporting Over heads Per Cube Say per Cube Per Sqrs Say per Sqrs Per m2 Say per m2 Corrugated sheets, Iron, Asbestoes or Aluminium Alloy, removed from roof or walls and stacked. Per Sqrs. 2 3 Hour Blacksmith Hour Labourer Allow for scaffolding Over heads Per square Say per Sqrs Per m2 Say per m2 Door or window,size up to 40 S.ft removed from existing walls and stacked per door or window. Per No. 600 400 150.00 150.00 15.00 400 400 2,400.00 200.00 400 400 1,600.00 200.00

1,800.00 252.00 4,104.00 4,104.00 2,052.00 2,052.00 220.88 221.00

2,600.00 364.00 8,892.00 8,892.00 2,964.00 2,964.00 319.05 319.00

315.00 44.10 359.10 359.00 38.59 39.00

01-Demolisher Mannar

6 1/2Day Labourer Over heads Per No Say Rs Door window, size over 40 S.ft removed - do - do Per No. 1/2Day Labourer Over heads Per No Say Rs :Door or window, sash only, upto 40 S.ft removed from existing walls and stacked. Per Sash. Hour Carpenter Hour Labourer Over heads Per sash Say Rs Door or window, sash only, over 40 S.ft - do - do Per Sash. Hour Carpenter Hour Labourer Over heads Per sash Say Rs Down pipes, 4" to 6" dia. G.I old or decayed, removed from existing building and stacked. Per 12.0 L.ft.Length Hour Labourer Over heads Per L.ft Say per L.ft. Per L.m Say per L.m. Drains demolished and debris cleared. Per 10.0 L.ft Brick in cement demolished (as in Item 1 less scaffolding) Over heads Per L.ft Say per L.ft. Per L.m Say per L.m. 01-Demolisher Mannar

400

400.00

400.00 56.00 456.00 456.00

400

600.00

600.00 84.00 684.00 684.00

10

1/2 1/2

600 400

37.50 25.00

62.50 8.75 71.25 71.00

11

3/4 3/4

600 400

56.25 37.50

93.75 13.13 106.88 107.00

12

400

50.00

50.00 7.00 4.75 5.00 16.39 16.00

13

0.13

Cube

1,000.00

1,000.00

130.00 18.20 14.82 14.00 45.90 46.00

14

7 Fence uprooted, Barbed wire rolled up and all materials stacked (length of fencing to measured).

3 2

15

Per 50 L.ft. (6 posts) Hour Labourers (Digging up) Day Labourers (Dismantling & rolling) Over heads Per L.ft Say per L.ft. Per L.m Say per L.m. Floors brick paved, demolished and debris cleared away. Per Sqrs 3" thick demolition as in item 2 (less scaffolding). Add 50% for extra difficulty. Overheads Per square 3" thick Say per Sqrs Per m2 Say per m2 Gate sash removed and stacked after demolishing cement concrete blocks or removing posts and separating pintles (demolishing brick work where necessary paid for seperately).

400 400

150.00 800.00

950.00 133.00 21.66 22.00 72.13 72.00

1/4

Cube

800

200.00 100.00

300.00 42.00 342.00 342.00 36.75 37.00

16

1/2Days Labourers Overheads Per No Say Rs Glass panes in doors and windows and fanlight removed and stacked. Per 6 S.ft./ Per 8 Panes Hour Carpenter Over heads Per S.ft Say per S.ft. Per M2 Say per M2. Gutter, eaves, removed and stackedfrom roof of single storeyed building Per 40.0 L.ft. 1Hour Labourers Allow for scaffolding Over heads 01-Demolisher Mannar

400

400.00

400.00 56.00 456.00 456.00

17

1 1/2

600

112.50

112.50 15.75 21.38 21.00 229.84 230.00

18

400

100.00 5.00

105.00 14.70

19

8 Per L.ft Say per L.ft. Per L.m Say per L.m. Gutter, eaves, removed from roofs of 2 storeyed building and stacked. Per 40.0 L.ft. 1Hour Labourers Add 50% Allow for scaffolding 5% Over heads Per L.ft Say per L.ft. Per L.m Say per L.m. Partitions removed and stacked at site, including making good to walls and floors. Per 105.0 Sq.ft.(15' x 7') 1 2 1/4 Day Day Day Carpenter Labourers Mason Allow for cement, sand etc. Over heads Per S.ft Say per S.ft. Per M2 Say per M2 Lime plastering chipped and debris cleared away. Per Sqrs. 3 Hour Labourer Overheads Per square Say per Sqrs Per m2 Say per m2 400 150.00 600 400 600 600.00 800.00 150.00 50.00

2.99 3.00 9.84 10.00

400

100.00 50.00 5.00

155.00 21.70 4.42 4.00 13.11 13.00

20

1,600.00 224.00 17.37 17.00 182.80 183.00

21

150.00 21.00 171.00 171.00 18.38 18.00

22

Rendering, cement, chipped and debris cleared away from brick walls and floors. Per Sqrs. 9 Hour Labourer 01-Demolisher Mannar 400 450.00 450.00

