Earth work excavation other than pipe laying works and wells Schedule Item No.

Earthwork excavating and depositing on bank with an initial lead of 10 meters and initial lift of 2 metres in 1. Sand, silt other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth SS 20 Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth SS 20 # Slush and silt under water upto 0.$% metre depth re&uiring the aid of baskets and vessels SS 20 # )rimming the bed and side slopes of the bank in all soils except hard rock upto a thickness of $.% cm and making it ready to receive the concrete. $.%0 cm to 1%cm thick Sectioning during forming bunds when earth moving machineries, lorries and rollers are used for consolidation. *ard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small si+e boulders SS 20 *ard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small si+e boulders SS 20# Soft disintegrated rock, laterite, soft rock or kankar, not re&uiring blasting .n loose boulders in excavation of various si+es 1%0mm to '2%mm /edium rock and dense medium rock not re&uiring blasting Extra for every additional 10 meters lead or part thereof over the initial lead Extra for every additional 1 meters lift or part thereof over the initial lift #reaking clods, consolidating and sectioning #reaking clods, consolidating and sectioning the earth scooped by bull do+ers dd relevant )01SS 0o.20 , rates for new tank bunds and closing breaches for extra watering and consolidation. !u.m 2".20 Description Unit Rate in Rupees

2.

!u.m

21.10

". (.

!u.m !u.m

2'.(0 %.(%

(. a. %.

!u.m !u.m

'.'% (.10

'.

!u.m

"".'%

$.

!u.m

"1.'0

,. -. 10. 11. 12. 1". 1(. 1%.

!u.m !u.m !u.m !u.m !u.m !u.m !u.m

($.00 $(.(0 ,2.,0 (.00 ".2% 2.00 '.0%

Schedule Item No. a2 b2 1'. 1$. 1,. 1-a #y hand roller

Description

Unit !u.m !u.m !u.m !u.m !u.m !u.m

Rate in Rupees '.'% 11.10 1.(0 %2.'0 11.10 -.-0

#y power roller including hire charges #enching old embankment slopes (%cm x (%cm 3uddle wall work )urfing in slopes including watering and fixing with initial lead upto %0m. 4efilling with excavated sand complying with standard specification for filing in foundation and basement 4efilling with excavated soil 5other than sand2 complying with the standard specification for filing in foundation and basement

!u.m

11.10

)he following foot note is applicable for the classifications of soils come under 6 7uarrying and blasting6 and 6Earth 8ork6 0ote9 a2 b2

Standard specification 0o.20: re&uires breaking clods, ramming and sectioning of spoil bank for which separate rate will not be paid. Standard specification 0o.20;# does not re&uire breaking clods, ramming and sectioning but re&uires neat banking in accordance with the standard specifications. 1ouble the relevant rate for standard specification 0o.20:# will apply to excavation in all the soils and rock classification given above for foundation of buildings, piers, wings and returns of bridges, culverts, sluices, regulators and cross masonry works, retaining walls, toe walls, cut:off walls and body walls of anicuts weirs, retaining walls of cause ways, road dam, pits for avenue trees, and pits for poles and towards and catch water pits and pipe laying works trenches for water supply and sewerage works.

c2

d2

n extra %0 percent over the rates for ordinary excavation in all the soils and rock classification given above shall be allowed for drains, channels, contour trenches and canals having bed width 1.2% m and below. )he extra percentage is applicable any for depth up to 2.00m the depth being measured from the bottom of excavation. n extra 2% percent over the rates for ordinary excavation in all the soils and rock classification given shall be allowed for drains, channels and canals having bed width 1.2%m to 2.00m. )he extra percentage is applicable only for depth up to 2.0m the depth being measured from the bottom of excavation. )hese rates for earth work do not include baling charge. )he baling charges are to be paid as per actual in case baling is done departmentally or at actual plus 10 percent extra in case baling is done by other agencies. *owever for estimate purpose baling charges are to be provided at 10 percent of the rates of respective items of excavation in all soils including medium rock and dense medium rock and at % percent of the rates for excavation in hard rock. 1ouble the relevant rate for standard specification 0o.20# for excavation in all soils and rock classification given above shall be allowed for circular trenches for soil and moisture conservation having bed width of 0.2%m and below with side slope of 1;291 and not less than 0.$% m in depth.

