Sie sind auf Seite 1von 3

Feed Installation Instructions 3 ft Antennas (with E-Mount) DA, UA, SU, SD, DAX UDA, UXA, SUX, SDX

1. Recommendations

NMT 534-00(e)

The feed is a precision component which should be handled with special care during installation. For instance, always carry the feed, supporting casting plate side. Any damage may degrade the antennas performance. Repair of feeds is not possible in the field.

2.

Feed disassembly
- Dismount the front part of the feed system (pre-assembled in factory). Remove the 4 socket screws M4 with SL washers A4 to split the feed system in 2 parts (Front & Rear) Front part of the feed system Depending of frequency, a tuning plate maybe pre-installed, (you do not need to removed it). Rear part of the feed system

3.

Antenna orientation depending of antenna offset


- Hold the antenna in the correct orientation depending of the offset to the Left or Right of the support pipe on the tower.

Antenna orientation for an Offset Left

Antenna orientation for an Offset Right

oa rd

db

ar

Sales department : Radio Frequency Systems GmbH Kabelkamp 20, D-30179 Hannover (Germany) Tel. +49-511 676-25 20 Fax +49-511 676-25 21 Plant: RFS France Trignac Fax +33 02 40 90 41 43

ar

db

oa rd

1/3

4.

Feed orientation for monopolarized feed system Output IEC Flange


Antenna TOP Vertical Polarization Horizontal Polarization Vertical Polarization

Output IEC Flange


+ N Transition Antenna TOP Horizontal Polarization

5.

Feed orientation for dualpolarized feed system


Antenna TOP

6.

Feed system installation


- Install the rear part of the feed system using the 4 socket screws M5 with washers, on the reflector casting ring

Rear part

Reflector casting ring

4 screws M5 4 sl washer A5 4 washers 5.3 15

NMT 534-00e

2/3

Front part of the feed system (if the feed is equipped with a tuning plate, you do not need to remove it)

Take care to not brake the mylar obturation

- Install the front part of the feed on the rear part, with the 4 M4 screws (refer to the previous pages for feeds system polarization)

4 socket screws M4 4 sl washers A4

7.

Feed polarization adjustment (to do after antenna installation on tower pipe)


Monopolarization M5 screws
P ol a P ol a
r.
st. ju Ad

Dual polarization M5 screws


r.
st. ju Ad

dj us t.

.A

r la Po 5

r la Po 5

- Loosen the 4 screws M5 - Adjust polarization 5 - Tighten the 4 M5 screws

8.

Next instructions (refer to main installation instructions)

NMT 534-00e

.A

dj us t.

3/3

Das könnte Ihnen auch gefallen