Beruflich Dokumente
Kultur Dokumente
DEMOLISHER
A 001 Demolition of brick work in cement motar, bricks stacked and debris cleared away
hour
22.88
A 002 Demolition of brick work in cement motar, bricks stacked and debris cleared away
hour
5.7
22.88
A 003 Demolition of brick work in cement motar, bricks stacked and debris cleared away
hour
22.88
way
A -
DEMOLISHER
A004 Demolition of cadjan roof or wall, timber stacked and debris cleared away, for single storey building PER Sq.m. L001 Unskilled labour hour 0.2 22.88 4.58 4.58 1.01 5.59
SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL A005 Demolition of ceiling,materials stacked and debris cleared away, for single storey building PER Sq.m. L002 Unskilled labour hour 0.5 22.88
11.44
SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL A006 Demolition of unreiforced concrete in ground floor slab (150mm) and debris cleared away PER Sq.m. L001 Unskilled labour hour 4 22.88
Demolition and removing of reinforced concrete (100mm) in roof or floor slabs and debris cleared away (first floor level) scaffolding paid seperately PER Sq.m.
hour
5.6
22.88
DEMOLISHER
A008 Removal of Galvanised iron or asbestos or aluminium corrugated sheets from roofs or wall from a single storey building and stacked. Removal of frame work paid seperately PRE Sq.m. L001 Unskilled labour hour 0.6 22.88 13.73
ALLOW FOR SCAFFOLDING - STEEL SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
A009 Removal of corrugated Galvanised iron or asbestos or aluminium sheets from roof or walls of two storeyed buildings and stacked. Removal of frame work paid seperately PER Sq.m. L001 Unskilled labour hour 0.8 22.88 18.30
ALLOW FOR SCAFFOLDING - STEEL SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
A010 Removal of corrugated Galvanised iron or aluminium or asbestos sheets from roof or walls of 3 storeyed buildings. Removal of frame work paid seperately. PER Sq.m. L001 Unskilled labour hour 1.0 22.88 22.88
ALLOW FOR SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION Basket Concrete Mixer Lorry 3 Tonnes Lorry 5 Tonnes Tractor 75 Cubes Vibrator
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION
UNIT
PRICE Rs. Cts. 37.50 37.50 37.50 37.50 37.50 37.50 37.50 300.00 37.50 37.50 22.88 183.00 183.00
Black Smith Carpenter Glazier Mason Painter Plumber Skilled labour Skilled Labour * Terrazzo Mason Tinker Unskilled Labour Unskilled Labour Sanitary labour *
Hour Hour Hour Hour Hour Hour Hour Day Hour Hour Hour Day Day
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION
UNIT
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION
UNIT
PRICE Rs. Cts. 30.75 30.00 50.00 223.00 218.50 649.91 11,000.00
1/2" M/s/ rods 100mm x 100mm Aluminium grating 150mmx150mm Aluminium grating 100mm x100mm Class I timber beams(4" x 4") 10mm chip board (8'x4') 10mm chip board (8'x4') * 1125 L, 16 BWG G.I. Tank 1150 X 2060 X 32MM 12mm Brass Screws Gauge 6 12mm chip board (8'x4') 12mm chip board (8'x4') * 12mm chromium plated stop cock. 12mm heavy quality brass push tap 12mm light brass push tap 12mm thick class I timber planks 12mm x 12mm class I timber beadings 12mm x 12mm imported class I timber fillets 12mm x 12mm local class I timber fillets 12mm x 12mm local Class II timber fillets. 150mm x 150mm Grating Aluminium 16mm Brass Screws Gauge 8 16mm x 16mm Class 1 timber 1800 L, 16 BWG G.I. Tank 2" x 4" H iron
Nos. m2 No. No. No. No. m2 m Lm. m L.M. No. Nos. m No. Kg.
1.00 260.50 774.84 410.00 250.00 200.00 743.00 11.00 10.00 11.00 7.00 50.00 2.00 25.00 14,300.00 44.00
No.
29.00
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
UNIT Kg
PRICE Rs. Cts. 132.50 8,975.00 1,022.00 25.00 2.05 940.55 600.00 470.00 1,540.00 26.00 29.00 76.00 676.67 32.00 20.00 20.00 1,175.69
20mm thick class A imported timber planks - Burma Teak m2 20mm thick planks of class I local timber 20mm x 20mm Class 1 timber battens 25mm brass screws - 8 25mm thick class I imported timber planks 25mm thick planks of Class I local timber 25mm thick planks of Class II local timber 25mm thick Teak timber planks 25mm x 20mm imported timber fillets 25mm x 25mm class I local timber fillets 25mm x 25mm Teak Timber 28mm thick Class I timber planks. 28mm x 15mm Class I timber 28mm x 28mm Class A timber. 28mm x 28mm Class I timber 31mm thick imported class I timber planks m2 m Nos. m2 m2 m2 m2 m Lm. m m2 m m m m2
32mm to 38mm thick (Burma Teak) imported Class I Timber m planks850.56 32mm x 12mm local class 1 timber fillets 32mm x 32mm Class I timber m m 29.00 76.00
m m3
83.00 27,500.00
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION 400 gal round plastic shell Tank 400 L , 16 BWG G.I. Tank 40mm to 50mm x 12mm class I timber fillets 40mm to 50mm x 12mm local class I timber fillets 40mm x 40mm class I timber sash bars 40mm x 40mm class II timber sash bars 50mm brass screws Gauge 8 50mm iron screws Gauge 10 50mm x 12mm Class A timber. 50mm x 12mm Class I timber 50mm x 12mm Class II local timber. 50mm x 15mm Class A timber. 50mm x 15mm Class I timber 50mm x 25mm Class A timber 50mm x 25mm class I local timber fillets 50mm x 25mm class I timber 50mm x 25mm Class II local timber. 50mm x 25mm class II timber 50mm x 50mm thick class 1 timber
PRICE Rs. Cts. 11,000.00 6,600.00 22.00 29.00 57.00 31.00 4.00 2.00 24.50 24.50 15.00 28.50 28.50 35.50 22.70 38.00 22.70 15.00 76.00
Kg
600mm x 125mm glass shelf with chromium plated brackets. No. Alkali resisting primer Aluminium paint * Lit. Lit.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION
UNIT
PRICE Rs. Cts. 275.00 122.00 21.90 238.00 227.00 200.00 175.00 60.00 30.00 50.00 55.00 85.00 115.00 137.50 38.14 1,450.00 35.00 45.00 75.00 120.00 160.00 200.00 350.00 550.00
Aluminium Wood Primer Angle iron 40 x 40 x 6mm Angle iron 50 x 50 x 7mm Anti - Corrosive Paint Asbestos cement riding(pair)
* * * *
Lit. m Kg. Lit. Nos. No. No. No. No. No. No. No. No. No. * Kg.
Asbestos plain ceiling sheet 1220 x 1220mm Assistgate valve, heavy quality brass 20mm Ball only (Plastic) 1" valve Ball only (Plastic) 1/2" valve Ball only (Plastic) 3/4" valve Ball Valve, 12mm (Plastic) Ball Valve, 20mm Ball Valve, 25mm Ball Valve, 32mm Barbed wire
Basin 360 x 560 with tap waste plug but excluding bracket. No. Bend G.I. 12mm Bend G.I. 20mm Bend G.I. 25mm Bend G.I. 32mm Bend G.I. 38mm Bend G.I. 50mm Bend G.I. 63mm Bend G.I. 75mm No. No. No. No. No. No. No. No.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION Bend PVC 20mm Bend PVC 25mm Bend PVC 32mm Bend PVC 40mm Bend PVC 50mm Bend PVC 63mm Bend PVC 75mm Bend PVC 90mm Bib Cock Brass, 12mm - English Bidets - White Binding wire Bitumen Bitumen washers Boiled Lime Bolt and nut iron 125 x 10mm Bolt and nut iron 125 x 12mm Bolt and nut iron 150 x 12mm Bolt and nut iron 225 x 10mm Bolt and nut iron 225 x 10mm Bolt and nut iron 45 x 6mm Bolt and nut iron 63 x 10mm Bolt Barrel Brass 100mm Bolt Barrel Brass 125mm Bolt Barrel Brass 150mm Bolt Barrel Brass 63mm * * * * * * * * * * * *
UNIT No. No. No. No. No. No. No. No. No. No. Kg. Kg. No. Kg No. No. No. Kg. No. No. No. No. No. No. No.
PRICE Rs. Cts. 6.60 8.75 13.15 26.25 42.45 89.70 217.00 363.15 300.00 4,950.00 47.25 53.80 1.00 5.00 15.00 18.50 20.00 110.00 20.00 1.20 6.00 55.00 70.00 85.00 30.00
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION
UNIT
PRICE Rs. Cts. 45.00 87.50 92.00 100.00 390.00 30.00 32.00 33.50 26.00 35.00 2,250.00 18.00 36.00 4.50 9.00 55.00 67.50
Bolt Barrel Brass 75mm Bolt Skeleton Brass 200mm Bolt Skeleton Brass 250mm Bolt Skeleton Brass 300mm Bolt Skeleton Brass 450mm Bolt Tower iron 100mm Bolt Tower iron 125mm Bolt Tower iron 150mm Bolt Tower iron 75mm Brass door knob Brick Cabin Hook & Eye Iron 150mm Cabin Hook & Eye Iron 200mm Cabin Hook & Eye Iron 50mm Cabin Hook & Eye Iron 75mm Cabin Hook Brass 150mm Cabin Hook Brass 200mm *
* * * * * * * * *
No. No. No. No. No. No. No. No. No. No. 1000nos * * * No. No. No. No.
* *
No. No.
Cabin Hook Brass 225mm Cabin Hook Brass 250mm Cabin Hook Brass 300mm Cabin Hook Brass 50mm Cabin Hook Brass 75mm Calicut pattern flat tiles *
* * *
No. No.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION Calicut pattern ventilator tiles Cap PVC 20mm Cap PVC 25mm Cap PVC 32mm Cap PVC 40mm Cap PVC 50mm Cap PVC 63mm Cap PVC 75mm Casement Fastner Brass Casement Stay Brass 250mm Casement Stay Brass 300mm Cement Cement block 100 x 200 x 400mm Cement block 150 x 200 x 400mm Cement block 200 x 200 x 400mm Chromium plated chain for flushing cistern Cistern Bracket * * *
UNIT No. No. No. No. No. No. No. No. No. No. No. 50kg 1 No. 1 No. 1 No. No. Pair
PRICE Rs. Cts. 121.00 4.80 5.70 7.70 10.50 14.70 21.25 68.38 55.00 55.00 70.00 300.00 14.50 26.50 30.00 85.00 54.00 1,805.00 135.00 210.00 3,537.00 19.00 52.00 282.00 282.00
Cistern High level C.I. - including 1/2" dia Ball Valve No. Clay Close fitting asbestos ridging Closet pedestal type Coal Tar Coconut rafters Colour pigment for cement Coloured cement m3 Pair No. Lit. m Kg. Kg.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION
UNIT
PRICE Rs. Cts. 7.55 9.55 14.80 31.40 44.85 51.40 35.00 45.00 60.00 75.00 90.00 125.00 275.00 305.00 209.27 252.19 65.62 48.00 66.00 6.15 42.00 28.90 62.20 206.50
Conduit Pipe 18mm Conduit Pipe 20mm Conduit Pipe 25mm Conduit Pipe 30mm Conduit Pipe 40mm Conduit Pipe 50mm Connector G.I. 12mm Connector G.I. 20mm Connector G.I. 25mm Connector G.I. 32mm Connector G.I. 38mm Connector G.I. 50mm Connector G.I. 63mm Connector G.I. 75mm Corrugated asbestos sheet Corrugated G.I. Sheet 24 BWG Cove moulding(63mmx40mm)imported classI Cove moulding(63mmx40mm)local class I Door handle Down pipe Clip PVC 89mm Down pipe Elbow PVC 89mm Down pipe joiner PVC 89mm Down pipe PVC 89mm Down spout square PVC 114mm - Large
m m m m m m No. No. No. No. No. No. No. No. Sq.m. Sq.m. m m Nos. No. No. No. m m
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION Down spout square PVC 114mm - Small DPC Tar Drainage Bend PVC 110mm 880 Drainage Tee PVC 110mm 880 Drainage 'Y' Junction PVC 110mm Inspection -450 Drive Screws and washers Elbow G.I. 12mm Elbow G.I. 20mm Elbow G.I. 25mm Elbow G.I. 32mm Elbow G.I. 38mm Elbow G.I. 50mm Elbow G.I. 63mm Elbow G.I. 75mm Elbow PVC 20mm Elbow PVC 25mm Elbow PVC 32mm Elbow PVC 40mm Elbow PVC 50mm Elbow PVC 63mm Elbow PVC 75mm Elbow PVC 90mm Emulsion Enamel Equal Tee PVC 20mm * *
*
UNIT m Lit. No. No. No. Nos. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. Lit. Lit. No.
PRICE Rs. Cts. 172.40 66.25 169.75 252.00 314.15 10.00 15.00 20.00 30.00 45.00 75.00 90.00 175.00 250.00 3.95 6.15 10.50 15.75 28.25 48.35 108.70 183.90 241.00 299.00 5.05
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION
UNIT
PRICE Rs. Cts. 8.55 14.25 21.25 37.20 56.90 104.15 55.00 243.50 5.25 8.30 11.15 17.95 26.70 35.00 71.05 108.70 12,500.00 1,900.00 395.00 315.00 446.00 80.00 656.00 420.88 252.19
Equal Tee PVC 25mm Equal Tee PVC 32mm Equal Tee PVC 40mm Equal Tee PVC 50mm Equal Tee PVC 63mm Equal Tee PVC 75mm Fanlight Catch Brass Faucet Socket PVC 110mm Faucet Socket PVC 20mm Faucet Socket PVC 25mm Faucet Socket PVC 32mm Faucet Socket PVC 40mm Faucet Socket PVC 50mm Faucet Socket PVC 63mm to smaller size Faucet Socket PVC 75mm Faucet Socket PVC 90mm Fibre glass storage tank 400 gals. Fittings for Bidet - Indian Fittings for Cistern Floor Paint - Quick drying Floor Paint (Epoxy) Flush pipe PVC (32mm) G.I. 18 BWG sheets(plain) G.I. 22 BWG sheets(plain) G.I. 24 BWG sheets(plain) *
No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. Lit. Lit. No. m2 m2 m2
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION G.I. Bolts and nuts G.I. Hook bolts G.I. Hook bolts 8mm x 115mm G.I. Joint nut 12mm G.I. Joint nut 20mm G.I. Joint nut 25mm G.I. Joint nut 32mm G.I. Joint nut 38mm G.I. Joint nut 50mm G.I. Reducing socket 25mm to smaller G.I. Ridging 2m x 1m - 24 B.W.G. G.I. sheet 18 B.W.G. G.I. Sheet 24 B.W.G. Gate valve, heavy quality brass 12mm Gate valve, heavy quality brass 20mm Gate valve, heavy quality brass 25mm Gate valve, heavy quality brass 32mm Gate valve, heavy quality brass 38mm Glass pane clear 3mm Glass pane clear 4mm Glass pane Figured 3mm Glass pane Figured 5mm Glass Tray Holder 100 x 100mm - White Glue Grating 100mm x 100mm Aluminium Gravel
UNIT No. No. Nos. No. No. No. No. No. No. No. Nos. Sq.m. Sq.m. No. No. No. No. No. Sq.m. Sq.m. Sq.m. Sq.m. Pair Kg. No. m3
PRICE Rs. Cts. 6.00 4.00 7.00 32.00 44.00 59.00 86.00 97.00 161.00 39.00 640.00 656.00 252.19 325.00 450.00 550.00 800.00 1,200.00 178.00 248.00 237.00 485.00 197.00 115.00 30.00 176.75
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION
UNIT
PRICE Rs. Cts. 16.80 14.00 26.25 20.65 107.70 30.65 34.00 80.60 20.00 36.00
Gutter Bracket half round (Short Arm Aluminium) Gutter Bracket Square PVC 114mm Gutter End Cap square PVC 114mm Gutter End Cap half round PVC 150mm Gutter Half round PVC 150mm x 4m Gutter Joiner square PVC 114mm Gutter Joiner half round PVC 150mm Gutter square PVC 114mm Hasp and staple Iron 100mm Hasp and staple iron 150mm * *
Hasp and staple safety type Brass 100mm Hasp and staple safety type Brass 150mm Hat Hook Brass High level plastic - plastic Hinge butt brass 100mm Hinge Butt Brass 100mm x 63mm Hinge Butt Brass 125mm x 100mm Hinge Butt Brass 38mm x 25mm Hinge Butt Brass 50mm x 38mm Hinge Butt Brass 75mm x 38mm Hinge Butt Brass 89mm x 63mm Hinge Butt iron 100mmx63mm Hinge Butt iron 125mmx100mm *
* *
90.00 175.00 47.50 900.00 49.75 41.00 97.50 13.50 17.50 19.00 36.00 33.50 38.50
* *
* *
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION Hinge Butt Iron 50mmx38mm Hinge Butt iron 75mmx38mm Hinge Centre Pivot Brass Hinge Gravity Brass Hinge Parliamentary Brass 100mm Hinge Parliamentary Brass 125mm Hinge Parliamentary Brass 150mm Hinge Spring Double Acting Brass 100mm Hinge T iron 150mm Hinge T iron 200mm Hinge T iron 250mm Hinge T iron 300mm Holdfasts Holdfasts - 250 x 25 x 6 Holdfasts - 400 x 25 x 6 Hooks 38mm G.I. Pipes Hooks for 12mm G.I. Pipes Hooks for 20mm G.I. Pipes Hooks for 25mm G.I. Pipes Hooks for 32mm G.I. Pipes Hooks for 38mm G.I. Pipes Imported Timber Kitchen sink 600 x 375 x 175mm - White Leather washer Limpet washers Lock Cupboard Four Levers Brass 63mm *
UNIT No. No. Set No. No. No. No. No. No. No. No. No. Nos. Nos. Nos. No. No. No. No. No. No. Cu.m. No. No. Nos. No.
PRICE Rs. Cts. 12.50 15.00 52.50 200.00 100.00 125.00 150.00 225.00 26.50 45.00 50.00 60.00 4.00 12.50 20.00 9.00 5.00 5.00 6.00 7.00 9.00 41,666.00 1,705.00 2.00 2.00 120.00
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION
UNIT
PRICE Rs. Cts. 450.00 1,912.50 1,293.75 450.00 250.00 1,375.00 1,350.00 2,218.00 1,843.00 168.00 280.00 2,450.00 1,200.00 933.00 898.00 816.00 30.75 24.25 396.00 327.00 144.50 101.00 53.75 100.65
Lock mortice single local made Lock Mortice Union Double Sash Lock Mortice Union Single Sash Lock Rim Double Lever Brass 150mm Lock Rim single Lever Brass 150mm Low level cistern - white Low level cistern - white - plastic Low level closet unit Low level commode with Trap - White Lunumidella 150 x 12mm Lunumidella 150 x 20mm Manhole Cover 600mm x 600mm with frame Metal 20mm Metal 25mm Metal 40mm Metal 50mm Mild steel Mild steel flat * *
No. No. No. No. No. No. No. No. No. Sq.m. Sq.m. No. m3 m3 m3 m3 Kg. Kg. No. No. No. No. No. No.
Mirror Frame Oval - White (380 x 330) mm Mirror Frame Square - white (320 x 280) mm Mirror only, oval (380 x 330) mm Mirror only, square Mitre Joint half round PVC 150mm Mitre Joint square PVC 114mm
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION Mould oil Night Latch - China Nipple G.I. 12mm Nipple G.I. 20mm Nipple G.I. 25mm Nipple G.I. 32mm Nipple G.I. 38mm
PRICE Rs. Cts. 33.00 152.00 10.00 18.00 28.00 35.00 60.00
Nipple G.I. 50mm Nipple G.I. 63mm Nipple G.I. 75mm Oil paint (Gloss) *
90.00 140.00 160.00 321.00 350.00 390.00 176.00 57.75 80.50 117.25 131.25 161.00 218.75 306.25 393.75 576.65 198.65
Pillar Cock Chromium Plated 12mm Pillar Cock Chromium plated 20mm Pintels and stay hinges 50mm x 6mm x 1m Pipe G.I. 12mm Pipe G.I. 20mm Pipe G.I. 25mm Pipe G.I. 32mm Pipe G.I. 38mm Pipe G.I. 50mm Pipe G.I. 63mm Pipe G.I. 75mm Pipe PVC 110mm type 1000 Pipe PVC 110mm type 400
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION
UNIT
PRICE Rs. Cts. 362.40 14.25 27.35 41.05 26.25 63.25 41.35 93.65 51.85 60.15 156.85 76.60 98.45 304.10 118.15 186.40 385.75 167.90 247.05 40.00 10.00 15.00 20.00 30.00
Pipe PVC 110mm type 600 Pipe PVC 20mm type 1000 (Anton) Pipe PVC 25mm type 1000 Pipe PVC 32mm type 1000 Pipe PVC 32mm type 600 Pipe PVC 40mm type 1000 Pipe PVC 40mm type 600 Pipe PVC 50mm type 1000 Pipe PVC 50mm type 400 Pipe PVC 50mm type 600 Pipe PVC 63mm type 1000 Pipe PVC 63mm type 400 Pipe PVC 63mm type 600 Pipe PVC 75mm type 1000 Pipe PVC 75mm type 400 Pipe PVC 75mm type 600 Pipe PVC 90mm type 1000 Pipe PVC 90mm type 400 Pipe PVC 90mm type 600 Plaster of paris Plug G.I. 12mm Plug G.I. 20mm Plug G.I. 25mm Plug G.I. 32mm *
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION Plug G.I. 38mm Plug G.I. 50mm Plug G.I. 63mm Plug G.I. 75mm Plugs Plugs PVC 20mm Plugs PVC 25mm Plugs PVC 32mm Plugs PVC 40mm Plugs PVC 50mm Plugs PVC 75mm Plywood board, 12mm M.R. Plywood board, ordinary 25mm Plywood board, ordinary M.R. 1150x2060x32mm Plywood board, ordinary M.R. 3mm Plywood board, ordinary M.R. 6mm Plywood board, ordinary M.R. 9mm Plywood door ordinary M.R. 838 x 2060 x 32mm Plywood door, ordinary B.R. 686x2060x32mm Plywood door, ordinary M.R. 686x2060x32mm Polythane Varnish Props (bamboo) 3 - 4 m Pudlo Cement PVC 75mm socket PVC 90mm socket *
UNIT No. No. No. No. No. No. No. No. No. No. No. Sq.m. Sq.m. No. Sq.m. Sq.m. Sq.m. No. No. No. Lit. No. Kg. No. No.
PRICE Rs. Cts. 40.00 50.00 75.00 175.00 15.00 5.00 6.00 8.00 11.00 15.00 66.00 317.00 190.00 1,500.00 125.00 195.00 242.00 1,120.00 1,200.00 1,010.00 304.00 50.00 130.00 52.95 92.75
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION
UNIT
PRICE Rs. Cts. 218.15 108.70 183.90 26.00 15.00 110.00 225.00 25.00 39.00 47.00 60.00 75.00 145.00 5.70 8.75 15.10 22.10 35.00 10.10 14.70 21.25 38.30 65.00 29.50 15.00
PVC Elbow 110mm PVC Elbow 75mm PVC Elbow 90mm Rag bolts Rawl plugs. Red lead Red Lead Paint *
No. No. No. No. No. Kg. Lit. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. No.
Reducing Socket G.I. 20mm to smaller Reducing Socket G.I. 25mm Reducing Socket G.I. 32mm Reducing Socket G.I. 38mm Reducing Socket G.I. 50mm Reducing Socket G.I. 75mm Reducing Socket PVC 25mm to smaller size Reducing Socket PVC 32mm to smaller size Reducing Socket PVC 40mm to smaller size Reducing Socket PVC 50mm to smaller size Reducing Socket PVC 63mm to smaller size Reducing Tee PVC 25mm to smaller size. Reducing Tee PVC 32mm to smaller size. Reducing Tee PVC 40mm to smaller size. Reducing Tee PVC 50mm to smaller size. Reducing Tee PVC 63 mm to smaller size. Ridge tile calicut pattern Gr. I Ring Brass 45mm to 38mm
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION Rivets (6.3mm x 10mm) Robe Hook 100 x 100mm - White Roofing nails Rubber plug 25mm to 32mm Rubber plug 32mm to 50mm Rubble 150mm to 225mm Running head PVC 150mm Running Head Square PVC 114mm Sand Screws Brass 12mm x Gauge 4 Screws Brass 12mm x Gauge 5 Screws Brass 20mm x Gauge 6 Screws Brass 25mm x Gauge 7 Screws Brass 30mm x Gauge 7 Screws Brass 40mm x Gauge 8 Screws Brass 45mm x Gauge 9 Screws Brass 50mm x Gauge 8 Screws Brass 16mm x Gauge 7 Screws Brass 20mm x Gauge 8 Screws Brass 25mm x Gauge 8 Screws Brass 30mm x Gauge 8 Screws brass 30mm x guage 8 Screws Brass 40mm x Gauge 8 Screws brass 50mm x Guage 10 Screws Iron 12mm x Gauge 6 *
UNIT No. No. Kg. No. No. m3 No. No. m3 Doz. Doz. Doz. Doz. Doz. Nos. Doz. No. Nos. Doz. Doz. Doz. Doz. Doz. Nos. Doz.
PRICE Rs. Cts. 2.00 109.00 77.00 19.00 30.00 495.00 61.50 71.75 390.00 4.89 8.61 13.76 20.58 23.10 2.82 44.63 3.48 1.22 18.90 24.57 30.56 30.56 33.84 5.20 3.51
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION
UNIT
PRICE Rs. Cts. 3.72 3.48 5.40 4.19 6.12 7.20 8.20 9.90 14.36 375.00 160.00 100.00 5.20 130.00 60.00 209.00 10.00 15.00 25.00 35.00 45.00 55.00 75.00 125.00
Screws Iron 12mm x Gauge 8 Screws Iron 16mm x Gauge 6 Screws Iron 16mm x Gauge 8 Screws Iron 20mm x Gauge 6 Screws Iron 25mm x Gauge 8 Screws Iron 30mm x Gauge 8 Screws Iron 40mm x Gauge 8 Screws Iron 45mm x Gauge 8 Screws Iron 50mm x Gauge 8 Seat cover plastic - Indian Shower Rose Copper 150mm x 12mm Shower Rose PVC 150mm x 12mm Slaked lime Slaked lime Snowcem Soap Holder - White Socket G.I. 12mm Socket G.I. 20mm Socket G.I. 25mm Socket G.I. 32mm Socket G.I. 38mm Socket G.I. 50mm Socket G.I. 63mm Socket G.I. 75mm
* * * * * * * * *
Doz. Doz. Doz. Doz. Doz. Doz. Doz. Doz. No. No. * * No. No. Kg. Bushels Kg. No. No. No. No. No. No. No. No. No.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION Socket PVC 20mm Socket PVC 25mm Socket PVC 32mm Socket PVC 40mm Socket PVC 50mm Socket PVC 63mm Socket PVC 75mm Socket PVC 90mm Solvent cement Spur Stones Squatting Pan (M) with 'P' Trap Stop cock Brass, 12mm - Italy Stop cock Brass, 20mm Stop cock Brass, 25mm Stop cock Brass, 32mm Stop cock Brass, 38mm Stop cock Brass, 50mm Straining bolts 16mm dia. Tap for wash Basin (M) - Malasiyan Tee equal PVC 75mm Tee equal PVC 90mm Thinner Tile calicut pattern Gr. I Tile cement pressed 200 x 200mm Tile glazed 108 x 108mm * * *
UNIT No. No. No. No. No. No. No. No. 50Grams No. No. No. No. No. No. No. No. No. No. No. No. Lit. No. No. No.
PRICE Rs. Cts. 3.95 5.90 8.30 12.70 19.05 31.50 52.95 92.75 37.20 30.00 440.00 225.00 300.00 425.00 800.00 1,250.00 1,450.00 18.00 390.00 104.15 238.00 86.00 10.50 12.15 5.50
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION
UNIT
PRICE Rs. Cts. 5.00 9.50 61.50 23,400.00 18,350.00 11,150.00 600.00 470.00 280.00 750.00 587.00 343.00 923.00 720.00 420.00 470.00 294.00 175.00 33.70 265.00 159.00 2,450.00 1,320.00
Tile half round (asbestos covering) Gr. I Tile half round Gr.I Tile Terrazzo 300 x 300mm Timber beams Class I Timber beams Class ii Timber beams Class iii Timber plank 25mm class i Timber plank 25mm class ii Timber plank 25mm class iii Timber plank 31mm Class i Timber plank 31mm Class ii Timber plank 31mm Class iii Timber plank 38mm class i Timber plank 38mm class ii Timber plank 38mm class iii Timber planks 25mm class B Toilet Paper Holder 150 x 150 mm - White Tooth Brush Holder 200 x 100mm -White Tor steel Towel Rack Bar 750 mm Towel Rack Holder 100 x 100mm - White Tower bolts, iron 250mm Two way tap for wash Basin (L) - Italy Urinal - White * *
No. No. No. Cu.m. Cu.m. Cu.m. Sq.m. Sq.m. Sq.m. Sq.m. Sq.m. Sq.m. Sq.m. Sq.m. Sq.m. Sqm. No. No. Kg. No. Pair No. No. No.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION Valve Socket PVC 20mm Valve Socket PVC 25mm Valve Socket PVC 32mm Valve Socket PVC 40mm Valve Socket PVC 50mm Valve Socket PVC 63mm Valve socket PVC 75mm Valve socket PVC 90mm Wash Basin (L) Bracket Wash Basin (L) Waste Wash Basin (L) with Pedestal - White Wash Basin (L) without Pedestal - White Wash Basin (M) Bracket Wash Basin (M) Round - White Wash Basin (M) Waste Weathershield * *
UNIT No. No. No. No. No. No. No. No. Pair No. No. No. Pair No. No. Lit. m2 No. No. * * * * * Kg. Kg. Kg. Kg. Kg. m
PRICE Rs. Cts. 5.05 6.60 8.75 25.40 29.75 44.20 100.35 155.00 58.00 145.00 2,530.00 1,694.00 58.00 935.00 125.00 305.00 119.72 65.00 45.00 31.92 30.06 31.92 30.10 30.10 15.00
Weld mesh(galvanised) 50 x 50mm, Gauge 10 Wire Dome, 100mm Wire Dome, 50mm Wire nail S.W.G. 12 to 14 Wire nail S.W.G. 4 to 10 Wire nail S.W.G. 4 to 14 Wire nail S.W.G. 4 to 18 Wire nail S.W.G. 4 to 8 Wood plugs.
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION
UNIT
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION
UNIT
Fluorescent lamp, batten type 40W with enamelled reflector(English make) Fluorescent lamp, batten type 40W with diffuser(Chinese make) Fluorescent lamp, batten type 40W with diffuser(English make) Incandecent bulb, 25W to 100W DESCRIPTION
No.
No.
395.00
Incandecent bulb holder Incandecent bulb shade Main switch single phase 15 Amps 250v, MEM Main switch single 30 Amp 250v, MEM Distribution Board, 4 way Distribution Board, 6 way Distribution Board, 10 way Distribution Board, 12 way Helegen lamp 1000w Fluorescent bulb 20 w or 40 w Starter for Fluorescent bulb Choke for fluorescent bulb R.C.C.B. 40Amp (Crabtree) Round block(PVC) Ceiling Rose (PVC) Cable PVC 1mm2 Earth wire PVC 2.5mm2
No. No. No. No. No. No. No. No. No. No. No. No. No. No. No. m m
11.00 23.00 625.00 697.00 145.00 170.00 225.00 260.00 100.00 53.00 15.00 123.00 2,100.00 4.00 13.00 5.00 11.00
Note:The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services Tax.
DESCRIPTION
UNIT
Socket outlet, surface type, 5 Amps (Indian or Chinese make) Socket outlet, surface type, 15 Amps (Indian or Chinese make) Socket outlet flush type, 5 Amps (Clipsal , Tenby or Carbtree) DESCRIPTION
No.
No.
70.00
No.
150.00
UNIT
Socket outlet flush type, 15 Amps (Clipsal , Tenby or Carbtree) Ceiling Fan, sweep 1425 mm(National or KDK) Fluorescent lamp, batten type 40w with enemelled reflector(Chinese make)
No.
No. No.
3,100.00 335.00
DEMOLISHER
Unskilled labour
8.00
22.88
A012 Removal of a door or a window frame including sashes (size over 4 sq.m.) from
Unskilled labour
12.00
22.88
A013 Removal of door or window sash(size upto 4sq.m.)from existing wall and
Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
0.5 0.5
22.88 37.50
A014 Removal of door or window sash from existing wall(over 4sq.m.)and stacked.
PER No.
L001 L002
Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
0.75 0.75
22.88 37.50
- DEMOLISHER
Unskilled labour
0.30
22.88
A016 Demolition of brick drains and clearing debries as directed. Rate included to
backfill the drain with the available earth and compacted. PER L.m.
L001
Unskilled labour
0.90
22.88
A017 Removal of expanded metal or mesh from existing frames and stacking as
directed. PER m2
L001
Unskilled labour
Hour
1.2
22.88
27.46
A018 Uprooting of fence post, rolling up barbed wire and stacking all material as
Unskilled labour
1.25
22.88
A-
DEMOLISHER
A019 Demolition of brick paved cement rendered floors and cleaning debris as directed
Unskilled labour
0.70
22.88
A020 Removing and stacking of gate sash (02 Nos.) after demolishing two cement concrete
Unskilled labour
8.00
22.88
A021 Removing glass panes in doors, windows and fanlights and stacking as
directed PER M2
L002
Skilled labour
2.00
37.50
A022 Removing eaves gutter from roof of single storeyed buildings and stacking
Hour
0.20
22.88
A-
DEMOLISHER
A023 Removing eaves gutter from roof of two storeyed buildings and stacking
Hour
0.30
22.88
A024 Removing eaves gutter from roofs of 3 or more stroyed buildings and
Hour
0.35
22.88
ALLOW FOR SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
A025 Removing partition and stacking at site including making good to walls and floors.
