Sie sind auf Seite 1von 1

Part No.

Section

Quantity

Working Drawing

[mm]

[nos]

(not to scale)

Flat
75/6
l = 90

8
50

240

30

75

300

41.84g

gas cutting
prohibited

700

6 holes 17,

5.23

galvanized
35

IS Round
Bar 75
or 3
l = 110

galvanized

46

17

2.48g

1 hole 46
R=25

30

2.20
8 17

17 8

60
110

8.80g

galvanized

hole 10
min 75

drill hole 311, cut thread M 35 and fit tightly with part no 1d before galvanization
Rod 36
l = 650

Rod 10
l = 60

IS Round
Bar 75
or 3
l =220
Rod 6
l = 130

Plate
350/200/6

thread M36

5.16

85

Flat
100/6
l = 1800

5
6
Produced by

50

galvanized

5.92

2 holes 38
35

35

150

170

175

300

galvanized

min75
to be welded

0.03

to part No. 2a

0.12g

galvanized

5 holes 14

175

11.84g

3.30

13.20u

untreated

25
10 holes 14

1.48

8
25 50 50 50 50 50 50 50 50 50 25
16 holes 18

50

20

20

875

...........*

8.31 ...........u
1530

35 50 50

50 50 35

1800

4.75
20

Nepal

11.84u

50 50

680

680

5050 20

7 holes 14

9.50u

Section

Quantity

[mm]

[nos]

Angle
40/40/5
l=750

Angle
40/40/5
l=685

280

50 50 20 20 20

330

50

395

150

10
11
12
13

Hex Nut
M36

14

Ri-Bar
16
l = 1500
Ri-Bars 20

4.46u

2.03

4.06u

0.049

2.06c

0.096

16.13c

42

0.015

0.63c

168

0.03

5.04c

13

0.37

4.81c

2.37

18.96R

.......

........R

.......

........R

.......

........D

.......

........D

or full threaded

40

thread 25 mm
40

1500

8
12

G=2.47kg/m1

..........

bend stirrup as given in

Stirrup 12

respective construction Drawing

l=..............

.......

open Thimble

.......

for 50x50cm, l=2200mm, G=1.95kg/pc


for 80x80cm, l=3550mm, G=3.15kg/pc

Thimble to ISI 2315-1978 for Cable .........mm


MS forged ISI Standard hot dip galvanized

Bulldog Grip

2.23

50 20 20 20

thread min 30mm

168

17
18

20

20

Hex Bolt
M16x40

16

(not to scale)

42

l=..............

kg / pc total kg

5 holes 14

Hex Nut
M12
Hex Nut
M16

Weight

Working Drawing
5 holes 14

Hex Bolt
M12x40

15

mill

85

* obtain quantity from respective


construction drawing.

Angle
40/40/5
l=1600

No.1c before galvanization

0.32g

down 15

25

Angle
40/40/5
l = 500

0.04

fix and weld to part


60

20.64g

galvanized

20

630

Part No.

20

355

l = 700

0.31

1 hole 14

45 45
325

Flat
100/10

Weight
kg / pc total kg

.......

Bulldog Grip to ISI 2361-1970 for Cable ......mm

A = ................. kg.
Total transportation Weight
B+C+D+R+ 1.69kg.

B = ................. kg.
Total Structural
Steel = (u+g)

g = 86.04 kg.

C = 28.67 kg
Nuts, Bolts, Washers

D =............ kg.
Bulldog Grips & Thimbles

R = ............ kg
Reinforcement Steel

The following steelparts must be


hot dip galvanized acc. to IS
2629 & 2633, min thickness
= 80 m
Part No. 1 & 2
All Nuts & Bolts must conform
to IS 1363 and are galvanized
acc. to IS 1367, Part XIII
Cable
mm

Bulldog grips
for two cables

26
32

10
12

Structural Steel
to be galvanized

HMG / Ministry of Local Development


Transportation
Weights of welded
Parts:
Part No. 1 = 18.78 kg
Part No. 2 = 6.05 kg

Weight. (kg/pc)
Thimble Bulldog
grip
0.75
1.1
1.85
1.3

DoLIDAR / Short SpanTrail Bridge Standard


Bridge Name:
No:

Bank:

Span:

Steelpart List for one Foundation:

Main Cable Anchorage


for Suspension Bridges
2 Main Cables ...... mm (26 or 32mm)
centre to centre distance : 2.50 m
Nos. of Anchorages required : ......
Date : September 30, 2002

Drawing No. 42N

Swiss Association for International Cooperation, in partnership with His Majestys Government of Nepal, funded and supported by the Swiss Government (SDC Nepal).

Das könnte Ihnen auch gefallen