IDAHO OIL AND GAS CONSERVATION COMMISSION Application For Permit to Drill, Deepen or Plug Back
APPLICATION TO Drill

~J

Deepen

Plug Back

C
Date 6/23/2010

NAME OF COMPANY OR OPERATOR. Bridge Energy, Inc. Address 1~D Lincoln Street, Suite 1110

City: Denyer_____________________ Stale: QQ__ Zip Code: ~ 3_~_Telephone: 433831.9022 Distance, in miles and direction from nearest town or post office: Approximately 1.2 mile east olNew Plymouth. ID DESCRIPTION OF WELL AND LEASE Name of Lease. Tracy Trust Well Location. Section. 2 Well Number: #3 2 Township:_7J~J_______________ Range: 4W Elevation (ground) 2245.8 (or block and survey) County: ayett feet feet

(give footage from section lines): _2033 FSL 647 FWL (NW h SW Field and Reservoir (if wildcat, so state): Hamilton

/4

Nearest distance from proposed location to property or lease line: 78 Distance from proposed location to nearest drilling, completed or applied for on the same lease N/A Proposed depth: 2.500 ft Approx date work will start: Sugus3t2OlO Rotary or cable tools: Rotary Number of acres in lease. 232 acres

Number of wells on lease, including this well, completed in or drilling to this reservoir:J______________________________ If lease purchased with one or more wells drilled, complete the following information Purchased from (name) N/A Address of above N/A Status of bond N/A_______________________________________________ and expected new producing zone) Survey plats and drilling prognosis are attached.
______________________________

Remarks: (If this is an application to deepen or plug back, briefly describe work to be done, giving present producing zone

~ exceptioniocation.is herebyiequeste&PJease directanyinquideslo.Ryanlvtorgan, P.E. (Centra Consi.ilting. Inc.) at 1-2flR~3&94OO .Eeeisase


~

c-n

uz

ri

CERTIFICATE: I, the undersigned, state that I am the C~n~qjtapt....______________________________________ of Bridge Energy, lnc~_~

(5,

(compar~) a~d that I am

authorized by said company to make this application and that this application was prepared under my su~5~vision and direction and that the facts stated herein are true, correct and complete to the best of my knowledge Date:

if7 f ho

Signature Approval Date:

Permit Number

NOTICE: Before sending in this form be sure that you have

L~Co~~ I 41S- 11075-zoo/~

/OApproved by

aLi~f
JUN
i, IhI

atio~i

quested See instructions on back.


FORM P-i Aulhorzed by Order No. 2 Rev. 08/14/07

2 9 2~~0 UI

SOUTHWESTERN IDAHO AREA DEPARTMENT nr I AMfl~

Lying in a Portion of the Northwest 1/4 of the Southwest 1/4 of Section 2, Township 7 North, Range 4 West of the Boise Meridian, Fayette County, Idaho 2010

TRACY TRUST 32 SITE

EXHIBIT MAP OF

/S~

I..~~

C-

~J

\_~

\
-S
,~

780 _______
~,

4110

~ ~
664

-C

-r~----

-~

a
NO
LV

\~:.
I
~

-;
%

CANAL

lyin

IT
U~

S.) I
.7.

- -

~,

1/

2/

)V~\

~P\ \ ~(~$
t,~2
~ --

1.

5,

I
,~

~-~-

~?

~I~?

,- ~
I

N!

c]L

DATE: June 28, 2010

I,

t;rti,9) (~
FILE: 05340104 ESPINO SITE.dwg

SCALE: 1

ONE MILE

Surveyors

Planners

1103 West Main Street Middleton, Idaho 2085855858

Lying in a Portion of the Northwest of the Southwest 1/4 of Section 2, Township 7 North, Range 4 West of the Boise Meridian, Payette County, Idaho
S89l 205E 5277.44
FOUND 5/8IRON PIN2 NO CAP

TRACY TRUST 32 SITE

EXHIBIT MAP OF

FOUND BC IRON PIPE BENT WREBAR IN CENTER

1r
FOUND ILLEGIBLE ALUMINUM CAP

~.1

SCALE: 1

1000

IDAHO ST.

1318.97
(0
ND

S892733E 2638.30

NEY4SW1A N W~ S
5jff~4 PIN Ummc~

co

1324.40
tO

1313.10
(N CN 0 ND
C.