Rate to include painting new plaster patches to match existing colour. Note :- Material cost will cover from the labour cost. PER M2
L001 L002
Hour Hour
1.60 1.00
22.88 37.50
A-
DEMOLISHER
A026 Chipping and removing of lime plaster on Brick walls, cement concrete walls
Hour
0.30
22.88
A027 Chipping and removing of cement rendering on brick walls and floors and
Hour
1.0
22.88
A028 Chipping and removing of cement rendering on cement concrete walls and
Hour
1.35
22.88
A-
DEMOLISHER
A029 Removing roof tiles and timber and stacking serviceable material at ground and
Hour Hour
0.90 0.20
22.88 37.50
A030 Removing roof tiles and timber and stacking serviceable material and
Hour Hour
1.30 0.20
22.88 37.50
A031 Removing roof tiles and timber and staking serviceable material at ground and
Hour Hour
1.70 0.20
22.88 37.50
ALLOW FOR SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
A-
DEMOLISHER
A032 Demolition of rubble masonary in cement sand motar and stacking rubble and
Unskilled labour Hour 9.00 ALLOW FOR SCAFFOLDING/TOOLS SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
22.88
A033 Demolition of rubble masonary in lime cement sand motar stacking rubble and
Unskilled labour Hour 6.00 ALLOW FOR SCAFFOLDING/TOOLS SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
22.88
Unskilled labour
1.75
22.88
A035 Removing half round tiles or calicut tiles from roof of single storeyed buildings
Hour
0.40
22.88
DEMOLISHER
A036 Removing of half round tiles or calicut tiles from roof of two storeyed buildings and
Hour
0.60
22.88
A037 Removing half round tiles or calicut tiles from roof of three storeyed building and
Hour
0.90
22.88
A038 Removing water proof treatment of bitumen from flat roof and clearing
Unskilled labour
1.70
22.88
DEMOLISHER
A039 Removing asbestos ceiling including timber frame work, stacking serviceable materials
Hour Hour
0.90 0.90
22.88 37.50
serciceable material at ground and clearing debris as directed in two storeyed buildings PER M2
L001 L002
Unskilled labour Hour 1.30 Skilled labour Hour 0.90 ALLOW FOR SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
22.88 37.50
A041 Removing valance barge boarding, stacking materials and clearing away
Hour
0.20
22.88
DEMOLISHER
A042 Removing valance barge boarding, stacking materials and clearing debris
Hour
0.30
22.88
A043 Chipping of cement lime sand plastering in soffit and cleaning debris as directed
PER m2
L001
Hour
1.50
22.88
A044 Cutting down trees girth not exceeding 600mm, grubing uprooting, logging and
Unskilled labour
16.00
22.88
DEMOLISHER
A045 Cutting down trees, uprooting and grubbing girth exceeding 600mm but
less than 900mm excavation filled in earth logging and stacking. PER No.
L001
Unskilled labour
20.00
22.88
A046 Cutting down trees, uprooting and grubbing girth exceeding 900mm but
less than 1200mm excavation filled in earth logging and stacking. PER No.
L010
Unskilled labour
5.00
183.00
A047 Cutting down trees, uprooting and grubbing girth exceeding 1200mm but less than
1600mm excavation filled in earth, rate to include logging and stacking Per No.
L010
Unskilled labour
7.00
183.00
B-
EXCAVATOR
B001 Excavation of drains in any soil except rock requiring blasting as directed
Hour day
4.5 0.2
22.88 52.00
(Cost of tool include in Basket rate) SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
B002 Excavation for foundation to a depth not exceeding 1.5 m in any material except rock
requrin blasting part return fill in and ram and surplus disposed within the site as directed. PER M3
L001 Unskilled labour E001 Basket
Hour day
5.0 0.2
22.88 52.00
(Cost of tool include in Basket rate) SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
B003 Excavation and levelling site in any material except rock requiring
blasting surplus disposed including transport upto 0.4Km depositing and levelling PER M3
L001 Unskilled labour E001 Basket E002 Tractor 75 Cubes
Hour day Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
B-
EXCAVATOR
B004 Filling under floors with gravel or other approved quality of filling spread,
watered and well rammed in 75mm layers (material avialable at site) PER M3
L001 Unskilled labour E001 Basket
Hour day SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
5.0 0.2
22.88 52.00
B005 Filling under floors with gravel or other approved quality filling spread
and well rammed in75mm layers with imported earth (1.6Km transport) PER m3
L001 Unskilled labour M001 Gravel P001 Basket
Hour Cu.m. No. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
B006 Filling under floors with gravel or other approved quality of filling spread
ALLOW FOR EXTRA TRANSPORT SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
C-
CONCRETOR
PER M3
L001 L002 M014 M007 M004 E0010
Hour Hour 50 Kg. Cum Cu.m. day SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
PER M3
L001 L002 M014 M007 M004 E001
Hour Hour 50 Kg. Cum Cu.m. day SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
C003 1:2 1/2:5 (25mm) cement concrete for volumes exceeding 3 cu.m.
PER M3
L001 L002 M014 M007 M005 E001
Hour Hour 50 Kg. Cum Cu.m. day SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
C-
CONCRETOR
C004 1:2 1/2:5 (25mm) cement concrete for volumes upto 3 cu.m
PER M3
L001 L002 M014 M007 M005 E001
Hour Hour 50 Kg. Cum Cu.m. day SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
PER M3
L001 L002 M014 M007 M006 E001
Hour Hour 50 Kg. Cum Cu.m. day SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
PER M3
L001 L002 M014 M007 M006 E001
Hour Hour 50 Kg. Cum Cu.m. day SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
C-
CONCRETOR
and 12mm thick 1:2 cement sand rendering (extra over concrete floors) PER L.M
L001 L002
Hour Hour
0.3 0.7
22.88 37.50
and
12mm thick 1:2 cement sand rendering (extra over concrete floors) PER L.M
L001 L002
Hour Hour
0.7 1.3
22.88 37.50
Unskilled labour Skilled labour Cement Sand Metal 20mm Mild Steel *
10 mm dia
17.16 28.13 24.00 3.12 16.80 26.75 9.00 124.96 27.49 152.45
ALLOW FOR MOULDS AND CURING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
C-
CONCRETOR
C010 225mm high 75mm thick curb in cement concrete including and 15mm
ALLOW FOR SHUTTERING EXCAVATION CURING ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
225mm wide and 225mm avarage depth, with 75mm thick sides and base rate to include for excavation & return fill of earth. PER L.M
L001 L002 M014 M007 M005
ALLOW FOR SHUTTERING, BRACKETS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
C C012
CONCRETOR 112mmx150mm size lintol of 1:2:4 (20mm) cement concrete including form work.(reinforcement paid separately.) PER L.m
Unskilled labour Hour Skilled labour Hour Cement 50 Kg. Sand Cum Metal 20mm Cu.m. Timber plank 25mm Class iii Sq.m. ALLOW FOR TIMBER PROPS AND NAILS SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
45.76 48.75 30.00 3.90 24.00 28.00 16.50 196.91 43.32 240.23
Unskilled labour Skilled labour Cement Sand Metal 20mm Timber plank 25mm class iii
45.76 48.75 60.00 3.90 36.00 84.00 23.30 301.71 66.38 368.09
ALLOW FOR TIMBER PROPS AND NAILS SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
CONCRETOR
Unskilled labour Skilled labour Cement Sand Metal 20mm Timber plank 25mm Class iii ALLOW FOR NAILS AND PROPS
54.91 56.25 90.00 7.80 60.00 126.00 33.00 427.96 94.15 522.11
Unskilled labour Skilled labour Cement Sand Metal 20mm Timber plank 25mm class iii ALLOW FOR NAILS AND PROPS
59.49 63.75 120.00 11.70 84.00 168.00 41.75 548.69 120.71 669.40
C-
CONCRETOR
Unskilled labour Hour Skilled labour Hour Cement 50 Kg. Sand Cum Metal 20mm Cu.m. Timber plank 25mm Class iii Sq.m. ALLOW FOR PROPS AND NAILS SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
59.49 65.63 90.00 7.80 60.00 28.00 29.50 340.41 74.89 415.30
Unskilled labour Skilled labour Cement Sand Metal 20mm Timber plank 25mm Class iii ALLOW FOR PROPS AND NAILS
70.93 75.00 150.00 11.70 96.00 126.00 46.17 575.80 126.68 702.48
CONCRETOR
C018 340mm x 300mm size beam in 1:2:4 (20mm) cement concrete including
Unskilled labour Skilled labour Cement Sand Metal 20mm Timber plank 25mm class iii ALLOW FOR NAILS AND PROPS
91.52 112.50 210.00 11.70 120.00 168.00 62.30 776.02 170.72 946.74
Unskilled labour Skilled labour Cement Sand Metal 20mm Timber plank 25mm class iii
CONCRETOR
C020 100mm thick flat roof in 1:2:4 (20mm) cement concrete and reinforced
with expanded metal, 12mm thick 1:2 cement rendering with 5% pudllo cement and lime puttying soffit complete (reinforced paid seperately) PER M2
L001 L002 M014 M007 M006 M008 M012
Unskilled labour Skilled labour Cement Sand Metal 20mm Boiled lime Pudlo Cement
Hour Hour 50 Kg. Cum Cum Kg. Kg. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
200.20 131.25 210.00 31.20 120.00 3.25 52.00 747.90 164.54 912.44
C021 75mm thick slabs over drains in 1:2:4(20mm) cement concrete reinforced
PER m2
L001 L002 L014 L007 L006 L048
Unskilled labour Skilled labour Cement Sand Metal 20mm Timber plank 25mm class iii
C-
CONCRETOR
Unskilled labour Skilled labour Cement Sand Metal 20mm ALLOW FOR MOULDS
C-
CONCRETOR
C023 100mm x75mm x 50mm spur stones in 1:2:4 (20mm) cement concrete
Unskilled labour Skilled labour Cement Sand Metal 20mm ALLOW FOR MOULDS
C024 Squatting plates for latrines in 1:2:4(20mm) cement concrete with mild steel
reinforcements 225mm centres both ways. PER No. say - 1.25 x 1.25 x 0.10 m
L001 L002 L003 M014 M007 M006 M031
Unskilled labour Skilled labour Black smith Cement Sand Metal 20mm Mild Steel *
10 mm dia
91.52 75.00 18.75 31.20 1.56 6.00 278.75 25.15 527.93 116.14 644.07
ALLOW FOR BINDING AND MOULDS SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
CCONCRETOR C025 1:2:4 (20mm) cement concrete using concrete mixer and vibrator
ALLOW FOR WATER AND CONCRETE MIXER VIBRATOR ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
and finishes paid for separately) in ground floor using mixer and vibrator PER m3
L001 L002 M014 M007 M006 E001
388.96 105.00 1,920.00 81.90 1,200.00 15.60 190.50 3,901.96 858.43 4,760.39
ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
CONCRETOR
Unskilled labour Hour 22.60 22.88 Skilled labour Hour 2.80 37.50 Cement 50 Kg. 6.40 300.00 Sand Cum 0.21 390.00 Metal 20mm Cu.m. 1.00 1,200.00 Basket day 0.30 52.00 ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
517.09 105.00 1,920.00 81.90 1,200.00 15.60 190.50 4,030.09 886.62 4,916.71
CONCRETOR
shuttering and finishes paid for separately). PER m3 Unskilled labour Hour 31.10 22.88 Skilled labour Hour 2.80 37.50 Cement 50 Kg. 6.40 300.00 Sand Cum 0.21 390.00 Metal 20mm Cum 1.00 1,200.00 Basket day 0.30 52.00 ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
711.57 105.00 1,920.00 81.90 1,200.00 15.60 215.00 4,249.07 934.79 5,183.86
shuttering and finishes paid for separately) using mixer and vibrator. PER m3
L001 L002 M014 M007 M006 E001
517.09 131.25 1,920.00 81.90 1,200.00 12.48 190.47 4,053.19 891.70 4,944.89
ALLOW FOR CURING, WATER, MIXER, VIBRATOR, FUEL, OPERATORS SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
C030 1:2:4(20mm) cement concrete in beams in 1st floor (reinforcement,
Unskilled labour Hour 28.20 22.88 Skilled labour Hour 3.50 37.50 Cement 50 Kg. 6.40 300.00 Sand Cum 0.21 390.00 Metal 20mm Cu.m. 1.00 1,200.00 Basket day 0.24 52.00 ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
645.22 131.25 1,920.00 81.90 1,200.00 12.48 190.47 4,181.32 919.89 5,101.21
C-
CONCRETOR
Unskilled labour Hour 36.70 22.88 skilled labour Hour 3.50 37.50 Cement 50 Kg. 6.40 300.00 Sand Cum 0.21 390.00 Metal 20mm Cu.m. 1.00 1,200.00 Basket day 0.24 52.00 ALLOW FOR WATER & MIXER VIB. OPERATORS FUEL ECT. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
839.70 131.25 1,920.00 81.90 1,200.00 12.48 215.00 4,400.33 968.07 5,368.40
C032 Shuttering for floor slab concrete including 100mm x 50mm class ii
Unskilled labour Skilled labour Timber plank 25mm class iii G.I. sheet 18 B.W.G. Props (bamboo) 3 - 4 m Wire nail S.W.G. 4 to 8 * Mould oil
59.49 33.75 30.80 1.31 375.00 6.02 39.60 545.97 120.11 666.08
CONCRETOR
C033 Shuttering for 225mm x 225mm column shafts including class ii timber
Unskilled labour Skilled labour Timber plank 25mm class iii Timber beams Class ii Bolt and nut iron 225 x 10mm Props (bamboo) 3 - 4 m
ALLOW FOR SCREWS AND NAILS SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
C034 Shuttering for beams sides, soffit including class ii timber joists and
Unskilled labour Skilled labour Timber plank 25mm class iii G.I. Sheet 18 B.W.G. Props (bamboo) 3 - 4 m Wire nail S.W.G. 4 to 18 * Mould oil
25.17 41.25 308.00 3.28 25.00 12.04 9.90 424.64 93.42 518.06
CONCRETOR
C035 1:2:4 (20mm) cement concrete in lintol and beams in ground floor using
mixer and vibrator (reinforcement and shuttering paid for separately) PER m3
L001 L002 M014 M007 E001 M006
1,034.18 210.00 1,920.00 85.80 10.40 1,200.00 190.47 4,650.85 1,023.19 5,674.04
ALLOW FOR WATER, CURY, MIXER, VIBRATOR, FUEL, OPERATORS SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
C036 1:2:4(20mm) cement concrete in lintol and beams as per item co35 in 1st floor
PER m3
L001 L002 M014 M007 M006 E001
Unskilled labour Hour 50.80 Skilled labour Hour 5.60 Cement 50 Kg. 6.40 Sand Cum 0.22 Metal 20mm Cu.m. 1.00 Basket day 0.20 ALLOW FOR WATER, MIXER & VIBRATOR SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
1,162.30 210.00 1,920.00 85.80 1,200.00 10.40 190.47 4,778.97 1,051.37 5,830.35
C037 100mm thick 1:2:4(20mm) cement concrete in 1st floor slab using mixer
ALLOW FOR WATER ANY MIXER, OPERATOR FUEL ECT. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
reinforcemnet and shuttering paid for separately) using mixer and vibrator. PER m2 Unskilled labour Hour 2.70 22.88 Skilled labour Hour 0.43 37.50 Cement 50 Kg. 0.80 300.00 Metal 20mm Cu.m. 0.04 1,200.00 Sand Cum 0.03 390.00 ALLOW FOR WATER, CURING, MIXER, VIBRATOR, FUEL, OPERATOR ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D-
BRICKLAYER
D001 Segmental brick arch in 1:3 cement sand mortar including centering
PER m3
L001 L002 M010 M014 M007
Hour 22.60 Hour 17.00 1000 Nos. 0.51 50 Kg. 2.20 Cu.m. 0.15
ALLOW FOR WATER AND SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D002 225mm Brick work in 1:5 cement sand mortar (above 3 cu.m) upto 1st floor level
PER m3
M010 M007 M014 L001 L002
1000 Nos. 0.512 Cum 0.100 50 kg. 1.300 Hour 14.100 Hour 8.500
ALLOW FOR WATER AND SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D003 225mm brick work in 1:5 cement sand mortar upto 1st floor level (upto 3cu.m)
PER m3
L001 L002 M010 M007 M014
Hour 16.200 Hour 10.600 1000 Nos. 0.512 Cum 0.100 50 kg. 1.300
ALLOW FOR WATER AND SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D-
BRICKLAYERS
D004 225 brick work in 1:5 cement sand mortar in piers upto 1st floor level
PER m3
L001 L002 M010 M007 M014
Hour 18.330 Hour 12.730 1000 Nos. 0.517 Cum 0.090 50 kg. 1.300
ALLOW FOR WATER AND SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D005 225mm brick work in 1:5 cement sand mortar with bricks available at site
ALLOW FOR WATER AND SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D006 112mm brick work in 1:5 cement sand mortar upto 1st floor level
ALLOW FOR SCAFFOLDING AND WATER SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D-
BRICKLAYER
D007 112mm brick work in 1:5 cement sand mortar upto 1st floor level(upto 10 sq.m.)
PER m2
M010 M007 M014 L001 L002
ALLOW FOR SCAFFOLDING AND WATER SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D008 112mm brick work in 1:5 cement sand mortar using available bricks including
ALLOW FOR WATER AND SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D009 225mm brick work in 2.5 lime sand mortar upto first floor level (above 3cu.m)
PER m3
M010 M007 M009 L001 L002
1000 Nos. 0.512 Cum 0.100 Kg. 66.250 Hour 14.100 Hour 8.500
ALLOW FOR WATER AND SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D-
BRICKLAYER
D010 225mm brick work in 2:5 lime sand mortar upto 1st floor level (upto 3Cu.m.)
PER m3
M010 M007 M009 L001 L002
1000 Nos. 0.512 Cum 0.100 Kg. 66.250 Hour 16.200 Hour 10.600
ALLOW FOR WATER AND SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D011 225mm brick work in 2:5 lime sand mortar with bricks available at site,
ALLOW FOR WATER AND SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D012 Extra over item D002 to D005 and D009 to D011 for brick work from
Hour
4.2
22.88
D-
BRICKLAYER
D013 Extra over item D002 to D005 and D009 to D011 for brick work above second
Hour
12.7
22.88
D014 Extra over item D006 to D008 for brick work from first floor level to
Hour
1.4
22.88
D015 Extra over item D006 to D008 for brick work above 2nd floor level
PER m2
L001
Hour
4.2
22.88
D-
BRICKLAYER
D019 Weathered and throated brick coping in 1:5 cement sand mortar on 112mm thick
walls complete with 12mm thick 1:3 sand cement rendering and cement floating coat. PER L.m.
M010 M007 M014 L001 L002
1000 Nos. Cum 50 Kg. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D020 Weathered and throated brick coping in 1:5 cement sand mortar on 340mm
thick walls complete with 12mm thick 1:3 cement sand rendering and cement floating coat. PER L.m
M010 M007 M014 L001 L002
1000 Nos. Cum 50 Kg. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D021 Wheathered and throated brick coping in 1:5 cement sand mortar on 225mm
thick walls complete with 12mm thick 1:3 cement sand rendering and cement floating coat. PER L.m
M010 M007 M014 L001 L002
1000 Nos. Cum 50 Kg. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
BRICKLAYER
D022 Weathered and throated brick coping in 1:5 cement sand mortar on 225mm
thick walls using available bricks complete with 12mm thick 1:3 cement sand rendering and cement floating coat. PER L.m
M007 M014 L001 L002
Cum 50 Kg. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D023 Brick cornices in 1:5 cement mortar complete with 12mm thick 1:3
1000 Nos. Cum 50 Kg. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
and making good to floor and wall (lintol,arch.door & window paid for separately). up to 3m2 PER No.
L001 L002 M010 M007 M014 M009
Hour 16.00 Hour 12.00 1000 Nos. 0.10 Cum 0.03 50 Kg. 0.52 Kg. 8.70 SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D-
BRICKLAYER
D025 300mm wide 225mm to 300mm deep, brick drains in with 112mm thick side walls
in 1:5 cement motar complete with 12mm thick 1:2 cement sand rendering with smooth finish and necessary expansion joints(rate to included for excavation) & backfilling. PER L.m
L001 L002 M010 M014 M007
Hour Hour 1000 Nos. 50 Kg. Cum SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D026 225mm wide 150mm to 225mm deep brick drains in 1:5 cement sand mortar
complete with 12mm thick 1:2 cement sand rendering with smooth finish and necessary expansion joints (rate to included for necessary excavation and backfilling) side walls should be 112mm thick. PER L.m
L001 L002 M010 M014 M007
Hour Hour 1000 Nos. 50 Kg. Cum SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D027 Scott's pattern drains including apron of overall width 750mm brick
masonary in 1:5 cement mortar and 12mm thick 1:2 cement sand rendering and necessary expansion joints ( rate to include necessary excavation) PER L.m
M010 M014 M007 L001 L002
1000 Nos. 50 Kg. Cum Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D-
BRICKLALYER
D028 300mm wide and 150mm to 225 high brick work in 1:5 cement sand motar
steps complete with 12mm thick 1:3 cement sand rendering with smooth finish with 300mm deep foundation. Rate to include excavation. PER L.m
M010 M014 M007 L001 L002
1000 Nos. 50 Kg. Cum Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
D029 Formation of vent openings upto 300mm height and 150mm width on
existing walls and making good to walls. Rate to include painting to match the existing colours. PER No.
M009 M007 L001 L002
Boiled lime Sand Unskilled labour Skilled labour ALLOW FOR PAINTS ETC.
E-
MASON
E001 Random rubble masonry in 1:5 cement sand mortar (above 3 cu.m.)
PER m3
M002 M007 M014 L001 L002
E002 Random rubble masonry in 1:5 cement sand mortar (upto 3cu.m)
PER m3
M002 M007 M014 L001 L002
E003 Random rubble masonary in 1:5 cement sand mortar using rubble available at
Cum 50 Kg. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
FF001
PAVIOR Expansion joints in brick floors filled with bitumen and sand PER L.m
L001 L002
Hour Hour
0.08 0.08
22.88 37.50
F002
Expansion joints in concrete floors filled with bitumen and sand (to full depth of concrete and rendering) PER L.m
Hour Hour Cum Kg. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
F003
75mm thick brick paved floor set in 1:5 cement sand mortar and including 12mm thick 1:3 cement rendering with smooth finish. PER m2
1000 Nos. Cum 50 Kg. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
FF004
PAVIOR 75mm thick brick paved floors set in 1:5 cement motar and 12mm thick 1:3 cement rendering with smooth finish with available brick including sorting out and cleaning bricks. PER m2
Cum 50 Kg. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
F005
75mm thick 1:2 1/2:5 (25mm) cement concrete floors including 12mm thick 1:2 cement rendered with smooth finish with expansion joints filled with cement and sand PER m2 Metal 25mm Sand Cement Unskilled labour Skilled labour Cu.m. Cum 50 Kg. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.03 0.02 0.46 1.00 2.60 933.00 390.00 300.00 22.88 37.50 27.99 7.80 138.00 22.88 97.50 294.17 64.72 358.89
F F006
PAVIOR 100mm thick, 1:2:4 (20mm) cement concrete in upper floors including form work, with 12mm thick 1:3 cement sand rendering with smooth finish and lime putty rendering to soffit and expansion joints filled with cement and sand (reinforcement paid for separately). PER m2
M007 M006 M014 M009 M048 M045 M363 M038 M364 L001 L002
Sand Metal 20mm Cement Boiled lime Timber plank 25mm class iii Timber beams Class ii Props (bamboo) 3 - 4 m Wire nail S.W.G. 12 to 14 * Mould oil Unskilled labour Skilled labour
Cum Cu.m. 50 Kg. Kg. Sq.m. Cu.m. No. Kg. Lit. Hour Hour
0.030 0.033 0.650 1.750 0.110 0.013 1.000 0.910 0.330 7.430 2.600
390.00 1,200.00 300.00 5.00 280.00 18,350.00 50.00 31.92 33.00 22.88 37.50
11.70 39.60 195.00 8.75 30.80 238.55 50.00 29.05 10.89 170.00 97.50 881.84 194.00 1,075.84
Spreading watering & ramming gravel in floors for 100mm thickness PER m2
Cu.m. Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
0.30 0.43
176.75 22.88
F008
Terrazzo tile flooring supplied and laid.rate to include for 12mm thick 1:3 cement motar levelling screed etc. PER m2
Tile Terrazzo 300 x 300mm * Cement Sand Unskilled labour Skilled labour Terrazzo Mason
ALLOW FOR STEEL PIN COLOURED CEMENT AND POLISHING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
F011
Supplying and fixing ceramic floor tiles to floors including 20mm thick 1:3 cement sand bedding. PER m2
200mm x 200mm ceramic floor tile. No. 25.00 Cement 50 Kg. 0.27 Sand Cum 0.02 Unskilled labour Hour 4.00 Skilled labour Hour 5.60 ALLOW FOR WASTAGE SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
F012
Supplying and fixing of glazed tiles with all specials to walls including raking plaster and bedding in 12mm thick 1:3 cement motar joints shall be filled with tile grout. PER m2 Tile glazed 108 x 108mm * No. 86.000 5.50 473.00 Cement 50 Kg. 0.270 300.00 81.00 Sand Cum 0.021 390.00 8.19 Unskilled labour Hour 4.000 22.88 91.52 Skilled labour Hour 8.000 37.50 300.00 ADD 10% SPECIALS AND WASTAGES ETC. 47.30 SUB TOTAL 1,001.01 OVER HEAD & PROFITS 22.00% 220.22 TOTAL 1,221.23
F F013
PAVIOR Supplying and fixing of glazed tiles to walls including raking plaster and bedding in 12mm thick 1:2 cement motar (Tiles supplied by the client PER m2
50 Kg. Cum Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
F014
Supplying and fixing of pressed cement tiles of approved pattern and colour to floors including 20mm thick 1:3 cement sand bedding PER m2
Tile cement pressed 200 x 200mm * No. 25.000 Cement 50 Kg. 0.270 Sand Cum 0.021 Unskilled labour Hour 4.000 Skilled labour Hour 5.600 ALLOW FOR WASTAGE SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
G-
ROOFER
Unskilled labour Black smith G.I. Hook bolts 8mm x 115mm Limpet washers
G002 Supplying and fixing of corrugated GI (24 BWG) sheets roofing on class I timber
purlins complete including treating timber with wood preservatives ridging measured seperately) PER m2
M040 M043 M369 L001 L002 M141
G.I. Sheet 24 B.W.G. Timber beams Class I Drive screws and washers Unskilled labour Skilled labour Wood Preservative (Black/ Coloured) *
G003 Supplying and fixing of corrugated GI (24 BWG) sheet on 100mm x 50mm
Timber beams Class I Corrugated G.I. Sheet 24 BWG * Drive screws and washers Unskilled labour Skilled labour
G-
ROOFER
G004 Supplying and fixing of corrugated GI (24 BWG) sheets on existing roof frame
or wall. PER m2
M026 M369 L001 L002
Corrugated G.I. Sheet 24 BWG * Drive screws and washers Unskilled labour Skilled labour
G005 Supplying and fixing of corrgated asbestos sheet roofing on class I timber
Corrugated asbestos sheet Timber beams Class I Drive Screws and washers Unskilled labour Skilled labour Wood Preservative (Black / coloured) *
Timber beams Class I Corrugated asbestos sheet Drive Screws and washers Unskilled labour Skilled labour
G-
ROOFER
existing frame work with necessary coach screws and linpet washers or hook bolts PER m2
M023 M369 L001 L002
Corrugated asbestos sheet Drive screws and washers Unskilled labour Skilled labour
purlins complete with GI ridging washers hook bolts or clips including treating timber with wood preservative. PER m2
M369 M141 M043 M040 L001 L002
Drive screws and washers Wood preservative (black / coloured)* Timber beams Class I G.I. Sheet 24 B.W.G. Unskilled labour Skilled labour
G009 supplying and fixing corrugated GI cladding on class I timber frame work
Timber beams Class I G.I. Sheet 24 B.W.G. Drive screws and washers Unskilled labour Skilled labour
G-
ROOFER
G010 24BWG Corrugated GI sheets fixid to roof wall or fence with necessary
cup washers hool bolts or screws (timber framing paid for seperately) PER m2
M040 M369 L001 L002
G.I. Sheet 24 B.W.G. Drive Screws and washers Unskilled labour Skilled labour
Unskilled labour
1.3
22.88
Unskilled labour
0.5
22.88
Unskilled labour
1.7
22.88
G-
ROOFER
Unskilled labour
0.67
22.88
G016 Rectification of leaks in corrugated sheet roof patched with jute hesseian
dipped in asphalt and laid over with a cement and sand layer. PER No.
L001
Unskilled labour
Hour
1.2
22.88
ALLOW FOR JUTE HESSIAN, BITUMEN AND CEMENT SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
G-
ROOFER
G018 Calicut pattern ridging bedded in cement sand and lime mortar 1:1:4 coloured
88.50 3.90 11.86 15.00 12.58 20.63 12.05 164.52 36.19 200.71
ALLOW FOR COLOURING POWDER SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
G019 Calicut pattern ridging bedded in cement sand and lime mortar 1:1:4 coloured
Sand Slaked lime Cement Unskilled labour Skilled labour ALLOW FOR COLOURING POWDER
G-
ROOFER
PER L.M.
M373 M369 L001 L003
G.I. Ridging 2m x 1m - 24 B.W.G. Drive Screws and washers Unskilled labour Black smith
PER L.M
M025 M369 L001 L002
Close fitting asbestos ridging Drive Screws and washers Unskilled labour Skilled labour
G022 Half round tile ridging bedded in lime cement mortar 1:1:4 and coloured to
Tile half round Gr.I Sand Slaked lime Unskilled labour Skilled labour Cement ALLOW FOR COLOURING POWDER
38.00 3.90 14.20 16.02 26.25 18.00 12.05 128.41 28.25 156.66
G-
ROOFER
G023 Ridging with half round bedded in lime cement mortar 1:1:4 coloured to
Sand Slaked lime Unskilled labour skilled labour Cement ALLOW FOR COLOURING POWDER
Sand Slaked lime Cement Unskilled labour Skilled labour ALLOW FOR COLOURING POWDER
ALLOW FOR LIME SAND ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
G-
ROOFER
G026 Supplying and laying calicut pattern flat tiles (up to 5 tiles) in single
No. Hour
1.00 0.17
10.50 22.88
ALLOW FOR SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
G027 Supplying and laying calicut pattern flat tiles(above 5 tiles) in single
No. Hour
1.00 0.07
10.50 22.88
ALLOW FOR SCAFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
G028 Supplying and laying calicut pattern flat tiles (upto 5 tiles) in buildings of
No. Hour
1.00 0.33
10.50 22.88
ALOW FOR SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
G-
ROOFER
G029 Supplying and laying calicut pattern flat tiles (above 5 upto 25 tiles)
No. Hour
1.00 0.13
10.50 22.88
ALLOW FOR SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
PER m2
M027 Tile calicut pattern Gr. I L001 Unskilled labour
No. Hour
14.00 0.43
10.50 22.88
ALLOW FOR SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
G031 Laying calicut pattern tiles in any building (Tiles available at site)
PER m2
L001
Unskilled labour
0.43
22.88
G034 Glass tiles laid in small quantities including fixing with G.I. Wire where
Unskilled labour
0.5
22.88
G-
ROOFER
G036 Supplying and laying half round tiles upto 50 Nos. in single storeyed building
No. Hour
1.00 0.03
9.50 22.88
G037 Supplying and laying half round tiles above 50 and upto 100 in single
No. Hour
1.00 0.02
9.50 22.88
G038 Supplying and laying half round tiles upto 50 on buildings of more than
No. Hour
1.00 0.07
9.50 22.88
No. Hour
1.00 0.05
9.50 22.88
G-
ROOFER
PER m2
M029 Tile half round Gr.I L001 Unskilled labour
No. Hour
56.00 0.86
9.50 22.88
G041 Half round tiles laid in any building (Tiles available at site)
PER m2
L001
Unskilled labour
0.86
22.88
PER m2
L001
Unskilled labour
0.65
22.88
PER m2
L001
Unskilled labour
0.29
22.88
G-
ROOFER
G044 Supplying and laying one layer half round tiles over the existing asbestos roof
PER m2
M030 Tile half round (asbestos covering) Gr. I L001 Unskilled labour
No. Hour
38.00 0.08
5.00 22.88
G045 Supply and fixing of calicut pattern tiled roof on class I sawn timber frame work
Timber beams class I 50mm x 25mm timber class I Tile calicut pattern Gr. I Ridge tile calicut pattern Gr. I Binding wire * Wire nail S.W.G. 12 to 14 * Wood preservative (Black / coloured)* Cement Slaked Lime Sand Skilled labour Unskilled Labour Allow for colouring powder
0.02 3.61 13.00 1.33 0.07 0.07 0.18 0.03 0.03 0.00 2.96 1.86
23,400.00 22.70 10.50 29.50 47.25 31.92 54.00 300.00 5.20 390.00 37.50 22.88
468.00 81.95 136.50 39.24 3.07 2.23 9.72 8.10 0.14 1.56 111.00 42.56 9.00 913.06 200.87 1,113.93
I I001
CARPENTER & JOINER 40mm to 50mm x 12mm plain chamfered class I timber beading fixed complete with brass screw. PER L.m.
