ABSTRACT: A. Cost of Materials B. Hire charges of Machinery C. Cost of Labour Add for enabling works @ Total cost for
Rs: Rs: Rs: TOTAL Rs: 0.00% Rs: 10.00 Rm Rs: Rate per Rm Rs: Rate approved per Rm Rs: YEAR: 2010-11
11226.52 0.00 1154.11 12380.63 0.00 12380.63 1238.00 1238.00 ITEM No: 45
ITEM: Supplying and fixing flat rubber seals and hot dipped G.I bolts / nuts / washers of approved quality including removing existing worn-out / damaged flat type rubber seals from
gates, cleaning surface, making holes in new seals, fixig seals / bolts tightly in position, cost of all materials, labour, scaffolding etc., complete with all leads and all lifts. DATA: Consider replacing 10 m length of worn-out / damaged seals: Consider spacing of bolt fixing holes at 100 mm. Conside consumption of gas for making holes in seal at 2 minute per hole. Consider consumption of oxygen gas at 1.8 cum and acetylene gas at 0.6 cum / hour. 1. Requirement of materials : Flat type rubber bottom seal conforming to IS: 11855 Hot dipped G I bolts / Nuts / Washers @ 2 kg / metre length of seal Quantity of oxygen gas for 100 holes ( 100 x 2 x 1.8 / 60 ) Quantity of acetylene gas for 100 holes ( 100 x 2 x 0.6 / 60 ) 2. Requirement of machinery : No machinery proposed for the work. 3. Requirement of workforce : Marker / Fabricator / Erector Helper marker / fabricator RATE ANALYSIS A. MATERIALS: Sl No 1 2 3 4 5 Perticulars Unit Rm kg cum cum LS Quantity 10.00 20.00 2.00 6.00 2.00 UNIT :
: : : :
: 2 No. : 4 Nos. 10.00 Rm Rate in Rs. 147.00 95.00 258.00 48.00 30.00 Total Rs: Rs: Rs: Rs: Rs: Rs: Amount in Rs. 1470.00 1900.00 516.00 288.00 60.00 4234.00 42.34 423.40 211.70 84.68 4996.12
Flat type rubber bottom seal Hot dipped G I bolts / Nutd / Washers Acetylene gas Oxygen gas Sundries (cutting torch /wire brush etc ) Add for small Tools and Plants @ Add for Contractor's Profit @ Add for Contractor's Overheads @ Add for scaffolding / ladder etc @
100
B. MACHINERY: Sl No 1
Description NIL
Unit
Add for small Tools and Plants @ 1% Add for Contractor's Profit on DPOL / Energy @ 10% Add for Contractor's Overheads @ 5% Total hire charges of Machinery :
Rate in Rs. 0.00 0.00 Total Rs: Rs: Rs: Rs: Rs:
C. LABOUR: Sl No 1 2
Description
Marker / Fabricator Helper marker / fabricator Add for small Tools and Plants @ Add for Contractor's Profit @ Add for hidden cost on Labour @ Add for Contractor's Overheads @
Rate in Rs. 157.50 141.50 Total Rs: Rs: Rs: Rs: Rs: Rs:
Amount in Rs. 315.00 566.00 881.00 8.81 88.10 132.15 44.05 1154.11
ABSTRACT: A. Cost of Materials B. Hire charges of Machinery C. Cost of Labour Add for enabling works @ Total cost for
Rs: Rs: Rs: TOTAL Rs: 0.00% Rs: 10.00 Rm Rs: Rate per Rm Rs: Rate approved per Rm Rs: YEAR: 2010-11
4996.12 0.00 1154.11 6150.23 0.00 6150.23 615.00 615.00 ITEM No: 46
ITEM: Supplying and fixing Z - type rubber seals and hot dipped G.I bolts / nuts / washers of approved quality including removing existing worn-out / damaged Z - type rubber seals from gates, cleaning surface, making holes in new seals, fixig seals / bolts tightly in position, cost of all materials, labour, scaffolding etc., complete with all leads and all lifts. DATA: Consider replacing 10 m length of worn-out / damaged seals: Consider spacing of bolt fixing holes at 100 mm. Conside consumption of gas for making holes in seal at 3 minute per hole. Consider consumption of oxygen gas at 1.8 cum and acetylene gas at 0.6 cum / hour. 1. Requirement of materials : Z- type rubber side seal conforming to IS: 11855 : 10 m Hot dipped G I bolts / Nuts / Washers @ 2 kg / metre length of seal : 20 kg Quantity of oxygen gas for 100 holes ( 100 x 2 x 1.8 / 60 ) : 6.00 cum