C LI)

0
CIV)

SE 4 S WA
PIN FOUND

0~~~
U)
FOUND 5/SIRON PIN PEAS 247810

3~~2 ~ 2614.47 1307.23 7/ 13O7.24j N89271 3W


_______________

FOUND 5/SIRON PIN PLS 797

1/ SE Is! AVENUE IDAHO WEST N,4D 83-GRID BEARINGS N435822.720 W1i64719.085 NAVD 88 VERTICAL DATUM EL= 2245.8

DATE: June 28, 2010

FILE: 05340104 ESPINO SEC11ON.dwg

Surveyors
I

Planners

1103 West Main Street Middleton, Idaho 2085855858

Lying in a Portion of the Northwest 1/4 of the Southwest 1/4 of Section 2, Township 7 North, Range 4 West of the Boise Meridian, Payette County, Idaho 2010
iDAhO ST

TRACY TRUST 32 SITE

TOPOGRAPHIC MAP OF

S892733E 1318.97

I
N.

12 CULVERTS
I,

0~

1r
3
[2

/N
SCALE: 1
=

200

IDAHO WEST NAD 83 GRID BEARiNGS N435822.720 WI 164719085 NA ID 88 IER TIC/iL DATUM EL= 2245.8

DATE: June 28, 2010

FILE: 05340104 ESPINO TOPO.dwg

Surveyors

Planners

1103 West Mom Street Middleton, Idaho 2085855858

2enFEErmPRc~osED
1 -

* ~
~

8E0112) WEb (SMIE STATE

*: ~
S~SI%]8

200

SCALE
100

I
I
DRAINAGE DITCH

EXISTING IF CMP CULVERTSt

CLOSE BOUNDARY

(FEET) IINCHZOOFT

200

LEGEND

2241

EDGE OF GRAVEL EDGEOFPAVEMENT 5 CONTOUR 1 CONTOUR

WELL SITE BOUNDARY

4~N
-

Mr

FEET PLVMOUTN WEll S~CT1oN2) (SAWSTA1E I CLOSEST OF NEAREST WA APPROXIMATE L ON L


d 50

1. WAlER WEll LOCATiON IS APPROXIWJED FROM DM0 DEPARTMENT OF WATER RESOURCES WEU. LOG DATA SI-EETS. WElLS ARE O~Y LOCATED TO TT-E NEAREST QUARTER SECTiON. WEll IS APPRO)WMTED BASED ON PROXMTYTORESL3ENT1AJ. STRUCTURE. 2. PROPERTY BOUNDARIES ARE BASED ON PAlETTE COUNTY ASSESSCMSTA3( PAR ..

PROJECT BOUNDARY

STRUCTURE

S ~~~OJECT L&ATION W~ITEWaL 0 VICINITY MA.P

Rig Specification
Return to Drilling Rig Inventories Summary

Page 1 of 3

P,ec,s,on D,iIirn~

Convert to Imperial Rig # Superintendent Category Loads Winter (include boiler) Rated Vertical Depth (m) Region Rated with Drill Pipe (mm) 194 Mike Skuce Mechanical 14 3000 U S North 102 Rig Type Operation Centre Rig Type Code Class Horse Power Range Rig Locator Status Super SingleT Mid Continent SL Super Singles 1000 Completed
C

RIG LAYOUT DRAWING NOTE To open the rig layout attachment, click on the icon below. If you do not have Adobe Acrobat Reader installed to view the PDF file, dick to download a free copy Rig Layout PDF File Attachment Rig 1 94s1 -12 (Rig Layout) Approved pdt
.

DRAWWORKS MIE M Drawworks National D600-PSD Drawworks Capacity (daN) 133500 Drawworks Drive CAT C-18 (1) (Quantity) MAST Mast Type Static Hook Load (daN) Drill Line Size (mm) API SF2 (daN) SUBSTRUCTURE Substructure Type Floor Height (~) Trailer 330-381 Manufacturer Kelly Bushing to Ground
(m)

Auxiliary Brake Rated Power kW (hp) with Number of lines Rating kW (hp) Each
-

Eaton 224 WCB Disc Brake 450 (600) 8 470 (630)

Slant Single 133500 25.4 154900

Manufacturer Mast Clear Height (m) Number of lines API SF3 (daN)

Precision/Quality 22,9 8 103700

Rostel Industries N/A No Limit

Clear Height (in) 2.60-3 10 Rotary Capacity (daN) 133500 This Rig Type is Equipped with a Pipe Arm HOISTING AND ROTATING EQUIPMENT Recision/RosIeI PDCA7

Setback Capacity (daN)

http://rnaiI.preeisiondriIling.com/precision/pdrig.nsf/33c4 I 823beaf9d2b872575c30057d73...