40mm to 50mm x 12mm local class I timber fillets m Screws Brass 40mm x Gauge 8 Nos. Unskilled labour Hour Skilled labour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I002
25mm x20mm plain chamfered Imported timber beadings fixed complete with brass screws PER L.m
25mm x 20mm Imported timber fillets Screws Brass 40mm x Gauge 8 Unskilled labour Skilled labour
I003
Beading or filleting in Class I timber for glass panes fixed complete with brass springs of brass panel pins. PER L.m
M384 12mm x 12mm local class I timber fillets L002 Skilled labour
m Hour
1.100 0.200
11.00 37.50
ALLOW FOR PANEL PIN AND PUTTY SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
Beading or filleting on under side of ceiling removed and re fixed with brass screws complete. PER L.m M382 Screws Brass 40mm x Gauge 8 Nos. 2.0 2.82 L001 Unskilled labour Hour 0.2 22.88 L002 Skilled labour Hour 0.2 37.50
I004
I005
Beading filleting in class I local timber for glass panes fixed complete with brass springs or brass panel pins PER L.m
M386 12mm x12mm local class I timber fillets L002 Skilled labour
Lm. Hour
1.1 0.2
#N/A 37.50
ALLOW FOR BRASS PANEL PINS AND PUTTY SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I004
Beading or filleting on under side of ceiling removed and re fixed with brass screws complete. PER L.m
M382 Screws Brass 40mm x Gauge 8 L001 Unskilled labour L002 Skilled labour
I I005
CARPENTER & JOINER Barge valance facia boards 20mm thick in class I timber fixed complete with necessary iron screws (above 0.03 m3) PER m2
Timber plank 25mm class I Sq.m. 50mm iron screws Gauge 10 Nos. Unskilled labour Hour Skilled labour Hour ALLOW FOR MACHINE PLANING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I006
Barge valance facia boards 20mm thick in class I local timber fixed complete with necessary iron screws (upto 0.03 m3) Timber plank 25mm class I Sq.m. 50mm iron screws Gauge 10 Nos. Unskilled labour Hour Skilled labour Hour ALLOW FOR MACHINE PLANING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.97 8.21 0.86 3.43 600.00 2.00 22.88 37.50 582.00 16.42 19.68 128.63 30.00 776.72 170.88 947.60
I007
Barge valance facia boards 20mm thick in class II timber fixed complete with necessary iron screws (above 0.03 m3) PER m2
Timber plank 25mm class II Sq.m. 50mm iron screws Gauge 10 Nos. Unskilled labour Hour Skilled labour Hour ALLOW FOR MACHINE PLANING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I I008
CARPENTER & JOINER Barge valance facia boards 20mm thick in class II local timber fixed complete with necessary screws (upto 0.03 m3) PER m2
Timber plank 25mm class ii Sq.m. 50mm iron screws Gauge 10 Nos. Unskilled labour Hour Skilled labour Hour ALLOW FOR MACHINE PLANING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I009
Barge valance facia boards available fixed including cutting and minor repairs PER m2
L001 Unskilled labour L002 Skilled labour M387 50mm iron screws Gauge 10
I010
Flat asbestos ceiling fixed to 100mm x 50mm joists and 50x50mm bearers of class I timber including 40mm x 12mm cover fillets and 40 x 40mm coves of class I timber. 2coats of alkali resisting primer and 2 coats of emulision paint. PER m2 Unskilled labour Hour Skilled labour Hour Painter Hour Timber Beams Class I Cu.m. Wire nail S.W.G. 12 to 14 * Hour Wood preservative (black / coloured) * Hour Asbestos plain ceiling sheet 1220 x 1220mm No. 20mm G.I. Clout nails Kg. 40mm to 50mm x 12mm local class I timber fillets m Screws Brass 40mm x Gauge 8 No. Cove moulding(63mmx40mm)local class I m Alkali resisting primer * Lit. Emulsion * Lit. 3.313 1.767 1.767 0.013 1.767 1.767 0.75 0.025 0.084 1.078 1.00 0.020 0.040 22.88 37.50 37.50 23,400.00 31.92 54.00 200.00 132.50 29.00 2.82 48.00 334.00 241.00 75.80 66.26 66.26 304.20 56.40 95.42 150.00 3.31 2.44 3.04 48.00 6.68 9.64 20.40 699.53 153.90 853.43
L001 L002 L005 M043 M037 M141 M024 M391 M384 M382 M469 M084 M073
ALLOW FOR CEMENT SAND SCAFFOLDING AND BRUSHES SUB TOTAL OVER HEAD & PROFITS 22 % TOTAL
I I011
CARPENTER & JOINER Asbestos, plywood, cainte or colotex ceiling supplied by client cut and fixed on existing bearers rafter or frames (Beading or cover fillets paid separately). PER m2
M391 20mm G.I. Clout nails L001 Unskilled labour L002 Skilled labour
ALLOW FOR SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I012
Asbestos ceiling or partition fixed with clout heading nails to existing bearers or frames (beadings or cover fillets paid seperately) PER m2
Asbestos plain ceiling sheet 1220 x 1220mmmNo. Unskilled labour Hour Skilled labour Hour 20mm G.I. clout nails Kg. ALLOW FOR SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I I013
CARPERNTER & JOINER Canito treotex or colotex ceiling or partition fixed to exixting bearers, rafters or frames (beadings or cover fillets paid for separately) PER m2
Asbestos plain ceiling sheet 1220 x 1220mmmNo. Unskilled labour Hour Skilled labour Hour 20mm G.I. clout nails Kg. ALLOW FOR SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I I013
CARPENTER & JOINER Lunumidella ceiling boards of 150mm x 20mm renewed in small quantites. PER L.m
M054 Lunumidella 150 x 20mm L001 Unskilled labour L002 Skilled labour
ALLOW FOR NAILS SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I014
Lunumidella ceiling fixed with wire nails (boards available at site) PER m2
M037 Wire nail S.W.G. 4 to 14 L001 Unskilled labour L002 Skilled labour
ALLOW FOR SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I I015
CARPENTER & JOINER 20mm Lunumidella ceiling or partition beaded and rebated nailed to under side of existing joists rafters or frames above 10m2 (fillets or beading paid for separately). PER m2
Lunumidella 150 x 20mm Wire nail S.W.G. 4 to 14 * Unskilled labour Skilled labour ALLOW FOR SCAFFOLDING
I016
20mm Lunumidella ceiling or partition beaded and rebated nailed to nder side of existing joists, rafters or frames upto 10m2 (fillets and beading paid for separately.) PER m2
Lunumidella 150 x 20mm Wire nail S.W.G. 4 to 18 * Unskilled labour Skilled labour ALLOW FOR SCAFFOLDING
I017
Ceiling openings 600mm x 450mm approx formed complete with 50mm x 50mm bearers (glass tiles or sheets paid for seperately) PER No.
Lunumidella 150 x 12mm Timber beams Class I Unskilled labour Skilled labour ALLOW FOR NAILS
I I018
CARPENTER & JOINER Cleaning of ceiling upper side and clearing away the debris PER m2
L001
Unskilled labour
0.22
22.88
I019
Cove moulding with 63mm x 40mm imported class I timber fixed with brass screws and plugs new or renewed PER L.m
Cove moulding(63mm x 40mm)imported class I m Wood plugs. m Screws Brass 50mm x Gauge 8 No. Unskilled labour Hour skilled labour Hour ALLOW FOR CEMENT AND SAND SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I I020
CARPENTER & JOINER Supplying and fixing of Doors and Windows ledged, braced and battened with grooved and tongued joints 100mm x 75mm frames and 20mm thick sashes in class I local timber complete with brass furniture with local mortice lock for doors heavy gauge stays fastners and barrel bolts for windows. PER m2
Timber beams Class I Timber plank 25mm class I Brass screws (40mm) Guage 8 Screws brass 50mm x Gauge 8 Hinge Butt Brass 100mm x 63mm * Lock mortice single local made Unskilled labour Skilled labour
ALLOW FOR SPUR STONES ROWL PLUGS, DOWELS, SAND PAPER ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I021
Supplying and fixing of 20mm thick ledged, braced and battened sashes and 100mm x75mm frames in class II timber for doors and windows with local mortice lock for doors or heavy gauge casement stays, fastners and barrael bolts for windows. PER m2 Timber beams Class ii Cu.m. 0.03 18,350.00 550.50 Timber plank 25mm class II Sq.m 1.30 470.00 611.00 Brass screws (40mm) Guage 8 Nos. 40.00 2.82 112.80 Screws Brass 50mm x Guage 10 Nos. 4.00 5.20 20.80 Hinge Butt Brass 100mm x 63mm * Nos. 1.00 41.00 41.00 Lock mortice single local made Nos. 0.70 450.00 315.00 Unskilled Labour Hour 6.00 22.88 137.28 Skilled Labour Hour 16.00 37.50 600.00 ALLOW FOR SPUR STONES RAWL, DOWELS SAND PAPER ETC. 115.00 SUB TOTAL 2,503.38 OVER HEAD & PROFITS 22.00% 550.74 TOTAL 3,054.12
I I022
CARPENTER & JOINER Supplying and fixing of 20mm thick ledged, braced and battened sash only for doors and windows in class I timber fixed with available furniture PER m2
Timber plank 25mm class I Screws Brass 40mm x Gauge 8 Screws Brass 25mm x Gauge 7 Unskilled labour Skilled labour ALLOW FOR SAND PAPER ETC.
I 023
Supplying and fixing of 20mm thick ledged, braced and battened sash for door and windows in class II timber fixed with available furniture. PER m2
Timber plank 25mm class ii Screws Brass 40mm x Gauge 8 Screws Brass 50mm x Gauge 10 Unskilled labour Skilled labour ALLOW FOR SAND PAPER ETC.
I I024
CARPENTER & JOINER Supplying and fixing of 25mm thick framed and 15mm thick battened sashes and 100mm x 75mm frame class I local timber complete with brass furniture, for doors and windows (locks paid seperately) PER m2
Timber beams Class I Cu.m. 0.032 23,400.00 Timber plank 31mm class I Sq.m. 0.500 750.00 25mm thick planks of class I local timber m2 0.816 600.00 Hinge Butt Brass 100mm x 63mm * No. 2.000 41.00 Screws Brass 40mm x Gauge 8 Doz. 1.330 33.84 Screws Brass 25mm x Gauge 7 Doz. 0.330 20.58 Unskilled labour Hour 10.600 22.88 Skilled labour Hour 22.500 37.50 ALLOW FOR BARREL BOLTS ETC. ALLOW FOR SPUR STONES DOWELS,RAWL PLUGS AND SCREWS SAND PAPER ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
748.80 375.00 489.60 82.00 45.01 6.79 242.53 843.75 155.00 115.00
I025
Supplying and fixing of 25mm thick framed and 15mm thick battened sashes with 100mm x 75mm frames in class II local timber complete with brass furniture for doors and windows (locks paid seperately) PER m2
Timber beams Class ii Cu.m. 0.032 Timber plank 31mm Class ii Sq.m. 0.500 25mm thick planks of class II local timber m2 0.816 Hinge Butt Brass 100mm x 63mm * No. 2.000 Screws Brass 40mm x Gauge 8 Doz. 1.330 Screws Brass 25mm x Gauge 7 Doz. 0.330 Unskilled labour Hour 10.600 Skilled labour Hour 22.500 ALLOW FOR BARREL BOLTS ETC ALLOW FOR SUPER STONES DOWLS, RAWLS PLUGS, SCREWS AND SAND PAPER ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
587.20 293.50 383.52 82.00 45.01 6.79 242.53 843.75 155.00 115.00
I I026
CARPENTER & JOINER Supplying and fixing of 32mm thick framed and 15mm thick battened sashes with 100mm x 75mm frames in class I local timber complete with brass furniture for doors and windows (locks paid seperately) PER m2
Timber beams Class I Cu.m. 0.032 23,400.00 Timber plank 38mm class I Sq.m. 0.500 923.00 25mm thick planks of class I local timber m2 0.816 600.00 Hinge Butt Brass 100mm x 63mm * No. 2.000 41.00 Screws Brass 40mm x Gauge 8 Doz. 1.330 33.84 Screws Brass 25mm x Gauge 7 Doz. 0.330 20.58 Unskilled labour Hour 10.600 22.88 Skilled labour Hour 22.500 37.50 ALLOW FOR BARREL BOLTS, SKELTON BOLTS ALLOW FOR SPURSTONES, DOWELS,RAWL PLUGS SAND PAPER AND SCREWS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
748.80 461.50 489.60 82.00 45.01 6.79 242.53 843.75 155.00 115.00
I027
Supplying and fixing of 32mm thick framed and 15mm thick battened sashes with 100mm x 75mm frames in class II local timber complete with brass furniture for doors and windows (locks opaid seperately) PER m2
Timber beams Class II Cu.m. 0.032 18,350.00 Timber plank 38mm class II Sq.m. 0.500 720.00 25mm thick planks of class II local timber m2 0.816 470.00 Hinge Butt Brass 100mm x 63mm * No. 2.000 41.00 Screws Brass 40mm x Gauge 8 Doz. 1.330 33.84 Screws Brass 25mm x Gauge 7 Doz. 0.330 20.58 Unskilled labour Hour 10.600 22.88 Skilled labour Hour 22.500 37.50 ALLOW FOR BARREL BOLTS, SKELTON BOLTS ALLOW FOR SPURSTONES, DOWELS, SANDPAPER RAWL PLUGS AND SCREWS SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
587.20 360.00 383.52 82.00 45.01 6.79 242.53 843.75 155.00 115.00
I I028
CARPENTER & JOINER Supplying and fixing of 25mm thick, ledged, braced and battened sash in class I timber for doors and windows (Barrel Bolts, Skeleton Bolts paid seperately) PER m2
Timber plank 31mm class I Screws brass 30mm x Guage 8 Screws brass 25mm x Guage 7 Unskilled labour Skilled labour
Sq.m. 1.500 Doz. 3.740 Doz. 0.374 Hour 6.000 Hour 14.000
ALLOW FOR SAND PAPER ETC SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I029
Supplying and fixing of 25mm thick, ledged , braced and battened sash in class II local timber for doors and windows( Barrel Bolts & Skeleton Bolts paid seperately) PER m2
Timber plank 31mm class II Screws brass 30mm x Guage 8 Screws brass 25mm x Guage 7 Skilled labour Unskilled labour
Sq.m. 1.500 Doz. 3.740 Doz. 0.374 Hour 14.000 Hour 6.000
ALLOW FOR SAND PAPER ETC SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I030
Supplying and fixing of 32mm thick, ledged, braced and battened sash in class I timber for doors and windows. (Barrel Bolts & Skeleton Bolts paid seperately) PER m2
Timber plank 38mm class I Screws brass 30mm x Guage 8 Screws brass 25mm x Guage 7 Skilled labour Unskilled labour ALLOW FOR SAND PAPER ETC
Sq.m. 1.500 Doz. 3.740 Doz. 0.374 Hour 15.000 Hour 6.000
I031
Supplying and fixing of 32 thick, ledged, braced and battened sash in class II local timber for doors and windows (Barrel Bolts & Slkeleton Bolts paid seperately) PER m2
Timber plank 38mm class II Screws brass 30mm x Guage 8 Screws brass 25mm x Guage 8 Skilled labour Unskilled labour
ALLOW FOR SCREWS AND SAND PAPER SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I032
Supplying and fixing of 25mm thick sash in imported timber for doors and windows (Iron Mongery glazing paid seperately) PER m2
M427 32mm thick imported timber planks L002 Skilled labour L001 Unskilled labour ALLOW FOR SCREWS AND SAND PAPER
m2 hour hour
I033
M381 M382 M043 M051 M425 M429 M430 M062 M068 L001 L002
Supplying and fixing of battened, door for gurge 32mm framed 15mm thick battened with 125mm x 100mm frames in class I timber with iron pintels and strap hinges Iron tower bolts for doors for Hasp & Staple. PER m2 Hasp and staple Iron 100mm * No. 0.200 20.00 4.00 Screws Brass 40mm x Gauge 8 Nos. 3.400 2.82 9.59 Timber beams class I Cu.m 0.02 23,400.00 468.00 Timber plank 38mm class I sq.m 0.60 923.00 553.80 25mm thick planks of class I local timber M2 0.64 600.00 384.00 Holdfasts - 250 x 25 x 6 Nos. 1.00 20.00 20.00 Pintels and stay hinges 50mm x 6mm x 1m Nos. 1.00 176.00 176.00 Bolt & nut iron 45 x 6mm Nos. 5.00 1.20 6.00 Bolt Tower iron 75mm * Nos. 0.20 26.00 5.20 Unskilled labour Hour 4.000 22.88 91.52 Skilled labour Hour 6.000 37.50 225.00 ALLOW FOR SPUR STONES SAND PAPER DOWELS 65.00 ALLOW FOR MACHINE PLANING 70.00 SUB TOTAL 2,078.11 OVER HEAD & PROFITS 22.00% 457.18 TOTAL 2,535.29 Supplying and fixing of glazed and panelled, 32mm thick sash and with 100mm x 75mm frames in class I local timber for doors and windows including all Brass furniture. (Door lock paid seperately) PER m2 Timber beams class I Timber plank 38mm class I 25mm thick planks of class I local timber 40mm x 40mm class I timber sash bars 12mm x 12mm local class I timber fillets Glass Pane clear 3mm Hinge butt brass 125mm x 100mm * Bolt skeleton brass 300mm * Bolt barrel brass 150mm * 25mm brass screws - 8 Unskilled labour Skilled labour Cu.m sq.m M2 L.m L.m sq.m No. No. Nos. Nos. hour hour 0.02 0.64 0.25 1.64 5.30 0.36 1.50 0.40 0.80 12.00 6.00 12.00 23,400.00 923.00 600.00 57.00 11.00 178.00 97.50 100.00 85.00 2.05 22.88 37.50 468.00 590.72 150.00 93.48 58.30 64.08 146.25 40.00 68.00 24.60 137.28 450.00 50.00 65.00 2,405.71 529.26 2,934.97
I034
M043 M049 M425 M432 M386 M197 M122 M099 M096 M398 L001 L002
ALLOW FOR SPUR STONES, RAWL PLUGS, SCREWS, DOWELS, SAND PAPER ETC. ALLOW FOR MACHINE PLANING & JOINT SUB TOTAL OVER HEAD & PROFITS 22 % TOTAL
I035
Supplying and fixing of glazed or pannelled 32mm thick sashes with 100mm x 75mm frames in class II local timber complete with brass furniture for doors and windows. ( door lock paid seperately) PER m2
M044 M050 M426 M433 M434 M197 M122 M099 M096 M398 L001 L002
Timber beams class II Timber plank 38mm class II 25mm thick planks of class II local timber 40mm x 40mm Class II timber sash bars 12mm x 12mm local class II timber fillets. Glass pane clear 3mm Hinge Butt Brass 125mm x 100mm * Bolt Skeleton Brass 300mm * Bolt Barrel Brass 150mm * Screws brass 25mm x Gauge 8 Unskilled labour Skilled labour ALLOW FOR MACHINE PLANING
Cum m2 m2 L.m L.m sqm No. No. No. No. hour hour
0.02 0.64 0.25 1.64 5.30 0.36 2.00 0.40 0.33 9.00 6.00 12.00
18,350.00 720.00 470.00 31.00 12.00 178.00 97.50 100.00 85.00 2.05 22.88 37.50
367.00 460.80 117.50 50.84 63.60 64.08 195.00 40.00 28.05 18.45 137.28 450.00 65.00 50.00
ALLOW FOR SPUR STONES RAWL PLUGS, SCREWS, DOWELS, SAND PAPER ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I I036
CARPENTER & JOINER Supplying and fixing of doors or windows glazed and or panelled sashes 32mm thick in class I timber with brass furniture. PER m2
M049 M425 M432 M386 M197 M122 M099 M096 M398 L002 L001
Timber plank 31mm class I 25mm thick planks of class I local timber 40mm x 40mm class I timber sash bars 12mm x 12mm local class I timber fillets Glass Pane clear 3mm Hinge Parliamentary Brass 125mm Bolt Skeleton Brass 300mm * Bolt barrel Brass 150mm * 25mm brass screws - 8 Skilled labour Unskilled labour
sq.m m2 L.m L.m sq.m No. No. No. No. hour hour
0.72 0.28 1.86 6.00 0.41 1.00 0.50 0.90 10.00 12.00 6.00
750.00 600.00 57.00 11.00 178.00 125.00 100.00 85.00 2.05 37.50 22.88
540.00 168.00 106.02 66.00 72.98 125.00 50.00 76.50 20.50 450.00 137.28
ALLOW FOR SAND PAPER AND SCREWS SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL I037 Supplying and fixing of glazed or panelled, 32mm thick sashes in class II timber with brass furniture for doors and windows. PER m2 M050 M426 M433 M434 M197 M122 M099 M096 M398 L001 L002 Timber plank 31mm class II 25mm thick planks of class II local timber 40mm x 40mm class II timber sash bars 12mm x 12mm local class II timber fillets. Glass pane clear 3mm Hinge parliamentary Brass 125mm Bolt Barrel Brass 150mm * Bolt Skeleton Brass 300mm * 25mm brass screws - 8 Unskilled labour Skilled labour ALLOW FOR SAND PAPER AND SCREWS SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL sq.m m2 L.m L.m sq.m No. No. No. No. Hour Hour 0.73 0.28 1.86 6.00 0.40 1.00 0.50 0.90 10.00 6.00 12.00 587.00 470.00 31.00 12.00 178.00 125.00 85.00 100.00 2.05 22.88 37.50
428.51 131.60 57.66 72.00 71.20 125.00 42.50 90.00 20.50 137.28 450.00 35.00 1,661.25 365.48 2,026.73
I038
Supplying and fixingbof panelled 31mm thick sash and 100mm x 75mm frames in class I timber and trelised with weld mesh no.32 and complete with brass furniture PER m2
M043 M049 M425 M035 M386 M117 M127 M382 M389 L001 L002
Timber beams class I Timber plank 31mm class I 25mm thick planks of class I local timber Weld mesh(galvanised) 50 x 50mm, Gauge 10 12mm x12mm local class I timber fillets Hinge butt brass 100mm Lock mortice single local made Screws Brass 40mm x Gauge 8 Screws Brass 50mm x Gauge 8 Unskilled labour Skilled labour
0.03 0.52 0.29 0.36 1.87 1.00 0.70 16.00 4.00 10.60 22.50
23,400.00 750.00 600.00 935.00 11.00 99.00 450.00 2.82 3.48 22.88 37.50
702.00 390.00 174.00 336.60 20.57 99.00 315.00 45.12 13.92 242.53 843.75 80.62 3,263.11 717.88 3,980.99
ALLOW FOR SPUR STONE DOWELS, RAWL PLUGS AND SCREWS SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I039
Supplying and fixing of 31mm door sash panelled and terllis with Gal weld mesh with 31 class I timber and available furniture. PER m2
Timber plank 31mm class I 25mm thick planks of class I local timber Weld mesh(galvanised) 50 x 50mm, Gauge 10 12mm x 12mm local class I timber fillets Skilled labour Unskilled labour 40mm to 50mm x 12mm local class I timber filets 25mm brass screws - 8 ALLOW FOR SAND PAPER ETC.
465.00 204.00 392.70 24.42 637.50 138.65 435.00 8.20 30.00 2,335.47 513.80 2,849.27
I040
Supplying and fixing of 32mm panneled doors sash and with BRC No. 32 weld mesh in class I timber with available furniture. PER m2
28mm thick class I timber planks. 25mm thick planks of class I local timber Weld mesh (galvanised) 50x50mm, gauge 10 12mm x12mm local class I timber fillets Skilled labour Unskilled labour 40mm to 50mm x 12mm local class I timber fillets 25mm brass screws - 8 ALLOW FOR SAND PAPER ETC.
419.54 204.00 392.70 24.42 637.50 138.65 435.00 8.20 15.00 2,275.01 500.50 2,775.51
SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL I041 Supplying and fixing of 32mm panelled door sashes and 100mm x 75mm frames in class I timber fixed complete with brass furniture. (door lock paid seperately) PER m2 M043 M049 M425 L002 L001 M117 M382 M389 Timber beams class I Timber plank 38mm class I 25mm thick planks of class I local timber Skilled labour Unskilled labour Hinge Butt Brass 125mm x 100mm * Screws Brass 40mm x Gauge 8 Screws Brass 50mm x Gauge 8 Cu.m sq.m m2 hour hour No. No. No. 0.03 0.67 0.52 10.00 6.00 1.50 12.30 3.00 23,400.00 923.00 600.00 37.50 22.88 97.50 2.82 3.48
702.00 618.41 312.00 375.00 137.28 146.25 34.69 10.44 150.00 50.00 2,536.07 557.94 3,094.01
ALLOW FOR MACHINE PLANING AND JOINTS ALLOW FOR SPUR STONES RAWL PLUGS AND SCREWS SUB TOTAL OVER HEAD & PROFITS 22% TOTAL
I I042
CARPENTER & JOINER Removing , easing and refixing of doors or windows. PER No
Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
1.50 1.50
22.88 37.50
I043
1.00
37.50
I044
Renewing in short lenghs with Class I timber in Doors and Windows frames. PER L.m.
Cu.m. Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
0.013 4.400
23,400.00 37.50
I I045
CARPENTER & JOINER Altering door or window frame by filleting existing rebate using Class I timber and rehanging screws and sashes on opposite side. PER No.
32mm x 12mm local class 1 timber fillets Screws Brass 30mm x Gauge 8 Screws Brass 25mm x Gauge 8 Skilled labour Unskilled labour
I046
Renewing of glazing bars in door or windows in Class I timber, (per 2.0m, 32mm x 32mm)
PER m M432 40mm x 40mm class I timber sash bars L002 Skilled labour L001 Unskilled labour L.m. Hour Hour 1.17 2.80 0.94 57.00 37.50 22.88 66.69 105.00 21.51 193.20 42.50 235.70
I047
Fixing of louvered Door or Window sash 25mm to 32mm in Imported Timber with available furniture. PER m2
M427 31mm to 38mm thick (Burma Teak) imported Class Timber planks M518 12mm thick class I timber planks M133 Screws brass 25mm x Gauge 8 L002 Skilled labour L001 Unskilled labour ALLOW FOR SAND PAPER SUB TOTAL OVER HEAD & PROFITS 22% TOTAL
I I048
CARPENTER & JOINER Supplying and fixing 38mm x 38mm x 125mm tapered doors tops in Class I timber PER Nos.
M520 50mm x 50mm thick class 1 timber L002 Skilled labour L001 Unskilled labour ALLOW FOR CEMENT ETC.
Lm Hour Hour
I049
Fixing of door or window sashes to position (sash and fittings supplied by client)
PER NO. L002 Skilled labour L001 Unskilled labour ALLOW FOR TOOLS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour Hour 3.00 3.00 37.50 22.88 112.50 68.64 10.00 191.14 42.05 233.19
I I050
CARPENTER & JOINER Removing and refixing of door sashes in new position
PER NO. L002 Skilled labour L001 Unskilled labour Hour Hour 2.00 2.00 37.50 22.88 75.00 45.76
I051
Supplying and fixing of 25mm thick swing doors (900mm x 450mm each) with 12mm panel or glazed and panelled in Class I timber including brass gravity hinges.
PER PAIR M435 M518 M120 M135 L002 L001 M133 28mm thick Class I timber planks. 12mm thick class I timber planks Hinge Gravity Brass Screws Brass 40mm x Gauge 8 Skilled labour Unskilled labour Screws Brass 25mm x Gauge 8 ALLOW FOR SAND PAPER m2 m2 No. Doz. Hour Hour Doz. 0.51 0.79 4.00 1.00 20.00 6.00 3.00 676.67 743.00 200.00 33.84 37.50 22.88 24.57 345.10 586.97 800.00 33.84 750.00 137.28 73.71 3.00
I I052
CARPENTER & JOINER Supplying and fixing 25mm thick swing doors (900mm x 450mm each) panels in Class I timber complete with gravity hinges. PER pair
28mm thick Class I timber planks. Hinge Gravity Brass Screws brass 40mm x Gauge 8 Plywood board, 12mm M.R. Skilled labour Unskilled labour ALLOW FOR SAND PAPER ETC.
345.10 800.00 33.84 177.52 750.00 137.28 3.00 2,246.74 494.28 2,741.02
I053
Supplying and fixing quadrant fillets 20mm x 20mm with spring or nails in Class I timber. PER m
M388 25mm x 25mm class I local timber fillets L002 Skilled labour ALLOW FOR NAILS OR SPRINGS
Lm. Hour
1.10 0.33
29.00 37.50
I054
Supplying and fixing quadrant fillets 25mm x 25mm with springs or nails in Class I timber. PER m
Lm Hour
1.10 0.33
76.00 37.50
I I055
CARPENTER & JOINER Supplying and fixing of gate sash with available posts at site including fixing post (Gate and posts supplied by Client) PER sash
Hour Hour
8.00 2.00
22.88 37.50
183.04 75.00
I056
Supplying and fixing of louver blades with 10mm minimum thickness in Class I timber up to 100mm width. PER m
M518 12mm thick class i timber planks L002 Skilled labour ALLOW FOR NAILS ETC.
m2 Hour
0.120 1.312
743.00 37.50
I057
Supplying and fixing of louvers blades with 10mm minimum thickness and 100mm to 150mm wide in class I timber. PER m
M518 12mm thick class i timber planks L002 Skilled labour ALLOW FOR NAILS ETC.
m2 Hour
0.160 1.400
743.00 37.50
I I058
CARPENTER & JOINER Supplying and fixing of louver blades with a 10mm minimum thickness and 150mm to 225mm wide in Class I timber. PER m
M518 12mm thick class i timber planks L002 Skilled labour ALLOW FOR NAILS ETC.
m2 Hour
0.230 1.640
743.00 37.50
I059
Fixing of available partitions including making good to walls and floors. PER m2
Hour Hour
0.92 2.46
37.50 22.88
ALLOW FOR PLUGS, SCREWS, CEMENT & PAINT SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I I060
CARPENTER & JOINER Fixing of full panelled or panelled and glazed 38mm thick partitions with 100mm x 50mm frames and 25mm x 25mm quadrant fillets, complete with brass screws in Class I local timber. PER m2
0.02 0.36 0.36 7.52 3.38 26.73 9.83 0.43 0.93 0.04
23,400.00 600.00 #N/A 76.00 25.00 37.50 22.88 178.00 41.76 31.92
468.00 216.00 #N/A 571.52 84.50 1,002.38 224.91 76.54 38.84 1.28 3.00 #N/A #N/A #N/A
I061
Fixing of glazed and plywood panelled partitions in Class I timber with 100mm x 100mm x 300mm intermediate posts 100mm x 50mm x 2150mm and 40mm x 200mm capping complete. PER m2
M043 M046 M061 M524 M526 L002 L001 M197 M137 M038
Timber beams Class I Timber plank 25mm class I Plywood board, 12mm M.R. 32mm x 32mm Class I timber 20mm x 20mm Class 1 timber battens Skilled labour Unskilled labour Glass Pane clear 3mm Screws Brass 50mm x Gauge 8 Wire nail S.W.G. 12 to 14 * ALLOW FOR SAND PAPER ETC.
0.003 0.360 0.360 7.520 3.380 26.730 9.830 0.430 0.930 0.040
23,400.00 600.00 317.00 76.00 25.00 37.50 22.88 178.00 41.76 31.92
70.20 216.00 114.12 571.52 84.50 1,002.38 224.91 76.54 38.84 1.28 3.00 2,403.28 528.72
TOTAL
2,932.00
I I062
CARPENTER & JOINER Supplying and fixing 100mm long tapered 75mm x 50mm plugs in Class I timber on walls with 1:3 cement mortar finish neately. PER No.
M043 Timber beams Class I L002 Skilled labour L001 Unskilled labour ALLOW FOR CEMENT & PAINT
I063
Supplying of 3 ply plywood panels 6mm thick and fixing to existing frames (beading paid for separately). PER m2
M059 Plywood board, ordinary M.R. 6mm L002 Skilled labour ALLOW FOR NAILS SCREWS ETC.
Sq.m. Hour
1.005 1.802
195.00 37.50
I064
Fixing of 2135mm long, 125mm x 125mm verandah post tapering to 100mm x 100mm on spur stone in Class I timber(Spur stone paid for separately). PER No.
M043 Timber beams Class I L002 Skilled labour L001 Unskilled labour
I I065
CARPENTER & JOINER Fixing of 2135mm long, 150mm x 150mm verandah post tapering to 125mm x 125mm on spur stone in Class I local timber(Spur stone paid for separately). PER No.
M043 Timber beams Class I L002 Skilled labour L001 Unskilled labour
I066
Fixing of round jungle timber available wooden posts 150m to 200mm(posts supplied by Client). PER m
1.300
22.88
I067
M529 Coconut rafters L002 Skilled labour L001 Unskilled labour ALLOW FOR NAILS ETC.
m Hour Hour
I I068
CARPENTER & JOINER Supplying and fixing of 50mm x 25mm reepers in Class I timber new or renewed with Iron nails up to 30m (Shifting of tiles paid for separately) Rate include applying wood preservative. PER m
50mm x 25mm Class I timber m Skilled labour Hour Unskilled labour Hour Wire nail S.W.G. 12 to 14 * Kg. ALLOW FOR WOOD PRESERVATIVE SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I069
Supplying and fixing of 50mm x 25mm reepers in Class I timber new or renewed with Iron nails over 30m (Shifting of tiles paid for separately) Rate include applying wood preservative. PER m
50mm x 25mm Class I timber m Skilled labour Hour Unskilled labour Hour Wire nail S.W.G. 12 to 14 * Kg. ALLOW FOR WOOD PRESERVATIVE SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I070
Supplying and fixing of 50mmx25mm reepers in ClassII local timber new or renewed with Iron nails up to 30m (Shifting of tiles paid for separately) Rate include applying wood preservative. PER m
50mm x 25mm Class II timber m Skilled labour Hour Unskilled labour Hour Wire nail S.W.G. 12 to 14 * Kg. ALLOW FOR WOOD PRESERVATIVE SUB TOTAL OVER HEAD & PROFITS 22% TOTAL
I071
Supplying and fixing of 50mmx25mm reepers in ClassII local timber new or renewed with Iron nails over 30m (Shifting of tiles paid for separately) Rate include for apply wood preservative. PER m
50mm x 25mm Class II timber m Skilled labour Hour Unskilled labour Hour Wire nail S.W.G. 12 to 14 * Kg. ALLOW FOR WOOD PRESERVATIVE SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I072
Supplying and fixing of 50mm x 12mm reepers in Class I local timber new or renewed with Iron nails up to 30m. PER m
M485 50mm x 12mm Class I timber L002 Skilled labour L001 Unskilled labour ALLOW FOR NAILS WOOD PRESERVATIVE
m Hour Hour
I I073
CARPENTER & JOINER Supplying and fixing of 50mm x 12mm reepers in Class I local timber new or renewed with Iron nails over 30m and apply wood preservative. PER m
50mm x 12mm Class I timber m Skilled labour Hour Unskilled labour Hour Wire nail S.W.G. 12 to 14 * Kg. ALLOW FOR WOOD PRESERVATIVE SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I074
Fixing of available reepers with wir nails and apply wood preservative. PER m
L002 Skilled labour Hour L001 Unskilled labour Hour M038 Wire nail S.W.G. 12 to 14 * Kg. ALLOW FOR WOOD PRESERVATIVE SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I075
Supplying and fixing calicut pattern tiles roof on Class I sawn timber frame work including ridges, hips etc. PER m2
M043 M530 M027 M028 M037 M038 M141 M014 M416 M007 L002 L001
Timber beams Class I 50mm x 25mm class I timber Tile calicut pattern Gr. I Ridge tile calicut pattern Gr. I Wire nail S.W.G. 4 to 10 * Wire nail S.W.G. 12 to 14 * Wood Preservative (black / coloured) * Cement Slaked lime Sand Skilled labour Unskilled labour ALLOW FOR COLOURING POWDER ETC. SUB TOTAL OVER HEAD & PROFITS TOTAL
Cu.m. m No. No. Kg. Kg. Lit. 50 Kg. 25Kg. Cum Hour Hour
0.018 3.609 12.550 0.810 0.065 0.016 0.204 0.027 0.675 0.004 1.650 1.650
23,400.00 22.70 10.50 29.50 30.06 31.92 54.00 300.00 5.20 390.00 37.50 22.88
421.20 81.92 131.78 23.90 1.95 0.51 11.02 8.10 3.51 1.56 61.88 37.75 1.82 786.90 173.12 960.02
I076
Supplying and fixing calicut pattern tiled roof on Class II sawn timber frame work including ridges, hips etc. PER m2
M044 M484 M027 M028 M037 M038 M141 M416 M007 M014 L002 L001
Timber beams class II Cu.m. 50mm x 25mm Class II timber m Tile calicut pattern Gr. I No. Ridge tile calicut pattern Gr. I No. Wire nail S.W.G. 4 to 10 * Kg. Wire nail S.W.G. 12 to 14 * Kg. Wood Preservative (black / coloured) * Lit. Slaked lime 25Kg. Sand Cum Cement 50 Kg. Skilled labour Hour Unskilled labour Hour ALLOW FOR COLOURING POWDER ETC. SUB TOTAL OVER HEAD & PROFITS 22.00%
0.018 3.609 12.550 0.810 0.065 0.016 0.204 0.675 0.004 0.027 1.650 1.650
18,350.00 15.00 10.50 29.50 30.06 31.92 54.00 5.20 390.00 300.00 37.50 22.88
330.30 54.14 131.78 23.90 1.95 0.51 11.02 3.51 1.56 8.10 61.88 37.75 1.82 668.22 147.01
TOTAL
815.23
I077
M043 M485 M028 M029 M037 M038 M141 M014 M416 M007 L002 L001
Supplying material and fixing half round tiled roof on Class I sawn timber frame work including fidges, hips etc. PER m2 Timber beams class I Cu.m. 0.017 23,400.00 50mm x 25mm Class I timber m 7.218 22.70 Ridge tile calicut patten Gr. I No. 0.810 29.50 Tile half round Gr.I No. 61.340 9.50 Wire nail S.W.G. 4 to 10 * Kg. 0.065 30.06 Wire nail S.W.G. 12 to 14 * Kg. 0.016 31.92 Wood Preservative (black / coloured) * Lit. 0.245 54.00 Cement 50 Kg. 0.027 300.00 Slaked lime Bushels 0.027 5.20 Sand Cum 0.004 390.00 Skilled labour Hour 1.794 37.50 Unskilled labour Hour 1.794 22.88 ALLOW FOR COLOURING POWDER ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Supplying material and fixing half round tiles roof on Class II sawn timber frame work including fidges, hips etc. PER m2
397.80 163.85 23.90 582.73 1.95 0.51 13.23 8.10 0.14 1.56 67.28 41.05 1.82 1,303.92 286.86 1,590.78
I078
M044 M485 M028 M029 M037 M038 M141 M014 M416 M007 L002 L001
Timber beams class II Cu.m. 50mm x 25mm Class II timber m Ridge tile calicut pattern Gr. I m Tile half round Gr. I No. Wire nail S.W.G. 4 to 10 * Kg. Wire nail S.W.G. 12 to 14 * Kg. Wood Preservative (black / coloured) * Lit. Cement 50 Kg. Slaked lime Bushels Sand Cum Skilled labour Hour Unskilled labour Hour ALLOW FOR COLOURING POWDER ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
0.017 7.218 0.810 61.340 0.065 0.016 0.245 0.027 0.027 0.004 1.794 1.794
18,350.00 15.00 29.50 9.50 30.06 31.92 54.00 300.00 5.20 390.00 37.50 22.88
311.95 108.27 23.90 582.73 1.95 0.51 13.23 8.10 0.14 1.56 67.28 41.05 1.82 1,162.48 255.75 1,418.23
I079
Sorting out of available timber cut to required sizes and fixed in partitions and frames. PER m3
Hour Hour
12.80 4.30
37.50 22.88
480.00 98.38
ALLOW FOR SCREWS , SAND PAPER ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I080
Sorting out of available timber cut to required sizes and fixed in roof and other carpentry work. PER m3
L002 Skilled labour L001 Unskilled labour ALLOW FOR NAILS, SPIKES ETC.
