JANUARY SEMESTER 2014 EMCM5103 - CONTRACT MANAGEMENT ASSIGNMENT (60%) QUESTION 1 Tenaga National Berhad would like to build a 2000 MVA nuclear power generation facility to meet the demands of the country in the coming years. The project is expected to complete and start generating power from 2016. Based on the above project, write an essay to discuss and evaluate the following procurement strategies: Turnkey Concession Public Private Partnership

You essay should have the following headings: (a) (b) (c) (d) Introduction Description of the three strategies Evaluate each strategies in terms of ease of management, financial burden, risks of failure, total cost of project, time of completion Recommendation of the best strategy with reasons [TOTAL: 20 MARKS]

QUESTION 2 You have been assigned by management to prepare the project proposal based on special requirements listed below. You may include any other pertinent matters which may support your proposal. Project Title Proposed Design, Construction, Completion and Commissioning of the New Self-Catered Hostel and other associated works at International Islamic University, Malaysia, Gombak, Selangor Darul Ehsan. Scope of Works The Works shall cover planning, design, construction supervision, testing, commissioning and maintenance thereof for the period on the following works:A. Civil Works Site Works Drainage System Road Works Geotechnical Works

___________________________________________________________________________
B. C. D. E. External/Internal Water Supply System Sewerage Pipelines and Sewage Treatment Plant Structural Works and Foundation Building and Associated Works.

Proposed Site Plan The development of the 6 acres of land is planned to comprise of the following buildings: Self-Catered Hostel Management Centre Examination Hall Multi-purpose Hall Store (Refer to Fig 2: The Proposal Site Plan Fig 3: The Site Topography Survey Fig 4: The Proposed Layout Plan Self-Centered Hostel) Special Requirements a) All Works with respect to investigations, design, construction and maintenance shall comply with all the Government Requirements regulations/by-laws and also the need statements for each scope of services. b) All engineering investigations, design, construction and supervision shall be carried out, developed and refined by the Contractor who shall engage qualified Consultants or P.E.s (Professional Engineers registered with the Board of Engineers, Malaysia) for the relevant disciplines of the Works. The Contractor shall undertake to do all detailed drawings and alterations as and when necessary at no cost variation to the accepted Tender Sum. c) All designs of the Works shall optimally satisfy the requirement of the latest standard engineering practice in respect of functionally adequacy, safety, suitability and effectiveness, and if required, shall be approved by the local authorities. d) The contractor shall submit detailed design for all aspects of the Works mentioned in the Scope of Works. Progressive changes, if any, in the design process shall also be supported by design calculations and subject to Project Directors approval. e) The Contractor shall need to include the Design Development Plan (DDP) in the CPM to be submitted to the Superintender Officer. The DDP shall include all the design phases in detail. f) The Contractor shall also need to submit their proposed master plan for the development which indicating progressive interactive submission and approval. g) Codes of Practice and Standards adopted to cover design, material, workmanship, performance, etc shall be relevant Malaysian, British or International Codes of Practice or Standards. h) The Contractor shall (if necessary) carry out sufficient soil investigations prior to commencement of any foundation and soil retention design. i) The contractor to submit their technical and financial proposal. The proposal shall include the project implementation schedule and how to carry out the implementation of the project if awarded the Works. j) The Contractor shall include their description method of procurement to be used and also the organization structure including flow of authorization.

___________________________________________________________________________

___________________________________________________________________________

___________________________________________________________________________

[TOTAL: 40 MARKS] END OF ASSIGNMENT QUESTIONS

Das könnte Ihnen auch gefallen