6 14 2010

Rig Specification
Top Drive Model Rotary Table Model Power Wrench Model Top Drive Capacity (daN) Rotary Table Capacity (daN) 111300 Rotary Table Clearance 521 (mm) Maximum Diameter (mm) 298

Page 2 of 3

lipTable Rostel SST9O7O

MUD PUMPS AND MUD SYSTEM Manufacturer & Model BPMMP BSF-1000 (Triplex) Rated Power kW (hp) Stroke (mm) 254 Mud Pump Drive (Quantity) CAT C-32 (1) Rating kW (hp) Each
-

MUD PUMP I

750(1000) 700(950) 750(1000) 700(950)

Manufacturer & Model BPMMP 8SF-bOO (Triplex) Rated Power kW (Lip) Stroke (mm) 254 Mud Pump Drive (Quantity) CAT C-32 (1) Rating kW (hp) Each
-

MUD PUMP 2

Premix Tank Volume (m3) 12 Trip Tank Volume (m3) 31 Centrifugal Pump Quantity:2 Shale Shaker Quantity 1 Atmospheric Degasser Additional Information

(m3)

Mud Tank Total Volume

MUD SYSTEM

50

# of Mud Tanks

Pill Tank Volume (m3) 1 5 TripTank Surface Area (m3) 2 1 Centrifugal Pump Size 5x6 Shale Shaker Brancit King Cobra Linear Motion Single Atmospheric 762mm OD 102mm Inlet 03mm Vent Line
-

WELL CONTROL SYSTEM Annular Shatter Spher a Ram #1 Shatter LWS Double
-

Trim Type Nace Accumulator Manufacturer ECS. PLC Accumulator Volume (I) 318 5 Accumulator Pumps Choke Manifold Style (mm) 51 x 76 x 51 Pressure Rating (kPa) 21000 Well control equipment listed is rigs normal inventory Well control equipment is subject to change; Operator should confrm current configuration and specific requirements with the Precision Drilling Contracts Representative. ELECTRICAL POWER Power Distribution Type Power Generators Quantity 1 ngle AC Diesel Generator with Distribution Panel

Pressure Rating (kPa) Size (mm) Pressure Rating (kPa) Size (mm) BOP Additional Infoniation Remote Panel Type # of Stations:

279 21000 279

POWER GENERATION
Generator Drive -18 Generator Size (kW)

MISCELLANEOUS EQUIPMENT Winterization Fuel Tank Qty Water Tank Qty Boiler w/Stearn Lines Pretabs Boiler Rating kW (Lip) 125 Rig Shelter 1 Total Fuel Tank Capacity (1)14200 1 Total Water Tank Capacity 57000

http: rnaiI.precisiondrilling.com precisionlpdrig.nsf 33c4 1 823beaf9d2b872575c30057d7L.

6 14 2010

Rig Specification

Page 3 of 3
(I) Flare Tank, Hydraulic SOP Handler, Hydraulic Catwalk, Hydraulic Pipe Arm, Hydraulic Pipe Table. Substructure Leveling Jacks, Power Tong, Hydraulic Pull Downs

Special Equipment

NOTES TUBULARS Rig carnes sufficient tubular nventory of drill collars and drillpipe to drill 75% of rated depth Exact quantities and descriptions of tubulars on the rig are available on request, Specific requirements for different types or quantities of BHA components and/or additional drilipipe above that normally carr ed as part of the rig inventory, are to be discussed with the Contracts Representative of Precision Drilling. Previous DocumentL~J ~JNext Document

http: rnai{.precisiondrilling.corn precision pdrig nsf 33c4 I

823hea19d2h872575c30057c173...