Hour Hour
21.300 4.300
37.50 22.88
I081
Fixing or renewing partitions and frames with Class I timber (excluding Milla) including panels and boards. PER m3
M043 Timber beams class I L002 Skilled labour L001 Unskilled labour
I082
Fixing or renewing partitions and frames with Class II timber including panels and boards PER M3 Cu.m. Hour Hour 1.00 256.00 128.00 18,350.00 37.50 22.88 18,350.00 9,600.00 2,928.64 200.00 31,078.64 6,837.30 37,915.94
M044 Timber beams class II L002 Skilled labour L001 Unskilled labour ALLOW FOR TOOLS ETC.
I083
Fixing or renewing Class I timber in roof and other carpentry work. PER m3
M043 Timber beams class I L002 Skilled labour L001 Unskilled labour ALLOW FOR TOOLS ETC.
I084
Fixing or renewing Class II timber in roof and other carpentry work. PER m3
M044 Timber beams class II L002 Skilled labour L001 Unskilled labour ALLOW FOR TOOLS ETC.
I085
Renewing of trellis laths 16mm x 16mm in Class I local timber in quantities over 30m. PERm
M511 16mm x 16mm Class 1 timber M038 Wire nail S.W.G. 12 to 14 * L002 Skilled labour
m Kg. Hour
I086
Renewing of trellis laths 16mm x 16mm in Class I local timber in quantities up to 30m. PERm m Kg. Hour 1.100 0.004 0.175 25.00 31.92 37.50 27.50 0.13 6.56 34.19 7.52 41.71
M511 16mm x 16mm Class 1 timber M038 Wire nail S.W.G. 12 to 14 * L002 Skilled labour
I087
Renewing of trellis laths 25mm x 12mm in Class I local timber in quantities over 30m. PERm
M527 28mm x 15mm Class I timber L002 Skilled labour M038 Wire nail S.W.G. 12 to 14 *
m Hour Kg.
I088
Renewing of trellis laths 25mm x 12mm in Class I local timber in small quantities upto 30m. PER m
M527 28mm x 15mm Class I timber L002 Skilled labour M038 Wire nail S.W.G. 12 to 14 *
m Hour Kg.
I089
Supplying and fixing of trellis laths 25mm x 25mm in Class I local timber. PER m
M483 28mm x 28mm Class I timber L002 Skilled labour M038 Wire nail S.W.G. 12 to 14 *
m Hour Kg.
I090
M486 50mm x 15mm Class I timber L002 Skilled labour M038 Wire nail S.W.G. 12 to 14 *
m Hour Kg.
I091
Supplying and fixing in position 100mm x 75mm door frame in Class I timber PER m2
Timber beams class I Skilled labour Unskilled labour Spur stones Holdfasts - 400 x 25 x 6
ALLOW FOR CEMENT, SAND, DOVEL PINS ETC. SUB TOTAL OVER HEAD & PROFITS TOTAL
I092
Supplying and fixing in position of 100mm x 50mm Class I timber door frames. PER m2
Timber beams class I Skilled labour Unskilled labour Spur Stones Holdfasts - 400 x 25 x 6
ALLOW FOR CEMENT , SAND & DOUBLE PINS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
I093
Supplying and fixing of 32mm thick ordinary sash single (ordinary finish) plywood door hung on 100mm x 75mm frame in Class I timber complete with brass furniture(lock paid for separately). PER m2
M043 M512 M429 L002 L001 M056 M117 M099 M096 M135 M133 M132
Timber beams class I Spur Stones Holdfasts - 400 x 25 x 6 Skilled labour Unskilled labour Plywood door ordinary M.R. 838 x 2060 x 32mm Hinge Butt Brass 100mm x 63mm * Bolt Skeleton Brass 300mm * Bolt Barrel Brass 150mm * Screws brass 40mm x Gauge 8 Screws brass 25mm x Gauge 8 Screws brass 20mm x Gauge 8 ALLOW FOR MACHINE PLANING ALLOW FOR DOWELS, CEMENT ETC.
Cu.m. No. Nos. Hour Hour No. No. No. No. Doz. Doz. Doz.
0.022 0.950 2.830 4.000 2.000 0.472 1.416 0.472 0.472 0.480 0.943 0.480
23,400.00 30.00 20.00 37.50 22.88 1,120.00 41.00 100.00 85.00 33.84 24.57 18.90
514.80 28.50 56.60 150.00 45.76 528.64 58.06 47.20 40.12 16.24 23.17 9.07 75.00 8.57 1,601.73 352.38 1,954.11
I094
Supplying and fixing of 32mm thick ordinary sash single (ordinary finish) plywood door hung on 100mm x 50mm frame in Class I timber complete with brass furniture(lock paid for separately). Timber beams class I Spur Stones Holdfasts - 250 x 25 x 6 Skilled labour Unskilled labour Plywood door ordinary M.R. 838 x 2060 x 32mm Hinge Butt Brass 100mm x 63mm * Bolt Skeleton Brass 300mm * Bolt Barrel Brass 150mm * Screws brass 40mm x Gauge 8 Screws brass 25mm x Gauge 8 Screws brass 20mm x Gauge 8 ALLOW FOR MACHINE PLANING ALLOW FOR DOWELS, CEMENT ETC. Cu.m. No. Nos. Hour Hour No. No. No. No. Doz. Doz. Doz. 0.014 0.943 2.830 4.000 2.000 0.472 1.416 0.472 0.472 0.480 0.943 0.480 23,400.00 30.00 20.00 37.50 22.88 1,120.00 41.00 100.00 85.00 33.84 24.57 18.90 327.60 28.29 56.60 150.00 45.76 528.64 58.06 47.20 40.12 16.24 23.17 9.07 75.00 8.57 1,414.32 311.15
M043 M512 M429 L002 L001 M056 M117 M099 M096 M135 M133 M132
TOTAL
1,725.47
I095
Supplying and fixing of 32mm thick ordinary sash single (ordinary finish) plywood door on existing frame(lock paid for separately). PER m2
Skilled labour Unskilled labour Plywood door ordinary M.R. 838 x 2060 x 32mm Hinge Butt Brass 100mm x 63mm * Bolt Skeleton Brass 300mm * Bolt Barrel Brass 150mm * Screws brass 20mm x Gauge 8 Screws brass 25mm x Gauge 8
I096
Supplying and fixing of 32mm thick marine type plywood door (ordinary water proof) on existing frame.(lock paid for separately). PER m2
Plywood door ordinary M.R. 636x2060x32mm No. Skilled labour Hour Unskilled labour Hour Bolt Barrel Brass 150mm * No. Screws brass 20mm x Gauge 8 Doz. Ring Brass 45mm to 38mm No. Screws brass 25mm x Gauge 8 No. Hinge butt brass 100mm x 63mm * No. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
717.10 106.39 64.91 120.70 13.42 10.65 18.43 58.06 1,109.66 244.13 1,353.79
I097
Supplying & fixing 2100 to 3000mm high, 4mm thick glazed partition with 12mm thick chipboard panels on 100 x 75 and 100 x 100mm uprights at 900mm intervals & 100 x 50mm as horizontal members in CI I timber with 50 x 12mm timber beadings around glasspane. PER m2
12mm chip board (8'x4') * Timber beams class I Glass pane Clear 4mm 40mm to 50mm x 12mm local class I timber fillets ets. Skilled labour Unskilled labour Wire nail S.W.G. 12 to 14 * Screws brass 25mm x Gauge 8 ALLOW FOR CEMENT, SAND ETC.
309.93 397.80 134.91 64.38 331.24 43.24 4.60 11.62 10.76 1,308.49 287.87 1,596.36
I098
Supplying & fixing 2100 to 3000mm high, 4mm thick glazed partition with 10mm thick chipboad panels on 100 x 75mm & 100x100mm uprights at 900mm intervals & horizontal members in Cl I timber and 50 x 12mm timber beading around glass pane. PER m2 10mm chip board (8'x4') * No. 0.400 649.91 259.96 Timber beams class I Cu.m. 0.017 23,400.00 397.80 Glass pane Clear 4mm Sq.m. 0.544 248.00 134.91 40mm to 50mm x 12mm local class I timber fillets m 2.220 29.00 64.38 Wire nail S.W.G. 12 to 14 * Kg. 0.144 31.92 4.60 Screws Brass 25mm x Gauge 8 Doz 0.473 24.57 11.62 Skilled labour Hour 8.833 37.50 331.24 Unskilled labour Hour 1.890 22.88 43.24 ALLOW FOR CEMENT, SANS ETC. 10.76 SUB TOTAL 1,258.52 OVER HEAD & PROFITS 22.00% 276.87 TOTAL 1,535.39
I099
Supplying & fixing 2100 to 3000mm high panelled partition with 12mm thick chipboard on both sides with 100 x 50mm & 100 x 100mm upright fixed at 900mm intervals & 100 x 50mm as horizontal members in Cl I timber. PER m2
Timber beams class I 12mm chip board (8'x4') 50mm x 25mm Class I local timber fillets Wire nail S.W.G. 12 to 14 * Skilled labour Unskilled labour
I100
Supplying & fixing 2100 to 3000mm high panelled partition with 10mm thick chipboard on both sides with 100 x 50mm & 100 x 100mm upright fixed at 900mm intervals & 100 x 50mm as horizontal members in Class I timber. PER m2
10mm chip board (8'x4') Timber beams class I Skilled labour Unskilled labour Wire nail S.W.G. 12 to 14 * 50mm x 25mm Class I local timber fillets
I101
Supplying & fixing 12mm thick lunumidella planks inceiling to frame work consisting of 100 x 50mm joists and 50 x50mm bearers in Class I timber. Rate to include for 2 coats of tarnap to joists and bearers. PER m2
Timber beams class I Wire nail S.W.G. 12 to 14 * Skilled labour Unskilled labour Wood Preservative (black / coloured) * Lunumidella 150 x 12mm ALLOW FOR CEMENT AND SAND
280.80 2.36 68.63 51.71 8.80 218.40 31.54 662.24 145.69 807.93
I102
Supplying & fixing 20mm thick lunumidella planks in ceiling to frame work consisting of 100 x 50mm joists and 50 x50mm bearers in Class I timber. Rate to include for 2 coats of tarnap to joists and bearers. PER m2
Timber beams class I Wire nail S.W.G. 12 to 14 * Skilled labour Unskilled labour Wood Preservative (black / coloured) * Lunumidella 150 x 20mm ALLOW FOR CEMENT AND SAND
280.80 2.36 68.63 51.71 8.80 364.00 31.54 807.84 177.72 985.56
J J001
IRON MONGER Supplying and fixing of 45mm x 6mm bolts and nuts with washers. PER No.
M062 Bolt and nut iron 45 x 6mm * L002 Skilled labour ALLOW FOR WASHERS ETC.
No. Hour
1.000 0.500
1.20 37.50
J002
Supplying and fixing of 65mm x 10mm bolts and nuts with washers. PER No.
M063 Bolt and nut iron 63 x 10mm * L002 Skilled labour ALLOW FOR WASHERS ETC.
No. Hour
1.000 0.500
6.00 37.50
J003
Supplying and fixing of 125mm x 10mm bolts and nuts with washers. PER No.
M064 Bolt and nut iron 125 x 10mm * L002 Skilled labour ALLOW FOR WASHERS ETC.
No. Hour
1.000 0.500
15.00 37.50
J J004
IRON MONGER Supplying and fixing of 225mm x 10mm iron bolts and nuts washers. PER No.
M065 Bolt and nut iron 225 x 10mm * L002 Skilled labour ALLOW FOR WASHERS ETC.
No. Hour
1.000 0.500
20.00 37.50
J005
Supplying and fixing 125mm x 12mm iron bolts and nuts with washers. PER No.
M066 Bolt and nut iron 125 x 12mm L002 Skilled labour ALLOW FOR WASHERS ETC.
No. Hour
1.000 0.500
18.50 37.50
J006
Suupplying and fixing of 150mm x 12mm iron bolts and nuts with washers. PER No.
M067 Bolt and nut iron 150 x 12mm * L002 Skilled labour ALLOW FOR WASHERS ETC.
No. Hour
1.000 0.500
20.00 37.50
J J007
IRON MONGER Supplying of 75mm iron heavy quality tower bolts and fixing with iron screws. PER No.
M068 Bolt Tower iron 75mm * M085 Screws Iron 16mm x Gauge 8 * L002 Skilled labour
J008
Supplying of 100mm iron heavy quality tower bolts and fixing iron screws. PER No.
M069 Bolt Tower iron 100mm * M085 Screws Iron 16mm x Gauge 8 * L002 Skilled labour
J009
Supplying of 125mm iron heavy quality tower bolts and fixing iron screws. PER No.
M070 Bolt Tower iron 125mm * M085 Screws Iron 16mm x Gauge 8 * L002 Skilled labour
J J010
IRON MONGER Supplying of 150mm iron heavy quality tower bolts and fixing them with iron screws. PER No.
M071 Bolt Tower iron 150mm * M085 Screws Iron 16mm x Gauge 8 * L002 Skilled labour
J011
Making 1000mm (approx) iron brackets out of 40mm x 6mm flat iron with fish tail at end and fixing to walls and making good to walls. PER No.
M033 Mild steel flat * L020 Skilled labour (Carpenter & Mason) ALLOW FOR CEMENT SAND ETC.
Kg. day
2.000 0.400
24.25 300.00
J012
Supplying 50mm x 50mm G.I. Weldmesh (gauge 10) and fixing to existing frame with staples (Fillets and beading paid separately). PER m2
M035 Weld mesh(galvanised) 50 x 50mm, Gauge 10 * L002 Skilled labour L001 Unskilled labour ALLOW FOR STAPLES ETC.
m2 Hour Hour
J J013
IRON MONGER Supplying 50mm x 50mm G.I. Weldmesh (gauge 10) and fixing to window frame with 50 x 12mm Class II timber beading including painting mesh with red lead and 2 coats of enamel paint, beading with primer and 2 coats of enamel. PER m2
Weld mesh(galvanised) 50 x 50mm, Gauge 10 * 50mm x 12mm Class II local timber. Skilled labour Unskilled labour Timber plank 25mm Class III Painter ALLOW FOR PAINT ETC. & SCREWS
137.68 61.50 75.00 45.76 420.00 112.50 100.00 952.44 209.54 1,161.98
J014
Supplying and fixing of 50mm iron cabin hooks and eyes. PER No.
M072 Cabin Hook & Eye Iron 50mm * L002 Skilled labour
No. Hour
1.000 0.330
4.50 37.50
J015
Supplying and fixing of 75mm iron cabin hooks and eyes. PER No.
M072 Cabin Hook & Eye Iron 75mm * L002 Skilled labour
No. Hour
1.100 0.330
9.00 37.50
J J016
IRON MONGER Supplying and fixing of 150mm iron cabin hooks and eyes. PER No.
M073 Cabin Hook & Eye Iron 150mm * L002 Skilled labour
No. Hour
1.000 0.330
18.00 37.50
J017
Supplying and fixing of 200mm iron cabin hooks and eyes. PER No.
M074 Cabin Hook & Eye Iron 200mm * L002 Skilled labour
No. Hour
1.000 0.330
36.00 37.50
J018
Making iron gate with 40 x 40 x 6mm angle iron frame work including bracing and horizontal centre member with 16mm M.S. bar at 150mm centres and fixing in position. PER m2
Angle iron 40 x 40 x 6mm * Mild steel * Mild steel flat * Black smith Unskilled labour ALLOW FOR COAL ETC. ALLOW FOR WELDING
488.00 369.00 121.25 300.00 183.00 80.00 400.00 1,941.25 427.08 2,368.33
J J019
IRON MONGER Supplying of 20mm x 3mm gutter hook brackets and fixing in position with iron screws. PER No.
Mild steel Flat * Screws iron 25mm x Gauge 8 * Skilled labour Unskilled labour ALLOW FOR COAL ETC.
J020
Supplying of approved heavy quality safety type 100mm iron hasp and staples and fixing in position with iron screws. PER No.
M075 Hasp and staple Iron 100mm * M087 Screws iron 25mm x Gauge 8 * L002 Skilled labour
J021
Supplying of approved heavy quality safety type 150mm iron hasp and staples and fixing in position with iron screws. PER No.
M076 Hasp and staple Iron 150mm * M087 Screws iron 25mm x Gauge 8 * L002 Skilled labour
J J022
IRON MONGER Making 300 x 50mm hasp and staple out of 6mm iron plate and fixing in position with 6 x 50mm bolts and nuts. PER No.
Mild steel (Flat) Bolt and nut iron 45 x 6mm * Skilled labour (Carpenter & Mason) Unskilled labour *
J023
Supplying and fixing of approved heavy quality 50mmx38mm iron butt hinges. PER No.
Hinge Butt Iron 50mmx38mm Screws iron 25mm x Gauge 8 * Skilled labour Unskilled labour
J024
Supplying and fixing of approved heavy quality 75mmx38mm iron butt hinges. PER No.
Hinge Butt Iron 75mmx38mm Screws iron 25mm x Gauge 8 * Skilled labour Unskilled labour
J J025
IRON MONGER Supplying and fixing of approved heavy quality 100mmx63mm iron butt hinges. PER No.
Hinge Butt Iron 100mmx63mm Screws iron 25mm x Gauge 8 * Skilled labour Unskilled labour
J026
Supplying and fixing of approved heavy quality 125mmx100mm iron butt hinges. PER No.
Hinge Butt Iron 125mmx100mm Screws iron 25mm x Gauge 8 * Skilled labour Unskilled labour
J027
M087 Screws iron 25mm x Gauge 8 * L002 Skilled labour L001 Unskilled labour
J J028
IRON MONGER Supplying and fixing of 40 x 6mm, 300mm long iron strap hinge with necessary bolts and nuts excluding pintle. PER No.
Mild steel Flat * Kg. Bolt and nut iron 150 x 12mm * No. Skilled labour Hour Unskilled labour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
J029
Supplying and fixing of 50 x 6mm , 900mm long iron strap hinges with necessary bolts and nuts including pintles. PER No.
Mild steel Flat * Bolt and nut iron 150 x 12mm * Skilled labour Unskilled labour
J030
Supplying of 60 x 10 x 1050mm iron double strap hinges, flat iron bend to shape and fixing with bolts and nuts. PER No.
Mild steel Flat * Bolt and nut iron 150 x 12mm * Skilled labour (Carpenter & Mason) Unskilled labour * ALLOW FOR COAL ETC.
J031
Supplying of 65 x 10 x 1650mm iron double strap hinges, flat iron bend to shape and fixing with bolts and nuts. PER No.
Mild steel Flat * Bolt and nut iron 150 x 12mm * Skilled labour (Carpenter & Mason) Unskilled labour * ALLOW FOR COAL ETC.
J032
Supplying and fixing of heavy quality 150mm iron T hinges with iron screws. PER No.
Hinge T iron 150mm Screws Iron 12mm x Gauge 8 * Unskilled labour Skilled labour
J033
Supplying and fixing of heavy quality, 200mm iron T hinges with screws. PER N0.
M081 Hinge T iron 200mm M084 Screws Iron 12mm x Gauge 8 * L001 Unskilled labour
1.000
37.50
J034
Supplying and fixing of heavy quality 250mm iron T hinges with iron screws. PER No.
Hinge T iron 250mm Screws Iron 12mm x Gauge 8 * Unskilled labour Skilled labour
J035
Supplying and fixing of heavy quality 300mm iron T hinges with iron screws. PER No.
Hinge T iron 300mm Screws Iron 12mm x Gauge 8 * Unskilled labour Skilled labour
J036
Supplying and fixing of 3mm x 50mm x 225mm iron hold fasts. PER No.
Mild steel Flat * Screws Iron 40mm x Gauge 8 * Skilled labour Unskilled labour
J037
Cutting iron rods supplied by Client to correct length inserting in window frames including painting with red lead and 2 coats of anti - corrosive paint. PER No.
L002 Skilled labour L001 Unskilled labour L008 Plumber ALLOW FOR PAINT ETC.
J038
Supplying mild steel rods in reinforcing lintols, beams, columns and laid in position with binding wire. PER Kg.
Mild Steel * Binding wire * Skilled labour Unskilled labour ALLOW FOR WASTAGE
J J039
IRON MONGER Supplying mild steel rods in reinforcing foundation and laid in position with G.I. binding wire. PER Kg.
Mild Steel * Binding wire * Skilled labour Unskilled labour ALLOW FOR WASTAGE
J040
Bending and tying reinforcement and laid in position in beams lintols, floors, etc. with G.I. Wire, Steel rod supplied by Client, (mild steel or tor steel) PER Kg.
Kg. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
J041
Bending and tying reinforcement and laid in position in foundation with G.I. Binding wire, (mild steel or tor steel supplied by Client, ) PER Kg.
Kg. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
J J042
IRON MONGER Supplying 16mm dia. Mild steel bars and fixing in window frames at 100mm centres including painting with red lead and 2 coats anti - corrosive paint. PER m
M031 Mild steel * Kg L002 Skilled labour Hour L001 Unskilled labour Hour ALLOW FOR PAINTING ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
J043
Supplying 20mm dia. Mild steel bars and fixing in window frames at 100mm centres including painting with red lead and 2 coats anti - corrosive paint. PER m
M031 Mild steel * Kg. L002 Skilled labour Hour L001 Unskilled labour Hour ALLOW FOR PAINTING ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
J044
Supplying pintels for gates and garage doors and fixing in position in cement concrete (Concrete paid separately.) PER No.
M531 Mild steel Flat * L002 Skilled labour L001 Unskilled labour ALLOW FOR COAL ETC.
J J045
IRON MONGER Supplying and fixing 100mm x 16mm rag bolts with nuts, washers. PER No.
M531 Mild steel Flat * Kg. L002 Skilled labour Hour L001 Unskilled labour Hour ALLOW FOR WASHERS & WASTE SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
J046
Supplying and fixing of 24 B.W.G. plain G.I. Sheets to existing frame with wire nails. PER m2 Sq.m. Hour Hour 1.000 1.435 1.435 252.19 37.50 22.88 252.19 53.81 32.83 30.00 368.84 81.14 449.98
M040 G.I. Sheet 24 B.W.G. L002 Skilled labour L001 Unskilled labour ALLOW FOR NAILS ETC.
J047
Supplying and BS 4449 high Yeild steel bars and laid in positing as reinforcement in beams, columns, slabs etc. with binding wire. PER Kg.
Tor steel * Binding wire * Skilled labour Unskilled labour ALLOW FOR WASTAGE
J048
Supplying and BS 4449 high Yeild steel bars and laid in positing as reinforcement in foundation with binding wire. PER Kg.
