Beruflich Dokumente
Kultur Dokumente
b=
l1 =
1.00 m
l2 =
2.80 m
d=
0.40 m
B=
4.20 m
2.20 m
0.00 m
h3 (bottom height) =
0.80 m
H=
3.00 m
lc extension d =
0.10 m
0.10 m
fcd
C25/30
= 1 * 1,8 / 1,5 =
rc volume =
rc weigth =
lc volume =
lc weigth =
soil volume =
soil weight =
16.67 N/mm2
4.24 m3
10.18 t
101.8
0.44 m3
0.88 t
8.80
6.16 m3
11.09 t
110.88
Reinforcing
PC52
fyd
300.00 N/mm2
5.00 cm
50
f=
25.00
gsoil =
1.80 t/m
0.44
3
radians
18.00
7.00
1.40 daN/cm2
0.15 MPa
0.14
Qmax / m =
0.00 t/m2
0.00
0.41
pa = ka * h1 * (g * h / 2 +q) =
2.41 t
Meff = pa * h1 / 2 =
3.62 tm
36161993.88
35.00 cm
350
1.00 m
1000
M=
ks - bed coefficient
ks = 2 * M / l =
pconv =
h0 = wall thickness - 50 mm =
considered width of wall b1 =
24.11
6.26
12
565.5
mm
Area
units
8=
50.3
mm
10=
78.5
mm
12=
113.1
mm
14=
153.9
mm
16=
201.1
mm
18=
254.5
mm
20=
314.1
mm
22=
380.1
mm
25=
490.9
mm
p%min =
0.15
peff% =
0.16
5
Aeff =
2
2
2
2
2
2
2
2
2
>
10.18 t
13.74
137.38
0.88 t
1.19
11.88
0.00 t
0.00
0.00
14.93 t
14.93
149.26
Wt = Wconcrete + Wsoil + WQ =
N=
0.00
M=
7.32
tm
Shear = 1,35 * pa =
4.88
Ntotal = N + Wt =
14.93
p1 =
p1
p2 =
p2
<
0.60 kg/cm2
1,2 *pconv
0.06
0.18
<
0.11 kg/cm
1,2 * pconv
0.01
0.18
Check overturning
RM =Ntotal * l/2 =
OVM = M + Shear * H =
22.4
tm
14.65
tm
146.46
>
1.53
Fs = RM / OVM =
kNm
Check sliding
S Fvertical = N + Wt =
14.9 t
149.3
S Fhorizontal =
2.41 t
24.1
m=
FS = m * S FV / SFH =
2.48
>
Settlement check
deff = effective settlement
Constructions in wich structure do not appear suplimentary efforts due to uneven settlements
da = allowable settlement
deff(1) = peff(1) / ks =
15 cm
150
0.43 cm
4.32
deff(2) = peff(2) / ks =
0.08 cm
0.76
<
<
deff(1)
deff(2)
Meff =
h0 = slab thickness - 50 mm =
da
da
0.26 tm
2567000
75.00 cm
750
1.00 m
1000
0.21
7
Aeff =
16
1407.7
mm
p%min =
0.15
peff% =
0.19
>
kN
kN
kN
mm
kN/m
MPa
MPa
kN/m
kN
Nmm
mm
mm
mm
Anec
>
348
0.15
kN
kN
kN
kN
0.00 kN
73.23 kNm
48.82 kN
149.26 kN
MPa
MPa
MPa
MPa
223.9 kN
146.5 kN
1.5
kN
kN
1.5
ven settlements
mm
mm
mm
Nmm
mm
mm
mm
Anec
>
11
0.15
0.00 m
h3 (bottom height) =
0.40
2.60
0.10
0.10
H=
lc extension d =
lean concrete thk. (lc) c =
fcd
C25/30
= 1 * 1,8 / 1,5 =
m
m
m
m
16.67 N/mm2
rc volume =
rc weigth =
2.24 m3
5.38 t
lc volume =
lc weigth =
0.36 m3
0.72 t
soil volume =
soil weight =
4.40 m3
8.80 t
Reinforcing
PC52
fyd
=
concrete rebar cover =
f=
gsoil =
M - modulus of edometric deformation
M=
ks - bed coefficient
ks = 2 * M / l =
300.00 N/mm2
5.00 cm
40.00
2.00 t/m
0.70
3
70.00 daN/cm2
1.40 daN/cm2
pconv =
0.15 Mpa
0.00 t/m2
0.22
pa = ka * h1 * (g * h / 2 +q) =
1.24 t
Meff = pa * h1 / 2 =
1.62 tm
h0 = wall thickness - 50 mm =
35.00 cm
1.00 m
2
5
Aeff =
p%min =
peff% =
565.5
Area
8=
50.3
10=
78.5
12=
113.1
14=
153.9
16=
201.1
18=
254.5
20=
314.1
22=
380.1
25=
490.9
0.15
0.16
5.38 t
7.26
0.72 t
0.97
0.00 t
0.00
Wt = Wconcrete + Wsoil + WQ =
8.23 t
8.23
N=
0.00
M=
2.84
Shear = 1,35 * pa =
2.18
Ntotal = N + Wt =
8.23
p1 =
p1
p2 =
p2
<
0.39 kg/cm2
1,2 *pconv
<
0.09 kg/cm2
1,2 * pconv
Check overturning
RM =Ntotal * l/2 =
10.7
OVM = M + Shear * H =
5.68
56.75
1.89
Fs = RM / OVM =
Check sliding
S Fvertical = N + Wt =
8.2 t
S Fhorizontal =
1.24 t
m=
FS = m * S FV / SFH =
0.28 cm
deff(2) = peff(2) / ks =
0.07 cm
deff(1)
deff(2)
<
<
da
da
Meff =
0.26 tm
h0 = slab thickness - 50 mm =
35.00 cm
1.00 m
2
5
Aeff =
565.5
p%min =
0.15
peff% =
0.16
rials data
0 KN/m
53.8 kN
7.20 kN
88 kN
50 mm
radians
20.00 kN/m3
7.00 Mpa
0.14 Mpa
0.00 kN/m2
12.44 kN
16169048.99
Nmm
350 mm
1000 mm
2.78 mm
Anec
12
mm
>
155
0.15
units
2
mm
mm
mm
mm
mm
mm
mm
mm
mm
>
n soil
72.58 kN
9.72 kN
0.00 kN
82.30 kN
0.00 kN
tm
28.38 kNm
21.83 kN
82.30 kN
0.04 Mpa
0.18 Mpa
0.01 Mpa
0.18 Mpa
ng
tm
107.0 kN
tm
56.8 kN
kNm
>
1.5
82.3 kN
12.4 kN
>
1.5
ck
2567000
Nmm
350 mm
1000 mm
0.44 mm
Anec
12
mm
>
>
24
0.15