ProductionPerformanceofOil&NaturalGassectorforthemonthofOctober,2013
I.
A.CRUDEOILPRODUCTIONPERFORMANCE
Month/Period
Planned Target(TMT)
3352.000 22613.000
94.9 97.4
-5.1 -2.6
-0.8 -1.2
B.COMPANY-WISE ACHIEVEMENT Company/State PlannedTarget (TMT) 2045.000 Actual Production (TMT) 1867.000 %ageachievement Surplus(+)Shortfall(-)(%age)
ONGC
91.3
-8.7
Gujarat
424.000
410.000
96.7
AndhraPradesh
22.000
24.000
109.1
TamilNaduAssa
19.000
18.000
94.7
106.000
107.000
100.9
Offshore
1474.000
1308.000
88.7
OIL
328.000
303.953
92.7
-7.3
Assam
327.000
301.716
92.3
ArunachalPradesh
1.000
2.237
223.7
PRIVATE/JVC
979.000
1008.452
103.0
3.0
TOTAL
3352.000
3179.405
94.9
-5.1
Reasonsforshortfall
ClosureofwellstomaintainliftGaspressureduetoenginereplacementandoverhaulingofProcessGas
(Offshore)
Compressor(PGC)atHeera,increasedwatercutinwellB-173A#2YHaffectedproduction.Lessthananticipated
ONGC Nadu)
(Tamil
OIL(Assam) Consequentialeffectofbandhsandblockades. Pvt./JVCs (Arunachal Pradesh) Pvt./JVCs (Gujarat) Productionislessduetounderperformanceofnew developmentofwellsand sand/wateringressissuesinolder wellsetc. Lessoilproductionduetointermittentflow.WellAsjol#7closedduetononrevivalafterwork-overjob.Oilwell haveceasedinBhandut.Underperformanceofproducingwellsin Camby&CB-OS/2.Highwatercutinproducing wellsinCB-ON/7.Naturaldecline.Wateringressissuesinwellbores.
AstatementshowingCrudeOilProductionduringOctober,2013andcumulativelyfortheperiodApril-October,2013vis--vis2012-13 isatAnnexure-I.
II.
October,2013*
22308.807
20787.129
93.2
-6.8
-16.1
24787.663
MCM:MillionCubicMetres.*:Provisional.
%ageachievement
Surplus(+)Shortfall(-)(%age)
99.0
-1.0
Rajasthan
119.550
129.839
108.6
AndhraPradesh
1.270
1.352
106.5
TamilNaduAssa
88.710
94.429
106.4
100.690
115.176
114.4
39.310
38.136
97.0
Tripura
69.960
80.425
115.0
High
1564.070
1503.514
96.1
236.950
225.213
95.0
-5.0
Assam
213.970
206.428
96.5
ArunachalPradesh
1.230
1.671
135.9
Rajasthan PRIVATE/JVC
21.750 1048.994
17.114 772.864
Onshore$
105.522
89.943
85.2
Offshore TOTAL
943.472 3269.504
682.921 2960.948
$:IncludingCoal2012-13isatAnnexure-II.BedMethaneproduction.
Pvt./JVCs(Arunachal Productionislessdue tounderperformanceofnewdevelopmentofwellsandsand/wateringressissuesin Pradesh) olderwellsetc. Pvt./JVCs(Gujarat) Lessoilproductionduetointermittentflow.WellAsjol#7closedduetononrevivalafterwork-overjob.Oil wellhaveceasedinBhandut.UnderperformanceofproducingwellsinCamby&CB-OS/2.High watercutin producingwellsinCB-ON/7.Naturaldecline.Wateringressissuesinwellbores.No gasproductionfromthe field aswellshaveceasedduetowaterloading inBoala.Gasproductionwasceasedw.e.f.10.11.2012as perGOIdirectivespriortofieldabandonmentinCB-ONN-2000/2. Pvt./JVCs Gasproductionislessduetounderperformanceofwells. (Rajasthan) Pvt./JVCs (Jharkhand) IncidentallyproducedCBMisbeingsoldinsmallquantities.