Over heads Per square Say per Sqrs Per m2 Say per m2 23

63.00 513.00 513.00 55.22 55.00

Rendering, cement, chipped and debris cleared away from cement concrete floors and walls. Per Sqrs. 9 Hour Labourer Add 50% Over heads Per square Say per sqrs per m2 Say per m2 400 450.00 225.00

675.00 94.50 769.50 770.00 82.78 83.00

24

Roof, removing tiles and timber, stacking serviceable material and cleaning debris in single storeyed building. Per Sqrs. 1/4 4 Day Carpenter 1/4Day Labourers Allow for scaffolding 5% Over heads Per square Say per square Per m2 Say per m2 Roof, removing tiles and timber - do - do - in 2 storeyed buildings. Per Sqrs. 1/4 4 2 Day Carpenter 1/4Day Labourer 1/4Day Labourer Allow for scaffolding 5% Over heads 14% Per square Say per square Per m2 Say per m2 Rubble masonary in cement, demolished, rubble stacked and debris cleared. 600 400 400 150.00 400.00 200.00 37.50 600 400 150.00 400.00 27.50

577.50 80.85 658.35 658.00 70.74 71.00

25

787.50 110.25 897.75 898.00 96.54 97.00

26

01-Demolisher Mannar

Per Cube. 2 1/2 Day Labourer Add 25% Allow for scaffolding 5% Overheads 14% Per cube Say per cube Per m3 Say per m3

10 400 1,000.00 250.00 62.50

1,312.50 183.75 1,496.25 1,496.00 528.62 529.00

27

Tiles, glazed demolished and debris cleared. Per Sqrs. 2 Day Labourer Overheads 14% Per Square Say per square Per m2 Say per m2 400 800.00 800.00 112.00 912.00 912.00 98.04 98.00

28

Tiles calicut or half round, removed from roof of single storeyed buildings and stacked at site. Per Sqrs. 4 Hour Labourer Allow for scaffolding 5% Overheads 14% Per square Say per square Per m2 Say per m2 Tiles calicut or half round removed from roof of 2 storeyed buildings and stacked. Per Sqrs. Hour Labourer Hour 2 Labourer Allow for scaffolding 5% Overheads 14% Per square Say per square Per m2 Say per m2 400 200.00 10.00

210.00 29.40 239.40 239.00 25.69 26.00

29

4 1

400 400

200.00 100.00 15.00

315.00 44.10 359.10 359.00 38.59 39.00

01-Demolisher Mannar

30

11 Waterproof Treatment of hot bitumen taken off from flat roof and debris cleared away. Per Sqrs. 2 Day Labourer Overheads 14% Per square Say per square Per m2 Say per m2 Ceiling Asbestoes, removing including timber frame work, stacking serviceable materials storeyed building- (and debris cleared away in single). Per Sqrs. Carpenter Labourer Allow for scaffolding 5% Overheads 14% Per square Say Rs Per m2 Say per m2 Ceiling Asbestoes removing including timber frame work - do - do in 2 storeyed building. Per Sqrs. 1 1 1/4 Day Day Day Carpenter Labourer Labourer (02) Allow for scaffolding 5% Overheads 14% Per square Say per square Per m2 Say per m2 Valance/Barge boarding removed, materials stacked and debris cleared away in single storeyed building. Per 40.0 L.ft 2 1Hour Labourer Allow for scaffolding 5% Overheads 14% Per L.ft 01-Demolisher Mannar 400 100.00 5.00 600 400 400 600.00 400.00 200.00 60.00 400 800.00 800.00 112.00 912.00 912.00 98.04 98.00

31

1 1

Day Day

600 400

600.00 400.00 50.00

1,050.00 147.00 1,197.00 1,197.00 128.85 128.00

32

1,260.00 176.40 1,436.40 1,436.00 154.38 154.00

33

105.00 14.70 2.99

34

12 Say per L.ft. Per L.m Say per L.m. Valance/Barge boarding removed - do - do in 2 storeyed building. Per 40.0 L.ft. 2 11/2hr Labourer Allow for scaffolding 5% Overheads 14% Per L.ft Say per L.ft. Per L.m. Say per L.m. Cement plastering, soffit chipped, and debris cleared away. Per Sqrs. 1 1/8 Day Labourer Add 25% for extra difficulty Allow for scaffolding 5% Overheads 14% Per square Say per square Per m2 Say per m2 400 450.00 112.50 28.13 400 150.00 7.50

3.00 9.84 10.00

157.50 22.05 4.49 4.00 13.11 13.00

35

590.63 82.69 673.31 673.00 72.35 72.00

01-Demolisher Mannar

Page 12

APPROVED B.S.R FOR THE 1ST HALF 0F 2005 IN MANNAR 01 - DEMOLISHER.

Code No 1 2 3 4 5 Black smith Carpenter Mason

Description

Unit Day Day Day Day Day

Rate 600.00 600.00 600.00 575.00 400.00

Skilled labour Gr.II Unskilled labour

01. Demolisher