e2

f2

g2

O EN !E"" E#$%&%'ION Schedul e Item No. 1. Description Unit Rate in Rupees 21.10

Earth work open well excavation, complying with relevant clauses of ).0.1.S.S. well sinking and with lead up to 10 metres in sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil. <irst depth of 2 metres. Earth work open well excavation, complying with relevant clauses of ).0.1.S.S. well sinking and with lead upto 10 metres in hard stiff clay, stiff black cotton soil, hard red earth, shales murrams gravel, stony earth and earth mixed with small si+e boulders and gravelly soil <irst depth of 2 metres Earth work open well excavation, complying with relevant clauses of ).0.1.S.S. well sinking and with lead up to 10 metres in soft disintegrated rock, laterite, soft rock or kankar, not re&uiring blasting, <irst depth of 2 metres =pen well excavation, complying with relevant clauses of ).0.1.S.S. well sinking and with lead up to 10m in medium rock and dense medium rock not re&uiring blasting. <irst depth of 2 metres =pen well excavation complying with relevant clauses of ).0.1.S.S. well sinking and with lead up to 10m in medium rock and dense medium rock re&uiring blasting. <irst depth of 2 metres =pen well excavation complying with relevant clauses of ).0.1.S.S. well sinking and with lead up to 10m in hard granite measured in solid including blasting and stacking. <irst depth of 2 metres Sinking well in loose soils, light black cotton soil, sandy loam and ordinary soil under water including bailing or pumping charges if necessary etc., complete first depth of 2 metres Sinking well in sand, including bailing or pumping charges if necessary etc. complete <irst depth of 2 metres

!u.m

2.

!u.m

"1.(%

".

!u.m

(,.(0

(.

!u.m

$,.'%

%.

!u.m

11,.%0

'.

!u.m

22-.-0

$.

!u.m

"2.'%

,.

!u.m

(%.,0

-.

Sinking well in hard stiff clay, light black cotton soil, hard red earth, shales, murram, gravel, stoney earth, and earth mixed with small si+e boulders and hard gravelly soil including bailing or pumping charges if necessary etc., complete ><irst depth of 2 metres

!u.m

(%.,0

0ote 9 =pen well Excavation a2 b2 ?p to 2m diameter of wells 10 percent excess will be allowed over the basic rates for open well excavation. )he rates do not include baling charges. .f the dewatering is to be done departmentally, 10 percent of cost of excavation shall be allowed for dewatering for estimate purposes. ctual or 10 percent whichever is less to be allowed for dewatering charges. <or any expenditure above this percentage prior approval of the competent authority should be obtained. Stage depth rates for well excavation6 )he stage depth for adopting the rates from the schedule of rates should be reckoned from ground level only irrespective of the fact, whether there is parapet wall or not. <or open well excavation for rates up to 12m depth the progression would be x, 2x, "x, (x, %x, and 'x and rate beyond 12 metre depth the progression should be ,x, 10x, 12x, 1(x and 1'x and so on.

c2

d2

R%'E (OR E%R') !OR* +, DE "O,IN- .%$)INERIES

Schedule Item No.

Description

Unit

Rate in Rupees

1.

Earth work in all soils except hard rock re&uiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete. Earth work in all soils except hard rock re&uiring blasting and conveying for formation of bund with an extra lead of every 100 metre or part thereof deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete. Earth work deploying earth moving machineries for desilting channel and forming bund on either side and depositing the earth on banks including @ungle clearance etc., complete. *aving width up to " m *aving width up to " m > 10 m Earth work excavation deploying earth moving machineries for desilting channel having a width of more than 10 m and forming bund on either side and depositing the earth on banks including @ungle clearance etc., complete. vi. "i/t charges 0 concrete 0 1rick or stone masonry a1ove or 1elow ground level Note2 )he rate for lime concrete, cement concrete, reinforced cement concrete, brick work and stone masonry worked out as per Standard 1ata will apply to basement and foundation up to a depth of 1.%0 m below ground level only 5basic rate2

!u.m

"(.1%

1.a.

!u.m

2.,0

2.

!u.m

a. b. "

!u.m !u.m !u.m

20.02 2(.'0 2,.$%

a2 1.

Statement I $oncrete a1ove ground level dd to the basic rate for works up to (.%0m height in ground floor 5height to be reckoned from floor level i.e. plinth level in ground level2

!u.m

"".'%

2.

dd for works in every upper floor over the rate of preceding floor +rick or stone masonry a1ove ground level dd to the above basic rate for works up to (.%0m height in ground floor 5height to be reckoned from floor level i.e. plinth level in ground level2 dd for works in every upper floor over the rate of preceding floor

!u.m

'$.1%

". i.

!u.m

22."0

ii.

