Sie sind auf Seite 1von 8

VEHICLE PARKING YARD AREA

Preliminary Design
Concrete Pavement - (Parking Yard Area)
DASP-JRCP-CALC-SB001

B
A

15-Feb-14
12-Feb-14

Issued for Approval


Issued for Internal Review

PH/SUR

PD/AHS

AHS

Rev

Date

Description

Prepared by

Checked by

Approved by

INFRASTRUCTURE
PARKING YARD AREA

Preliminary Design Concrete Pavement (Parking Yard Area)


Page

REVISION MODIFICATION LOG


REVISION
PAGE

DESCRIPTION
A

1
2
3
4
5
6
7
8
9
10

DASP-JRCP-CALC-SB001
15-Feb-14
Rev. B

INFRASTRUCTURE
PARKING YARD AREA

Preliminary Design Concrete Pavement (Parking Yard Area)


Page

DASP-JRCP-CALC-SB001
15-Feb-14
Rev. B

A. GENERAL
A.1 Scope
This calculation covers the design of Rigid Pavement / Concrete Pavement as a part of infrastructure vehicle parking yard
area of Prasada Pamunah Limbah Industri (WMI).
A.2 Reference Specifications, Codes and Standards
AASHTO 1995
: American Association of State and Transportation Officials
- Design of Pavement Structures
TO.IN-D-0683
: Infrastructure Vehicle Parking Yard Area - Layout Drawing
B. PARAMETER DESIGN
Assumed parimeter data are presented in the following table below;

CBR, above Sub-base, assume

Concrete strength, grade

Concrete flexural tensile strength


Foundation
stabilization
Reinforment grade
wiremesh 6 x 150 x 150, ASTM A185

Daily traffic data, assume ;


Passenger vehicle
Truck 2 axle
Truck 3 axle
Container trailer 40 feet
Truck mounted crane (60 t)
a. Traffic growth factor per year
b. Number of lane
c. initial serviceability index (p0)
d. terminal serviceability index (pt)
e. Directional distributional factor, (DD)
f. lane distribution factor, (DL)

18 =

1+

3.63 x ( L x + L2 x ) 5.20
( D + 1) 8.46 xL2 x

3.53

= 1.03

MR sb=

7500 psi

CBR (min) = 15 %
K = 300
f'c = 25 Mpa
f'cf = 3.75 Mpa
4900
5600

Fy =
Fu =
50
20
20
18
0

kg/cm2
kg/cm2

vhc/day
vhc/day
vhc/day
vhc/day
vhc/day
i=
=
=
=
=
=

Design years
Width of road
Pavement type
Jointed Reinforced Concrete Pavement (JRCP)
Pavement slope
Slab length/segment
Friction koef factor (concrete vs foundation)

B.1 Traffic Analysis


- Equivalent Single Axial Load, (ESAL)
4.62
Wx
L + L2 s
10 G / x
3.28
= 18
x G / 18 x L2 x
W18
10
L x + L2 x

where :
L18 = 18 kips
Lx = axle loads
L2s =
1
(standard axle)
L2x = vehicle's axle
1
for single axle
2
for double axle
3
for triple axle

CBR sb =

0
2
4.5
2
1
0.9

%
lanes

UR = 20 th
= 5 to 7 mtr
=
=
=

2
7
1.2

% max
m
Sirtu
1 ton = 2205 lbs

E=

(W x / W18 )

4.5 - pt
4.5- 1.5
D = assumed slab thickness
= 249 mm
= 9.78 in

G = log

x =

1+

3.63 x( L x + L2 x ) 5.20
( D + 1) 8.46 xL2 x

3.53

-0.079

INFRASTRUCTURE
PARKING YARD AREA

Preliminary Design Concrete Pavement (Parking Yard Area)


Page

Equivalent Axle Load Calculation, AASHTO


Axle Load (max)
No.
Vehicle Type
(kips)