III.A.REFINERYPRODUCTION
(INTERMSOFCRUDETHROUGHPUT)
Month / Period
%ageachievement
Vis--
96.6 100.2
-3.4 0.2
129906.000 130210.014
125565.593
*:Provisional. Note:RIL(SEZ)productionfiguresforAugust 2013arerevisedfrom3187TMT to3207TMT&Sept'2013proratedfiguresrevisedfrom3085TMT to 3089andOctober2013figuresareonproratedbasis. ThecrudethroughputinIOC(Guwahati,Digboi,Barauni&Bongaigaon),BPCL(Mumbai,Kochi),HPCL(Mumbai),NRL(Numaligarh),MRPL (Mangalore),ONGC(Tatipaka),HMEL(Bhatinda),RIL(SEZ)&Essarrefinerieshaveexceededtheirplannedtarget. Thecrudethroughputin IOC(Gujarat,Haldia,Mathura&Panipat),HPCL(Visakh),CPCL(Manali&Narimanam),BORL(Bina),&RIL (Jamnagar)refinerieswaslessthantheirplannedtarget.
Company/State
Reasonsforshortfall
IOCL,Mathura LowcrudethroughputduetodetermentofRef1shutdown(MoUshutdownperiod: 16-Sep'13to15-Oct'13,Actual:27Sep'13to01Non'13).CDUII&CDUIIIthruputwaslowerduetoOHCUshutdown(10d LowcrudethroughputforISD(VGO)management. aysinOct'13)forcatalystscooping. LowthruputduetoLSHSupliftmentproblem. CPCL,CBR BORL,Bina Refineryshutdownwastakenfor12daysforreplacementofreformercatalystin Hydrogenunit.
CPCL,Manali
HPCL,Visakh
Astatementshowingrefinery-wiseproductionduringthemonthofOctober,2013andcumulativelyfortheperiodApril-October,2013 vis--vis201213isatAnnexure-III.
III.REFINERYCAPACITYUTILISATION
Month October,2013*
Utilisation(%) 102.2
Perio d April-October,2013
Utilisation(%) 103.5
October,2012
106.6
April-October,2012
100.5
RCJ
ProductionPerformanceofOil&NaturalGassectorforthemonthofNovember, 2013
I. Month/Period
%age achievement
3323.000 25936.000
94.5 97.0
-5.5 -3.0
1.1 -0.9
ONGC Gujarat AndhraPradesh TamilNaduAssam Offshore OIL Assam ArunachalPradesh PRIVATE/JVC TOTAL C.REASONSFORSHORTFALL Company/State ONGC(Offshore)
2058.000 410.000 21.000 18.000 103.000 1506.000 321.000 320.000 1.000 944.000 3323.000
Actual Production (TMT) 1805.320 399.068 24.043 18.220 102.743 1261.246 295.700 293.600 2.100 1040.407 3141.427
%age achievement 87.7 97.3 114.5 101.2 99.8 83.7 92.1 91.8 210.0 110.2 94.5
-7.9
10.2 -5.5
ONGC(Gujarat)
Reasonsforshortfall ClosureofwellstomaintainliftGaspressureduetoenginereplacementandoverhaulingofProcessGasCompressor (PGC)atHeera,increasedwatercutinwellB-173A#2YH affected production. Lessthananticipated oilgainfrom new developmentwellsofD1field, delayincommissioningofB-193processplatformaffectedproduction.Delay inexecution ofG1developmentproject.Lessthananticipatedoilgainfrommarginalfieldsdevelopmentwells&sidetrackwells. Less than anticipated oil gain from workoverand new developmentwells affected production. Frequent GEBpower shutdown,ageingoffieldsresultingdeclineinreservoirpressure&increasedwatercutaffectedproduction. Consequentialeffectofbandhsandblockades. Production fromKSG#46 ceasedduetosuddenincreaseinwatercut.Furtherproduction from wells KSG#29,34,57, 11,29,58,65and66hasdeclinedduetosandingressandincreaseinwatercut. NoOilproductions asthewellsareceasedinDholasan&Bhandutfield. BreakdownofpumpatONGCunloadngfacility. HighwatercutinproducingwellsinCB-ON/7. Naturaldecline. Wateringressissuesinwellbores.