!u.m

((.$%

Note2 i3

<or the works above (.%m height in individual floor the rate of next floor may be taken. )he extra rates allowed for building works are applicable to irrigation works and road works also. )he extra rates may be allowed for the structures beyond 1.00m above ground level.

ii2 )he extra rates may be allowed considering the ground level as datum in respect of service reservoirs 5where there is no plinth level2 a3 1. 2. ". Statement ii $oncrete 1elow ground level dd the basic rate for works above 1.%m depth and up to (.%m depth below ground level dd the basic rate for works above (.%m depth and up to -.0 m depth below ground level dd extra over the above item 2 for every additional (.%m depth beyond -m depth below ground level +rick or stone masonry 1elow ground level 1. 2. ". dd the basic rates for works above 1.%m depth and up to (.%m depth below ground level dd the basic rates for works between (.%m depth and up to -.0m depth below ground level dd extra over the above item 2 for every additional (.%m depth beyond -m depth below ground level !u.m !u.m !u.m 22."0 ((.$% ((.$% !u.m "".2%

!u.m !u.m

''.%% ''.%%

Note 2 43 1. 2. ".

)he above extra rates are applicable for buildings, irrigations, and road works. <irst Arade stone includes hard granite, trap, etc. second Arade stone includes gneiss, lime stone etc. )he class of materials to be used should always be defined in the items, description in tender schedules, contract schedules etc. <or reinforced cement concrete work, only the hardest locally available stone will be used, if it has good bonding surface and is otherwise suitable proportions for concrete are defined in the relevant standard specification. 0ote under Sl.0o.1$- to 1,$ in the standard data book applies to arches over doors and windows. <or large arches in bridges and irrigation works, addition to this rate extra cost of centering is to be made.

(.

%.

'. a.

(or concrete mix E&ual mixes 5i.e.2 %0 percent mortar mixes only should be adopted for plain concrete for foundation, flooring and 4! !oncrete for roofs, lintels, etc. wherever cement is used with hard broken stones or brick @elly. (0 percent or %0 percent mortar mixer may be adopted where lime concrete with brick aggregate is used according to the condition at site.

b.

Schedule Item No. 1.

Description $ON$RE'E &I+R%'ORS 8here vibrators are specified for consolidation in plain !ement concrete, this rate per cu.m over and above the provision made in the standard data book for consolidation with manual labour may be allowed. 8here vibrators are specified for consolidation in 4!! this rate per cu. m over and above the provision made in the standard data book for consolidation with manual labour may be allowed. Sca//olding centering etc.

Unit

Rate in Rupees

!u.m

1-.-0

2.

!u.m

2'.'0

1. 2. ". (. %. '.

Scaffolding charges for plastering for repair works only (m to 'm above ground level Scaffolding charges for plastering for repair works only 'm to 10m above ground level Scaffolding charges for plastering for repair works only over 10m above ground level Scaffolding charges for white or colour washing, for repair works only. (m to ' m above ground level Scaffolding charges for white or colour washing for repair works only. 'm to 10m above ground level Scaffolding charges for white or colour washing, for repair works only. =ver 10m above ground level Scaffolding charges for painting for repair works only (m to 'm above ground level

1m2 1m2 1m2 1m2 1m2 1m2 1m2 1m2 1m2

)o be deleted )o be deleted )o be deleted )o be deleted )o be deleted )o be deleted )o be deleted )o be deleted )o be deleted

,. -.

Scaffolding charges for painting for repair works only 'm to 10m above ground level Scaffolding charges for painting for repair works only over 10m above ground level lastering

1.

!lean removal of lime plaster from walls and racking out @oints 20mm deep or from terraced roofs racking out @oints 12mm deep !lean removal of lime plaster from walls !lean removal of cement plaster from walls !lean removal of cement plaster from walls and racking out @oints 20mm deep

s&.m s&.m s&.m s&.m

2.,0 2.20 2."% ".00

2. ". (.

!hite washing and colour washing and distempering a. !hite washing Schedule Item No. 1. 2. Description )horough scrapping of old plastered surface 8ashing of plastered surface with soap, soda and water 5or2 with soda, lime, brush and water2 Unit s&.m s&.m 1.'% Rate in Rupees 1."%

ainting5 wood oiling5 tarring5 varnishing 1ee6s waxing etc 1. 4emoving old paints from doors and windows by blow lamp and scrapping, including removal and refitting of shutters 4emoving old paints from doors and windows by scrapping and refitting of shutters 4emoving paints from doors, windows and wood work by manual labour 4emoving old paint from structural steel by blow lamp or sand paper 4e:polishing the mosaic flooring including polishing stone and hire charges for polishing machine but excluding cost of electrical charges. Scrapping and removing old paint from structural steel by manual labour 4emoving old paint from iron surface with sand paper s&.m -.-0

2.

s&.m

(.2%

".

s&.m

2.-0

(.

s&.m

'.0%

%.

s&.m

%.,%

'.

s&.m

2.$0

$.

s&.m

2.'0

Schedule Item No.

