MATERIALS: Bought out PARTS

MEP202 Design, Innovation & Manufacturing


(2012)

v2012

BUY, WHY? - ADVANTAGES


Component manufacture specialized manufacturers Low cost Ready availability (?) Saves on manufacturing by oneself Better quality Large variety Saves time Spares easy to procure

v2012

BUY, WHY? - DISADVANTAGES


Cannot get custom designed components Design needs to be adopted to what is available Needs careful selection wrong model/type problem!

v2012

BUY, and how to use?


Fit into the assembly Modifications generally not done no welding, cutting, etc. Use ONLY as recommended by manufacturer Design mating parts according to the bought part

v2012

What parts & equipment can one BUY?


Bearings anti-friction, bearing housing Sprockets Chains Ropes, cables, cable ties Wheels, tyres, castors Fastners nuts, bolts, screws, washers, rivets, Gear box Pulleys Valves, taps Pumps, vacuum pumps Compressors Engines Brushes Couplings
v2012

Motor, Geared motor, Stepper motor, motor starter MCB, switches, electric cables ICs Breadboards Connectors Wires Pumps, vacuum pumps, compressors, engines Heaters

Buying components & parts


> Manufacturer: for engineered products > For standard parts, e.g. fastners,.. Manufacturer + Standard From the design & BoM, specify: Manufacturer AND their model/part no.; ! there could be more than one manufacturer for that part, specify model/part no. for each. Part details are available in the catalogue MUST READ (and understand every detail), for correct and complete interpretation

v2012

Harmonizing the design


MUST READ - understand every detail, >>> for correct and complete interpretation

Make doubly sure that the other components and parts of the product are compatible with the parts and/or equipment being procured.

v2012

Design evolution - Iterative


Design

Bought out parts

v2012

Components procurement information


From detailed design, specify: Item descriptor (name) Manufacturers Model/part no. from manufacturers catalogue No. of pieces needed Cost Alternate components in case the above are not available Where available shop, dealer, web-based ordering, Mode of payment

v2012

Component procurement - process

Special requirements, hence: Team to buy; process? Take cash advance from facilitator; OR Buy yourself and follow IITD procedures

v2012

10

ADVICE
Browse catalogues of manufacturers: www.element14.com Thomson catalogue Industrial products finder www.asme.org

v2012

11

Concluded.