DESCRIPTION
MF 1 Concrete
MF 1 Rebar
MF 1 Formworks
MF 1 Soil Poison
MF 1 Lean Concrete
MF 2 Concrete
MF 2 Rebar
MF 2 Formworks
MF 21 Soil Poison
MF 2 Lean Concrete
MF 3 Concrete
MF 3 Rebar
MF 3 Formworks
MF 3 Soil Poison
MF 3 Lean Concrete
MF 4 Concrete
MF 4 Rebar
MF 4 Formworks
MF 4 Soil Poison
MF 4 Lean Concrete
MF 5 Concrete
MF 5 Rebar
MF 5 Formworks
MF 5 Soil Poison
MF 5 Lean Concrete
MF 6 Concrete
MF 6 Rebar
MF 6 Formworks
MF 6 Soil Poison
MF 6 Lean Concrete
REASON
DRAWING/S.I. /C.B.
REFERENCE
CB No. ST-002
Unit
m3
kg
m2
m2
m3
m3
kg
m2
m2
m3
m3
kg
m2
m2
m3
m3
kg
m2
m2
m3
m3
kg
m2
m2
m3
m3
kg
m2
m2
m3
Original Contract
Unit Price
1,000.00
6.43
350.00
170.00
1,000.00
1,000.00
6.43
350.00
170.00
1,000.00
1,000.00
6.43
350.00
170.00
1,000.00
1,000.00
6.43
350.00
170.00
1,000.00
1,000.00
6.43
350.00
170.00
1,000.00
1,000.00
6.43
350.00
170.00
1,000.00
Amount
12,480.00
4,696.30
5,488.00
5,317.60
780.00
36,360.00
26,830.20
8,176.00
11,697.70
2,272.50
125,650.00
119,637.54
15,112.74
34,041.10
7,853.13
18,576.00
8,691.00
6,790.00
7,245.40
1,161.00
43,504.00
19,365.43
9,166.74
13,697.02
2,719.00
9,920.00
5,234.34
5,740.00
4,896.00
620.00
907.86 m3
455.04
413,112.61
Quantity
12.48
730.37
15.68
31.28
0.78
36.36
4172.66
23.36
68.81
2.27
125.65
18606.15
43.18
200.24
7.85
18.58
1351.63
19.40
42.62
1.16
43.50
3011.73
26.19
80.57
2.72
9.92
814.05
16.40
28.80
0.62
Unit
m3
kg
m2
m2
m3
m3
kg
m2
m2
m3
m3
kg
m2
m2
m3
m3
kg
m2
m2
m3
m3
kg
m2
m2
m3
m3
kg
m2
m2
m3
Change Order
Unit Price
1,000.00
6.43
350.00
170.00
1,000.00
1,000.00
6.43
350.00
170.00
1,000.00
1,000.00
6.43
350.00
170.00
1,000.00
1,000.00
6.43
350.00
170.00
1,000.00
1,000.00
6.43
350.00
170.00
1,000.00
1,000.00
6.43
350.00
170.00
1,000.00
Amount
17,000.00
8,470.21
5,992.00
6,522.90
1,500.00
51,000.00
46,952.32
9,156.00
15,284.70
3,500.00
138,000.00
171,043.59
15,463.30
36,835.75
9,000.00
21,000.00
9,700.07
6,965.00
7,845.50
1,500.00
50,000.00
34,914.29
10,763.87
15,853.16
3,500.00
15,000.00
7,163.47
7,350.00
6,757.50
1,000.00
Total Amount
Variance
4,520.00
3,773.90
504.00
1,205.30
720.00
14,640.00
20,122.12
980.00
3,587.00
1,227.50
12,350.00
51,406.04
350.56
2,794.65
1,146.88
2,424.00
1,009.08
175.00
600.10
339.00
6,496.00
15,548.86
1,597.13
2,156.15
781.00
5,080.00
1,929.13
1,610.00
1,861.50
380.00
1513.45 m3
455.04
688,680.29
275,567.67
11.5 m3
5281.14 kg
96.84 m2
1,000.00
6.43
350.00
11,500.00
33,957.73
33,894.00
11,500.00
33,957.73
33,894.00
Quantity
17.00
1317.30
17.12
38.37
1.50
51.00
7302.07
26.16
89.91
3.50
138.00
26600.87
44.18
216.68
9.00
21.00
1508.57
19.90
46.15
1.50
50.00
5429.91
30.75
93.25
3.50
15.00
1114.07
21.00
39.75
1.00
33 Additional 2pcs C8
-Concrete
-Rebar
-Formworks
Shearwall 3 (Sumpit/Retaining
34 Wall)
-Concrete
-Rebar
-Formworks
-Cutting of Existing Rebars
-Structural Epoxy
-Concrete Epoxy
35 Shearwall 3
-Concrete
-Formworks
10 m3
3826.52 kg
88.8 m2
1,000.00
6.43
350.00
10,000.00
24,604.52
31,080.00
10,000.00
24,604.52
31,080.00
1.02 m3
90 kg
14.26 m2
1,000.00
6.43
350.00
1,017.75
578.70
4,991.00
4,000.00
5,000.00
5,000.00
1,017.75
578.70
4,991.00
4,000.00
5,000.00
5,000.00
135.00 m3
869.96 m2
1,000.00
350.00
135,000.00
304,486.88
9,000.00
5,415.38
1,411,902.85
169,428.34
2,028,824.50
243,458.94
616,921.65
74,030.60
1,581,331.20
2,272,283.44
690,952.25
CB No. ST-003
MDCBP-ASBIC-ARIA-SI-14-021
Dimension governed is in
Architectural
TOTAL
Vat 12%
GRAND TOTAL
126 m3
854.49 m2
1,000.00
350.00
126,000.00
299,071.50
Excavation Obstruction
Item
Breaking of Slab
Demolition of Columns/Footings/Tie Beams/
Shearwall
Demolition of Concrete Septic Tank
Demolition of RC Pipe Culvert
Demolition of CHB Wall
Area (m2)
Thickness/height (m)
Volume (m3)
376.01
0.3
112.80
56
8
4
4.96
2.5
2.5
2.5
2.5
140
20
10
12.4
AMOUNT