(L18+L2S)4.62
(LX+L2X)4.62

DASP-JRCP-CALC-SB001
15-Feb-14
Rev. B

10G/x

10G/18

Front

Mid

Rear

Front

Mid

Rear

Front

Mid

Rear

Front

Mid

Passenger vehicle

2.20

2.203

3735.9

3735.9

1.00

1.00

0.99

0.99

Truck 2 axle

13.63

26.458

3.345

0.182

1.01

1.20

1.00

1.03

Truck 3 axle

13.77

41.300

3.205

0.022

1.01

1.19

1.00

1.02

Container trailer 40 feet

16.65

25.90

49.956

1.405

0.2

0.010

1.02

1.02

1.48

1.00

1.00

1.06

Truck mounted crane (60 t)

39.96

95.914

1.18

0.029

0.001

2.61

14.05

1.11

Rear

Equivalent Axle Load Calculation, AASHTO, continued,..


Wx
No.

Vehicle Type

Rear

Front

3716.30

3716.30

0.0003

0.0003

Truck 2 axle

3.33

0.19

0.30

Truck 3 axle

3.19

0.22

0.31

Container trailer 40 feet

1.40

0.10

0.71

Truck mounted crane (60 t)

0.03

0.01

62.50

Front
1

Passenger vehicle

2
3

Mid

Daily

Ei

W18

1.64

Mid

Rear

Traffic
v/day

Design Traffic

W18, ESAL

vhc at design year

177

0.001

50

365,000

5.34

5.6

20

146,000

741,579

9.04

9.4

20

146,000

1,228,955

20.35

21.7

18

131,400

2,562,644

681.20

743.7

0.61

TOTAL Equivalent Single Axle Load

4,533,355

C. PAVEMENT THICKNESS
The Assumed D (slab thickness) used for Equivalent Axle Load Calculation shall give the same value with D;
in following formula;

where ;

PSI
log 10

S ' c xCd x( D 0.75 1.132)


4.5 1.5 + (4.22 0.32 xp ) x log [
log 10 (W18 ) = Z R xSo + 7.35 x log 10 ( D + 1) 0.06 +
10
t
7
1.624 x10

18.42
1+
215.63 xJ D 0.75

( D + 1) 8.46
( Ec / k ) 0.25

75
=
%
-0.674
=
= (Overall Stand Dev, 0.35 for rigid, 0.45 for flexible)
0.35
=
p0 - pt
PSI =
2.5
=
S'c = 0 . 75 x fc '
3.75
=
MPa
543.90 psi
=
R
ZR
S0

Cd
J
Ec
MR
k

R%

0.8
=
4.2
=
= 57000 x fc '
3,432,304 psi
=
1500 * CBR
=
22,500
=
psi
MR/19.4
=
1159.79
=
pci

trial error should be perform to full fill required balance 0.001;


6.656
- log10(W18), based on estimate thick
=
log
(W
),
based
on
estimate
traffic
6.656
=
10
18

SN

D. REINFORCEMENT
The required area of reinforcing steel (As);
in jointed reinforced concrete pavements is calculated using the following nomograph :

15

SN
Dev ZR

50

0.000

93

-1.476

60

-0.253

94

-1.555

70

-0.524

95

-1.645

75

-0.674

96

-1.751

80

-0.841

97

-1.881

85

-1.037

98

-2.045

90

-1.282

99

-2.327

91

-1.340

99.9

-3.090

92

-1.405

99.99

-3.750

o.k. !!!

The require thickness of concrete pavement for CBR under concrete pavement:
Concrete thickness, t
=
9.78 in
= 250.0 mm

R%

Dev ZR

%, shall be :

Preliminary Design Concrete Pavement (Parking Yard Area)

INFRASTRUCTURE
PARKING YARD AREA

Page
Parameters for input :
7.0
L =
mtr
22.97
=
ft
1.2
F =
0.6 * fy
fs =
294
=
Mpa
43
=
Ksi

DASP-JRCP-CALC-SB001
15-Feb-14
Rev. B

0.04 %

Fig. D.1 Reinforcement Design Chart for Jointed Concrete Pavement


Result from nomograph (Fig. C.1)
0.04
=
%
Minimum required reinforcement for shrinkage (SNI'91);
min =
0.14 %
0.14
%
Adopted
=
As

=
=

% x h x 1000
350
mm2/m

Use wiremesh

M-6

with spacing

150

Table D.1 Wiremesh area per 1m Width (mm2)


Wire
Wire
Dia.