AstatementshowingCrudeOilProductionduringNovember,2013andcumulativelyfortheperiodApril-November,2013vis--vis2012-13isat Annexure-I.
PlannedTarget(MCM)
3243.060 25551.867
B. COMPANY-WISEACHIEVEMENT Company/State
ActualProduction(MCM)
%ageachievement
ONGC
1916.136
96.3
Gujarat
113.820
126.508
111.1
http://pib.nic.in/newsite/PrintRelease.aspx
1/4
Rajasthan
1.230
1.479
120.2
AndhraPradesh
83.870
96.708
115.3
TamilNaduAssam
97.560
108.617
111.3
Tripura
38.240
37.461
98.0
MumbaiHighOffshore
72.520
61.913
85.4
1582.810
1483.450
93.7
OIL
224.820
226.402
100.7
0.7
Assam
202.580
205.262
101.3
ArunachalPradesh
1.200
1.518
126.5
Rajasthan
21.040
19.622
93.3
PRIVATE/JVC
1028.190
750.744
73.0
-27.0
Onshore$
113.103
102.293
90.4
Offshore
915.087
648.451
70.9
TOTAL
3243.060
2893.282
89.2
-10.8
$:IncludingCoalBedMethaneproduction.
C. REASONSFORSHORTFALL
Company/State
Reasonsforshortfall
ONGC(Offshore)
ONGC(Assam)
ONGC(Tripura)
Lessofftakebyconsumers.
OIL(Rajasthan)
LessthanthecommittedwithdrawalofRajasthanRajyaVidyutUtpadanNigamLimited(RRVUNL).
Pvt./JVCs (WestBengal)
CBMproducedinsamllquantitiesarebeinginternallyusedandflaredasnomarketinnearvicinity. LessoilproductionduetobreakdownofpumpatONGCunloadngfacility. Highwatercutinproducingwellsin CB-ON/7. Naturaldecline. Wateringressissuesinwellbores.Nogasproductionfromthefieldaswellshave ceasedduetowaterloadinginBoala. Gas productionwasceasedw.e.f.10.11.2012 asperGOIdirectives priortofieldabandonmentinCB-ONN-2000/2. IncidentallyproducedCBMisbeingsoldinsmallquantities.
Pvt./JVCs (Gujarat)
Pvt./JVCs (Jharkhand)
Pvt./JVCs (Off-shore)
TaptigasproductionislessthanbudgetduetonondeliveryofexpectedvolumesfrominfillwellsandMTA#3 earlywaterbreakthroughfollowedbyloading.Atotalof9wellsinD1,D3and2wellsinMAhaveceasedtoflow
http://pib.nic.in/newsite/PrintRelease.aspx
2/4
III.A.REFINERYPRODUCTION
(INTERMSOFCRUDETHROUGHPUT)
Month/Period
PlannedTarget(TMT)
ActualProduction (TMT)
%age achievement
November,2013*
17818.000
17802.709
99.9
April-November,2013*
147724.000
147968.305
100.2
0.2
2.5
April-November,2012
144303.636
The crude throughput in IOC (Guwahati, Haldia,Digboi, BarauniPanipat&Bongaigaon), BPCL (Mumbai, Kochi), HPCL (Mumbai), NRL (Numaligarh),ONGC(Tatipaka),BORL(Bina),HMEL(Bhatinda)&RIL(SEZ) refinerieshaveexceededtheirplannedtarget. ThecrudethroughputinIOC(Gujarat&Mathura),HPCL(Visakh),CPCL(Manali&Narimanam), MRPL(Mangalore,) RIL(Jamnagar)&Essarrefinerieswaslessthantheirplannedtarget.