6 14 2010

RIG LAYOUT
c
l.4m

RIG 194SL
WELL 6Dr,~

WELL

PIPE MOLE

FLARE PIT 04 IE: 26/03/07 DEC Mo 8~ O4SLW


,PPOOVCD 0? GSCI I

MINIMUM LOCATION SIZE


FROM HOLE CENTER TO To TO TO CROWN END 8*01< or RIG DOG ROUSE SIDE SUMP SIDE 50 50 3D 20

I I oclock 50 in from well center On

Sm

IOn

15m

IPRECIS~

R LU G

CALGARY, ALBERTA, CANADA

BRIDGE RESOURCES
TRACY TRUST 3-2 WELLBORE DATA SHEET
WELL: LOCATION SPUD DATE OBJECTIVE

LEASE:

Bridge Resources Tracey Trust 3-2 Sect 2lTcwnship lNIRange 4W P.yette County Aogust Hamilton Sands

TOTAL DEPTH: SURFACE LOCATION BOTTOM HOLE LOCATION:

ELEVATION:

25000 N43-58-22 720 WI 1631-19 085 N43-58-22 720 WII6-47-t9.085

ELEVATION(KB): HOLE

22460 22639

FORMATION EVALUATION

CASING SIZE

MUD FRACTURE WEIGHT GRADIENT COMMENTS (IN) TVD pp~ rpa) ~

SIZE

16 Une PIpe-WeIded~

82k

No FIT

26

82ft

WBM
84

84

Top of cmt-500ft
12 114 SON 8.6

p waseppft-R111-Jss-s-rc

600.9

FT

600+0

0.4

Mud Logging

Each i0*ilromCOtt

83/4

Halibu non
&lacynuVoniesiwnIy.somc side wee ~es

SBM

DRILLENG PROGNOSES BRIDGE ENERGY, LLC Tracy Trust 3-2 (Hamilton Prospect) NW/4 SW/4 of Section 2-Township 7N-Range 4W Payette County, Idaho July 16, 2010 GENERAL NOTE: Surface Location: Bottomhole Location: Proposed TO/Objective: Elevation: Drilling Rig: MECHANICAL Casing Design: SIZE 16 9-5/8 5-1/2 2-7/8 INTERVAL 0- 60 0 600+ 0 2500 02500 LENGTH 82 600 2,500 2,500 DESCRIPTION Conductor (0.219 WT) 36#, 3-55, STC 17#,J-55,STC 6.5#,J-55,EUE
----

lhis well is to be drilled as a tight hole. Unauthorized personnel arc not to be allowed on the rig floor, and all information is to be kept confidential.

2033 FSL and 647 FWL (NWSW), Section 2 T7N R4W


Same TI) 2500 2,246 OL (ungraded); 2,264 KB (estimated). To be determined.

21.9 2.69 3.16

8.18 1.60 3.05

7.04 1.91 1.45

NOTE: If mud weight exceeds 10.0 ppg at TO, casing design may be altered. Clean and drift all strings of casing prior to running. Remove all thread sealant (Kindex) prior to running. Unload production casing and tubing strings with a forklift. CEMENT CASING/HOLE SIZE 16 -24 9-5/8
-

CEMENT SLURRY Cement to surface with 4 yds Redi-mix. Lead: Premium Light cement +2%CaC12 + 1/4 pps flocele Tail: Class 0 +2%CaCI2 + l/4ppsflocele

PPG

YIELD

12-1/4

100 100

12.0 15.8

2.27 1.15

NOTE: Precede cement with 50 bbl fresh water. Have 100 sx neat cement and one-inch tubing on location for topping-off. Cement volume has been calculated assuming 100% excess.

Drilling Prognosis Hamilton Prospect Tracy Trust 3-2 Page Two CASING/HOLE SIZE 5 1/2 83/4 CEMENT SLURRY Class 0 cement containing fluid loss additive, bonding agent, and retarder as required.