101
Quantity of acetylene gas for 100 holes 2. Requirement of machinery : No machinery proposed for the work. 3. Requirement of workforce : Marker / Fabricator / Erector Helper marker / fabricator RATE ANALYSIS A. MATERIALS: Sl No Perticulars 1 2 Z- type rubber side seal Hot dipped G I bolts / Nutd / Washers
( 100 x 2 x 0.6 / 60 )
: 2.00 cum
: 3 No. : 6 Nos. 10.00 Rm Rate in Rs. 295.00 95.00 contd Amount in Rs. 2950.00 1900.00
Unit
Quantity
3 4 5
Acetylene gas Oxygen gas Sundries (cutting torch /wire brush etc ) Add for small Tools and Plants @ Add for Contractor's Profit @ Add for Contractor's Overheads @ Add for scaffolding / ladder etc @
cum cum LS
Rate in Rs. contd 258.00 48.00 30.00 Total Rs: Rs: Rs: Rs: Rs: Rs:
Amount in Rs. 516.00 288.00 90.00 5744.00 57.44 574.40 287.20 287.20 6950.24
B. MACHINERY: Sl No 1
Description NIL
Unit
Add for small Tools and Plants @ 1% Add for Contractor's Profit on DPOL / Energy @ 10% Add for Contractor's Overheads @ 5% Total hire charges of Machinery : C. LABOUR: Sl No 1 2
Rate in Rs. 0.00 0.00 Total Rs: Rs: Rs: Rs: Rs:
Description
Marker / Fabricator Helper marker / fabricator Add for small Tools and Plants @ Add for Contractor's Profit @ Add for hidden cost on Labour @ Add for Contractor's Overheads @
Rate in Rs. 157.50 141.50 Total Rs: Rs: Rs: Rs: Rs: Rs:
Amount in Rs. 472.50 849.00 1321.50 13.22 132.15 198.23 66.08 1731.17
ABSTRACT:
102
A. Cost of Materials B. Hire charges of Machinery C. Cost of Labour Add for enabling works @ Total cost for
Rs: Rs: Rs: TOTAL Rs: 0.00% Rs: 10.00 Rm Rs: Rate per Rm Rs: Rate approved per Rm Rs: YEAR: 2010-11
6950.24 0.00 1731.17 8681.41 0.00 8681.41 868.00 868.00 ITEM No: 47
ITEM: Providing and fixing 100 x 50 mm 10 gauge non-galvanized weld mess to concrete / masonry
including fixing the same to exposed reinforcement bars or by driving rafter nails, cost of all materials, machinery, labour, scaffolding etc., complete with all leads and lifts. DATA: Consider fixing 100 sqm weld mesh. Consider 5 % extra for over-laps and wastage. 1. Requirement of materials : Weld mess 100 x 50 mm 10 gauge ( non-galvanized ) ( 100 x 1.05 ) Rafter nails for fixing @ 0.1 kg / sqm ( 100 x 0.1 ) 2. Requirement of machinery : No machinery proposed for the work. 3. Requirement of workforce : Mason Class-I Heavy mazdoor RATE ANALYSIS A. MATERIALS: Sl No 1 2 Perticulars Unit sqm kg Quantity 105.00 10.00 UNIT :
: 105 sqm : 10 gk
: 1 No : 2 Nos. 100.00 sqm Rate in Rs. 150.00 55.00 Total Rs: Rs: Rs: Rs: Rs: Rs: Amount in Rs. 15750.00 550.00 16300.00 163.00 1630.00 815.00 163.00 19071.00
Weld mess 100 x 50 mm 10 gauge Rafter nails Add for small Tools and Plants @ Add for Contractor's Profit @ Add for Contractor's Overheads @ Add for scaffolding / ladder etc @
B. MACHINERY: Sl No 1
Description NIL
Unit
Add for small Tools and Plants @ 1% Add for Contractor's Profit on DPOL / Energy @ 10% Add for Contractor's Overheads @ 5% Total hire charges of Machinery :
Rate in Rs. 0.00 0.00 Total Rs: Rs: Rs: Rs: Rs:
103
C. LABOUR: Sl No 1 2
Description
Mason Class-I Heavy mazdoor Add for small Tools and Plants @ Add for Contractor's Profit @ Add for hidden cost on Labour @ Add for Contractor's Overheads @
Rate in Rs. 159.00 132.00 Total Rs: Rs: Rs: Rs: Rs: Rs:
Amount in Rs. 159.00 264.00 423.00 4.23 42.30 63.45 21.15 554.13
ABSTRACT: A. Cost of Materials B. Hire charges of Machinery C. Cost of Labour Add for enabling works @ Total cost for
Rs: Rs: Rs: TOTAL Rs: 0.00% Rs: 100.00 sqm Rs: Rate per sqm Rs: Rate approved per sqm Rs: YEAR: 2010-11
19071.00 0.00 554.13 19625.13 0.00 19625.13 196.00 196.00 ITEM No: 48