Tor steel * Binding wire * Skilled labour Unskilled labour ALLOW FOR WASTAGE
BRASS FOUNDER
K001 Removing and refixing of Bolts, casement fastners or stays, including making good to holes in frames and sashes. PER No. L002 Skilled labour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.500 37.50 18.75 18.75 4.13 22.88
K002 Supplying fixing and polishing of 63mm heavy quality brass barrel bolts with brass screws. PER No. M092 Bolt Barrel Brass 63mm * M389 Screws Brass 20mm x Gauge 8 L002 Skilled labour No. No. Hour 1.000 6.000 0.330 30.00 1.58 37.50 30.00 9.48 12.38 51.86 11.41 63.27
K003 Supplying fixing and polishing of 75mm heavy quality brass barrel bolts with brass screws. PER No. M093 Bolt Barrel Brass 75mm * M389 Screws brass 20mm x gauge 8 L002 Skilled labour No. No. Hour 1.000 6.000 0.330 45.00 1.58 37.50 45.00 9.48 12.38 66.86 14.71 81.57
BRASS FOUNDER
K004 Supplying fixing and polishing of 100mm heavy quality brass barrel bolts with brass screws. PER No. M094 Bolt Barrel Brass 100mm * M389 Screws Brass 20mm x Gauge 8 L002 Skilled labour No. No. Hour 1.000 6.000 0.330 55.00 1.58 37.50 55.00 9.48 12.38 76.86 16.91 93.77
K005 Supplying fixing and polishing of 125mm heavy quality brass barrel bolts with brass screws. PER No. M094 Bolt Barrel Brass 125mm * M389 Screws brass 20mm x Gauge 8 L002 Skilled labour No. No. Hour 1.000 6.000 0.330 70.00 1.58 37.50 70.00 9.48 12.38 91.86 20.21 112.07
K006 Supplying fixing and polishing of 150mm heavy quality brass barrel bolts with brass screws. PER No. M094 Bolt Barrel Brass 150mm * M389 Screws Brass 20mm x Gauge 8 L002 Skilled labour No. No. Hour 1.000 6.000 0.330 85.00 1.58 37.50 85.00 9.48 12.38 106.86 23.51 130.37
BRASS FOUNDER
K007 Supplying and fixing of 200mm brass skeleten bolts with brass screws. PER No. M097 Bolt Skeleton Brass 200mm * L002 Skilled labour M394 Screws Brass 20mm x Gauge 8 No. Hour No. 1.000 0.500 9.000 87.50 37.50 1.58 87.50 18.75 14.22 120.47 26.50 146.97
K008 Supplying and fixing of 250mm brass skeleten bolts with brass screws. PER No. M098 Bolt Skeleton Brass 250mm * L002 Skilled labour M394 Screws Brass 20mm x Gauge 8 No. Hour No. 1.000 0.500 9.000 92.00 37.50 1.58 92.00 18.75 14.22 124.97 27.49 152.46
K009 Supplying and fixing of 300mm brass skeleten bolts with brass screws. PER No. M099 Bolt Skeleton Brass 300mm * M394 Screws Brass 20mm x Gauge 8 L002 Skilled labour No. No. Hour 1.000 9.000 0.500 100.00 1.58 37.50 100.00 14.22 18.75 132.97 29.25 162.22
BRASS FOUNDER
K010 Supplying and fixing of 450mm brass skeleten bolts with brass screws. PER No. M100 Bolt Skeleton Brass 450mm * M394 Screws Brass 20mm x Gauge 8 L002 Skilled labour No. No. Hour 1.000 12.000 0.500 390.00 1.58 37.50 390.00 18.96 18.75 427.71 94.10 521.81
K011 Supplying , fixing and polishing of 50mm heavy quality brass cabin hooks with brass screws. PER No. M101 Cabin Hook Brass 50mm * L002 Skilled labour M395 Screws Brass 16mm x Gauge 7 No. Hour No. 1.000 0.500 9.000 24.50 37.50 1.22 24.50 18.75 10.98 54.23 11.93 66.16
K012 Supplying , fixing and polishing of 75mm heavy quality brass cabin hooks with brass screws. PER No. M102 Cabin Hook Brass 75mm * L002 Skilled labour M395 Screws Brass 16mm x Gauge 7 No. Hour No. 1.000 0.500 9.000 35.00 37.50 1.22 35.00 18.75 10.98 64.73 14.24 78.97
BRASS FOUNDER
K013 Supplying , fixing and polishing of 150mm heavy quality brass cabin hooks with brass screws. PER No. M103 Cabin Hook Brass 150mm * L002 Skilled labour M395 Screws Brass 16mm x Gauge 7 No. Hour No. 1.000 0.500 9.000 55.00 37.50 1.22 55.00 18.75 10.98 84.73 18.64 103.37
K014 Supplying , fixing and polishing of 200mm heavy quality brass cabin hooks with brass screws. PER No. M104 Cabin Hook Brass 200mm * L002 Skilled labour M395 Screws Brass 16mm x Gauge 7 No. Hour No. 1.000 0.500 9.000 67.50 37.50 1.22 67.50 18.75 10.98 97.23 21.39 118.62
BRASS FOUNDER
K015 Supplying , fixing and polishing of 225mm heavy quality brass cabin hooks with brass screws. PER No. M396 Cabin Hook Brass 225mm * L002 Skilled labour M395 Screws Brass 16mm x Gauge 7 No. Hour No. 1.000 0.500 9.000 80.00 37.50 1.22 80.00 18.75 10.98 109.73 24.14 133.87
K016 Supplying , fixing and polishing of 250mm heavy quality brass cabin hooks with brass screws. PER No. M105 Cabin Hook Brass 250mm * L002 Skilled labour M395 Screws Brass 16mm x Gauge 7 No. Hour No. 1.000 0.500 9.000 87.50 37.50 1.22 87.50 18.75 10.98 117.23 25.79 143.02
K017 Supplying , fixing and polishing of 300mm heavy quality brass cabin hooks with brass screws. PER No. M106 Cabin Hook Brass 300mm * L002 Skilled labour M395 Screws Brass 16mm x Gauge 7 No. Hour No. 1.000 0.500 9.000 105.00 37.50 1.22 105.00 18.75 10.98 134.73 29.64 164.37
BRASS FOUNDER
K018 Supplying and fixing of Brass heavy quality casement fastners with mortice plate polished, with brass screws. PER No. M107 Casement Fastner Brass * M394 Screws Brass 16mm x gauge 7 L002 Skilled labour No. No. Hour 1.000 4.000 0.750 55.00 1.22 37.50 55.00 4.88 28.13 88.01 19.36 107.37
K019 Supplying , fixing and polishing of 250mm heavy quality casement stays. PER No. M108 Casement Stay Brass 250mm * M394 Screws Brass 16mm x Gauge 7 L002 Skilled labour No. No. Hour 1.000 4.000 0.500 55.00 1.22 37.50 55.00 4.88 18.75 78.63 17.30 95.93
K020 Supplying , fixing and polishing of 300mm heavy quality casement stays. PER No. M109 Casement Stay Brass 300mm * M394 Screws Brass 16mm x Gauge 7 L002 Skilled labour No. No. Hour 1.000 4.000 0.500 70.00 1.22 37.50 70.00 4.88 18.75 93.63 20.60 114.23
BRASS FOUNDER
K021 Supplying and fixing of Heavy quality brass fanlight catches complete with brass screws. PER No. M110 Fanlight Catch Brass * M394 Screws Brass 16mm x Gauge 7 L002 Skilled labour No. No. Hour 1.000 4.000 0.750 55.00 1.22 37.50 55.00 4.88 28.13 88.01 19.36 107.37
K022 Supplying, fixing and polishing of Heavy quality brass door handles with brass screws. PER No. M397 Door handle M389 Screws Brass 20mm x gauge 8 L002 Skilled labour No. No. Hour 1.000 4.000 0.250 66.00 1.58 37.50 66.00 6.32 9.38 81.70 17.97 99.67
K023 Supplying, fixing and polishing of 150mm brass safety type heavy quality hasp and staple with brass screws complete. PER No. M112 Hasp and staple safety type Brass 150mm * M394 Screws Brass 20mm x gauge 8 L002 Skilled labour No. No. Hour 1.000 7.000 0.500 175.00 1.58 37.50 175.00 11.06 18.75 204.81 45.06 249.87
BRASS FOUNDER
K024 Supplying, fixing and polishing of 100mm brass safety type heavy quality hasp and staple with brass screws complete. PER No. M111 Hasp and staple safety type Brass 100mm * M394 Screws brass 20mm x Gauge 8 L002 Skilled labour No. No. Hour 1.000 7.000 0.500 90.00 1.58 37.50 90.00 11.06 18.75 119.81 26.36 146.17
SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL K025 Supplying and fixing of brass hat hooks with brass screws K025 Hat Hook Brass * M389 Screws Brass 25mm x Gauge 8 L002 Skilled labour No. No. Hour 1.000 4.000 0.500 47.50 1.58 37.50
K026 Supplying, fixing and polishing of 50mmx 38mm heavy quality brass butt hinges with brass screws. PER No. M114 M382 L002 L001 Hinge Butt Brass 50mm x 38mm Screws Brass 20mm x Gauge 8 Skilled labour Unskilled labour * No. No. Hour Hour 1.000 6.000 0.250 0.350 35.00 1.58 37.50 22.88 35.00 9.48 9.38 8.01 61.86 13.61 75.47
BRASS FOUNDER
K027 Supplying, fixing and polishing of 75mmx38mm heavy quality brass butt hinges with brass screws. PER No. M115 M382 L002 L001 Hinge Butt Brass 75mm x 38mm * Screws Brass 40mm x Gauge 8 Skilled labour Unskilled labour No. No. Hour Hour 1.000 6.000 0.380 0.330 19.00 2.82 37.50 22.88 19.00 16.92 14.25 7.55 57.72 12.70 70.42
K028 Supplying, fixing and polishing of 89mm x63mm heavy quality brass butt hinges with brass screws. PER No. M116 M382 L002 L001 Hinge Butt Brass 89mm x 63mm Screws Brass 40mm x Gauge 8 Skilled labour Unskilled labour No. No. Hour Hour 1.000 8.000 0.380 0.380 36.00 2.82 37.50 22.88 36.00 22.56 14.25 8.69 81.50 17.93 99.44
K029 Supplying, fixing and polishing of 100mm x 63mm heavy quality brass butt hinges with brass screws. PER No. M117 M382 L002 L001 Hinge Butt Brass 100mm x 63mm * Screws Brass 40mm x Gauge 8 Skilled labour Unskilled labour No. No. Hour Hour 1.000 8.000 0.380 0.380 41.00 2.82 37.50 22.88 41.00 22.56 14.25 8.69 86.50 19.03 105.54
BRASS FOUNDER
K030 Supplying, fixing and polishing of 125mm x 100mm heavy quality brass butt hinges with brass screws. PER No. M118 M382 L002 L001 Hinge Butt Brass 125mm x 100mm * Screws Brass 40mm x Gauge 8 Skilled labour Unskilled labour No. No. Hour Hour 1.000 8.000 0.380 0.380 97.50 2.82 37.50 22.88 97.50 22.56 14.25 8.69 143.00 31.46 174.47
K031 Supplying, fixing and polishing of Brass center pivot hinges(Consisting of 2 pieces) heavy quality with brass screws.. PER No. M119 M133 L001 L002 Hinge Centre Pivot Brass * Screws brass 20mm x Gauge 8 Unskilled labour Skilled labour Set Doz. Hour Hour 1.000 0.500 0.500 0.500 52.50 18.90 22.88 37.50 52.50 9.45 11.44 18.75 92.14 20.27 112.41
K032 Supplying and fixing of Brass gravity hinges with brass screws complete. PER No. M120 M382 L002 L001 Hinge Gravity Brass Screws Brass 20mm x Gauge 8 Skilled labour Unskilled labour No. No Hour Hour 1.000 8.000 0.500 0.500 200.00 1.58 37.50 22.88 200.00 12.64 18.75 11.44
BRASS FOUNDER
K033 Supplying, fixing and polishing of 100mm x 90mm brass parliamentary heavy quality hinges with brass screws complete. PER No. M121 M387 L001 L002 Hinge Parliamentary Brass 100mm Screws Brass 25mm x Gauge 8 Unskilled labour Skilled labour No. No. Hour Hour 1.000 8.000 0.380 0.380 100.00 2.05 22.88 37.50 100.00 16.40 8.69 14.25 139.34 30.66 170.00
K034 Supplying, fixing and polishing of 125mm x 150mm brass parliamentary heavy quality hinges with brass screws complete. PER No. M122 M382 L001 L002 Hinge Parliamentary Brass 125mm Screws Brass 25mm x gauge 8 Unskilled labour Skilled labour No. No. Hour Hour 1.000 8.000 0.380 0.380 125.00 2.05 22.88 37.50 125.00 16.40 8.69 14.25 164.34 36.16 200.50
SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL K035 Supplying, fixing and polishing of 150mm x 180mm brass parliamentary heavy quality hinges with brass screws. PER No. M122 M382 L001 L002 Hinge Parliamentary Brass 150mm Screws Brass 25mm x Gauge 8 Unskilled labour Skilled labour No. No. Hour Hour 1.000 10.000 0.380 0.380 150.00 2.05 22.88 37.50
BRASS FOUNDER
K036 Repairing and re - fixing available spring hinges. PER No. L002 Skilled labour L003 Black smith ALLOW FOR SCREWS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour Hour 1.000 2.000 37.50 37.50 37.50 75.00 16.40 128.90 28.36 157.26
K037 Supplying and fixing 100mm brass, double acting springs hinges. PER No. M532 M135 L002 L001 Hinge Spring Double Acting Brass 100mm Screws brass 30mm x Gauge 8 Skilled labour Unskilled labour No. No. Hour Hour 1.000 8.000 2.000 2.000 225.00 2.55 37.50 22.88 225.00 20.37 75.00 45.76 366.13 80.55 446.68
K038 Fixing of hinges in position with brass screws, the hinges supplied by Client. PER No. M135 Screws brass 30mm x Gauge 8 L002 Skilled labour L001 Unskilled labour Nos. Hour Hour 8.000 0.500 0.500 2.55 37.50 22.88 20.37 18.75 11.44 50.56 11.12 61.69
BRASS FOUNDER
K039 Making and supplying brass keys for door locks. PER No. L003 Black smith ALLOW FOR BLANK KEY SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour 2.500 37.50 93.75 50.00 143.75 31.63 175.38
K040 Supplying, fixing and polishing good quality brass door knobs. PER No. M533 Brass door knob L002 Skilled labour ALLOW FOR SCREWS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL No. Hour 1.000 0.250 35.00 37.50 35.00 9.38 2.10 46.48 10.22 56.70
K041 Fixing available door locks. PER No. M133 Screws brass 25mm x Gauge 8 L002 Skilled labour Doz. Hour 0.500 1.500 24.57 37.50 12.29 56.25 68.54 15.08 83.62
BRASS FOUNDER
K042 Repairing and re - fixing door locks. PER No. L003 Black smith M133 Screws brass 25mm x Gauge 8 L002 Skilled labour Hour Doz. Hour 2.000 0.500 1.500 37.50 24.57 37.50 75.00 12.29 56.25 143.54 31.58 175.12
K043 Supplying 65mm brass, 4 lever approved quality locks for cupboards and fiixing in position with brass screws. PER No. M124 Lock Cupboard Four Levers Brass 63mm M132 Screws brass 20mm x Gauge 8 L002 Skilled labour No. Doz. Hour 1.000 0.333 1.000 120.00 18.90 37.50 120.00 6.29 37.50 163.79 36.03 199.83
K044 Repairing and refixing cupboard locks. PER No. L002 Skilled labour L003 Black smith Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.150 0.500 37.50 37.50 5.63 18.75 24.38 5.36 29.74
BRASS FOUNDER
K045 Supplying, fixing and polishing 150mm brass, 2 lever , approved qualiry rim lock. PER No. M126 Lock Rim Double lever Brass 150mm M133 Screws brass 25mm x Gauge 8 L002 Skilled labour No. Doz. Hour 1.000 0.500 1.500 450.00 24.57 37.50 450.00 12.29 56.25 518.54 114.08 632.62
K046 Supplying, fixing and polishing 150mm brass, single lever , approved qualiry rim lock. PER No. M127 Lock Rim single lever Brass 150mm M133 Screws brass 25mm x Gauge 8 L002 Skilled labour No. Doz. Hour 1.000 0.500 1.500 250.00 24.57 37.50 250.00 12.29 56.25 318.54 70.08 388.62
K047 Supplying, fixing and polishing 150mm brass, double lever , approved qualiry rim lock. PER No. M126 Lock Rim Double lever Brass 150mm M133 Screws brass 25mm x Gauge 8 L002 Skilled labour No. Doz. Hour 1.000 0.500 1.500 450.00 24.57 37.50 450.00 12.29 56.25 518.54 114.08 632.62
BRASS FOUNDER
K048 Supplying and fixing of 125mm good quality single lever rim lock. PER No. M127 Lock Rim single lever Brass 150mm M133 Screws brass 25mm x Gauge 8 L002 Skilled labour No. Doz. Hour 1.000 0.500 1.500 250.00 24.57 37.50 250.00 12.29 56.25 318.54 70.08 388.62
K047 Supplying and fixing of night latch Yale or Union lock with duplicate keys. PER No. M128 Night Latch - China M133 Screws brass 25mm x Gauge 8 L002 Skilled labour No. Doz. Hour 1.000 0.500 2.000 152.00 24.57 37.50 152.00 12.29 75.00 239.29 52.64 291.93
K048 Supplying and fixing of 32mm to 40mm brass rings to doors and windows with brass screws. PER No. M125 Ring Brass 45mm to 38mm M132 Screws brass 20mm x Gauge 8 L002 Skilled labour No. Doz. Hour 1.000 0.250 0.250 15.00 18.90 37.50 15.00 4.73 9.38 29.10 6.40 35.50
BRASS FOUNDER
K049 Supplying and fixing of Union mortice lock (imported) for single sash. PER No. M128 Lock Mortice Union single Sash L002 Skilled labour No. Hour 1.000 4.000 1,293.75 37.50 1,293.75 150.00 1,443.75 317.63 1,761.38
K050 Supplying and fixing of Union Mortice (Imported) lock for double sash. PER No. M129 Lock Mortice Union Double Sash L002 Skilled labour No. Hour 1.000 6.000 1,912.50 37.50 1,912.50 225.00 2,137.50 470.25 2,607.75
PLASTERER
L001 15mm thick , 1:1:5 cement lime plastering. PER m2 M010 M550 M007 L004 L001 cement Boiled lime sand Mason Unskilled labour SCAFFOLDING 3 % 50Kg. Kg. Cu.m. Hour Hour 0.086 2.400 0.021 0.646 1.292 300.00 5.00 390.00 37.50 22.88 25.80 12.00 8.19 24.23 29.56 2.99 102.77 22.61 125.37
M550 Boiled lime Kg. L004 Mason Hour L001 Unskilled labour Hour ALLOW FOR SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
L003 65mm x 65mm Cove moulding build in existing walls in 1:2 cement mortar.
PER m M010 M007 L004 L001 cement 50Kg. sand Cu.m. Mason Hour Unskilled labour Hour ALLOW SCAFFOLDING, WATER & LIME SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.036 0.003 0.656 0.656 300.00 390.00 37.50 22.88 10.80 1.17 24.60 15.01 10.00 61.58 13.55 75.13
PLASTERER
L004 Plastering of 50mm to 100mm wide cracks in wall with 1:3 cement plaster after chipping. PER m M010 L004 L001 M007 cement 50Kg. Mason Hour Unskilled labour Hour sand Cu.m. ALLOW SCAFFOLDIN, WATER & LIME PUTTY SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.013 0.164 0.328 0.002 300.00 37.50 22.88 390.00 3.90 6.15 7.50 0.78 10.00 28.33 6.23 34.56
L005 Cresting with broken glass in 1:4 cement mortar on coping of boundary wall. PER m M010 M007 L004 L001 cement sand Mason Unskilled labour 50Kg. Cu.m. Hour Hour 0.082 0.009 0.500 0.500 300.00 390.00 37.50 22.88 24.60 3.51 18.75 11.44 10.00 68.30 15.03 83.33
ALLOW FOR GLASS BOTTLING, SCAFFOLDING & WATER SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
L006 75mm x 12mm Ddo moulding in walls in 1:1:4 lime and cement mortar for replacement to match existing, or to be extra over rate for plastering. PER m M010 M007 L004 L001 M550 cement sand Mason Unskilled labour Boiled lime ALLOW FOR SCAFFOLDING & WATER 50Kg. Cu.m. Hour Hour Kg. 0.008 0.002 0.800 0.800 0.230 300.00 390.00 37.50 22.88 5.00 2.40 0.78 30.00 18.30 1.15 10.00 62.63 13.78 76.41
L PLASTERER L007 150mm x 25mm Dado moulding in walls in 1:1:4 lime and cement mortar only for replacement to match existing or to be extra over rate for plastering. PER m M010 M007 L004 L001 M550 cement 50Kg. sand Cu.m. Mason Hour Unskilled labour Hour Boiled lime Kg. ALLOW FOR SCAFFOLDING & WATER SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.033 0.008 1.000 1.000 0.900 300.00 390.00 37.50 22.88 5.00 9.90 3.12 37.50 22.88 4.50 10.00 87.90 19.34 107.24
L008 100mm x 50mm Dado moulding in cement and sand 1:2 built in existing wall or to be extra over rate for plstering PER m M010 M007 L004 L001 cement 50Kg. sand Cu.m. Mason Hour Unskilled labour Hour ALLOW FOR SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.082 0.006 1.200 1.200 300.00 390.00 37.50 22.88 24.60 2.34 45.00 27.46 10.00 109.40 24.07 133.47
L009 Laying of Flashing or plaster bands over tiles 100mm to 150mm wide on roof in 1:1:4 cement and lime mortar rate including scaffolding and colour figment to match tile colour PER m M010 M007 L004 L001 M550 cement sand Mason Unskilled labour Boiled lime 50Kg. Cu.m. Hour Hour Kg. 0.026 0.005 0.250 0.500 0.720 300.00 390.00 37.50 22.88 5.00 7.80 1.95 9.38 11.44 3.60 10.00 44.17 9.72 53.89
ALLOW FOR SCAFFOLDING & COLOUR FIGMENTS SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
PLASTERER
L010 Letters embosed in plaster 20mm thick 150mm high in cement and sand 1:2 cement floated and painted. PER No. L004 Mason L001 Unskilled labour L015 Painter ALLOW FOR CEMENT, PAINT ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour Hour Hour 0.500 0.250 0.125 37.50 22.88 37.50 18.75 5.72 4.69 5.00 34.16 7.51 41.67
L011 15mm thick 1:1:5 Lime plastering and finished smooth with lime putty. PER m2 M007 M550 L004 L001 M010 sand Cu.m. Boiled lime Kg. Mason Hour Unskilled labour Hour cement 50Kg. ALLOW FOR SCAFFOLDING & WATER SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.021 3.000 1.300 1.300 0.086 390.00 5.00 37.50 22.88 300.00 8.19 15.00 48.75 29.74 25.80 5.00 132.48 29.15 161.63
L012 1:2 cement plastering flush in surface cracks including raking out joints and lime putty floating and painting to matchthe existing surface PER m L004 Mason L001 Unskilled labour ALLOW FOR CEMENT, SAND & LIME PUTTY SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour Hour 0.164 0.250 37.50 22.88 6.15 5.72 5.00 16.87 3.71 20.58
PLASTERER
L013 15mm 1:3 cement sand plastering in brick masonary etc. including cement floating PER m2 M010 M007 L004 L001 cement sand Mason Unskilled labour 50Kg. Cu.m. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.108 0.009 2.500 2.500 300.00 390.00 37.50 22.88 32.40 3.51 93.75 57.20 186.86 41.11 227.97
L014 12mm thick 1:2 cement rendering , above 10m2 PER m2 M010 M007 L004 L001 cement sand Mason Unskilled labour 50Kg. Cu.m. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.161 0.015 0.650 1.300 300.00 390.00 37.50 22.88 48.30 5.85 24.38 29.74 108.27 23.82 132.09
L015 12mm thick 1:2 cement rendering upto 10m2. PER m2 M010 M007 L004 L001 cement sand Mason Unskilled labour 50Kg. Cu.m. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.161 0.015 0.800 1.600 300.00 390.00 37.50 22.88 48.30 5.85 30.00 36.61 120.76 26.57 147.33
PLASTERER
L016 12mm thick 1:3 cement rendering , above 10m2. PER m2 M010 M007 L004 L001 cement sand Mason Unskilled labour 50Kg. Cu.m. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.115 0.015 0.650 1.300 300.00 390.00 37.50 22.88 34.50 5.85 24.38 29.74 94.47 20.78 115.25
L017 12mm thick 1:3 cement rendering , upto 10m2. PER m2 M010 M007 L004 L001 cement sand Mason Unskilled labour 50Kg. Cu.m. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.115 0.015 0.800 1.600 300.00 390.00 37.50 22.88 34.50 5.85 30.00 36.61 106.96 23.53 130.49
L018 20mm thick 1:2 cement rendering , above 10m2. PER m2 M010 M007 L004 L001 cement sand Mason Unskilled labour 50Kg. Cu.m. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.242 0.022 0.865 1.730 300.00 390.00 37.50 22.88 72.60 8.58 32.44 39.58 153.20 33.70 186.90
PLASTERER
L019 20mm thick 1:2 cement rendering , upto10m2. PER m2 M010 M007 L004 L001 cement sand Mason Unskilled labour 50Kg. Cu.m. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.242 0.022 1.000 2.160 300.00 390.00 37.50 22.88 72.60 8.58 37.50 49.42 168.10 36.98 205.08
L020 20mm thick 1:3 cement rendering , above 10m2. PER m2 M010 M007 L004 L001 cement sand Mason Unskilled labour 50Kg. Cu.m. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.188 0.022 0.865 1.730 300.00 390.00 37.50 22.88 56.40 8.58 32.44 39.58 137.00 30.14 167.14
L021 20mm thick 1:3 cement rendering , up to 10m2. PER m2 M010 M007 L004 L001 cement sand Mason Unskilled labour 50Kg. Cu.m. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.188 0.022 1.000 2.160 300.00 390.00 37.50 22.88 56.40 8.58 37.50 49.42 151.90 33.42 185.32
PLASTERER
L022 Normal cement floating coat in rendering , using normal cement and finish smooth. PER m2 M010 cement L004 Mason L001 Unskilled labour ALLOW FOR CURING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 50Kg. Hour Hour 0.029 0.100 0.050 300.00 37.50 22.88 8.70 3.75 1.14 5.00 18.59 4.09 22.68
L023 Brown or Green cement floating in rendering with black cement and finish smooth. PER m2 M010 M011 L004 L001 cement Colour pigment for cement Mason Unskilled labour ALLOW FOR CURING 50Kg. Kg. Hour Hour 0.029 0.004 0.100 0.050 300.00 282.00 37.50 22.88 8.70 1.13 3.75 1.14 5.00 19.72 4.34 24.06
L024 Black cement floating in rendering with black cement and finish smooth. PER m2 M010 M011 L004 L001 cement Colour pigment for cement Mason Unskilled labour ALLOW FOR CURING 50Kg. Kg. Hour Hour 0.029 0.004 0.100 0.050 300.00 282.00 37.50 22.88 8.70 1.13 3.75 1.14 5.00 19.72 4.34 24.06
PLASTERER
L025 20mm thick , 1:2 cement rendering with 5% pudlo cement. PER m2 M010 M007 M012 L004 L001 cement 50Kg. sand Cu.m. Pudlo cement Kg. Mason Hour Unskilled labour Hour ALLOW FOR CURING & FLOATING CEMENT SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.242 0.022 0.549 0.865 1.730 300.00 390.00 130.00 37.50 22.88 72.60 8.58 71.37 32.44 39.58 10.00 234.57 51.61 286.18
L026 12mm x 150mm Skirting in 1:3, projected on flush with wall and including forming groove with smooth finish PER m M010 M007 L004 L001 cement sand Mason Unskilled labour ALLOW FOR WATER 50Kg. Cu.m. Hour Hour 0.033 0.003 0.800 0.800 300.00 390.00 37.50 22.88 9.90 1.17 30.00 18.30 2.00 61.37 13.50 74.87
L027 12mm x 150mm Skirting in 1:3 cement mortar projected in flush with wall and finished with red cement floating including forming groove. PER m M010 M007 M011 L004 L001 cement sand Colour pigment for cement Mason Unskilled labour ALLOW FOR WATER 50Kg. Cu.m. Kg. Hour Hour 0.032 0.003 0.001 1.000 0.800 300.00 390.00 282.00 37.50 22.88 9.60 1.17 0.28 37.50 18.30 2.00 68.86 15.15 84.01
PLASTERER
L028 15mm thick plastering , 1:1:3 cement lime and sand to R.C. beams and slab sooffit including floating with lime putty. PER m2 M010 M007 M550 L004 L001 cement sand Boiled lime Mason Unskilled labour ALLOW FOR SCAFFOLDING WATER ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 50Kg. Cu.m. Kg. Hour Hour 0.086 0.015 2.400 1.750 1.750 300.00 390.00 5.00 37.50 22.88 25.80 5.85 12.00 65.63 40.04 10.00 159.32 35.05 194.37
L029 20mm thick, 1:2 cement sand D.P.C. and finished smooth with 2 coats of hot tar blinded with coarse sand. PER m2 M010 M007 M013 L004 L001 cement sand DPC Tar * Mason Unskilled labour ALLOW FOR FIRE WOOD AND WATER ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 50Kg. Cu.m. Lit. Hour Hour 0.242 0.003 0.500 1.000 2.000 300.00 390.00 66.25 37.50 22.88 72.60 1.17 33.13 37.50 45.76 10.00 200.16 44.03 244.19
PLASTERER
L030 12mm x 100mm skirting in 1:3 cement sand mortar in flush with wall and finished with smooth cement floating. Rate include for forming groove. PER m2 M010 cement 50Kg. 0.022 300.00 M007 Sand Cu.m. 0.002 390.00 L004 Mason Hour 0.700 37.50 L001 Unskilled labour Hour 0.700 22.88 ALLOW FOR WATER SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL L031 12mm x 100mm skirting in 1:3 cement sand mortar projected in flush with wall and finished with colour cement floating. Rate include for forming groove. PER m M010 M007 M011 L004 L001 Cement Sand Colour pigment for cement Mason Unskilled labour ALLOW FOR WATER 50Kg. Cu. m. Kg. Hour Hour 0.021 0.002 0.001 0.900 0.700 300.00 390.00 282.00 37.50 22.88
M TINKER M001 Supplying and fixing of 100mm dia. G.I. 24 BWG down pipes fixed to walls with holdfast or plugs in 1:3 cement. PER m M022 L004 L007 L001 G.I. 24 BWG sheets(Plain) Mason Tinker Unskilled labour m2 Hour Hour Hour 0.400 0.250 2.250 1.000 319.87 37.50 37.50 22.88 127.95 9.38 84.38 22.88 52.50 297.08 65.36 362.44
ALLOW FOR PLUGS, BRACKETS, IRON SCREWS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
M002 Supplying and fixing of 150mm dia. G.I. 24 BWG down pipes fixed to walls with holdfast or plugs in 1:3 cement. PER m M022 L004 L007 L001 G.I. Sheet 24 B.W.G. Mason Tinker Unskilled labour m2 Hour Hour Hour 0.600 0.250 3.000 1.000 319.87 37.50 37.50 22.88 191.92 9.38 112.50 22.88 55.00 391.68 86.17 477.85
ALLOW FOR PLUGS, BRACKETS, SCREWS , SOLDER AND CEMENT SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
TINKER
M003 Supplying and fixing of 100 x 75mm rectangular G.I. 24 BWG down pipes fixed with holdfast or plugs in 1:3 cement. PER m M022 L004 L007 L001 G.I. 24 BWG sheets(Plain) Mason Tinker Unskilled labour m2 Hour Hour Hour 0.450 0.250 2.750 1.000 319.87 37.50 37.50 22.88 143.94 9.38 103.13 22.88 52.50 331.83 73.00 404.83
ALLOW FOR PLUGS, BRACKETS, IRON SCREWS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
M004 Fixing of 100 to 150mm circular or rectangular down pipes fixed with holdfast or plugs in 1:3 cement mortar (G.I. Sheets supplied by Client.) PER m L004 Mason L007 Tinker L001 Unskilled labour ALLOW FOR PLUGS, IRON SCREWS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL M005 Extra over item M001 to M004 in two storeyed buildings. PER m L004 Mason L001 Unskilled labour Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.125 0.500 37.50 22.88 4.69 11.44 16.13 3.55 19.68 Hour Hour Hour 0.029 0.293 0.234 37.50 37.50 22.88 1.09 10.99 5.35 16.00 33.43 7.35 40.78
TINKER
M006 Extra over item M001 to M004 in buildings of three or more storeyed. PER m L004 Mason L001 Unskilled labour Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.250 1.000 37.50 22.88 9.38 22.88 32.26 7.10 39.36
M007 Fixing of down pipes loose or new fixed with holdfast or plugs including making good to walls (down pipes supplied by Client, plugs or holdfast paid for separately). PER m L007 Tinker L001 Unskilled labour Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.350 0.350 37.50 22.88 13.13 8.01 21.13 4.65 25.78
M008 450mm wide G.I. Flashing (G.I. 24 BWG) fixed with 150mm turned up along and top edge tucked well into wall in cement lime mortar including removal of old flashing. PER m M022 L007 L004 L001 G.I. 24 BWG sheets(Plain) Tinker Mason Unskilled labour ALLOW FOR CEMENT, SAND SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL m2 Hour Hour Hour 0.600 1.000 0.250 1.250 319.87 37.50 37.50 22.88 191.92 37.50 9.38 28.60 13.37 280.77 61.77 342.54
TINKER
M009 Refixing of G.I. Flashing including making good to walls in cement and lime mortar. PER m L007 Tinker L004 Mason L001 Unskilled labour ALLOW FOR CEMENT, SAND, LIME ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour Hour Hour 0.750 0.250 1.000 37.50 37.50 22.88 28.13 9.38 22.88 14.62 75.00 16.50 91.50
M010 150mm G.I. Gutters eaves semi circular made with G.I. 24 B.W.G. and fixed with hooks or brackets and bolts and joints soldered complete. PER m M022 L007 L001 M546 M124 M123 G.I. 24 BWG sheets(Plain) Tinker Unskilled labour Mild steel Flat * Bolt and nut iron 63 x 10mm * Bolt and nut iron 45 x 6mm * ALLOW FOR MAKING BRACKETS, ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL m2 Hour Hour Kg. No. No. 0.350 2.500 1.500 0.228 2.500 1.667 319.87 37.50 22.88 24.25 5.15 1.20 111.95 93.75 34.32 5.53 12.88 2.00 19.53 279.96 61.59 341.55
TINKER
M011 150mm G.I. Gutters eaves semi circular made with G.I. 24 B.W.G. and fixed with hooks or brackets and screws and joints soldered complete (G.I. Sheets supplied by Client.) PER m L007 Tinker L001 Unskilled labour ALLOW FOR GUTTERS HOOKS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL day day 0.285 0.178 37.50 22.88 10.69 4.07 17.20 31.96 7.03 38.99
M012 150mm Gutters, eaves moulded in G.I. 24 BWG and fixed complete including brackets. PER m M022 G.I. 24 BWG sheets(Plain) L007 Tinker L001 Unskilled labour m2 Hour Hour 0.400 4.000 2.000 319.87 37.50 17.50 127.95 150.00 35.00 39.94 352.89 77.64 430.53
ALLOW FOR GUTTERS HOOKS ETC. AS IN ITEM NO M010 SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
M013 Extra over items M010 to M012 and M026 in two storeyed Buildings. PER m L007 Tinker L001 Unskilled labour Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 1.000 37.50 22.88 37.50 22.88 60.38 13.28 73.66
TINKER
M014 Extra over items M010 to M012 and M026 in three storeyed Buildings. PER m M445 Props (bamboo) 3 - 4 m L001 Unskilled labour L007 Tinker ALLOW FOR COIR, STRING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL No. Hour Hour 0.950 1.750 1.500 50.00 22.88 37.50 47.50 40.04 56.25 1.44 145.23 31.95 177.18
M015 Cleaning of Gutters, eaves and down pipes in single storeyed buildings. PER m L001 Unskilled labour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.150 17.50 2.63 2.63 0.58 3.21
M016 Cleaning of Gutters, eaves and down pipes in two storeyed buildings. PER m L001 Unskilled labour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.200 17.50 3.50 3.50 0.77 4.27
TINKER
M017 Re - grading Gutters eaves , in single storeyed Buildings. PER m L007 Tinker L001 Unskilled labour day Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.064 0.064 37.50 22.88 2.40 1.46 3.86 0.85 4.71
M018 Re - grading Gutters eaves , in two storeyed Buildings. PER m L007 Tinker L001 Unskilled labour Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.100 0.100 37.50 22.88 3.75 2.29 6.04 1.33 7.37
M019 Making openings to existing gutters to receive 100mm to 150mm down pipe attaching spigot piece joints soldered including making good. PER No. M022 G.I. 24 BWG sheets(Plain) L007 Tinker L001 Unskilled labour m2 Hour Hour 0.100 2.000 2.000 319.87 37.50 17.50 31.99 75.00 35.00 17.50 159.49 35.09 194.58
ALLOW FOR PLUGS, BRACKETS IRON SCREWS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
TINKER
M020 Making of 250 x 300 x 500mm deep gutter head with G.I. Sheets 24 B.W.G. down pipe and fixed complete. PER No. M022 G.I. 24 BWG sheets(Plain) L007 Tinker L001 Unskilled labour m2 Hour Hour 0.900 7.000 2.000 319.87 37.50 17.50 287.88 262.50 35.00 17.80 603.18 132.70 735.88
ALLOW FOR PLUGS, SCREWS FOR SOLDER AND CEMENT SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
M021 Making of 250 x 300 x 500mm deep gutter head with G.I. Sheets 24 B.W.G. down pipe and fixed complete.(Sheets supplied by Client). PER No. L007 Tinker L001 Unskilled labour ALLOW FOR LEAD, SOLDERING, FLUID ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour Hour 7.000 2.000 37.50 22.88 262.50 45.76 12.33 320.59 70.53 391.12
TINKER
M022 Making of 250 x 300 x 300mm deep gutter head with G.I. Sheets 24 B.W.G. down pipe and fixed complete. PER No. M022 G.I. 24 BWG sheets(Plain) L007 Tinker ALLOW FOR LEADS, ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL m2 Hour 0.500 5.000 319.87 37.50 159.94 187.50 2.39 349.83 76.96 426.79
M023 Making of 250 x 300 x 300mm deep gutter head with G.I. Sheets 22 B.W.G. down pipe and fixed complete.(Sheets supplied by Client). PER No. L007 Tinker L001 Unskilled labour ALLOW FOR LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour Hour 5.000 2.000 37.50 22.88 187.50 45.76 2.39 235.65 51.84 287.49
M024 Supplying of 20mm x 3mm Gutter hooks or brackets and fixing with iron screws. PER No. M546 M147 L005 L011 L012 Mild steel Flat * Screws Iron 16mm x Guage 6 Black Smith Unskilled labour Skilled labour ALLOW FOR COAL ETC. Kg. Doz. Hour day day 0.227 0.167 0.042 0.073 0.032 24.25 3.48 37.50 183.00 300.00 5.50 0.58 1.58 13.36 9.60 10.00
M025 Gutters, leaks, replaced or joints soldered. PER No. L007 Tinker L001 Unskilled labour ALLOW FOR LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour Hour 0.500 0.500 37.50 22.88 18.75 11.44 1.51 31.70 6.97 38.67
M026 G.I. 900mm wide overall, 22 B.W.G. Parapet gutters renewed on existing boards joints soldered and laid complete. PER m M023 L007 L002 L001 G.I. 22 BWG sheets(Plain) Tinker Skilled labour Unskilled labour m2 Hour Hour Hour 0.920 1.250 0.250 1.250 420.88 37.50 37.50 22.88 387.21 46.88 9.38 28.60 15.00 487.06 107.15 594.21