Area

mm

mm2

150 double reinforcement

Wire Mesh Area (mm2/m) each direction


Spacing (mm) c/c

50

75

100

125 150

175

200

225

250

275

300

325

10

11

12

13

14

15

16

12.6

252

168

126

101

84

72

63

56

50

46

42

39

19.6

392

261

196

157 131

112

98

87

78

71

65

60

28.3

566

377

283

226 189

162

142

126

113

103

94

87

38.5

770

513

385

308 257

220

193

171

154

140

128

118

50.3

1006

671

503

402 335

287

252

224

201

183

168

155

63.6

1272

848

636

509 424

363

318

283

254

231

212

196

10

78.5

1570

1047

785

628 523

449

393

349

314

285

262

242

E. JOINT DESIGN

Fig. E.1 Recommended Dim. of Dowel Bars


Tranverse Expansion Joint; refer to the following resources (Fig. E.1);
- Diameter, D
=
25 mm
- Length, L
=
500 mm
- Spacing, S
=
300 mm

Preliminary Design Concrete Pavement (Parking Yard Area)

INFRASTRUCTURE
PARKING YARD AREA

Page

DASP-JRCP-CALC-SB001
15-Feb-14
Rev. B

Transverse Construction Joint Rebars; refer to the following (Fig. E.2);


16 mm Deformed
- Diameter, D
=
750 mm
- Length, L
=
1,000 mm
- Spacing, S
=

Fig. E.2 Recommended Dim. & spacing of Tie Bars


E.1 Ilustration of Jointed Reinforced
Expansion Joint

Expansion Joint

Contraction Joint
Dowel 25 mm
@ 450 mm every
@30m (max)

Direction Of Travel
5 to 7 m
Construction Joint

Tie bar D16 mm


@ 1000 mm

3.5 m

3.5 m

3.5 m
Double layer reinforcement
M-6 @ 150 x 150 mm

Joint Sealant
(20 x 20 mm)

Joint Filler

PVC Pipe 11/2"


1/2 h
1/2 h

250

Dowel
Smooth bar 25 mm Spacing c/c 300 mm

250
30

Fig. E.3 Transverse Expansion Joint Detail


Joint Sealant
(20 x 40 mm)

Joint Sealant
(20x40 mm)

50
1/2 h
h
1/2 h

375
Fig. E.5 Longitudinal Contraction Joint Detail
(at center of segment width)

375

Tie Bar
Deformed bar 16 mm
Spacing c/c 1000 mm

Fig. E.4 Transverse Construction Joint Detail

INFRASTRUCTURE
PARKING YARD AREA

Preliminary Design Concrete Pavement (Parking Yard Area)


Page

Evaluate of material support


10.00 %
- CBR existing, estimate
=
15,000 psi
- Modulus Resilient subgrade, 1500*CBR =
- Assume material sub base;
= Unbound Granular Material
30000
with =approximate
elastic
psi modulus, E

- Refer to fig.E.5; thickness of sub base


with unbound granular material are;

=
=
=

10.2 in
259.08 mm
260 mm

Fig. E.5 Chart for estimating composite modulus of


subgrade reaction Kcomp, AASHTO, 1993

DASP-JRCP-CALC-SB001
15-Feb-14
Rev. B

INFRASTRUCTURE
PARKING YARD AREA

Preliminary Design Concrete Pavement (Parking Yard Area)


Page

DASP-JRCP-CALC-SB001
15-Feb-14
Rev. B