ITEM: Removing PCC / Shahbad slabs from the side lining of canal carefully and stacking the same on the road side / canal bed as directed with lead upto 50 m and all lifts. DATA: Consider removing & stacking lining slabs in 100 sqm lining area. 1. Requirement of materials : No materials required. 2. Requirement of machinery : No machinery proposed for the work. 3. Requirement of workforce : Heavy mazdoor @ 10 sqm per day RATE ANALYSIS A. MATERIALS: Sl No 1 Perticulars NIL Unit Quantity 0.00 0.00 1% 10% 5% Total cost of Materials : UNIT :
: 10 Nos. 100.00 sqm Rate in Rs. 0.00 0.00 Total Rs: Rs: Rs: Rs: Rs: Amount in Rs. 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Add for small Tools and Plants @ Add for Contractor's Profit @ Add for Contractor's Overheads @
B. MACHINERY: Sl No
Description
Unit
Quantity
Rate
Amount
104
NIL
0.00 0.00
Add for small Tools and Plants @ 1% Add for Contractor's Profit on DPOL / Energy @ 10% Add for Contractor's Overheads @ 5% Total hire charges of Machinery :
C. LABOUR: Sl No 1
Description
Unit Day
Heavy mazdoor
Add for small Tools and Plants @ Add for Contractor's Profit @ Add for hidden cost on Labour @ Add for Contractor's Overheads @
Rate in Rs. 132.00 0.00 Total Rs: Rs: Rs: Rs: Rs: Rs:
Amount in Rs. 1320.00 0.00 1320.00 13.20 132.00 198.00 66.00 1729.20
ABSTRACT: A. Cost of Materials B. Hire charges of Machinery C. Cost of Labour Add for enabling works @ Total cost for
Rs: Rs: Rs: TOTAL Rs: 0.00% Rs: 100.00 sqm Rs: Rate per sqm Rs: Rate approved per sqm Rs: YEAR: 2010-11
0.00 0.00 1729.20 1729.20 0.00 1729.20 17.00 17.00 ITEM No: 49
ITEM: Providing and filling / replacing gear oil of approved quality upto the required gauge level for Radicon Gear unit of hoists / gantry cranes including cost of all materials, machinery, labour etc., complete., with all leads and all lifts. DATA: Consider filling / replacing of 40 ltrs of gear oil for gear unit of hoist / gantry. 1. Requirement of materials : Gear oil 2. Requirement of machinery : No machinery proposed for the work. 3. Requirement of workforce : Machanic-II Helper fitter RATE ANALYSIS A. MATERIALS: Sl No Perticulars Unit Quantity UNIT :
: 40 ltrs
105
Gear oil
ltr
40.00 0.00
Add for small Tools and Plants @ Add for Contractor's Profit @ Add for Contractor's Overheads @
B. MACHINERY: Sl No 1
Description NIL
Unit
Add for small Tools and Plants @ 1% Add for Contractor's Profit on DPOL / Energy @ 10% Add for Contractor's Overheads @ 5% Total hire charges of Machinery : C. LABOUR: Sl No 1 2
Rate in Rs. 0.00 0.00 Total Rs: Rs: Rs: Rs: Rs:
Description
Mechanic-II Helper fabricator / fitter Add for small Tools and Plants @ Add for Contractor's Profit @ Add for hidden cost on Labour @ Add for Contractor's Overheads @
Rate in Rs. 151.00 141.50 Total Rs: Rs: Rs: Rs: Rs: Rs:
Amount in Rs. 75.50 70.75 146.25 1.46 14.63 21.94 7.31 191.59
ABSTRACT: A. Cost of Materials B. Hire charges of Machinery C. Cost of Labour Add for enabling works @ Total cost for
Rs: Rs: Rs: TOTAL Rs: 0.00% Rs: 40.00 ltr Rs: Rate per ltr Rs: Rate approved per ltr Rs: YEAR: 2010-11
7377.60 0.00 191.59 7569.19 0.00 7569.19 189.00 189.00 ITEM No: 50
ITEM: Providing and applying grease of approved quality to gate and hoist components requiring greasing as part of annual maintenance using grease gun wherever necessary including cost of all materials, machinery, labour, scaffolding etc., complete with all leads and all lifts. DATA: Consider 100 kg grease. 1. Requirement of materials :
106
Grease 2. Requirement of machinery : No machinery proposed for the work. 3. Requirement of workforce : Machanic-II Helper fitter
: 100 kg
: 2 Nos. : 4 Nos.
