Sie sind auf Seite 1von 5

www.inspectionforindustry.

com

InspectionandTestPlanforFanandBlower
ActivityBy No. 1 InspectionandTestPlan PreInspectionMeeting ReferenceDocument Spec. AcceptanceCriteria Spec. BeforeManufacturing 2 3 4 5 6 7 DWG,Design, CalculationDocument WPS&PQR WelderQualification Certificates NDTprocedures NDEPersonnel Certificates PWHTProcedure (ifneeded) Fan/BlowerImpeller DynamicandOverspeed BalanceTestProcedures FanandBlower MechanicalRunningTest Procedure FanandBlower PerformanceTest Procedure PressureTest Procedure API673 ASME ASME ASME ASME API673/ASME API673 ASMEIX ASMEIX ASMEV,VIII,IX ASMEV API673/ASME DWG, Calculationbook WeldingBook Certificates Procedures Certificates Procedure H H H H H H R R R R R R A A A A VerifyingDocument Manuf. MOM H TPI H Client H Remark

API673

API673

Procedure

API673

API673

Procedure

10

AMCAStandard

AMCAStandard

Procedure

11

API673/ASMEVIII

ASMEVIII/API673

Procedure

www.inspectionforindustry.com
12 PaintingProcedure Spec. Spec. Materials 13 14 MaterialCertificates MaterialIdentification Visual,Dimensionand MarkingControl(Fan Housing,Ducting, Gaskets,NutandBolts, Bearings,BearingHouses, Shaft,Wheelsandetc.) ASMEII/ASTM ASMEII/ASTM ASMEII/ASTM ASMEII/ASTM OriginalMaterial Certificates Report H H R W Procedure H R A

15

ASMEII/ASTM

ASMEII/ASTM

Report

DuringFabrication 16 17 ComponentsVisual Inspectionfordamage ComponentsDimensional ChecktoDrawing Requirements VisualExaminationof Weldedparts API673 DWG/API673 API673 DWG/API673 Report Report H H W W

18

ASME/API673

ASME/API673

Report

19

ComponentsConfirmation of SatisfactoryNDE Ductinginspection (Welded,Riveted,Rolled)

ASME/API673

ASME/API673

Report

21

Procedure/API673

Procedure/API673

Report

www.inspectionforindustry.com
22 DuctingPressureTest AuxiliaryEquipment InspectionandTesti.e. Silencer,Piping,Lubeoil Systemandetc. WPS/API673 WPS/API673 Report H W

27

API673

API673

Report

28

Impellervisualand DimensionalInspection

DWG/API673

DWG/API673

Report

30 31 32 35

ImpellerConfirmationof SatisfactoryNDE ImpellerDynamic BalanceTest ImpelleroverspeedTest Fan/Blower MechanicalRunningTest Fan/BlowerPerformance Test

ASME/API673 Procedure/API673 Procedure/API673 Procedure/API673

ASME/API673 Procedure/API673 Procedure/API673 Procedure/API673

Report Report Report Report

H H H H

W H H H

38

Procedure/API673

Procedure/API673 FinalInspection

Report

39 40 41 42

FinalVisual& DimensionalCheck SurfacePreparationand Painting CheckofNamePlate CheckofFinalBook

DWG/Spec. Procedure DWG Spec.

DWG SSSP/Spec. DWG Spec.

Report Report Report DWG/P.O

H H H H

H W H R

Submitted by

www.inspectionforindustry.com
Documentation 43 44 45 InspectionReports NCR ReviewFinalDataReport Spec./DWG Spec./DWG Spec./DWG Spec./DWG Spec./DWG Spec./DWG PreShipmentInspection 46 47 48 49 PreservationandPacking Marking LoadingInspection ShippingDocument Control Spec. Spec. Spec. Procedure Spec. Spec. Spec. Spec. Report Report Report PackingList H H H H H H H H Report Report Report H H H R R R

auxiliaryequipmentsuchaslubeoilsystem,filter,strainer,piping,steelstructureandetc.arenotincludedtothisITP Abbreviations: H:HoldPoint=HoldontheproductiontillTPIInspectorperformsinspectionandsupervisetherequiredtest W:WitnessPoint=ManufactureshallnotifyclientandTPIInspectorbutthereisnoholdontheproduction; ClientcanwaivethisinspectionbasedonhisdiscretionandinformsTPIInspectoraccordingly. R:DocumentReview=ReviewmeansReviewdocument,whichincludesofmaterialtestcertificates,WPS,PQR,NDTProceduresandetc. A:Approval SW:SpotWitness=foritemswithspotwitnessmanufactureshallnotifyTPIinspectorasfulfillingthemonitoring; ForexampleonerandomvisitforwholeUTtestsoroneortwovisitsforwholesurfacepreparationworksforpainting. MOM:MinuteofMeeting P.O:PurchaseOrder

formoreinformationreviewfollowingarticles:
4

www.inspectionforindustry.com
http://www.inspectionforindustry.com/thirdpartyinspectionforfanandblower.html http://www.inspectionforindustry.com/inspectionandtestplanforfanandblower.html

Das könnte Ihnen auch gefallen