Company/State
Reasonsforshortfall
IOCL,Gujarat IOCL,Mathura
ThroughputislowerbecauseofshiftingofplannedshutdownfromAug-Sep'13toOct-Nov'13.
http://pib.nic.in/newsite/PrintRelease.aspx
3/4
HPCL,Visakh
LowcrudethroughputforISD(VGO)management.
CPCL,Manali
LowcrudethroughputduetoRef-Ishutdownbasedoneconomics.
CPCL,CBR
LowthruputduetomaintainLSHSproductioninlinewithplannedofftakeandcrudemix.
MRPL,Mangalore
UnitswereundershutdownduetoRefineryblackout.
Astatementshowingrefinery-wiseproductionduringthemonthofNovember,2013andcumulativelyfortheperiodApril-November,2013vis-- vis2012-13isatAnnexure-III.
III.REFINERYCAPACITYUTILISATION
Month
Utilisation(%)
Period
Utilisation(% )
November,2013*
100.7
April-November,2013
102.9
November,2012
107.0
April-November,2012
101.3
Therefinery-wisedetailsofthecapacityutilisationduringNovember,2013andcumulativelyfortheperiodApril-November,2013vis-a- vis201213aregiveninAnnexure-IV.
ClickheretoseeAnnexure
RCJ
http://pib.nic.in/newsite/PrintRelease.aspx
4/4
24-January-2014 16:04IST
Production PerformanceofOil&NaturalGassectorforthemonthofDecember,2013
I. Month/Period
Surplus(+)Shortfall()Vis--vistarget (%age)
December,2013*
3435.000
3256.368
94.8
-5.2
1.6
April-December,2013*
29371.000
28411.237
96.7
-3.3
-0.6
April-December,2012
28595.392
ActualProduction(TMT)
Surplus(+)Shortfall(-)(%age)
ONGC
1881.420
-11.5
Gujarat
422.000
411.985
97.6
AndhraPradesh TamilNadu
22.000 19.000
25.112 20.105
114.1 105.8
AssamOffsho
107.000
107.752
100.7
re
1557.000
1316.466
84.6
OIL
335.000
290.860
86.8
-13.2
Assam
334.000
288.816
86.5
http://pib.nic.in/newsite/PrintRelease.aspx
1/5
ArunachalPradesh
1.000
2.044
204.4
PRIVATE/JVC
973.000
1084.088
111.4
11.4
TOTAL
3435.000
3256.368
94.8
-5.2
C.REASONSFORSHORTFALL Company/State
Reasonsforshortfall
ONGC(Offshore)
Closureofwellsforsafetyreasons&maintaininggas liftpressureduringstoppageof ProcessGasCompressor(PGC) formaintenanceatHeera&lessthananticipatedgain from developmentandsidetrackwells ofNeelamfield,increasedwatercutinwellB173A#2YHaffectedproduction.Lessthananticipatedoilgainfromnewdevelopmentwells ofD-1field,delay incommissioningofB-193processplatformaffectedproduction.Delay inexecutionofG1developmentproject. FrequentGEBpowershutdown,ageingoffieldsresultingdeclineinreservoirpressure& increasedwatercutaffectedproduction.
ONGC(Gujarat)
Pvt./JVCs (ArunachalPradesh)
Pvt./JVCs (Gujarat)
AstatementshowingCrudeOilProductionduringDecember,2013andcumulativelyfortheperiodApril-December,2013vis--vis201213isatAnnexure-I.
II.
December,2013*
April-December,2013*
28903.599
26682.087
92.3
-7.7
-15.0
April-December,2012
31379.915
MCM:MillionCubic Metres.*:Provisional.