UNIT :
100.00 kg Rate in Rs. 194.00 0.00 Total Rs: Rs: Rs: Rs: Rs: Rs: Amount in Rs. 19400.00 0.00 19400.00 194.00 1940.00 970.00 194.00 22698.00
100.00 0.00
Add for small Tools and Plants @ Add for Contractor's Profit @ Add for Contractor's Overheads @ Add for scaffolding / ladder etc @
B. MACHINERY: Sl No 1
Description NIL
Unit
Add for small Tools and Plants @ 1% Add for Contractor's Profit on DPOL / Energy @ 10% Add for Contractor's Overheads @ 5% Total hire charges of Machinery : C. LABOUR: Sl No 1 2
Rate in Rs. 0.00 0.00 Total Rs: Rs: Rs: Rs: Rs:
Description
Mechanic-II Helper fabricator / fitter Add for small Tools and Plants @ Add for Contractor's Profit @ Add for hidden cost on Labour @ Add for Contractor's Overheads @
Rate in Rs. 151.00 141.50 Total Rs: Rs: Rs: Rs: Rs: Rs:
Amount in Rs. 302.00 566.00 868.00 8.68 86.80 130.20 43.40 1137.08
ABSTRACT: A. Cost of Materials B. Hire charges of Machinery C. Cost of Labour TOTAL Add for enabling works @ Total cost for 0.00% 100.00 kg
107
Rate per kg Rate approved per kg SECTION:PRELIMINARY & MAINTENANCE WORKS YEAR: 2010-11
Rs: Rs:
ITEM: Providing and applying cardium compound of approved quality to wire ropes of hoists / gantry cranes as part of annual maintenance including cost of all materials, machinery, labour
etc., complete with all leads and all lifts. DATA: Consider 50 kg cardium compound. 1. Requirement of materials : Cardium compound 2. Requirement of machinery : No machinery proposed for the work. 3. Requirement of workforce : Machanic-II Helper fitter RATE ANALYSIS A. MATERIALS: Sl No 1 Perticulars Unit kg Quantity 50.00 0.00 UNIT :
: 50 kg
: 1 No. : 2 Nos. 50.00 kg Rate in Rs. 80.00 0.00 Total Rs: Rs: Rs: Rs: Rs: Rs: Amount in Rs. 4000.00 0.00 4000.00 40.00 400.00 200.00 80.00 4720.00
Cardium compound
Add for small Tools and Plants @ Add for Contractor's Profit @ Add for Contractor's Overheads @ Add for scaffolding / ladder etc @
B. MACHINERY: Sl No 1
Description NIL
Unit
Add for small Tools and Plants @ 1% Add for Contractor's Profit on DPOL / Energy @ 10% Add for Contractor's Overheads @ 5% Total hire charges of Machinery : C. LABOUR: Sl No 1 2
Rate in Rs. 0.00 0.00 Total Rs: Rs: Rs: Rs: Rs:
Description
108
Add for small Tools and Plants @ Add for Contractor's Profit @ Add for hidden cost on Labour @ Add for Contractor's Overheads @
ABSTRACT: A. Cost of Materials B. Hire charges of Machinery C. Cost of Labour Add for enabling works @ Total cost for
Rs: Rs: Rs: TOTAL Rs: 0.00% Rs: 50.00 kg Rs: Rate per kg Rs: Rate approved per kg Rs:
109