ALLOW FOR LEAD, SOLERING, FLUID CEMENT ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL M027 18 BWG 900mm wide valley gutters renewed on existing boards, sheets tarred, joints soldered and cement lime filletting complete. PER m M024 M476 M010 M481 M007 L001 L002 L007 G.I. 18 BWG sheets(Plain) Coal Tar Cement Slaked lime Sand Unskilled labour Skilled labour Tinker m2 Lit. 50 Kg. Kg. Cu.m. Hour Hour Hour 0.998 0.224 0.027 0.800 0.004 1.500 0.300 0.600 656.00 19.00 300.00 5.20 390.00 22.88 37.50 37.50
654.69 4.26 8.10 4.16 1.56 34.32 11.25 22.50 15.00 755.83 166.28 922.11
ALLOW FOR NAILS, SOLDERING, MATERIALS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
TINKER
M032 18 BWG 900mm wide valley gutters renewed including timber 25mm thick boarding sheet tarred joints soldered and cement lime filleting complete. PER m M024 M047 M476 M010 M550 M007 M041 M076 L001 L002 G.I. 18 BWG sheets(Plain) Timber planks 25mm class B Coal Tar Cement Boiled lime Sand Wire nail S.W.G. 12 to 14 * Wood Preservative (black / coloured) * Unskilled labour Skilled labour m2 Sq.m. Lit. 50 Kg. Kg. Cu.m. Kg. Lit. Hour Hour 0.998 1.000 0.224 0.027 0.800 0.004 0.067 0.335 3.500 2.000 656.00 470.00 19.00 300.00 5.00 390.00 31.92 54.00 22.88 35.00 654.69 470.00 4.26 8.10 4.00 1.56 2.14 18.09 80.08 70.00 15.00 1,327.92 292.14 1,620.06
ALLOW FOR NAILS, SLODERING MATERIAL ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
M033 Fixing of Half round, 150mm pvc Eaves gutters with aluminium brackets and brass screws at 450mm intervals including necessary moulded fittings. PER m M478 M401 M400 M404 M402 M405 M406 M197 L008 L001 Gutter half round PVC 150mm x 4m No. Gutter end cap half round PVC 150mm No. Mitre Joint half round PVC 150mm No. Gutter Bracket half round (Short Arm Aluminium) No. Gutter Joiner half round PVC 150mm No. Running head PVC 150mm No. Solvent cement 50 Grams Screws Brass 20mm x Gauge 6 Doz. Plumber Hour Unskilled labour Hour ALLOW FOR LADDER 0.273 0.137 0.068 3.100 0.205 0.137 0.137 0.580 0.273 0.273 107.70 20.65 53.75 16.80 34.00 61.50 37.20 13.76 37.50 17.50 29.40 2.83 3.66 52.08 6.97 8.43 5.10 7.98 10.24 4.78 3.00
M034 Fixing of 114mm PVC square Eave gutters with P.V.C. brackets and brass screws at 450mm intervals including all necessary moulded fittings. PER m M388 Gutter Square PVC 114mm M390 Gutter End Cap Square PVC 114mm M3989 Mitre Joint Square PVC 114mm M391 Gutter Joiner Square PVC 114mm M393 Gutter Bracket Square PVC 114mm M392 Running Head Square PVC 114mm M406 Solvent cement M197 Screws brass 20mm x Gauge 6 L008 Plumber L001 Unskilled labour ALLOW FOR LADDER SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL M035 Fixing of 87mm dia. PVC Down pipes with wooden plug including all necessary moulded fittings. PER m M395 M398 M396 M470 M397 M197 M406 L008 L002 L001 Down pipe PVC 89mm Down pipe Elbow PVC 89mm Down pipe joiner PVC 89mm Wood plugs. Down pipe Clip PVC 89mm Screws Brass 20mm x Guage 6 Solvent cement Plumber Skilled labour Unskilled labour ALLOW FOR LADDER & RAWL PLUG SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL m No. No. m No. Doz. 50 Grams Hour Hour Hour 1.093 0.547 0.137 0.547 0.547 0.091 0.205 0.273 0.273 0.546 62.20 42.00 28.90 15.00 6.15 13.76 37.20 37.50 37.50 17.50 67.98 22.97 3.96 8.21 3.36 1.25 7.63 10.24 10.24 9.56 10.00 155.40 34.19 189.59 m No. No. No. No. No. 50 Grams Doz. Hour Hour 1.000 0.137 0.068 0.205 3.100 0.137 0.137 0.580 0.273 0.273 80.60 26.25 100.65 30.65 14.00 71.75 37.20 13.76 37.50 17.50 80.60 3.60 6.84 6.28 43.40 9.83 5.10 7.98 10.24 4.78 3.00 181.65 39.96 221.61
GLAZIER
N001 Fixing of Glass panes with class I timber boarding (Glass Supplied by Client) PER m2 M479 12mm x 12mm Class I timber beadings L009 Glazier ALLOW FOR PUTTY, NAILS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL m Hour 19.650 5.000 11.00 37.50 216.15 187.50 20.18 423.83 93.24 517.07
N002 Supplying of 3mm thick clear Glass panes and fixing with class I timber beading. PER m2 M228 Glass Pane clear 3mm M479 12mm x 12mm Class I timber beadings L009 Glazier ALLOW FOR NAILS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL N003 Supplying of 4mm clear Glass panes and fixing with class I timber beading. PER m2 M229 Glass Pane clear 4mm M479 12mm x 12mm Class I timber beadings L009 Glazier ALLOW FOR NAILS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Sq.m. m Hour 1.100 8.000 4.000 248.00 11.00 37.50 272.80 88.00 150.00 20.18 530.98 116.82 647.80 Sq.m. m Hour 1.100 15.000 5.000 178.00 11.00 37.50 195.80 165.00 187.50 20.18 568.48 125.07 693.55
GLAZIER
N004 Supplying of 3mm figured Glass panes and fixing with Class I timber beading. PER m2 M230 Glass pane Figured 3mm M479 12mm x 12mm Class I timber beadings L009 Glazier ALLOW FOR NAILS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Sq.m. m Hour 1.10 15.00 5.00 237.00 11.00 37.50 260.70 165.00 187.50 20.18 633.38 139.34 772.72
N005 Supplying of 5mm figured Glass panes and fixing with Class I timber beading. PER m2 M231 Glass pane Figured 5mm M479 12mm x 12mm Class I timber beadings L009 Glazier ALLOW FOR NAILS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Sq.m. m Hour 1.10 8.00 4.00 485.00 11.00 37.50 533.50 88.00 150.00 20.18 791.68 174.17 965.85
P001 One coat of cement washing to walls of single storeyed buildings, patching and preparing surface. PER m2 M010 Cement L006 Painter L001 Unskilled labour ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 50 Kg. Hour Hour 0.004 0.088 0.088 300.00 37.50 17.50 1.20 3.30 1.54 1.28 7.32 1.61 8.93
P002 Two coat of cement washing to walls of single storeyed buildings, patching and preparing surface. PER m2 M010 Cement L006 Painter L001 Unskilled labour ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 50 Kg. Hour Hour 0.007 0.150 0.150 300.00 37.50 17.50 2.10 5.63 2.63 1.20 11.55 2.54 14.09
P003 One coat of cement washing externally to walls of buildings upper floor
PER m2 M010 Cement L006 Painter L001 Unskilled labour ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 50 Kg. Hour Hour 0.004 0.104 0.104 300.00 37.50 17.50 1.20 3.90 1.82 1.28 8.20 1.80 10.00
P004 Flags average size 1800mm x 900mm hung upon buildings as directed and removed when required (Flags supplied by Client. Any poles used are to be paid separately). PER No. L001 Unskilled labour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.500 22.88 11.44 11.44 2.52 13.96
P005 Flags small (burges) up to 100 hungs upon buildings as directed and removed when required (Flags supplied by Client. Any poles used are to be paid separately). PER No. L001 Unskilled labour day SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.007 22.88 0.16 0.16 0.04 0.20
P006 Flags small (burges) up to 100 hungs upon buildings as directed and removed when required (Flags supplied by Client. Any poles used are to be paid separately). PER No. L001 Unskilled labour day SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.006 22.88 0.14 0.14 0.03 0.17
P007 Flag poles (Supplied by Client) planted as directed removed when required and ground made good. PER post L001 Unskilled labour day SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.150 22.88 3.43 3.43 0.76 4.19
P008 Lettering 25mm to 50mm painted in Sinhala, English or Tamil including painting ground. PER p/letter L006 Painter ALLOW FOR BRUSHERS PAINT ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour 0.184 37.50 6.90 2.40 9.30 2.05 11.35
P009 Lettering 50mm to 75mm painted in Sinhala, English or Tamil including painting ground. PER p/letter L006 Painter ALLOW FOR BRUSHERS PAINT ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour 0.200 37.50 7.50 2.40 9.90 2.18 12.08
P010 Lettering 100mm to 125mm painted in Sinhala, English or Tamil including painting ground. PER p/letter L006 Painter ALLOW FOR BRUSHERS PAINT ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour 0.250 37.50 9.38 5.00 14.38 3.16 17.54
P011 Painting the metal surface with one coat of aluminium paint. PER m2 M480 Aluminium paint L015 Painter ALLOW FOR BRUSHERS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Lit. day 0.070 0.054 275.00 37.50 19.25 2.03 1.28 22.56 4.96 27.52
P012 Painting one coat of enamel paint including washing (using washing soda) , cleaning and smoothing down with sand paper. PER m2 M075 Enamel * L006 Painter Lit. Hour 0.081 0.430 299.00 37.50 24.22 16.13 8.00 48.34 10.64 58.98
ALLOW FOR BRUSHES , SAND PAPER, WASHING SODA ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
P013 Painting two coats of enamel paint including washing( using washing soda) cleaning and smoothing down with sand paper. PER m2 M075 Enamel * L006 Painter Lit. Hour 0.161 1.000 299.00 37.50 48.14 37.50 8.00 93.64 20.60 114.24
ALLOW FOR BRUSHES , SAND PAPER WASHING SODA ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL P014 Painting new wood work with primer and 2 coats of oil paint. PER m2 M077 Aluminium wood primer * M083 Oil paint (Gloss) * L006 Painter ALLOW FOR BRUSHES , SAND PAPER ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Lit. Lit. Hour 0.081 0.161 1.300 275.00 321.00 37.50
P015 Painting new wood work with one coat of approved wood primer PER m2 M077 Aluminium wood primer * L006 Painter ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Lit. Hour 0.081 0.500 275.00 37.50 22.28 18.75 2.50 43.53 9.58 53.11
P016 Painting steel work, with 1 coat of red lead including removing scale and wire brushing. PER m2 M082 Red Lead Paint * L006 Painter ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Lit. Hour 0.081 0.500 225.00 37.50 18.23 18.75 5.00 41.98 9.23 51.21
P017 Painting steel work, with 2 coat of red lead including removing scale and wire brushing. PER m2 M082 Red Lead Paint * L006 Painter ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Lit. Hour 0.162 1.000 225.00 37.50 36.45 37.50 5.00 78.95 17.37 96.32
P018 Painting walls with Alkali resisting primer where necessary. PER m2 M084 Alkali resisting primer * L006 Painter ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Lit. Hour 0.097 0.300 334.00 37.50 32.40 11.25 1.28 44.93 9.88 54.81
P019 Painting walls with one coat of emulsion paint including preparing surface of new work. PER m2 M073 Emulsion * L006 Painter Lit. Hour 0.081 0.300 241.00 37.50 19.52 11.25 10.00 40.77 8.97 49.74
ALLOW FOR BRUSHES PLASTER OF PARIS & WITING ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
P020 Painting walls with two coats of emulsion paint including preparing surface of new work. PER m2 M073 Emulsion * L006 Painter Lit. Hour 0.150 0.600 241.00 37.50 36.15 22.50 10.00 68.65 15.10 83.75
ALLOW FOR BRUSHES PLASTER OF PARIS & WITING ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
P021 Painting walls with one coat of emulsion paint including preparing surface of old work. PER m2 M073 Emulsion * L006 Painter ALLOW FOR BRUSHES & WITING ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Lit. Hour 0.081 0.376 241.00 37.50 19.52 14.10 10.00 43.62 9.60 53.22
P022 Painting walls with two coats of emulsion paint including preparing surface of old work. PER m2 M073 Emulsion * L006 Painter ALLOW FOR BRUSHES & WITING ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Lit. Hour 0.150 0.650 241.00 37.50 36.15 24.38 10.00 70.53 15.52 86.05
P023 Painting walls with two coats of snowcem or equivalent cemet paint to new work. PER m2 M080 Snowcem L006 Painter L001 Unskilled labour ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Kg. Hour Hour 0.345 0.700 0.400 60.00 37.50 22.88 20.70 26.25 9.15 5.00 61.10 13.44 74.54
P024 Painting old walls with two coats of snowcem or equivalent cement paint after scraping existing colourwash, sand papering and wiping down. PER m2 M080 Snowcem L006 Painter L001 Unskilled labour ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Kg. Hour Hour 0.345 0.700 0.700 60.00 37.50 22.88 20.70 26.25 16.02 5.00 67.97 14.95 82.92
P025 Painting old walls with one coat of snowcem or equivalent cement paint after scraping existing colour wash, sand papering and wiping PER m2 M080 Snowcem L006 Painter L001 Unskilled labour ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Kg. Hour Hour 0.197 0.400 0.600 60.00 37.50 22.88 11.82 15.00 13.73 5.00 45.55 10.02 55.57
P026 Removing paint entirely with blow lamp to bare timber. PER m2 L001 Unskilled labour ALLOW FOR BLOW LAMP OIL ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour 1.300 22.88 29.74 5.00 34.74 7.64 42.38
P027 Removing paint on panelled and moulded surfaces. PER m2 L001 Unskilled labour Hour 2.000 22.88 45.76 5.00 50.76 11.17 61.93
ALLOW FOR BLOW LAMP OIL SAND PAPER ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
P028 Painting G.I. Pipes 20mm to 40mm diameter with 2 coats of enamel paint. PER m M075 Enamel * L006 Painter ALLOW FOR BRUSHES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Lit. Hour 0.022 0.200 299.00 37.50 6.58 7.50 5.00 19.08 4.20 23.28
P029 Applying of 1 coat Tarnap or other wood preservative to old wood work. PER m2 M076 Wood Preservative (black / coloured) * L006 Painter ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Lit. Hour 0.122 0.200 54.00 37.50 6.59 7.50 1.28 15.37 3.38 18.75
P030 Applying of 2 coats Tarnap or other wood preservative to new wood work. PER m2 M076 Wood Preservative (Black / Coloured) * L006 Painter ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Lit. Hour 0.218 0.400 54.00 37.50 11.77 15.00 1.28 28.05 6.17 34.22
P031 Varnishing with 1 coat of polyurethene best Copal varnish after washing down and sand papering. PER m2 M079 Polythane Varnish * L001 Unskilled labour L006 Painter ALLOW FOR SAND PAPER BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Lit. Hour Hour 0.097 0.300 0.400 304.00 22.88 37.50 29.49 6.86 15.00 5.00 56.35 12.40 68.75
P032 Varnishing with 2 coats of Polyurathene varnish after washing down and sand papering. PER m2 M079 Polythane Varnish * L001 Unskilled labour L006 Painter ALLOW FOR SAND PAPER , BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Lit. Hour Hour 0.178 0.300 0.800 304.00 22.88 37.50 54.11 6.86 30.00 5.00 95.98 21.11 117.09
P033 Removing existing varnishing to bare timber and preparing surface. PER m2 L001 Unskilled labour ALLOW FOR SAND PAPER ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour 1.750 22.88 40.04 5.00 45.04 9.91 54.95
P034 Scraping and removing soot on walls and levelling internally(extra over colour washing). PER m2 L001 Unskilled labour ALLOW FOR TOOLS SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour 0.200 22.88 4.58 2.00 6.58 1.45 8.03
P035 Scraping of walls to original plaster, sand papering and lime putting cracks and defects, preparing surface for new application of distermper, snowcem paint or similar application. PER m2 L001 Unskilled labour L004 Mason Hour Hour 0.200 0.050 22.88 37.50 4.58 1.88 10.00 16.45 3.62 20.07
ALLOW FOR SAND PAPER LIME PUTTY & SCAFFOLDING ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
P036 White washing or colour washing wall with 1 coat in single storeyed building including patching and preparing surface. PER m2 M550 M482 M483 L006 L001 Boiled Lime Glue Yellow ochre Painter Unskilled labour Kg. Kg. Kg. Hour Hour 0.182 0.001 0.001 0.088 0.088 5.00 115.00 75.00 37.50 22.88 0.91 0.12 0.08 3.30 2.01 8.00 14.41 3.17 17.58
ALLOW FOR SCAFFOLDING, BRUSHES CEMENT ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
P039 White washing or colour washing external walls with one coat in buildings of more than two storeys. PER m2 M484 M482 M483 L006 L001 Slaked lime Glue Yellow ochre Painter Unskilled labour Bushels Kg. Kg. Hour Hour 0.182 0.001 0.001 0.088 0.144 130.00 115.00 75.00 37.50 22.88 23.66 0.12 0.08 3.30 3.29 8.00 38.44 8.46 46.90
ALLOW FOR CEMENT SAND AND SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
P040 White washing or colour washing external walls with two coats in 2 storeyed buildings.
PER m2 M484 M482 M483 L006 L001 Slaked lime Glue Yellow ochre Painter Unskilled labour Bushels Kg. Kg. Hour Hour 0.296 0.002 0.002 0.150 0.184 130.00 115.00 75.00 37.50 22.88 38.48 0.23 0.15 5.63 4.21 8.00 56.69 12.47 69.17
ALLOW FOR CEMENT SAND BRUSHES SCAFFOLDING ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
P041 White washing or colour washing external walls with 2coat in buildings with more than two storeys. PER m2 M484 M482 M483 L006 L001 Slaked lime Glue Yellow ochre Painter Unskilled labour Bushels Kg. Kg. Hour Hour 0.296 0.002 0.002 0.150 0.208 130.00 115.00 75.00 37.50 22.88 38.48 0.23 0.15 5.63 4.76 8.00 57.24 12.59 69.83
ALLOW FOR CEMENT SAND SCAFFOLDING BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
P042 Walls internal faces scraped to original plaster patching up cracks and defects lime putty sand papering applying plaster of paris and preparing surfaces for application of emulsion paint or enamel paint. PER m2 L001 Unskilled labour L004 Mason L006 Painter Hour Hour Hour 1.000 0.200 0.100 22.88 37.50 37.50 22.88 7.50 3.75 10.00
ALLOW FOR SAND PAPER , CEMENT SAND PLASTER OF PARIS AND SCAFFOLDING ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
P043 Walls external faces scraped to original plaster patching up cracks and defects and preparing surface including sand papering for application of snowcem / white washing in single storeyed buildings. PER m2 L001 Unskilled labour L004 Mason Hour Hour 1.000 0.200 22.88 37.50 22.88 7.50 2.77 33.15 7.29 40.44
ALLOW FOR CEMENT SAND LIME PUTTY AND SCAFFOLDING ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
P044 Walls external faces scraped to original plaster patching up cracks and defects and preparing surface including sand papering for application of snowcem or white washing in two storeyed buildings. PER m2 L001 Unskilled labour L004 Mason Hour Hour 1.300 0.200 22.88 37.50 29.74 7.50 2.77 40.01 8.80 48.81
ALLOW FOR CEMENT SAND AND SCAFFOLDING ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
P045 Walls external faces scraped to original plaster patching up cracks and defects and preparing surface including sand papering for application of snowcem or white washing in more than two storeyed buildings. PER m2 L001 Unskilled labour L004 Mason Hour Hour 1.700 0.200 22.88 37.50 38.90 7.50 15.00 61.40 13.51 74.91
ALLOW FOR CEMENT SAND AND LIME PUTTY. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
P046 Painting walls with 1 coat weathershield paint including preparing surface of new work. PER m2 M074 Weathershield L006 Painter * Lit. Hour 0.117 0.320 305.00 37.50 35.69 12.00 3.30 50.99 11.22 62.21
ALLOW FOR SCAFFOLDING, BRUSHES SAND PAPER ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
P047 Painting walls with 2 coats weathershield paint including preparing surface of new work. PER m2 M074 Weathershield * L006 Painter Lit. Hour 0.223 0.600 305.00 37.50 68.02 22.50 3.30 93.82 20.64 114.46
ALLOW FOR SCAFFOLDING, BRUSHES SAND PAPER ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
P048 Painting walls with 1 coat weathershield paint including preparing surface of old work. PER m2 M074 Weathershield * L006 Painter Lit. Hour 0.117 0.376 305.00 37.50 35.69 14.10 3.30 53.09 11.68 64.77
ALLOW FOR SCAFFOLDING, BRUSHES SAND PAPER ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
P049 Painting walls with 2 coats weathershield paint including preparing surface of old work. PER m2 M074 Weathershield * L006 Painter Lit. Hour 0.223 0.700 305.00 37.50 68.02 26.25 3.30 97.57 21.46 119.03
ALLOW FOR SCAFFOLDING, BRUSHES SAND PAPER ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
P050 Painting floors with 1 coat floor paint including preparing surface. PER m2 M081 Floor Paint - Quick drying M085 Thinner * L006 Painter ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Lit. Lit. Hour 0.082 0.008 0.250 315.00 86.00 37.50 25.83 0.69 9.38 1.28 37.18 8.18 45.36
P051 Painting floors with 2 coats floor paint including preparing surface. PER m2 M081 Floor Paint - Quick drying M085 Thinner * L006 Painter ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Lit. Lit. Hour 0.164 0.016 0.400 315.00 86.00 37.50 51.66 1.38 15.00 2.00 70.04 15.41 85.45
PLUMBER
Q001 Supplying and fixing of 12mm Ball float valve. PER No. M216 Ball Valve, 12mm (plastic) L008 Plumber L001 Unskilled labour No. Hour Hour 1.000 0.500 0.500 55.00 37.50 22.88 55.00 18.75 11.44 85.19 18.74 103.93
Q002 Supplying and fixing of 20mm Ball valve. PER No. M217 Ball Valve, 20mm L008 Plumber L001 Unskilled labour No. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 0.500 0.500 85.00 37.50 22.88 85.00 18.75 11.44 115.19 25.34 140.53
Q003 Supplying and fixing of 25mm Ball valve. PER No. M218 Ball Valve, 25mm L008 Plumber L001 Unskilled labour No. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 0.750 0.750 115.00 37.50 22.88 115.00 28.13 17.16 160.29 35.26 195.55
PLUMBER
Q004 Supplying and fixing of 32mm Ball valve. PER No. M219 Ball Valve, 32mm L008 Plumber L001 Unskilled labour No. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 1.000 1.000 137.50 37.50 22.88 137.50 37.50 22.88 197.88 43.53 241.41
Q005 Fixing of 12mm to 25mm Ball valve (Valve supplied by Client.) PER No. L008 Plumber L001 Unskilled labour Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q006 Removing , repairing , testing and fixing of Ball valve. PER No. L008 Plumber L001 Unskilled labour L007 Tinker ALLOW FOR LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour Hour Hour 0.500 0.500 1.000 37.50 22.88 37.50 18.75 11.44 37.50 6.80 74.49 16.39 90.88 0.500 0.500 37.50 22.88 18.75 11.44 30.19 6.64 36.83
PLUMBER
Q007 Supplying and fixing of Ball only plastic, for 12mm valve. PER No. M220 L008 L001 L007 Ball only (plastic) 1/2" valve Plumber Unskilled labour Tinker ALLOW FOR LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL No. Hour Hour Hour 1.000 0.500 0.500 0.250 30.00 37.50 22.88 37.50 30.00 18.75 11.44 9.38 7.00 76.57 16.84 93.41
Q008 Supplying and fixing of Ball only plastic, for 20mm valve. PER No. M221 L008 L001 L007 Ball only (plastic) 3/4" valve Plumber Unskilled labour Tinker ALLOW FOR LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL No. Hour Hour Hour 1.000 0.500 0.500 0.250 50.00 37.50 22.88 37.50 50.00 18.75 11.44 9.38 9.00 98.57 21.68 120.25
PLUMBER
Q009 Supplying and fixing of Ball only plastic, for 25mm valve. PER No. M222 L008 L001 L007 Ball only (Plastic) 1" valve Plumber Unskilled labour Tinker ALLOW FOR LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 114.66 25.23 139.89 No. Hour Hour Hour 1.000 0.750 0.750 0.250 60.00 37.50 22.88 37.50 60.00 28.13 17.16 9.38
Q010 Ball soldered and fixed to lever operating valve. PER No. L008 Plumber L001 Unskilled labour L007 Tinker ALLOW FOR LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour Hour Hour 0.500 0.500 0.250 37.50 22.88 37.50 18.75 11.44 9.38 5.94 45.51 10.01 55.52
PLUMBER
Q011 Fixing of lavatory Basin to wall and connected to existing water service and making good (Basin brackets and fittings supplied by Client). PER No. M485 Plugs L001 Unskilled labour L008 Plumber No. Hour Hour 4.000 8.000 6.000 15.00 22.88 37.50 60.00 183.04 225.00 10.16 478.20 105.20 583.40
ALLOW FOR SCREWS , CEMENT , RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
Q012 Fixing of lavatory Basin on existing brackets(Tap , waste trap and basin supplied by Client.). PER No. L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour Hour 4.000 4.000 37.50 22.88 150.00 91.52 10.16 251.68 55.37 307.05
PLUMBER
Q013 Supplying and fixing of lavatory Basin 560mm x 360mm with one taps, waste plug, with new brackets (additional tap , trap and outlet pipe paid separately). PER No. M122 Basin 360 x 560 with tap waste plug but excluding bracket. M485 Plugs L001 Unskilled labour L008 Plumber M113 Wash Basin (L) Bracket ALLOW FOR SCREWS, CEMENT RED LEAD SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL No. No. Hour Hour Pair 1.000 4.000 8.000 6.000 1.000 1,450.00 15.00 22.88 37.50 58.00 1,450.00 60.00 183.04 225.00 58.00 17.21 1,993.25 438.52 2,431.77
Q014 Supplying and fixing of lavatory Basin 560mm x 360mm with one tap on existing brackets complete (additional tap, trap and outlet pipe paid separately). PER No. M122 Basin 360 x 560 with tap waste plug but excluding bracket. M485 Plugs L001 Unskilled labour L008 Plumber ALLOW FOR SCREWS, CEMENT RED LEAD SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL No. No. Hour Hour 1.000 4.000 8.000 6.000 1,450.00 15.00 22.88 37.50 1,450.00 60.00 183.04 225.00 17.21 1,935.25 425.76 2,361.01
PLUMBER
Q015 Removing Basin, Urinal or sink including all fittings and walls made good. PER No. L008 Plumber L001 Unskilled labour L002 Skilled labour ALLOW FOR CEMENT , LIME ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour Hour Hour 3.000 4.000 1.000 37.50 22.88 37.50 112.50 91.52 37.50 12.08 253.60 55.79 309.39
Q016 C.I. Enamelled baths removing and re - fixing in new position and making good to walls and floors (extra pipes required paid separately). PER N0. L008 Plumber L001 Unskilled labour L002 Skilled labour ALLOW FOR CEMENT , RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour Hour Hour 10.000 14.000 4.000 37.50 22.88 37.50 375.00 320.32 150.00 63.40 908.72 199.92 1,108.64
PLUMBER
Q017 C.I. Enamelled baths any size including trap, tap, outlet pipes etc. fixed complete (Bath and fittings supplied by Client). PER N0. L008 Plumber L001 Unskilled labour L002 Skilled labour ALLOW FOR CEMENT , RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour Hour Hour 8.000 10.000 2.000 37.50 22.88 37.50 300.00 228.80 75.00 63.40 667.20 146.78 813.98
Q018 Fixing of C.I. Bends,elbows, tees, cresses any size upto 50mm(fittings supplied by Client). PER N0. L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD HEMP ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q019 Supplying and fixing of 12mm G.I. Bends. PER N0. M240 Bend G.I. 12mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL No. Hour Hour 1.000 0.250 0.250 35.00 37.50 22.88 35.00 9.38 5.72 2.27 52.37 11.52 63.89 Hour Hour 0.250 0.250 37.50 22.88 9.38 5.72 2.27 17.37 3.82 21.19
PLUMBER
Q020 Supplying and fixing of 20mm G.I. Bends. PER N0. M241 Bend G.I. 20mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL No. Hour Hour 1.000 0.250 0.250 45.00 37.50 22.88 45.00 9.38 5.72 2.27 62.37 13.72 76.09
Q021 Supplying and fixing of 25mm G.I. Bends. PER N0. M242 Bend G.I. 25mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q022 Supplying and fixing of 32mm G.I. Bends. PER N0. M243 Bend G.I. 32mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL No. Hour Hour 1.000 0.250 0.250 120.00 37.50 22.88 120.00 9.38 5.72 2.27 137.37 30.22 167.59 No. Hour Hour 1.000 0.250 0.250 75.00 37.50 22.88 75.00 9.38 5.72 2.27 92.37 20.32 112.69
PLUMBER
Q023 Supplying and fixing of 38mm G.I. Bends. PER N0. M244 Bend G.I. 38mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 175.10 38.52 213.62 No. Hour Hour 1.000 0.250 0.250 160.00 37.50 22.88 160.00 9.38 5.72
Q024 Supplying and fixing of 50mm G.I. Bends. PER N0. M245 Bend G.I. 50mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q025 Supplying and fixing of 75mm G.I. Bends. PER N0. M247 Bend G.I. 75mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER 570.11 125.42 695.53 No. Hour Hour 1.000 0.333 0.333 550.00 37.50 22.88 550.00 12.49 7.62 215.10 47.32 262.42 No. Hour Hour 1.000 0.250 0.250 200.00 37.50 22.88 200.00 9.38 5.72
Q026 Supplying and fixing of chain, chromium plated for flushing cistern. PER No.
No. Hour
1.000 0.500
85.00 37.50
Q027 Supplying and fixing of PVC reducing Sockets from 20mm to smaller sizes. PER No. L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 6.04 1.33 7.37 Hour Hour 0.100 0.100 37.50 22.88 3.75 2.29
Q028 Supplying and fixing of PVC reducing Sockets from 25mm to smaller sizes. PER No. M356 Reducing Socket PVC 25mm to smaller size. L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29
PLUMBER
Q029 Supplying and fixing of PVC reducing Sockets from 32mm to smaller sizes. PER No. M357 Reducing Socket PVC 32mm to smaller size. L008 Plumber L001 Unskilled labour No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29
ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A
Q030 Supplying and fixing of PVC reducing Sockets from 38mm to smaller sizes. PER No. M358 Reducing Socket PVC 40mm to smaller size. L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q031 Supplying and fixing of PVC reducing Sockets from 50mm to smaller sizes. PER No. M359 Reducing Socket PVC 50mm to smaller size. L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER #N/A #N/A #N/A No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29 #N/A #N/A #N/A No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29
Q032 Supplying and fixing of PVC reducing Tees from 20mm to smaller sizes. PER No. M361 Reducing Socket PVC 20mm to smaller size. L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29
Q033 Supplying and fixing of PVC reducing Tees from 25mm to smaller sizes. PER No. M361 Reducing Socket PVC 20mm to smaller size. L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q034 Supplying and fixing of PVC reducing Tees from 32mm to smaller sizes. PER No. M362 Reducing Socket PVC 32mm to smaller size. L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER #N/A #N/A #N/A No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29 #N/A #N/A #N/A No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29
Q035 Supplying and fixing of PVC reducing Tees from 40mm to smaller sizes. PER No. M363 Reducing Socket PVC 40mm to smaller size. L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29
Q036 Supplying and fixing of PVC reducing Tees from 50mm to smaller sizes. PER No.
M364 Reducing Socket PVC 50mm to smaller size. L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES
Q037 Supplying and fixing of 560mm x 510mm pedestal type wash basin(L) with two way tapand waste plug. PER No. M088 L002 L001 L008 Wash Basin(L) with pedestal - white Skilled labour Unskilled labour Plumber ALLOW FOR CEMENT ETC. Q PLUMBER SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour Hour 1.000 2.000 8.000 8.000 #N/A 37.50 22.88 37.50 #N/A 75.00 183.04 300.00
Q038 Supplying and fixing of 20mm p.v.c. Valve socket. PER No. M378 Valve Socket PVC 20mm L008 Plumber ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 8.80 1.94 10.74 No. Hour 1.000 0.100 5.05 37.50 5.05 3.75
Q039 Supplying and fixing of 25mm p.v.c. Valve socket. PER No.
M379 Valve Socket PVC 25mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES
PLUMBER
Q040 Supplying and fixing of 32mm PVC Valve socket. PER No. M379 Valve Socket PVC 25mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 12.64 2.78 15.42 No. Hour Hour 1.000 0.100 0.100 6.60 37.50 22.88 6.60 3.75 2.29
Q041 Supplying and fixing of 40mm PVC Valve socket. PER No. M381 Valve Socket PVC 40mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 31.44 6.92 38.35 No. Hour Hour 1.000 0.100 0.100 25.40 37.50 22.88 25.40 3.75 2.29
Q042 Supplying and fixing of 50mm PVC Valve socket. PER No. M382 Valve Socket PVC 50mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER 35.79 7.87 43.66 No. Hour Hour 1.000 0.100 0.100 29.75 37.50 22.88 29.75 3.75 2.29
Q043 Supplying and fixing of 75mm PVC Valve socket. PER No. M346 Valve Socket PVC 75mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 109.41 24.07 133.48 No. Hour Hour 1.000 0.150 0.150 100.35 37.50 22.88 100.35 5.63 3.43
Q044 Supplying and fixing of 90mm PVC Valve socket. PER No. M347 Valve Socket PVC 75mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 112.43 24.73 137.16 No. Hour Hour 1.000 0.200 0.200 100.35 37.50 22.88 100.35 7.50 4.58
PLUMBER
Q045 Supplying and fixing of 20mm p.v.c. Faucet socket. PER No. M336 Faucet Socket PVC 20mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29
Q046 Supplying and fixing of 25mm p.v.c. Faucet socket. PER No. M337 Faucet Socket PVC 25mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q047 Supplying and fixing of 32mm p.v.c. Faucet socket. PER No. M338 Faucet Socket PVC 32mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29 #N/A #N/A #N/A No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29
Q048 Supplying and fixing of 40mm p.v.c. Faucet socket. PER No. M339 Faucet Socket PVC 40mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29
Q049 Supplying and fixing of 50mm p.v.c. Faucet socket. PER No. M340 Faucet Socket PVC 50mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q050 Supplying and fixing of 75mm p.v.c. Faucet socket. PER No. M342 Faucet Socket PVC 75mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER #N/A #N/A #N/A No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29 #N/A #N/A #N/A No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29
Q051 Supplying and fixing of 90mm p.v.c. Faucet socket. PER No. M343 Faucet Socket PVC 90mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29
Q052 Supplying and fixing of 20mm p.v.c. equal Tee. PER No. M372 Faucet Socket PVC 20mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29
PLUMBER
Q053 Supplying and fixing of 25mm p.v.c. Equal Tee. PER No.