ff~j
300 15.8

YIELD

1.15

NOTE: Prior to cementing, slowly lower mud viscosity to 35-sec funnel viscosity. Circulate hole for I hour at this viscosity prior to cementing. Precede cement with 1000 gal mud flush and 30 bbl fresh water spacer. Cement top contingent upon the presence of potentially productive intervals. Actual cement volume to be determined from caliper log. Run pilot tests on proposed cement with actual make-up water. Cement design may be altered depending on actual bottomhole temperatures and the presence of lost circulation. Do not move the casing (under any circumstances) while setting the casing slips. CEMENTING ACCESSORIES Surface Casing: 1) Guide shoe with insert float located one joint above shoe. 2) Top wiper plug (rubber). 3) Centralizer with stop ring in middle of shoe joint. 4) Centralizers over collars on first three connections, omitting float collar. 5) Use a total of five centralizers. I) 2) 3) 4) 5) 6) 7) WELLHEAD Casing Head: 9-5/8 x 11 x 3,000 psi WP flanged casing head with two-2 LP outlets. Outlets equipped with one-2 3,000 psi WP ball valve, and one-2 x 3,000 psi WP bull plug on the outlets. 11 x 7-1/16 x 3,000 psi WP tubing head with two-2 LP threaded outlets. Outlets to be equipped with 2 x 3,000 psi WP ball valves. To be determined. Differential-fill float collar located one joint above differential-fill float shoe. Top and bottom wiper plug. Centralizer with stop-ring in the middle of shoe joint. Centralize through and 100 on either side of potentially productive intervals. Run at least 12 centralizers. Thread-lock all connections through float collar and use API casing dope on all remaining connections. Stage cementing tool may be run to ensure placement of cement across any productive intervals and fresh water sands. Centralize above and below stage cementing tool (if run).

Production Casing:

Tubing Head: Upper Half:

Drilling Prognosis Hamilton Prospect Tracy Trust 3-2 Page Three MUD PROGRAM INTERVAL WItIGHT (PPG) 8.5-9.0 ppg VISCOSITY (SEQ 30-45 sec WL (CCS)

0 600

NC

Spud well with fresh water viscosified with Pac Regular. Circulate reserve pit to maintain clear water at the pump suction. Addition of lime and/or a selective flocculant may be made at the flowline to promote solids settling in the reserve ph. Keep hole full and drill pipe moving at all times. Sweep hole with Super Sweep to insure the hole is clean prior to running surt~ce casing. INTERVAL 600+ 2500 WEIGHT (PPG) 8.5-9.8 ppg VISCOSITY (SEQ 28-34 sec WL (CCS1 tO ccs or less

After drilling our surface casing shoe, displace to Synthetic Base Mud, SBM. Reference SBM program for specific maintenance, product concentrations, and mud treatment. Keep hole fill at all times. Monitor pit volume constantly as lost circulation and water flows should be expected at all times. Sweep hole as dictated by hole conditions. Deviation tendencies in this area should not be severe; however, prudent drilling practices should be adhered to at all times. Surveys should be run at 500 ft intervals, unless otherwise indicated. WELL CONTROL EOULPMENT INTERVAL 0

EOUIPMENT None II x 3,000 psi WP double-gate HOP with blind and 4-1/2 pipe rams. Rig should be equipped with upper and lower kelly cocks, as well as stabbing valve (have wrench available at all times). BOP equipment will be tested after nipple-up and every 30 days thereafter. (Notil3 Idaho State field representative prior to testing). Close pipe rams daily and blind rams on trips, recording results on tour sheets.

600+

600+ 2500

GEOLOGICAL Geologist/Mud Logger: Geologist and mud logger with hotwire and chromatograph to be on location to from base of surface casing to TO. Noti& prior to spud and after setting surface casing. DIL-SFL-SP and BHC Sonic-GR-CAL to be run in tandem from base of surface casing to TO. LDT-CNL-GR-CAL may be run at the geologists discretion.

Electric Logging:

Drilling Prognosis Hamilton Prospect Tracy Trust 3-2 Page Four GEOLOGICAL (CoNtinued) Formation Tops: Assumes KB elevation of 2,264 ft. FORMATION DRILL DEPTH

SUB SEA 0 40

ands

MISCELLENEOUS I. Pump carbide lag prior to running surface casing and prior to drilling out shoe. Pump efficiencies will be calculated from this information. Run frequent carbide lags while drilling to determine degree of hole washout. Monitor mud hydraulics closely. An in-gauge hole is extremely critical to achieve open-hole packer seats, interpretabJe logs, and a good cement bond. Water will be hauled or pumped from nearby sources. Reserve pit is to be lined with a 12-mi! synthetic liner. It is anticipated that a mud motor and PDC bit will be used from approximately 600 to TV. In general, the above prognosis is presented as a guideline only; and is subject to change as dictated by hole conditions and geological interpretation. OFFICE NUMBER 303-969-9610 303-831-9022 303-831-9022 303-83 1-9022 Prepared by: CELL NUMBER 303-618-1877 303-981-7443 720-641-8737

2. 3. 4. 5. 6.