Description

Unit

Rates 7Rs.3

10

.iscellaneous i. Supplying B filling up the empty cement gunny bag with sand, stitching them conveying the same to site > and stacking as directed with in a lead of 10m excluding cost of bags, @ute, thread, needle, sand etc. 5labour only2 1riving piles upto 1% cm dia in river bed 3ointing the edge and driving bamboo; casuarinas; eucalyptus piles into river bed for the first 1m depth below ground level 1riving bamboo; !asuarinas; Eucalyptus piles into ground beyond 1m depth from ground level. <or every 1m 5or2 part thereof River $onservancy o/ *oram1u !orks v. vi. vii. viii. #rush wood bundles one metre girth and one metre long within an initial lead of 1.' C/ Extra for every additional lead of 1.' C/ 5for the above item2 1riving casuarinas piles into bed including scaffolding etc., complete !asuarinas walling pieces (0mm to %0mm diameter including fixing with nails and tying with ropes. =ne bundle =ne bundle 4/ 4/ 1.(0 0.1% "."0 (.(%

2.'0 bag 4/ Each $.,0 '.'%

ii. iii.

iv.

4/

'.'%

"a1our wrought and put up /or doors windows and ventilators 1. Dabour for wrought and put up in position of frames inclusive of fixing hold fast for doors, windows and ventilators etc. Dabour for wrought and put up in position of shutters for fully paneled doors 5external or internal2 moulded panels including labour charges for fixing furniture fittings, complying with standard drawings and standard specifications. Dabour for wrought and put up in position of shutters for fully paneled doors internal five plywood panels including labour charges for fixing furniture fittings, complying with standard drawings and standard specifications Dabour for wrought and put up in position of shutters for gla+ed and paneled doors including labour charges for fixing furniture fittings, complying with standard drawings and standard specifications. Description Dabour for wrought and put up in position of shutters for framed and planked doors including labour charges for !u.m ",%".,%

2.

s&.m

("%.'0

".

s&.m

"'".00

( . Schedule Item No. %.

s&.m

(0%."% Rate in Rupees "",.,0

Unit s&.m

11

fixing furniture fittings, complying drawings and standard specifications '.

with

standard s&.m 22-.-0

Dabour for wrought and put up in position of shutters for ledged and braced and planked doors including labour charges for fixing furniture fittings complying with standard drawings and standard specifications Dabour for wrought and put up in position of shutters for gla+ed windows including labour charges for fixing furniture fittings, complying with standard drawings and standard specifications Dabour for wrought and put up in position of shutters for windows panelled including labour charges for fixing furniture fittings, complying with standard drawings and standard specifications Dabour for wrought and put up in position of shutters for windows, ledged braced and planked doors including labour charges for fixing furniture fittings, complying with standard drawings and standard specifications Dabour for wrought and put up in position frames, shutters for ventilators gla+ed fixed double frames and with wire netting complete fixed in position in accordance with standard specifications and drawing Dabour for wrought and put up in position frames shutters for swing ventilators and fixed in position in accordance with standard specifications and drawings Dabour charges for fixing doors along with frames in position etc. complete5finished work2 Dabour charges for fixing windows and ventilators along with frames in position etc. complete Dabour wrought and put up in position flush shutters for single leaf shutters. 1ouble leaf shutters Dabour for wrought and put up in position fly proof wire gauge shutters for doors and windows and ventilators Dabour for wrought and put up for providing teak wood weld mesh screen with frames "6x"6 50.0$%mx0.0$%m2

$.

s&.m (0%."% s&.m ("%.'0

,.

-.

s&.m

22-.-0

10.

s&.m

"'".00

11.

s&.m

"",.,0

12. 1". 1(. 1%. 1'. 1$.

s&.m s&.m s&.m s&.m s&.m s&.m

'%."0 ,2.2% '0.%0 -(."% 21$.,0 "02.%0

Schedule Item No. +reaking metals i.

Description

Unit

Rate in Rupees

Dabour charges for breaking (0mm metal from departmental blasted stones

!u.m

11'.1%

12

ii. iii.

Dabour charges for breaking 20mm metal from departmental blasted stones Dabour charges for breaking %0mm metal from departmental blasted stones $ement .ortar Arinding /ortar 5Special Arinding lime2 Arinding /ortar 5=rdinary Arinding lime2 /ixing /ortar > !ement by manual /ixing /ortar: !ement by /achine /ixing .etal 8 Iron works 3etty ironwork for truss, straps etc. 58rought B fixed2labour only .ron works for trusses B record racks 5labour only2 Supplying B fixing mild steel grills for windows, ventilators, etc., including priming coat. <ixing /S rods round;s&uare for windows <ixing iron bars in windows and ventilators

!u.m !u.m

1$".00 ',.-%

i. ii. iii. iv. i. ii. iii. iv. v.

!u.m !u.m !u.m !u.m

10%.2% $-.,% "2.'% (".(% 1%.$0 1(.%0 %0.,0 ,.(% ,.(%

Cg kg Cg Cg Cg

13