M373 Equal Tee PVC 25mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES
Q054 Supplying and fixing of 32mm p.v.c. Equal Tee. PER No. M374 Equal Tee PVC 25mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q055 Supplying and fixing of 40mm p.v.c. Equal Tee. PER No. M375 Equal Tee PVC 40mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER #N/A #N/A #N/A No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29 #N/A #N/A #N/A No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29
Q056 Supplying and fixing of 50mm p.v.c. Equal Tee. PER No. M376 Equal Tee PVC 50mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29
SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q057 Supplying and fixing of 75mm p.v.c. Equal Tee. PER No. M348 Equal Tee PVC 75mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q058 Supplying and fixing of 40mm p.v.c. Equal Tee. PER No. M349 Equal Tee PVC 40mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88
Q059 Supplying and fixing of 20mm p.v.c. Plugs. PER No. M495 Plugs PVC 20mm(see M350) L008 Plumber ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour 1.000 0.100 #N/A 37.50 #N/A 3.75
Q060 Supplying and fixing of 20mm p.v.c. Plugs. PER No. M496 Plugs PVC 25mm (see M351) L008 Plumber ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour 1.000 0.100 #N/A 37.50 #N/A 3.75
Q061 Supplying and fixing of 32mm p.v.c. Plugs. PER No. M497 Plugs PVC 32mm (see M352) L008 Plumber ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour 1.000 0.100 #N/A 37.50 #N/A 3.75
PLUMBER
Q062 Supplying and fixing of 40mm p.v.c. Plugs. PER No. M498 Plugs PVC 40mm (see M353) L008 Plumber ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour 1.000 0.100 #N/A 37.50 #N/A 3.75
Q063 Supplying and fixing of 50mm p.v.c. Plugs. PER No. M499 Plugs PVC 50mm (see M354) No. 1.000 #N/A #N/A
Hour
0.100
37.50
3.75
Q064 Supplying and fixing of 75mm p.v.c. Plugs. PER No. M500 Plugs PVC 75mm L008 Plumber ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour 1.000 0.100 #N/A 37.50 #N/A 3.75
PLUMBER
Q065 Supplying and fixing of 20mm P.V.C. Sockets plain. PER No. M320 Socket PVC 20mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 9.99 2.20 12.19 No. Hour Hour 1.000 0.100 0.100 3.95 37.50 22.88 3.95 3.75 2.29
Q066 Supplying and fixing of 25mm P.V.C. Sockets plain. PER No. M321 Socket PVC 25mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES No. Hour Hour 1.000 0.100 0.100 5.90 37.50 22.88 5.90 3.75 2.29
SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q067 Supplying and fixing of 32mm P.V.C. Sockets plain. PER No. M322 Socket PVC 32mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER No. Hour Hour 1.000 0.100 0.100 8.30 37.50 22.88
Q068 Supplying and fixing of 40mm P.V.C. Sockets plain. PER No. M323 Socket PVC 40mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 18.74 4.12 22.86 No. Hour Hour 1.000 0.100 0.100 12.70 37.50 22.88 12.70 3.75 2.29
Q069 Supplying and fixing of 50mm P.V.C. Sockets plain. PER No. M324 Socket PVC 50mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 25.09 5.52 30.61 No. Hour Hour 1.000 0.100 0.100 19.05 37.50 22.88 19.05 3.75 2.29
Q070 Supplying and fixing of 75mm P.V.C. Sockets plain. PER No. M326 Socket PVC 75mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER 58.99 12.98 71.97 No. Hour Hour 1.000 0.100 0.100 52.95 37.50 22.88 52.95 3.75 2.29
Q071 Supplying and fixing of 90mm P.V.C. Sockets plain. PER No. M327 Socket PVC 75mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 65.03 14.31 79.33 No. Hour Hour 1.000 0.200 0.200 52.95 37.50 22.88 52.95 7.50 4.58
Q072 Supplying and fixing of 20mm p.v.c. pipes.(fittings paid separately.) PER m M293 Pipe PVC 20mm type 1000 L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q073 Supplying and fixing of 25mm (type 1000) p.v.c. pipes.(Fittings paid separately.) PER m M293 Pipe PVC 20mm type 1000 m 1.000 #N/A #N/A #N/A #N/A #N/A m Hour Hour 1.000 0.050 0.050 #N/A 37.50 22.88 #N/A 1.88 1.14
Hour Hour
0.067 0.067
37.50 22.88
2.51 1.53
Q074 Supplying and fixing of 32mm (type 1000) p.v.c. pipes.(Fittings paid separately.) PER m M293 Pipe PVC 32mm type 1000 L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 47.09 10.36 57.45 m Hour Hour 1.000 0.100 0.100 41.05 37.50 22.88 41.05 3.75 2.29
Q075 Supplying and fixing of 40mm (type 1000) p.v.c. pipes.(Fittings paid separately.) PER m M296 Pipe PVC 32mm type 1000 L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q076 Supplying and fixing of 50mm (type 1000) p.v.c. pipes.(Fittings paid separately.) PER m M297 Pipe PVC 50mm type 1000 L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES m Hour Hour 1.000 0.333 0.333 93.65 37.50 22.88 93.65 12.49 7.62 47.09 10.36 57.45 m Hour Hour 1.000 0.100 0.100 41.05 37.50 22.88 41.05 3.75 2.29
Q077 Supplying and fixing of 63mm (type 1000) p.v.c. pipes.(Fittings paid separately.) PER m M298 Pipe PVC 63mm type 1000 L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 176.96 38.93 215.89 m Hour Hour 1.000 0.333 0.333 156.85 37.50 22.88 156.85 12.49 7.62
Q078 Supplying and fixing of 75mm (type 1000) p.v.c. pipes.(Fittings paid separately.) PER m M299 Pipe PVC 75mm type 1000 L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 324.21 71.33 395.53 m Hour Hour 1.000 0.333 0.333 304.10 37.50 22.88 304.10 12.49 7.62
PLUMBER
Q079 Fixing of Closet pedestal type available at site with cement concrete after breaking concrete floor and making good and making connections to soil and flush pipe. PER No. M010 Cement L008 Plumber L001 Unskilled labour 50 Kg. Hour Hour 0.250 6.000 6.000 300.00 37.50 22.88 75.00 225.00 137.28
ALLOW FOR METAL , SAND RED LEAD, HEMP ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 437.28 96.20 533.48
Q080 Fixing of 20mm to 50mm p.v.c. Pipes with specials (pipes and specials supplied by Client.) PER m L008 Plumber L001 Unskilled labour Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.100 0.100 37.50 22.88 3.75 2.29 6.04 1.33 7.37
PLUMBER
Q081 Supplying and fixing of 20mm (type 1000) p.v.c. Pipes including specials and fittings. PER m
M293 Pipe PVC 20mm type 1000 L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES
m Hour Hour
Q082 Supplying and fixing of 25mm (type 1000) p.v.c. Pipes including specials and fittings. PER m M294 Pipe PVC 25mm type 1000 L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 33.39 7.35 40.73 m Hour Hour 1.000 0.100 0.100 27.35 37.50 22.88 27.35 3.75 2.29
PLUMBER
Q083 Supplying and fixing of 32mm (type 1000) p.v.c. Pipes including specials and fittings. PER m M295 Pipe PVC 25mm type 1000 L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES m Hour Hour 1.100 0.125 0.125 27.35 37.50 22.88 30.09 4.69 2.86
Q084 Supplying and fixing of 40mm (type 1000) p.v.c. Pipes including specials and fittings. PER m M296 Pipe PVC 40mm type 1000 L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 77.12 16.97 94.09 m Hour Hour 1.100 0.125 0.125 63.25 37.50 22.88 69.58 4.69 2.86
PLUMBER
Q085 Supplying and fixing of 50mm (type 1000) p.v.c. Pipes including specials and fittings. PER m M297 Pipe PVC 50mm type 1000 L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 115.09 25.32 140.41 m Hour Hour 1.100 0.200 0.200 93.65 37.50 22.88 103.02 7.50 4.58
Q086 Supplying and fixing of 63mm (type 1000) p.v.c. Pipes including specials and fittings. PER m M298 Pipe PVC 63mm type 1000 L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 184.61 40.61 225.23 m Hour Hour 1.100 0.200 0.200 156.85 37.50 22.88 172.54 7.50 4.58
PLUMBER
Q087 Supplying and fixing of 150mm x 12mm p.v.c. shower rose with specials. PER No. M117 Shower Rose PVC 150mm x 12mm L008 Plumber ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour 1.000 0.500 #N/A 37.50 #N/A 18.75
Q088 Supplying and fixing of plastic seat cover. PER No. M116 Seat cover plastic L008 Plumber No. Hour 1.000 1.000 #N/A 37.50 #N/A 37.50
Q089 Supplying and fixing of 12mm brass Gate valve. PER No. M501 Gate valve, brass 12mm L008 Plumber L001 Unskilled labour No. Hour Hour 1.000 0.500 0.500 #N/A 37.50 22.88 #N/A 18.75 11.44 #N/A #N/A #N/A
PLUMBER
Q090 Supplying and fixing of 20mm brass Gate valve. PER No. M502 Gate valve, brass 20mm L008 Plumber L001 Unskilled labour No. Hour Hour 1.000 0.500 0.500 #N/A 37.50 22.88 #N/A 18.75 11.44 #N/A #N/A #N/A
Q091 Supplying and fixing of 25mm brass Gate valve. PER No. M503 Gate valve, brass 25mm L008 Plumber L001 Unskilled labour No. Hour Hour 1.000 0.750 0.750 #N/A 37.50 22.88 #N/A 28.13 17.16 #N/A #N/A #N/A
Q092 Supplying and fixing of 32mm brass Gate valve. PER No. M504 Gate valve, brass 32mm L008 Plumber L001 Unskilled labour No. Hour Hour 1.000 1.000 1.000 #N/A 37.50 22.88 #N/A 37.50 22.88 #N/A #N/A #N/A
PLUMBER
Q093 Supplying and fixing of 38mm brass Gate valve. PER No. M505 Gate valve, brass 38mm L008 Plumber L001 Unskilled labour No. Hour Hour 1.000 1.000 1.000 #N/A 37.50 22.88 #N/A 37.50 22.88 #N/A #N/A #N/A
Q094 Supplying and installing of 400 gal capacity round plastic shell tank(with 2 Nos. of 01 oz.mat.) including scaffolding & transport. PER P/tank M547 400 gal round plastic shell Tank L011 Unskilled labour L018 Plumber ALLOW FOR SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q095 Disconneting pedestal type closet and plugging sewer connction and making good to all affected walls and floors. No. day day 1.000 4.000 1.000 11,000.00 183.00 300.00 11,000.00 732.00 300.00 550.00 12,582.00 2,768.04 15,350.04
PER No. M010 Cement L008 Plumber L001 Unskilled labour ALLOW FOR SAND METAL ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER 291.62 64.16 355.78 50 Kg. Hour Hour 0.167 4.000 4.000 300.00 37.50 22.88 50.10 150.00 91.52
Q096 Supplying and fixing pedestal type Closet (seat and cover available). PER No. M102 M010 L008 L001 Closet pedestal type Cement Plumber Unskilled labour ALLOW FOR SAND ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 3,974.28 874.34 4,848.62 No. 50 Kg. Hour Hour 1.000 0.250 6.000 6.000 3,537.00 300.00 37.50 22.88 3,537.00 75.00 225.00 137.28
Q097 Supplying and fixing of Closet pedestal type with low level glazed earthenware flushing cistern, flush pipe, double plastic seat cover 12mm stop cock trap etc. PER No. M506 M204 L008 L001 M109 M110 M094 Low level closet unit Stop Cock Brass, 12mm Plumber Unskilled labour Fittings for Cistern Cistern Bracket Low level cistern - white ALLOW FOR METAL SAND ETC. ALLOW FOR TRANSPORT SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. No. Hour Hour No. Pair No. 1.000 1.000 8.000 8.000 1.000 1.000 1.000 2,218.00 #N/A 37.50 22.88 395.00 54.00 1,375.00 2,218.00 #N/A 300.00 183.04 395.00 54.00 1,375.00
PLUMBER
Q098 Supplying and fixing of Closet squatting type with trap excluding cistern. PER No. M091 M010 L018 L011 Squatting Pan (M) with 'P' Trap Cement Plumber Unskilled labour ALLOW FOR METAL ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 600.28 132.06 732.34 No. 50 Kg. day day 1.000 0.333 1.000 1.000 440.00 300.00 37.50 22.88 440.00 99.90 37.50 22.88
Q099 Supplying and fixing of Closet, squatting type with trap with cistern flush pipe including 12mm stop cock and specials. PER No. M091 M010 L018 L011 M204 M109 M110 M094 Squatting Pan (M) with 'P' Trap Cement Plumber Unskilled labour Stop Cock Brass, 12mm Fittings for Cistern Cistern Bracket Low level cistern - White ALLOW FOR METAL ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. 50 Kg. day day No. No. Pair No. 1.000 0.333 1.000 1.000 1.000 1.000 1.000 1.000 440.00 300.00 37.50 22.88 #N/A 395.00 54.00 1,375.00 440.00 99.90 37.50 22.88 #N/A 395.00 54.00 1,375.00
PLUMBER
Q100 Removing Closet , squatting type and plugging sewer connections and making good to floors. PER No. M010 Cement L018 Plumber L011 Unskilled labour ALLOW FOR METAL SAND ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 50 Kg. hour hour 0.500 6.000 6.000 300.00 37.50 22.88 150.00 225.00 137.28 12.81 525.09 115.52 640.61
Q101 Installing Closet, squatting type including breaking floor and fixed in cement concrete (Closet supplied by Client.) PER No. M010 Cement L018 Plumber L011 Unskilled labour ALLOW FOR METAL SAND ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 50 Kg. hour hour 0.340 6.000 6.000 300.00 37.50 22.88 102.00 225.00 137.28 23.21 487.49 107.25 594.74
PLUMBER
Q102 Installing Closet, squatting type including trap, breaking floor and fixed in cement concrete (Closet and trap supplied by Client.) PER No. M010 Cement L018 Plumber L011 Unskilled labour ALLOW FOR METAL ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 50 Kg. hour hour 0.333 8.000 8.000 300.00 37.50 22.88 99.90 300.00 183.04 23.21 606.15 133.35 739.50
Q103 Installing Closet, squatting type including flushing cistern and pipes complete (Closet and all fittings supplied .) PER No. M485 L002 L001 L008 M010 Plugs Skilled labour Unskilled labour Plumber Cement ALLOW FOR METAL ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL No. Hour Hour Hour 50 Kg. 6.000 1.000 13.000 12.000 0.333 15.00 37.50 22.88 37.50 300.00 90.00 37.50 297.44 450.00 99.90 23.21 998.05 219.57 1,217.62
PLUMBER
Q104 Supplying and fixing of 12mm brass bib cocks of approved quality. PER No. M204 Stop Cock Brass, 12mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour 1.000 0.334 0.334 #N/A 37.50 22.88 #N/A 12.53 7.64
Q105 Supplying and fixing of 12mm chromium plated bib cocks of approved quality. PER No. M211 Pillar Cock chromium plated 12mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 370.17 81.44 451.60 No. Hour Hour 1.000 0.334 0.334 350.00 37.50 22.88 350.00 12.53 7.64
Q106 Fixing of Cocks, brass any size or push (cock supplied by Client.) PER No. L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER 20.17 4.44 24.60 Hour Hour 0.334 0.334 37.50 22.88 12.53 7.64
Q107 Removing of Cocks, brass bib push or stop cock of size 12mm to 40mm. PER No. L008 Plumber Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 37.50 0.00 0.00 0.00 0.00
Q108 Repairing of Cocks bib or stop by fixing leather washers. PER No. M507 Leather washer L008 Plumber L001 Unskilled labour No. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 0.500 0.500 2.00 37.50 22.88 2.00 18.75 11.44 32.19 7.08 39.27
Q109 Repairing of Cocks self closing by fixing leather washer. PER No. M507 Leather washer L008 Plumber L001 Unskilled labour No. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 1.000 1.000 2.00 37.50 22.88 2.00 37.50 22.88 62.38 13.72 76.10
PLUMBER
M272 Connector G.I. 12mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC.
Q111 Supplying and fixing of 20mm G.I. Connector. PER No. M273 Connector G.I. 20mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q112 Supplying and fixing of 25mm G.I. Connector. PER No. M274 Connector G.I. 25mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER 90.19 19.84 110.03 No. Hour Hour 1.000 0.500 0.500 60.00 37.50 22.88 60.00 18.75 11.44 75.19 16.54 91.73 No. Hour Hour 1.000 0.500 0.500 45.00 37.50 22.88 45.00 18.75 11.44
Q113 Supplying and fixing of 32mm G.I. Connector. PER No. M275 Connector G.I. 32mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. No. Hour Hour 1.000 0.500 0.500 75.00 37.50 22.88 75.00 18.75 11.44
Q114 Supplying and fixing of 38mm G.I. Connector. PER No. M276 Connector G.I. 38mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q115 Supplying and fixing of 50mm G.I. Connector. PER No. M277 Connector G.I. 50mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER 165.27 36.36 201.63 No. Hour Hour 1.000 0.667 0.667 125.00 37.50 22.88 125.00 25.01 15.26 120.19 26.44 146.63 No. Hour Hour 1.000 0.500 0.500 90.00 37.50 22.88 90.00 18.75 11.44
Q116 Supplying and fixing of 75mm G.I. Connector. PER No. M278 Connector G.I. 75mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 345.27 75.96 421.23 No. Hour Hour 1.000 0.667 0.667 305.00 37.50 22.88 305.00 25.01 15.26
Q117 Fixing of connector any size upto 38mm (connector supplied by Client.) PER No. L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 30.19 6.64 36.83 Hour Hour 0.500 0.500 37.50 22.88 18.75 11.44
Q118 Fixing of connector above 38mm and upto 75mm (connector supplied by Client.) PER No. L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER 40.27 8.86 49.13 Hour Hour 0.667 0.667 37.50 22.88 25.01 15.26
Q119 Supplying and fixing of Plastic cover for commode. PER No. M116 Seat cover plastic L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour 1.000 2.000 2.000 #N/A 37.50 22.88 #N/A 75.00 45.76
M248 Elbow G.I. 12mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC.
SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q121 Supplying and fixing of 20mm G.I. Elbows. PER No. M249 Elbow G.I. 20mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER No. Hour Hour 1.000 0.250 0.250 20.00 37.50 22.88
Q122 Supplying and fixing of 25mm G.I. Elbows. PER No. M250 Elbow G.I. 25mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 45.10 9.92 55.02 No. Hour Hour 1.000 0.250 0.250 30.00 37.50 22.88 30.00 9.38 5.72
Q123 Supplying and fixing of 32mm G.I. Elbows. PER No. M251 Elbow G.I. 32mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. No. Hour Hour 1.000 0.250 0.250 45.00 37.50 22.88 45.00 9.38 5.72
SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q124 Supplying and fixing of 38mm G.I. Elbows. PER No. M252 Elbow G.I. 38mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER No. Hour Hour 1.000 0.250 0.250 75.00 37.50 22.88
Q125 Supplying and fixing of 50mm G.I. Elbows. PER No. M253 Elbow G.I. 50mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 105.10 23.12 128.22 No. Hour Hour 1.000 0.250 0.250 90.00 37.50 22.88 90.00 9.38 5.72
Q126 Cleaning of cost iron Flushing cistern and painting with one coat Anti - corrosive paint internally. PER No. L008 Plumber ALLOW FOR PAINT AND BRUSHES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 93.75 20.63 114.38 Hour 2.500 37.50 93.75
PLUMBER
Q127 Supplying and fixing of Flushing cistern, cistern, C.I. 9 litres, excluding flush pipe and brackets but including ball valve. PER No. M119 Cistern High level C.I. L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour 1.000 4.000 4.000 #N/A 37.50 22.88 #N/A 150.00 91.52
Q128 Supplying and fixing of Flushing cistern, cistern, C.I. 9 litres, excluding flush pipe and brackets but ball valve. PER No. M120 Cistern High level C.I. L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour 1.000 4.000 4.000 #N/A 37.50 22.88 #N/A 150.00 91.52
PLUMBER
Q128 Supplying and fixing of Flushing cistern plastic 9 litres excluding flush pipe and brackets but ball valve. PER No. M120 Cistern high level plastic L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour 1.000 4.000 4.000 #N/A 37.50 22.88 #N/A 150.00 91.52
Q129 Fixing of Flushing cistern (cistern brackets supplied). PER No. M485 L002 L001 L008 Plugs Skilled labour Unskilled labour Plumber ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 339.02 74.58 413.60 No. Hour Hour Hour 4.000 1.000 4.000 4.000 15.00 37.50 22.88 37.50 60.00 37.50 91.52 150.00
PLUMBER
Q130 Supplying and fixing of low level porcelain Flushing cistern. PER No. M094 L008 L001 M110 Low level cistern - White Plumber Unskilled labour Cistern Brackets ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour Hour 1.100 4.000 4.000 1.000 1,375.00 37.50 22.88 #N/A 1,512.50 150.00 91.52 #N/A
Q131 Fixing of Flushing cistern lever forged out of wrought iron 25mm x 5m, bent to shape PER No. L005 Black Smith L001 Unskilled labour L008 Plumber ALLOW FOR STEEL ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 301.90 66.42 368.32 Hour Hour Hour 4.000 5.000 1.000 37.50 22.88 37.50 150.00 114.40 37.50
PLUMBER
Q132 Disconnecting C.I. Flushing cistern and plugging water connection including making good to all damage walls, floors etc. PER No. M256 Plug G.I. 12mm L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD CEMENT ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 251.52 55.33 306.85 No. Hour Hour 1.000 4.000 4.000 10.00 37.50 22.88 10.00 150.00 91.52
Q133 Removing of Flushing cistern and re- fixing in new position including necessary plugs, and making good to walls. PER No. M485 L002 L001 L008 M256 Plugs Skilled labour Unskilled labour Plumber Plug G.I. 12mm ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 590.54 129.92 720.46 No. Hour Hour Hour No. 4.000 1.000 8.000 8.000 1.000 15.00 37.50 22.88 37.50 10.00 60.00 37.50 183.04 300.00 10.00
PLUMBER
Q134 Refixing of Flush pipe of pedestal closets after removing old putty etc. PER No. L008 Plumber Hour 1.000 37.50 37.50
Hour
1.000
22.88
22.88
Q135 Fixing G.I. Flush pipe including solders, joints (Flush pipe supplied by Client). PER No. L008 Plumber L001 Unskilled labour ALLOW FOR RED LEAD, CEMENT ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 120.76 26.57 147.33 Hour Hour 2.000 2.000 37.50 22.88 75.00 45.76
Q136 Supplying and fixing 32mm p.v.c. flush pipe p.v.c. PER No. M295 Pipe PVC 32mm type 1000 L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER 71.24 15.67 86.91 m Hour Hour 1.000 0.500 0.500 41.05 37.50 22.88 41.05 18.75 11.44
Q137 Supplying and fixing of Hooks for G.I. 12mm pipes. PER No. M509 Hooks for 12mm G.I. Pipes L008 Plumber No. Hour 1.000 0.100 5.00 37.50 5.00 3.75 8.75 1.93 10.68
Q138 Supplying and fixing of Hooks for G.I. 20mm pipes. PER No. M510 Hooks for 20mm G.I. Pipes L008 Plumber No. Hour 1.000 0.100 5.00 37.50 5.00 3.75 8.75 1.93 10.68
Q139 Supplying and fixing of Hooks for G.I. 25mm pipes. PER No. M511 Hooks for 25mm G.I. Pipes L008 Plumber No. Hour 1.000 0.100 6.00 37.50 6.00 3.75 9.75 2.15 11.90
PLUMBER
Q140 Supplying and fixing of Hooks for G.I. 32mm pipes. PER No. M512 Hooks for 32mm G.I. Pipes L008 Plumber No. Hour 1.000 0.100 7.00 37.50 7.00 3.75 10.75 2.37 13.12
Q141 Supplying and fixing of Hooks for G.I. 38mm pipes. PER No.
No. Hour
1.000 0.100
9.00 37.50
Q142 Fixing of Hooks for G.I. Pipes,(Hooks available). PER No. L008 Plumber Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 37.50 0.00 0.00 0.00 0.00
PLUMBER
Q143 Supplying and fixing of 12mm G.I. Jam nuts. PER No. M514 G.I. Joint nut 12mm L008 Plumber L001 Unskilled labour No. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 0.100 0.100 32.00 37.50 22.88 32.00 3.75 2.29 38.04 8.37 46.41
Q144 Supplying and fixing of 20mm G.I. Jam nuts. PER No. M515 G.I. Joint nut 20mm L008 Plumber L001 Unskilled labour No. Hour Hour 1.000 0.100 0.100 44.00 37.50 22.88 44.00 3.75 2.29
Q145 Supplying and fixing of 25mm G.I. Jam nuts. PER No. M516 G.I. Joint nut 25mm L008 Plumber L001 Unskilled labour No. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 0.100 0.100 59.00 37.50 22.88 59.00 3.75 2.29 65.04 14.31 79.35
PLUMBER
Q146 Supplying and fixing of 32mm G.I. Jam nuts. PER No. M517 G.I. Joint nut 32mm L008 Plumber L001 Unskilled labour No. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 0.100 0.100 86.00 37.50 22.88 86.00 3.75 2.29 92.04 20.25 112.29
Q147 Supplying and fixing of 38mm G.I. Jam nuts. PER No. M518 G.I. Joint nut 38mm L008 Plumber L001 Unskilled labour No. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 0.100 0.100 97.00 37.50 22.88 97.00 3.75 2.29 103.04 22.67 125.71
Q148 Supplying and fixing of 50mm G.I. Jam nuts. PER No. M519 G.I. Joint nut 50mm L008 Plumber L001 Unskilled labour No. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 0.100 0.100 161.00 37.50 22.88 161.00 3.75 2.29 167.04 36.75 203.79
PLUMBER
Q149 Fixing of Jam nuts any size upto 50mm (Jam nuts supplied by Client). PER No. L008 Plumber L001 Unskilled labour Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.100 0.100 37.50 22.88 3.75 2.29 6.04 1.33 7.37
Q150 Supplying and fixing of Bath room type oval shape bevelled mirror, 380mm x 330mm with rawl plugs and chromium plated fittings. PER No. M104 Mirror Frame Oval - White L008 Plumber M103 Mirror only, oval ALLOW FOR PLUGS SCREWS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour No. 1.000 2.000 1.000 #N/A 37.50 #N/A #N/A 75.00 #N/A
Q151 Supplying and fixing 320mm x 280mm Rectangular bevelled mirror to wall with rawl plugs and chromium plated fittings.
PER No. M105 Mirror Frame Square - White L008 Plumber M101 Mirror only, square ALLOW FOR PLUGS SCREWS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER #N/A #N/A #N/A No. Hour No. 1.000 2.000 1.000 #N/A 37.50 101.00 #N/A 75.00 101.00
Q152 Supplying and fixing of 12mm G.I. Pipe. Rate to include trenching backfilling and making good to wall (fittings and pipe hooks paid separately). PER m M232 M520 L008 L001 Pipe G.I. 12mm Red lead Plumber Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A m Kg. Hour Hour 1.000 0.333 0.500 0.500 57.75 #N/A 37.50 22.88 57.75 #N/A 18.75 11.44
Q153 Supplying and fixing of 20mm G.I. Pipe. Rate to include trenching backfilling and making good to walls(fittings and pipe hooks paid separately). PER m M233 M520 L008 L001 Pipe G.I. 20mm Red lead Plumber Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A m Kg. Hour Hour 1.000 0.038 0.500 0.500 80.50 #N/A 37.50 22.88 80.50 #N/A 18.75 11.44
PLUMBER
Q154 Supplying and fixing of 25mm G.I. Pipe. Rate to include trenching backfilling and making good to walls(fittings and pipe hooks paid separately). PER m M234 M520 L008 L001 Pipe G.I. 25mm Red lead Plumber Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A m Kg. Hour Hour 1.000 0.042 0.500 1.000 117.25 #N/A 37.50 22.88 117.25 #N/A 18.75 22.88
Q155 Supplying and fixing of 32mm G.I. Pipe. Rate to include trenching backfilling and making good to walls(fittings and pipe hooks paid separately). PER m M235 M520 L008 L001 Pipe G.I. 32mm Red lead Plumber Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A m Kg. Hour Hour 1.000 0.033 0.500 1.000 131.25 #N/A 37.50 22.88 131.25 #N/A 18.75 22.88
PLUMBER
Q156 Supplying and fixing of 38mm G.I. Pipe. Rate to include trenching backfilling and making good to walls(fittings and pipe hooks paid separately). PER m M236 M520 L008 L001 Pipe G.I. 38mm Red lead Plumber Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A m Kg. Hour Hour 1.000 0.033 0.500 1.000 161.00 #N/A 37.50 22.88 161.00 #N/A 18.75 22.88
Q157 Supplying and fixing of 50mm G.I. Pipe. Rate to include trenching backfilling and making good to walls(fittings and pipe hooks paid separately). PER m M237 M520 L008 L001 Pipe G.I. 50mm Red lead Plumber Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A m Kg. Hour Hour 1.000 0.033 0.600 1.200 218.75 #N/A 37.50 22.88 218.75 #N/A 22.50 27.46
PLUMBER
Q158 Supplying and fixing of 75mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately). PER m M239 M520 L008 L001 Pipe G.I. 75mm Red lead Plumber Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A m Kg. Hour Hour 1.000 0.033 0.600 1.200 393.75 #N/A 37.50 22.88 393.75 #N/A 22.50 27.46
Q159 Fixing of 12mm to 50mm G.I. Pipes with specials bends, elbows etc.(Pipes and specials supplied by Client). Rate to include trenching and making good to walls. PER m M520 Red lead L001 Unskilled labour L008 Plumber ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A Kg. Hour Hour 0.033 1.200 0.600 #N/A 22.88 37.50 #N/A 27.46 22.50
PLUMBER
Q160 Fixing of 63mm to 75mm G.I. Pipes Rate to include trenching and making good to walls. (Fittings and pipe hooks paid separately,) PER m M520 Red lead Kg. 0.030 #N/A #N/A
Hour Hour
1.200 0.600
22.88 37.50
27.46 22.50
Q161 Removing of G.I. Pipes any size upto 50mm and trench filled in. PER m L001 Unskilled labour L008 Plumber Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 0.132 22.88 37.50 22.88 4.95 27.83 6.12 33.95
Q162 Removing of G.I. Pipes 50mm to 100mm and making good to walls and floors. PER m L001 Unskilled labour L008 Plumber M010 Cement ALLOW FOR BRICKS SAND ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 54.96 12.09 67.05 Hour Hour 50 Kg. 0.550 0.850 0.035 22.88 37.50 300.00 12.58 31.88 10.50
PLUMBER
Q163 Existing G.I. Pipes upto 50mm takeout cleaned and relaid. Rate to include backfilling. PER m L001 Unskilled labour L008 Plumber M520 Red lead ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour Hour Kg. 0.500 0.270 0.019 22.88 37.50 400.00 11.44 10.13 7.60 9.98 39.15 8.61 47.76
Q164 Existing G.I. Pipes 63mm to 75mm takeout cleaned and relaid. Rate to include backfilling. PER m L001 Unskilled labour L008 Plumber M520 Red lead ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour Hour Kg. 1.000 0.400 0.030 22.88 37.50 400.00 22.88 15.00 12.00 9.98 59.86 13.17 73.03
Q165 Existing G.I. Pipes upto 50mm takeout cleaned and relaid in new position. Rate to include backfilling. PER m L001 Unskilled labour L008 Plumber Red lead ALLOW FOR EXPENSES Hour Hour Kg. 1.200 0.300 0.019 22.88 37.50 400.00 27.46 11.25 7.60 9.98 56.29 12.38 68.67
PLUMBER
Q166 Cleaning of pipe outlets, upto 2400mm length, (Excluding removing and replacing. PER m L001 Unskilled labour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 22.88 22.88 22.88 5.03 27.91
Q167 G.I. Plugs of any size fixed in position (plugs supplied by Client). PER No. L008 Plumber L001 Unskilled labour Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.083 0.083 37.50 22.88 3.11 1.90 5.01 1.10 6.11
Q168 Supplying and fixing of 12mm G.I. Plugs. PER No. M256 Plug G.I. 12mm L008 Plumber L001 Unskilled labour No. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 0.083 0.083 10.00 37.50 22.88 10.00 3.11 1.90 15.01 3.30 18.31
PLUMBER
No. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
Q170 Supplying and fixing of 25mm G.I. Plugs. PER No. M258 Plug G.I. 25mm L008 Plumber L001 Unskilled labour No. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 0.083 0.083 20.00 37.50 22.88 20.00 3.11 1.90 25.01 5.50 30.51
Q171 Supplying and fixing of 32mm G.I. Plugs. PER No. M259 Plug G.I. 32mm L008 Plumber L001 Unskilled labour No. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 0.083 0.083 30.00 37.50 22.88 30.00 3.11 1.90 35.01 7.70 42.71
PLUMBER
Q172 Supplying and fixing of 38mm G.I. Plugs. PER No. M260 Plug G.I. 38mm L008 Plumber L001 Unskilled labour No. Hour Hour 1.000 0.083 0.083 40.00 37.50 22.88 40.00 3.11 1.90
Q173 Supplying and fixing of 50mm G.I. Plugs. PER No. M261 Plug G.I. 50mm L008 Plumber L001 Unskilled labour No. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 0.083 0.083 50.00 37.50 22.88 50.00 3.11 1.90 55.01 12.10 67.11
Q174 Supplying and fixing of 25mm to 32mm rubber plugs for wash basins and sinks. PER No. M521 Rubber plug 25mm to 32mm L008 Plumber No. Hour 1.000 0.250 19.00 37.50 19.00 9.38 28.38 6.24 34.62
PLUMBER
Q175 Supplying and fixing of 38mm to 50mm rubber plugs for wash basins and sinks PER No. M522 Rubber plug 32mm to 50mm L008 Plumber No. Hour 1.000 0.250 30.00 37.50 30.00 9.38 39.38 8.66 48.04
Q176 Supplying and fixing of Wooden plugs in Class I timber , 100mm long, tapered 75mm
to 50mm square section bedded in 1:2 cement mortar. PER No. M523 100mm x 100mm Class I timber beams(4" x 4") L002 Skilled labour L001 Unskilled labour ALLOW FOR CEMENT ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
Q177 Supplying and fixing of 12mm heavy quality brass push taps. PER No. M212 12mm heavy quality brass push tap L008 Plumber ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 262.53 57.76 320.28 No. Hour 1.000 0.334 250.00 37.50 250.00 12.53
PLUMBER
A178 Supplying and fixing of 12mm light pattern brass push taps. PER No. M214 12mm light brass push tap L008 Plumber ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 212.53 46.76 259.28 No. Hour 1.000 0.334 200.00 37.50 200.00 12.53
Q179 Making a platform, with bamboo and planks for lifting or lowering of storage tank to a height 4575mm to 9145mm and removing same. PER No.
M445 Props(bamboo) 3 - 4 m M047 Timber planks 25mm class B L011 Unskilled labour ALLOW FOR OTHER EXPENSES
PLUMBER
Q180 Making a platform, with bamboo and planks for lifting or lowering of storage tank to a height 9145mm to 15240mm and removing same. PER No. M445 Props(bamboo) 3 - 4 m M047 Timber planks 25mm class B L011 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Sq.m. day 7.000 0.070 2.500 #N/A 470.00 22.88 #N/A 32.90 57.20
Q181 Supplying and fixing of 600mm x 125mm glass shelves with chromium plated brackets to wall with rawl plugs. PER No. M524 600mm x 125mm glass shelf with chromium plated brackets. No. 1.000 #N/A #N/A
No. Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
4.000 1.250
#N/A 37.50
Q182 Fixing any size of shower rose in position (Shower rose supplied by client). PER N. L008 Plumber ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER 9.38 2.06 11.44 Hour 0.250 37.50 9.38
Q183 Supplying and fixing of 150mm copper shower rose. PER No. M118 Shower Rose Copper 150mm x 12mm L008 Plumber No. Hour 1.000 0.250 #N/A 37.50 #N/A 9.38 #N/A #N/A #N/A
Q184 Supplying and fixing of 150mm p.v.c. shower rose. PER No. M117 Shower Rose 150mm x 12mm L008 Plumber No. Hour 1.000 0.250 #N/A 37.50 #N/A 9.38 #N/A #N/A #N/A
Hour
1.000
37.50
37.50
PLUMBER
Q186 Supplying and fixing of 12mm G.I. Nipples. PER No. M264 Nipple G.I. 12mm L008 Plumber ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 14.69 3.23 17.92 No. Hour 1.000 0.125 10.00 37.50 10.00 4.69
Q187 Supplying and fixing of 20mm G.I. Nipples. PER No. M265 Nipple G.I. 20mm L008 Plumber ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 22.69 4.99 27.68 No. Hour 1.000 0.125 18.00 37.50 18.00 4.69
Q188 Supplying and fixing of 25mm G.I. Nipples. PER No. M266 Nipple G.I. 25mm No. 1.000 28.00 28.00
Hour
0.125
37.50
4.69
PLUMBER
Q189 Supplying and fixing of 32mm G.I. Nipples. PER No. M267 Nipple G.I. 32mm L008 Plumber ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 39.69 8.73 48.42 No. Hour 1.000 0.125 35.00 37.50 35.00 4.69
Q190 Supplying and fixing of 38mm G.I. Nipples. PER No. M268 Nipple G.I. 38mm L008 Plumber ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 64.69 14.23 78.92 No. Hour 1.000 0.125 60.00 37.50 60.00 4.69
Q191 Supplying and fixing of 50mm G.I. Nipples. PER No. M269 Nipple G.I. 50mm L008 Plumber ALLOW FOR RED LEAD ETC. SUB TOTAL 94.69 No. Hour 1.000 0.125 90.00 37.50 90.00 4.69
20.83 115.52
PLUMBER
Q192 Fixing in position of G.I. Nipples upto 50mm (nipple supplied by Client) PER No. L008 Plumber ALLOW FOR RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 4.69 1.03 5.72 Hour 0.125 37.50 4.69
Q193 Repairing Piller cock and fixing to basin without damaging the basin. PER No. L008 Plumber ALLOW FOR WASHERS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 56.25 12.38 68.63 Hour 1.500 37.50 56.25
Q194 Supplying and fixing 12mm chromium plated pillar cocks to basin. PER No. M211 Pillar cock chromium Plated 12mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 395.29 86.96 482.25 No. Hour Hour 1.000 0.750 0.750 350.00 37.50 22.88 350.00 28.13 17.16
PLUMBER
Q195 Supplying and fixing 20mm chromium plated pillar cocks to basin. PER No. M213 Pillar cock chromium Plated 20mm L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 435.29 95.76 531.05 No. Hour Hour 1.000 0.750 0.750 390.00 37.50 22.88 390.00 28.13 17.16
Q196 Fixing of Sink in any size with all fittings (Sink and fittings supplied by Client.) PER No. M485 L002 L008 L001 Plugs Skilled labour Plumber Unskilled labour ALLOW CEMENT ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 543.04 119.47 662.51 No. Hour Hour Hour 4.000 2.000 6.000 8.000 15.00 37.50 37.50 22.88 60.00 75.00 225.00 183.04
PLUMBER
Q197 Supplying and fixing of 610mm x 380mm x 180mm glazed earthenware sink with all fitting on existing brackets. PER No.