PERSONNEL Van Hall, Consulting Engineer Jeff Kim, Manager of Operations Ed Davies, President Ron Richards

Ron Richards for Bridge Energy Inc.

/ ;/ / 7

t ~

/
1
-f
I).

Ii),
rs~s Ut

g//

,Iici1)~c~

SI

_________________________________________________ -I-.

n-jo 1VflN:X~l
C> .71) CQ:3P-P17n711 c-p.
SrU.,--p~

4yr,s

1NJA2C;,jw ~*i1~

i,W~~--~

I/It

-,w;

~os~p

rIo:

Janets
_____

___

11./

r-.~

__ -______

-i3~~j -Jr r ~_J~,J*. 0


i

I,

!~~l

(r~ti~ Sn Ut

S02 VOtni /Ji Wi ~li0

cWIWLUJ

it

=)

-=~Ra~2bth

N____
,frn~__

~4

.~L~:w

ZiicLi

4 1116 SM X 2 1116 SM CHOKE MANIFOLD

21?1~ ~MC-,,E%thL.)E

4--Jfli

~~.flV~

t~t

2AVE

1 ~6 5I~ S~CE~ ~PCQ~

.~

~ ej,, sr~i r

VAI yr

r =

/,
-

\j---,

-~~:

_.?

t,~

CHOKE2 :16 GMLXFLAI2J. IC TRIM

(~RC3SS :~c SWAY 41 1~ 5MX ~ i~

5ry

RIG FLOOR

WHS, LLC GOP Schematic Nt) on Surface- Razorback Rig

RIG FLOOR

GROUND LEVEL

TOP O//

//

27 Below CL

I~115~M

I /

FROM GL

to Boftorn of Rotary Beam is

167 114

REQ 7/3012010

C~WA
MEMORANDUM
August 2. 2010 To: Nancy Welbaum, DL

CONSULTING INC.

From: Ryan V. Morgan; P.E., LEED AP Cc: Re: Nancy, Per your request via email last Friday please find attached the additional information regarding distances from the proposed well to the additional features requested Closest Gas Well 2600 (Veatch) Closest Water Well 440 (Residential well located to the east) Closest Structure 400 (residential home located to the east)

Steve West; Jeff Hammel, E.I Additional Information for Tracy Trust Well

Please note that the distance to the production boundary is not supplied as this boundary s yet to be determined Should you have additional questions please at us know

cEN-rRA Consulting, Inc. 413 West Idaho Street, Suite 302, Boise, Idaho Tel: (208) 338-9400

Fax: (208) 338-3844

~ centrainc corn

C~WA
August 5,2010 Nancy Welbaum 8355 W. State Street Boise, ID 83714 Re:

CONSULTING INC.

Tracy Trust Gas Well Spacing Exemption Request

Dear Nancy, Bridge Energy Inc. is proposing the second well in Section 2, Township 7 North, Range 4 West, Payette County, Idaho, and requests a spacing exemption due to the following: 1. The first well drilled in the section, the Espino 1-2 well, was originally drilled to a depth significantly deeper than what has been proposed for the second well. However, the Espino 1-2 well could not be completed at the deeper depth and was subsequently plugged back and completed in a depth similar to the proposed total depth for the Tracy well. Test results indicate that the first well, the Espino 1-2, is not currently capable of commercial production. Additional data is needed, which can only be acquired at this time from a subsequent well in the section, to evaluate and recommend further work on the Espino well. The physical infrastructure necessary to produce any wells in this area does not currently exist, and production from more than one well in the section will not result from successful drilling and completion operations on the Tracy Trust 2-2 well. Furthermore, it is anticipated that Bridge will submit to the State Oil and Gas Conservation Commission a comprehensive petition for revised spacing of a production pool(s), upon evaluation of all test and production data gathered from all drilling and completion operations. This would occur after the additional test data is gathered but prior to establishment of the infrastructure needed to produce gas from its operations. This would also necessitate the implementation of an established process through which the State Oil and Gas Commission would convene to consider such requests. Such process does not appear to be in place at the present time.

2. 3. 4.

5.

Should you have any additional questions, please contact us at 208.338.9400 Sincerely,

tephen E. West President Cc: Bridge Energy Inc 1580 Lincoln St, Suite 1110 Denver, CO 80203