ActualProduction(MCM)
%ageachievement
Surplus(+)Shortfall(-)(%age)
ONGCGujarat
2068.620
1999.013
96.6
-3.4
Rajasthan
116.330
119.547
102.8
AndhraPradesh
1.270
1.399
110.2
TamilNadu
84.860
98.740
116.4
102.100
116.199
113.8
http://pib.nic.in/newsite/PrintRelease.aspx
2/5
Assam
39.860
38.952
97.7
Tripura
75.060
68.152
90.8
1649.140
1556.024
94.4
227.690
227.897
100.1
0.1
204.700
206.821
101.0
ArunachalPradesh
1.240
1.609
129.8
Rajasthan PRIVATE/JVC
21.750
19.467
89.5
1055.422
774.766
73.4
-26.6
Onshore$
120.665
102.698
85.1
Offshore
934.757
672.068
71.9
TOTAL
3351.732
3001.676
89.6
-10.4
$:IncludingCoalBedMethaneproduction.
C. REASONSFORSHORTFALL Company/State
Reasonsforshortfall
ONGC(Offshore)
ONGC(Assam)
Lackofconsumers.
ONGC(Tripura)
Lessofftakebyconsumers.
OIL(Rajasthan)
Lessthanthecommitted withdrawalofRajasthanRajyaVidyutUtpadanNigamLimited(RRVUNL).
Pvt./JVCs (WestBengal) IncidentallyproducedCBMisbeingsoldinsmallquantitiesasthefield iscurrentlyunderdecvelopment. Onlyonewellisproducingandothertwowellsareceasedduetowaterloading.NaturaldeclineinHazirafield.Nogasproductionfr omthefieldaswellshaveceasedduetowaterloadinginBoala. Gasproduction wasceasedw.e.f.10.11.2012asperGOIdirectivesprior tofieldabandonmentinCB-ONN-2000/2. IncidentallyproducedCBMisbeingsoldinsmallquantities.
Pvt./JVCs (Gujarat)
Pvt./JVCs (Jharkhand)
Pvt./JVCs (Off-shore)
AstatementshowingnaturalgasproductionduringDecember,2013andcumulativelyfortheperiodApril-December,2013vis--vis 2012-13isatAnnexure-II.
http://pib.nic.in/newsite/PrintRelease.aspx
3/5
2/26/2014
PrintRelease
III.A.REFINERYPRODUCTION
ActualProduction(TMT)
% ageachievement
December,2013*
18232.000
18631.188
102.2
-1.7
April2013*
December,
165956.000
166616.968
100.4
0.4
2.1
April-December,2012
163256.153
Note:RIL(SEZ)productionfiguresforOct132013arerevisedfrom3191.582TMTto 3206TMT&Nov'2013proratedfiguresrevisedfrom 3081.476TMTto3084.533andDec'2013figuresareonproratedbasis. ThecrudethroughputinIOC(Haldia,BarauniPanipat&Bongaigaon),BPCL(Mumbai),HPCL(Mumbai&Visakh),NRL(Numaligarh), MRPL(Mangalore),ONGC(Tatipaka),BORL(Bina),HMEL(Bhatinda), Essar(Vadinar)&RIL(SEZ) refineries haveexceededtheir plannedtarget. Thecrudethroughputin IOC(Guwahati,Gujarat,Digboi&Mathura),BPCL(Kochi),CPCL(Manali&Narimanam)&RIL(Jamnagar) refinerieswaslessthantheir plannedtarget. Company/State Reasonsforshortfall
BPCLKochi
CPCL,Manali
LowcrudethroughputduetoRef-Ishutdownbasedoneconomics.
CPCL,CBR
LowthruputduetoreducedCrudeavailability.
III.REFINERYCAPACITYUTILISATION Month
Utilisation(%)
Period
Utilisation(%)
December,2013*
102.0
April-December,2013
102.8
December,2012
104.7
April-December,2012
101.7
2/26/2014
PrintRelease
http://pib.nic.in/newsite/PrintRelease.aspx
5/5