M089 Kitchen Sink 600 x 375 x 175mm White L008 Plumber L001 Unskilled labour ALLOW CEMENT ETC.
Q198 Supplying and fixing of 610mm x 380mm x 180mm glazed earthenware sink with all fittings. Rate to include for provision of brackets. PER No. M089 M112 L008 L001 Kitchen Sink 600 x 375 x 175mm White Wash Basin(M) Bracket Plumber Unskilled labour ALLOW CEMENT ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour Hour 1.000 5.500 5.500 5.500 #N/A #N/A 37.50 22.88 #N/A #N/A 206.25 125.84
PLUMBER
Q199 Removing Sink or basin and refixing in new position. PER No. M485 L008 L004 L001 Plugs Plumber Mason Unskilled labour No. Hour Hour Hour 4.000 8.000 3.000 12.000 15.00 37.50 37.50 22.88 60.00 300.00 112.50 274.56
ALLOW CEMENT, RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 747.06 164.35 911.41
Q200 Making 600mm x 600mm x 150mm sink in 112mm brick masonary in cement 1:5 including 12mm thick 1:2 cement rendering. Rate to include making holes in the wall and supplying and fixing of 50mm outlet pipes. PER No. M009 M010 M007 M297 L004 L001 Brick Cement sand Pipe PVC 50mm type 1000 Mason Unskilled labour 1000 Nos. 50 Kg. Cu.m. m Hour Hour 0.032 0.500 0.115 0.310 6.000 6.000 2,250.00 300.00 390.00 93.65 37.50 22.88 72.00 150.00 44.85 29.03 225.00 137.28 658.16 144.80 802.96
PLUMBER
Q201 Supplying and fixing of 12mm plain G.I. Sockets. PER No. M280 Socket G.I. 12mm L008 Plumber L001 Unskilled labour ALLOW RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 17.55 3.86 21.41 No. Hour Hour 1.000 0.125 0.125 10.00 37.50 22.88 10.00 4.69 2.86
Q202 Supplying and fixing of 20mm plain G.I. Sockets. PER No. M281 Socket G.I. 20mm L008 Plumber L001 Unskilled labour ALLOW RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q203 Supplying and fixing of 25mm plain G.I. Sockets. PER No. M282 Socket G.I. 25mm L008 Plumber L001 Unskilled labour ALLOW RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER 32.55 7.16 39.71 No. Hour Hour 1.000 0.125 0.125 25.00 37.50 22.88 25.00 4.69 2.86 22.55 4.96 27.51 No. Hour Hour 1.000 0.125 0.125 15.00 37.50 22.88 15.00 4.69 2.86
Q204 Supplying and fixing of 32mm plain G.I. Sockets. PER No. M283 Socket G.I. 32mm L008 Plumber L001 Unskilled labour ALLOW RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 42.55 9.36 51.91 No. Hour Hour 1.000 0.125 0.125 35.00 37.50 22.88 35.00 4.69 2.86
Q205 Supplying and fixing of 38mm plain G.I. Sockets. PER No.
M284 Socket G.I. 38mm L008 Plumber L001 Unskilled labour ALLOW RED LEAD ETC.
SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q206 Supplying and fixing of 50mm plain G.I. Sockets. PER No. M285 Socket G.I. 50mm L008 Plumber L001 Unskilled labour ALLOW RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER No. Hour Hour 1.000 0.125 0.125 55.00 37.50 22.88
Q207 Supplying and fixing of 75mm plain G.I. Sockets. PER No. M287 Socket G.I. 75mm L008 Plumber L001 Unskilled labour ALLOW RED LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 135.08 29.72 164.80 No. Hour Hour 1.000 0.167 0.167 125.00 37.50 22.88 125.00 6.26 3.82
Q208 Supplying and fixing of 20mm to smaller size G.I. Reducing sockets. PER No. M288 Reducing Socket G.I. 20mm to smaller L008 Plumber L001 Unskilled labour ALLOW OTHER EXPENSES No. Hour Hour 1.000 0.125 0.125 25.00 37.50 22.88 25.00 4.69 2.86
SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q209 Supplying and fixing of 25mm to smaller size G.I. Reducing sockets. PER No. M526 G.I. reducing Socket 25mm to smaller L008 Plumber L001 Unskilled labour ALLOW OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER No. Hour Hour 1.000 0.125 0.125 39.00 37.50 22.88
Q210 Supplying and fixing of 32mm to smaller size G.I. Reducing sockets. PER No. M289 Reducing Socket G.I. 32mm to smaller L008 Plumber L001 Unskilled labour ALLOW OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour 1.000 0.125 0.125 #N/A 37.50 22.88 #N/A 4.69 2.86
Q211 Supplying and fixing of 38mm to smaller size G.I. Reducing sockets. PER No. M290 Reducing Socket G.I. 38mm to smaller L008 Plumber L001 Unskilled labour ALLOW OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour 1.000 0.125 0.125 #N/A 37.50 22.88 #N/A 4.69 2.86
Q212 Supplying and fixing of 50mm to smaller size G.I. Reducing sockets. PER No. M291 Reducing Socket G.I. 50mm to smaller L008 Plumber L001 Unskilled labour ALLOW OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER #N/A #N/A #N/A No. Hour Hour 1.000 0.125 0.125 #N/A 37.50 22.88 #N/A 4.69 2.86
Q213 Supplying and fixing of 75mm to 50mm size G.I. Reducing sockets. PER No. M292 Reducing Socket G.I. 75mm L008 Plumber L001 Unskilled labour ALLOW OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 155.08 34.12 189.20 No. Hour Hour 1.000 0.167 0.167 145.00 37.50 22.88 145.00 6.26 3.82
Q214 Fixing in position of G.I. Socket in any size (Socket supplied by Client.) PER No. L008 Plumber L001 Unskilled labour ALLOW OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 7.55 1.66 9.21 Hour Hour 0.125 0.125 37.50 22.88 4.69 2.86
Q215 Supplying of white porcelain soap tray and fixing to wall by rawl plugs. PER No. M095 Soap Holder - White No. 1.000 209.00 209.00
No. Hour
2.000 1.000
#N/A 37.50
#N/A 37.50
Q216 Steel work in RSJ's as supports for tanks. Fixed in position upto 6000mm in height and painted 2 coats red and 2 coats anti corrosive paint. PER No. M494 M082 M078 L008 L001 L015 2" x 4" H iron Red lead paint Anti - Corrosive Paint Plumber Unskilled labour Painter ALLOW FOR CEMENT ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A Kg. Lit. Lit. Hour Hour day 1.000 0.008 0.008 0.023 0.046 0.006 44.00 #N/A #N/A 37.50 22.88 37.50 44.00 #N/A #N/A 0.86 1.05 0.23
Q217 Supplying and fixing of 12mm brass stop cocks. PER No. M204 Stop Cock Brass , 12mm L008 Plumber L001 Unskilled labour ALLOW FOR LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour 1.000 0.500 0.500 #N/A 37.50 22.88 #N/A 18.75 11.44
PLUMBER
Q218 Supplying and fixing of 20mm brass stop cocks. PER No. M205 Stop Cock Brass , 20mm L008 Plumber L001 Unskilled labour ALLOW FOR LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour 1.000 0.500 0.500 #N/A 37.50 22.88 #N/A 18.75 11.44
Q219 Supplying and fixing of 25mm brass stop cocks. PER No. M206 Stop Cock Brass , 25mm L008 Plumber L001 Unskilled labour ALLOW FOR LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q220 Supplying and fixing of 32mm brass stop cocks. PER No. M207 Stop Cock Brass , 32mm L008 Plumber L001 Unskilled labour ALLOW FOR LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER #N/A #N/A #N/A No. Hour Hour 1.000 0.500 0.500 #N/A 37.50 22.88 #N/A 18.75 11.44 #N/A #N/A #N/A No. Hour Hour 1.000 0.500 0.500 #N/A 37.50 22.88 #N/A 18.75 11.44
Q221 Supplying and fixing of 38mm brass stop cocks. PER No. M208 Stop Cock Brass , 38mm L008 Plumber L001 Unskilled labour ALLOW FOR LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour 1.000 0.500 0.500 #N/A 37.50 22.88 #N/A 18.75 11.44
Q222 Supplying and fixing of 50mm brass stop cocks. PER No. M209 Stop Cock Brass , 50mm L008 Plumber L001 Unskilled labour ALLOW FOR LEAD ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q223 Supplying and fixing of 12mm chromium plated stop cocks. PER No. M215 12mm chromium plated stop cock. L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 440.19 96.84 537.03 No. Hour Hour 1.000 0.500 0.500 410.00 37.50 22.88 410.00 18.75 11.44 #N/A #N/A #N/A No. Hour Hour 1.000 0.500 0.500 #N/A 37.50 22.88 #N/A 18.75 11.44
PLUMBER
Q224 Hoist & place in position of 1125 - 1800 litre GI tank upto a height of 6000mm & remove old tank include disconnect & connect all pipes & paint the new tank with red lead paint & 2 coats of anti corrosive paint.(Tank supplied by client & scaffolding paid. PER No. L008 L001 L006 M082 M078 Plumber Unskilled labour Painter Red Lead Paint * Anti - Corrosive paint * ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour Hour Hour Lit. Lit. 4.500 17.000 14.000 0.700 1.400 37.50 22.88 37.50 225.00 238.00 168.75 388.96 525.00 157.50 333.20 65.00 1,638.41 360.45 1,998.86
Q225 Hoisting and placing in position of 110 to 910 litre G.I. Tank upto a height of 6000mm & removing the old tank including connecting & disconnecting all pipes & painting the new tank with red lead paint & 2 coats of anti corrosive paint.(Tank supplied by client & scaffolding paid. PER No. L008 L001 L006 M082 M078 Plumber Unskilled labour Painter Red Lead Paint * Anti - Corrosive paint * ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Hour Hour Hour Lit. Lit. 4.500 12.000 5.000 0.225 0.450 37.50 22.88 37.50 225.00 238.00 168.75 274.56 187.50 50.63 107.10 65.00 853.54 187.78 1,041.31
PLUMBER
Q226 Placeing in position of 110 - 910 litre GI tank upto a height of 6000mm & fix erction of steel support, include fixing of all pipes & paint the tank & support with red lead paint & 2 coats anti corrosive paint.(Tank , pipes, fittings, RSJ's , supplied by the client.) PER No. M082 M078 L008 L001 L006 Red Lead Paint Anti - Corrosive paint Plumber Unskilled labour Painter ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A Lit. Lit. Hour Hour Hour 0.225 0.450 3.500 8.000 5.000 #N/A #N/A 37.50 22.88 37.50 #N/A #N/A 131.25 183.04 187.50
Q227 Placeing in position of 1125 - 1800 litre GI tank at a height of 6000mm & remove & fix of steel supports, remove old tank include disconnect all pipes and paint new tank & supports with red lead paint & 2 coats of anticorrosive paint(Tank , pipes , fittings RSJs.) PER No. M082 M078 L008 L001 L006 Red Lead Paint Anti - Corrosive paint Plumber Unskilled labour Painter ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A Lit. Lit. Hour Hour Hour 0.700 1.400 3.500 11.000 14.000 #N/A #N/A 37.50 22.88 37.50 #N/A #N/A 131.25 251.68 525.00
PLUMBER
Q228 Cleaning of tanks upto the storage capacity of 1800 litres. PER No. L001 Unskilled labour ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 91.52 20.13 111.65 Hour 4.000 22.88 91.52
Q229 Cleaning of tanks of storage capacity over 1800 litres. PER No. L001 Unskilled labour ALLOW FOR BRUSHES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 183.04 40.27 223.31 Hour 8.000 22.88 183.04
Q230 Removing of G.I. Storage tank and making good to walls and floor (scaffolding paid separately where necessary.) PER No. L008 Plumber L001 Unskilled labour ALLOW FOR CEMENT ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 295.54 65.02 360.56 Hour Hour 3.000 8.000 37.50 22.88 112.50 183.04
PLUMBER
Q231 Supplying and installing of 400 litre. 16 BWG G.I. Tank including painting the tank with one coat of primer and 2 coats of anti - corrosive paint. PER No.
400 L, 16 BWG G.I. Tank Red Lead Paint Anti - Corrosive paint Plumber Unskilled labour Painter ALLOW FOR BRUSHES , WASHERS ETC.
Q232 Supplying and installing of 1125 litre. 16 BWG G.I. Tank including painting the tank with primer and 2 coats of anti - corrosive paint. PER No. M413 M082 M078 L008 L001 L006 1125 L, 16 BWG G.I. Tank Red Lead Paint Anti - Corrosive paint Plumber Unskilled labour Painter ALLOW FOR BRUSHES , WASHERS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Lit. Lit. Hour Hour Hour 1.000 0.620 1.240 3.500 4.000 6.000 11,000.00 #N/A #N/A 37.50 22.88 37.50 11,000.00 #N/A #N/A 131.25 91.52 225.00
PLUMBER
Q233 Supplying and installing of 1800 litre. 16 BWG G.I. Tank including painting the tank with one coat primer and 2 coats of anti - corrosive paint. PER No. M414 M082 M078 L008 1800 L, 16 BWG G.I. Tank Red Lead Paint Anti - Corrosive paint Plumber No. Lit. Lit. Hour 1.000 0.900 1.800 3.500 14,300.00 #N/A #N/A 37.50 14,300.00 #N/A #N/A 131.25
L001 Unskilled labour L006 Painter ALLOW FOR BRUSHES , WASHERS ETC.
Hour Hour
11.000 12.000
22.88 37.50
251.68 450.00
Q234 Supplying and fixing of wall type Urinals. PER No. M093 M470 L002 L008 L001 Urinal - White Wood plugs Skilled labour Plumber Unskilled labour ALLOW FOR CEMENT , SCREWS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. m Hour Hour Hour 1.000 0.200 0.500 0.500 1.000 1,320.00 #N/A 37.50 37.50 22.88 1,320.00 #N/A 18.75 18.75 22.88
PLUMBER
Q235 Supplying and fixing of wall type Urinals.(Urinals available) PER No. M470 L002 L008 L001 Wood plugs Skilled labour Plumber Unskilled labour ALLOW FOR CEMENT , SCREWS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A m Hour Hour Hour 0.200 0.500 0.500 1.000 #N/A 37.50 37.50 22.88 #N/A 18.75 18.75 22.88
Q236 Fixing of P.V.C. bends elbows. Tees and other specials upto 75mm (Fittings supplied by Client.) PER No. L008 Plumber L001 Unskilled labour ALLOW FOR SOLVENT , CEMENT , ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 6.04 1.33 7.37 Hour Hour 0.100 0.100 37.50 22.88 3.75 2.29
PLUMBER
Q237 Supplying and fixing of 20mm p.v.c. bends. PER No. M328 Bend PVC 20mm L008 Plumber L001 Unskilled labour ALLOW FOR SOLVENT , CEMENT , ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 12.64 2.78 15.42 No. Hour Hour 1.000 0.100 0.100 6.60 37.50 22.88 6.60 3.75 2.29
M329 Bend PVC 25mm L008 Plumber L001 Unskilled labour ALLOW FOR SOLVENT , CEMENT , ETC.
SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q239 Supplying and fixing of 32mm p.v.c. bends. PER No. M330 Bend PVC 32mm L008 Plumber L001 Unskilled labour ALLOW FOR SOLVENT , CEMENT , ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER No. Hour Hour 1.000 0.100 0.100 13.15 37.50 22.88
Q240 Supplying and fixing of 32mm p.v.c. bends. PER No. M331 Bend PVC 40mm L008 Plumber L001 Unskilled labour ALLOW FOR SOLVENT , CEMENT , ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 32.29 7.10 39.39 No. Hour Hour 1.000 0.100 0.100 26.25 37.50 22.88 26.25 3.75 2.29
Q241 Supplying and fixing of 50mm p.v.c. bends. PER No. M332 Bend PVC 50mm L008 Plumber L001 Unskilled labour ALLOW FOR SOLVENT , CEMENT , ETC. No. Hour Hour 1.000 0.100 0.100 42.45 37.50 22.88 42.45 3.75 2.29
SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q242 Supplying and fixing of 75mm p.v.c. bends. PER No. M334 Bend PVC 75mm L008 Plumber L001 Unskilled labour ALLOW FOR SOLVENT , CEMENT , ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER No. Hour Hour 1.000 0.100 0.100 217.00 37.50 22.88
Q243 Supplying and fixing of 90mm p.v.c. bends. PER No. M335 Bend PVC 90mm L008 Plumber L001 Unskilled labour ALLOW FOR SOLVENT , CEMENT , ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 374.02 82.28 456.30 No. Hour Hour 1.000 0.180 0.180 363.15 37.50 22.88 363.15 6.75 4.12
Q244 Supplying and fixing of 20mm p.v.c. elbows. PER No. M368 Elbow PVC 20mm L008 Plumber L001 Unskilled labour ALLOW FOR SOLVENT , CEMENT , ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL No. Hour Hour 1.000 0.100 0.100 3.95 37.50 22.88 3.95 3.75 2.29 2.01 12.00 2.64 14.64
Q245 Supplying and fixing of 25mm p.v.c. elbows. PER No. M367 Elbow PVC 25mm L008 Plumber L001 Unskilled labour ALLOW FOR SOLVENT , CEMENT , ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q PLUMBER 12.19 2.68 14.87 No. Hour Hour 1.000 0.100 0.100 6.15 37.50 22.88 6.15 3.75 2.29
Q246 Supplying and fixing of 32mm p.v.c. elbows. PER No. M368 Elbow PVC 32mm L008 Plumber L001 Unskilled labour ALLOW FOR SOLVENT , CEMENT , ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 16.54 3.64 20.18 No. Hour Hour 1.000 0.100 0.100 10.50 37.50 22.88 10.50 3.75 2.29
Q247 Supplying and fixing of 40mm p.v.c. elbows. PER No. M369 Elbow PVC 40mm L008 Plumber L001 Unskilled labour ALLOW FOR SOLVENT , CEMENT , ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL Q248 Supplying and fixing of 50mm p.v.c. elbows. PER No. M370 Elbow PVC 50mm No. 1.000 28.25 28.25 21.79 4.79 26.58 No. Hour Hour 1.000 0.100 0.100 15.75 37.50 22.88 15.75 3.75 2.29
L008 Plumber L001 Unskilled labour ALLOW FOR SOLVENT , CEMENT , ETC.
Hour Hour
0.100 0.100
37.50 22.88
3.75 2.29
Q249 Supplying and fixing of 75mm p.v.c. elbows. PER No. M344 Elbow PVC 75mm L008 Plumber L001 Unskilled labour ALLOW FOR SOLVENT , CEMENT , ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 114.74 25.24 139.98 No. Hour Hour 1.000 0.100 0.100 108.70 37.50 22.88 108.70 3.75 2.29
Q250 Supplying and fixing of 90mm p.v.c. elbows. PER No. M345 Elbow PVC 90mm L008 Plumber L001 Unskilled labour ALLOW FOR SOLVENT , CEMENT , ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 194.77 42.85 237.62 No. Hour Hour 1.000 0.180 0.180 183.90 37.50 22.88 183.90 6.75 4.12
PLUMBER
Q251 Supplying and fixing of p.v.c. reducing sockets 20mm to smaller sizes. PER No. M356 Reducing Socket PVC 25mm to smaller size L008 Plumber L001 Unskilled labour ALLOW FOR SOLVENT , CEMENT , ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour Hour 1.000 0.100 0.100 #N/A 37.50 22.88 #N/A 3.75 2.29
Q252 Supplying of 200mm x 400mm half rounded , tooth brush holders and fixing with rawl plugs. PER No. M096 Toothe Brush Holder 200 x 100mm white M525 Rawl plugs L008 Plumber L001 Unskilled labour ALLOW FOR OTHER EXPENSES SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. No. Hour Hour 1.000 2.000 0.750 0.750 #N/A #N/A 37.50 22.88 #N/A #N/A 28.13 17.16
DRAINLAYER
R001 Supplying and fixing of 150mm x 150mm C.I. Grating. PER No. M226 150mm x 150mm C.I. Grating L001 Unskilled labour No. Hour 1.000 0.125 #N/A 22.88 #N/A 2.86 #N/A #N/A #N/A
R002 600mm x 600mm manhole upto 600mm deep, constructed with 225mm brick in 1:3 cement mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm) concrete foundation. Rate to include forming of channels. PER No. M009 M007 M005 M010 L001 L004 Brick Sand Metal 25mm Cement Unskilled labour Mason 1000 Nos Cu.m. Cu.m. 50 Kg. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.260 0.285 0.170 2.040 20.000 8.000 2,250.00 390.00 #N/A 300.00 22.88 37.50 585.00 111.15 #N/A 612.00 457.60 300.00 #N/A #N/A #N/A
DRAINLAYER
R003 1000mm x 700mm manhole 600mm to 1200mm deep, constructed with 225mm brick in 1:3 cement mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm) concrete foundation. Rate to include forming of channels. PER No.
1000 Nos Cu.m. Cu.m. 50 Kg. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
R004 1000mm x 700mm manhole 1200mm to 1800mm deep, constructed with 225mm brick in 1:3 cement mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm) concrete foundation. Rate to include forming of channels. PER No. M009 M007 M005 M010 L001 L004 Brick Sand Metal 25mm Cement Unskilled labour Mason 1000 Nos Cu.m. Cu.m. 50 Kg. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.875 0.736 0.250 4.580 7.000 2.500 2,250.00 390.00 #N/A 300.00 22.88 37.50 1,968.75 287.04 #N/A 1,374.00 160.16 93.75 #N/A #N/A #N/A
DRAINLAYER
R005 Supplying and fixing of 550mm x 500mm rectangular C.I. Manhole cover. PER No. M227 M528 M010 L002 L001 Manhole Cover 550mm x 500mm Rag bolts Cement Skilled labour Unskilled labour No. No. 50 Kg. Hour Hour 1.000 4.000 0.200 2.000 2.000 #N/A 26.00 300.00 37.50 22.88 #N/A 104.00 60.00 75.00 45.76
R006 Constructing and placing in position of 75mm thick 600mm x 600mm reinforced concrete manhole cover, reinforced with 6mm dia. M.S. rods at 75mm centres both ways. PER No. M004 M007 M010 M549 L005 L002 L001 Metal 40mm Sand Cement Tor Steel Black Smith Skilled labour Unskilled labour Cu.m. Cu.m. 50 Kg. Kg. Hour Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.028 0.015 0.210 2.500 0.500 2.000 2.000 898.00 390.00 300.00 #N/A 37.50 37.50 22.88 25.14 5.85 63.00 #N/A 18.75 75.00 45.76 #N/A #N/A #N/A
DRAINLAYER
R007 Supplying and fixing of wire domes 100mm pipes. PER No. M224 Wire Dome, 100mm L008 Plumber No. Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 0.500 65.00 37.50 65.00 18.75 83.75 18.43 102.18
R008 Supplying and fixing of wire domes for 50mm pipes. PER No.
No. Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
1.000 0.500
45.00 37.50
R009 110 dia. Pvc(type 600) laid in 350 x 150mm thick 1:3:6(25mm) concrete upto 600mm depth of trench. Rate to include excavation. PER m M308 M010 M007 M005 L004 L011 L018 Pipe PVC 110mm type 600 Cement Sand Metal 25mm Mason Unskilled labour Plumber ALLOW FOR ERASE PART ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL R DRAINLAYER 591.99 130.24 722.23 m 50 Kg. Cu.m. Cu.m. Hour day day 1.000 0.420 0.045 0.080 0.030 0.400 0.030 362.40 300.00 390.00 933.00 37.50 22.88 37.50 362.40 126.00 17.55 74.64 1.13 9.15 1.13
R010 110 dia. Pvc(type 600) laid in 150mm thick 1:3:6(25mm) concrete upto 600mm to 1200mm depth of trench. Rate to include excavation. PER m M308 M010 M007 M005 L004 L011 L018 Pipe PVC 110mm type 600 Cement Sand Metal 25mm Mason Unskilled labour Plumber ALLOW FOR TRANSPORT ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 594.97 130.89 725.86 m 50 Kg. Cu.m. Cu.m. Hour day day 1.000 0.420 0.045 0.080 0.030 0.530 0.030 362.40 300.00 390.00 933.00 37.50 22.88 37.50 362.40 126.00 17.55 74.64 1.13 12.13 1.13
R011 110 dia. Pvc(type 600) embedded in 150mm thick 1:3:6(25mm) over 1200mm to 1800mm depth of trench. Rate to include excavation. PER m M308 M010 M007 M005 L004 L011 L018 Pipe PVC 110mm type 600 Cement Sand Metal 25mm Mason Unskilled labour Plumber ALLOW FOR TRANSPORT ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 598.86 131.75 730.60 m 50 Kg. Cu.m. Cu.m. Hour day day 1.000 0.420 0.045 0.080 0.030 0.700 0.030 362.40 300.00 390.00 933.00 37.50 22.88 37.50 362.40 126.00 17.55 74.64 1.13 16.02 1.13
DRAINLAYER
R012 Supplying and fixing of 100m x 100mm aluminium grating. PER No. M527 100mm x 100mm Aluminium grating L001 Unskilled labour No. Hour 1.000 0.250 30.00 22.88 30.00 5.72 35.72 7.86 43.58
MISCELLANEOUS
S001 Supplying of Bamboos PER m M445 Props (bamboo) 3 - 4m No. 0.350 #N/A #N/A #N/A #N/A #N/A
S002 Supplying of Bamboos and fixing in position. PER m M445 Props (bamboo) 3 - 4m L001 Unskilled labour ALLOW FOR COIR, STRING ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A No. Hour 0.350 0.132 #N/A 22.88 #N/A 3.02
S003 Removing of Bamboos and re-fixing with coir string. PER m L001 Unskilled labour Hour 0.180 22.88 4.12
ALLOW FOR COIR, STRING ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 4.12 0.91 5.02
MISCELLANEOUS
S004 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to SLS 31 of 1988) an exsisting timber post with GI staples. PER m M039 Barbed wire L002 Skilled labour L001 Unskilled labour ALLOW FOR STAPLES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A Kg. Hour Hour 0.093 0.030 0.030 #N/A 37.50 22.88 #N/A 1.13 0.69
S005 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to SLS 31 of 1988) an exsisting concrete post . PER m M039 Barbed wire L002 Skilled labour L001 Unskilled labour ALLOW FOR HOOK BOLTS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A Kg. Hour Hour 0.093 0.050 0.050 #N/A 37.50 22.88 #N/A 1.88 1.14
MISCELLANEOUS
S006 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to SLS 31 of 1988) in short lengths and timber posts with G.I. Staples. PER m M039 Barbed wire L002 Skilled labour L001 Unskilled labour ALLOW FOR STAPLES ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A Kg. Hour Hour 0.093 0.040 0.040 #N/A 37.50 22.88 #N/A 1.50 0.92
S007 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to SLS 31 of 1988) in short lengths an concrete or steel posts with available hook bolts.. PER m M039 Barbed wire L002 Skilled labour L001 Unskilled labour Kg. Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL S008 Fixing of Barbed wire with G.I. Staples in existing timber posts(Barbed wire supplied by Client.) PER m L002 Skilled labour L001 Unskilled labour ALLOW FOR STAPLES ETC. SUB TOTAL 1.81 Hour Hour 0.030 0.030 37.50 22.88 1.13 0.69 0.093 0.060 0.060 #N/A 37.50 22.88 #N/A 2.25 1.37 #N/A #N/A #N/A
0.40 2.21
S009 Fixing of barbed wire fence with hook bolts on concrete or steel posts (Barbed wire supplied by Client.) PER m L002 Skilled labour L001 Unskilled labour ALLOW FOR HOOK BOLTS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 3.02 0.66 3.68 Hour Hour 0.050 0.050 37.50 22.88 1.88 1.14
S010 Straining and refixing of barbed wire on the fence with staples. PER m L002 Skilled labour L001 Unskilled labour Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.040 0.040 37.50 22.88 1.50 0.92 2.42 0.53 2.95
S011 Straining and refixing only the barbed wire on concrete or steel posts with available hook bolts. PER m L002 Skilled labour L001 Unskilled labour Hour Hour SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 0.050 0.050 37.50 22.88 1.88 1.14 3.02 0.66 3.68
MISCELLANEOUS
S012 Construction and fixing of 100mm x 150mm and 1700mm high in 1:1
1/2:3 (20mm) cement concrete intermediate fence posts reinforced with 4 Nos. 6mm dia. MS rods. PER No. M006 M007 M010 M549 M037 L001 L002 Metal 20mm Sand Cement Tor Steel Binding wire Unskilled labour Skilled labour ALLOW FOR MOULDS SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A Cu.m. Cu.m. 50 Kg. Kg. Hour Hour Hour 0.030 0.015 0.255 1.800 0.228 3.000 2.000 1,200.00 390.00 300.00 #N/A #N/A 22.88 37.50 36.00 5.85 76.50 #N/A #N/A 68.64 75.00
S013 Construction and fixing of 100mm x 150mm and 2285mm high in 1:1 1/2:3 (20mm) cement concrete intermediate fence posts reinforced with 4 Nos. 6mm dia. MS rods. PER No. M006 M007 M010 M549 M037 L005 L001 L002 Metal 20mm Sand Cement Tor Steel Binding wire Black Smith Unskilled labour Skilled labour ALLOW FOR MOULDS SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL S MISCELLANEOUS #N/A #N/A #N/A Cu.m. Cu.m. 50 Kg. Kg. Kg. Hour Hour Hour 0.036 0.018 0.350 2.270 0.340 1.000 3.000 1.000 1,200.00 390.00 300.00 #N/A #N/A 37.50 22.88 37.50 43.20 7.02 105.00 #N/A #N/A 37.50 68.64 37.50
Q014 Construction and fixing of end posts and struts as per drawing. Rate to include excavation and base concrete. PER No. M004 Metal 40mm Cu.m. 0.200 898.00 179.60
Metal 20mm Sand Cement Mild Steel Binding wire Black Smith Skilled labour Unskilled labour
Cu.m. Cu.m. 50 Kg. M/ton Kg. Hour Hour day SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL
110.40 66.30 537.00 #N/A #N/A 121.88 206.25 34.32 #N/A #N/A #N/A
S015 Construction of barbed wire fence 5 strands with 4 points at 75mm centre. Including corner posts, struts, intermediate post binding concrete as per drawing. PER m M004 M006 M007 M010 M033 M037 M039 M529 M530 L005 Metal 40mm Metal 20mm Sand Cement Mild Steel Binding wire Barbed wire G.I. Hook bolts Straining bolts 16mm dia. Black Smith ALLOW FOR MOULDS ETC. SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL S MISCELLANEOUS #N/A #N/A #N/A Cu.m. Cu.m. Cu.m. 50 Kg. M/ton Kg. Kg. No. No. Hour 0.009 0.017 0.014 0.175 0.003 0.112 1.400 0.550 0.165 1.100 898.00 1,200.00 390.00 300.00 #N/A #N/A #N/A 4.00 18.00 37.50 8.08 20.40 5.46 52.50 #N/A #N/A #N/A 2.20 2.97 41.25
S016 Supplying and fixing of 12mm dia. 450mm long straining bolts. PER No. M531 1/2" M/S rods L005 Black Smith L001 Unskilled labour ALLOW FOR NUTS, ETC. SUB TOTAL 0.00 Kg. Hour day 0.00 0.00 0.00
0.00 0.00
S017 Cleaning of lavatory or sewage block (without clearing rods). PER P/Block L020 Sanitary Labourer day SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL 1.000 #N/A #N/A #N/A #N/A #N/A
S018 Cleaning of lavatory or sewage block (with contractor and clearing rods). PER P/Block L020 Sanitary Labourer day SUB TOTAL OVER HEAD & PROFITS 22.00% TOTAL #N/A #N/A #N/A #N/A #N/A
MISCELLANEOUS
MISCELLANEOUS
MISCELLANEOUS
MISCELLANEOUS
MISCELLANEOUS
MISCELLANEOUS
MISCELLANEOUS
MISCELLANEOUS
MISCELLANEOUS
A -
DEMOLISHER
A008 Removal of iron asbestos aluminium corrugated sheets from roofs or wall from a single storey building and stacked PER Sq.m. L001 Unskilled labour L 002 Skilled labour ALLOW FOR SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 25.00% TOTAL A009 Removal of corrugated iron asbestos aluminium sheets from roofs or walls of two storeyed buildings and stacked. PER Sq.m. L001 Unskilled labour L002 Skilled labour ALLOW FOR SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 25.00% TOAL A010 Removal of corrugated iron luminium asbestos sheets from roof or walls of 3 storeyed buildings. PER Sq.m. L001 Unskilled labour L002 Skilled labour ALLOW FOR SCAFFOLDING SUB TOTAL OVER HEAD & PROFITS 25.00% TOTAL 0.500 hour 0.200 hour @ @ 0.400 hour 0.350 hour @ @ 0.300 hour 0.300 hour @ @