# from KT Issues
Description
Create Date Target Date Closed Teams Involed Date 1/13/2013 6/1/2014 Infrastruture, AMS, Portfolio groups
Lead/POC
DataPower Service health checks and test harness suites DataPower Hardware Checkout tests
11/13/2013
3/31/2014
11/13/2013
3/31/2014
11/13/2013
3/31/2014
web java
Sonam
11/13/2013
3/31/2014
Sonam
7 Netinsight upgrade
new
Migrate netinsight to new servers with new release and new database
12/11/2013
3/31/2014
web java
Goutham
new
12/11/2013
4/30/2014
web java,MQ
9 Upgrade ControlHub
12/5/2014
3/31/2014
10 Upgrade Worksite
12/5/2014
5/2/2014
new
NDM support is new to the team. We need to understand and document the Nasco reqs.
1/8/2014
3/31/2014
Mike Vine
new
1/22/2014
3/31/2014
Manny
new
1/22/2014
3/31/2014
Eswari
new
Build out an electronic forms infrastructure. IBM Forms classis and IBM forms experience builder will used.
1/28/2014
3/7/2014
1/28/2014
Web java
Becky
new
Take over TW Admin support Regularly Scheduled Patching for all Groups. SeeBeyond will receive the 820 file from Edifacs for processing and bypass FACILEDI
11/13/2013 None
SeeBeyond will receive the 834 file from Edifacs for processing and bypass FACILEDI
11/13/2013 None
This is a 2 step activity 1/7/2014 which requires configuration on Nagios server and DataPower . Install and configure SNMPD And SNMPTT utility on Nagios for receiving SNMP Traps. Configure SNMP settings on DataPower to trigger traps for certificate expiry , battery expiry ,hardware failure and critical application errors . This facilitates real time event based monitoring .
Ongoing
DataPower
Eswari
22 Tumbleweed NOOP
Offload DataPower logs onto NAS , to facilitate log archival and rotation Remove NOOP from lower environments
2/3/2014 Ongoing
DataPower
Eswari
2/12/2014
3/7/2014
Bruce
Support decomms Performance Testing and tuning of Netezza DB with Informatica Powercenter. JVMtop is a console application to monitor all accessible, running jvms and display JVM internal metrics on a machine for performance tuning and optimization
3/4/2014
3/31/2014
Informatica
Venkat Meruva
Status/Comment
02/26: Working with Provider TEam to do full regression test. Seeing some data issues. 02/19: AMS still testing. 02/12: Still testing. AMS driven. check with David Dance. 02/05: Testing in progress. 01/30: Infrastructure complete. AMS is testing. In final stages of project. DM is last remaining application. HLM reporting will remain running on 8.x until mid 2014 before being shutdown. 12/11: in progress and on track 01/08: ETL infrastructure work done. AMS doing some fine tuning. Target date end of Feb.
02/26: Matt provided info for Test. Still need other env ids. 02/19: Matt to assign someone to help. 02/12: working with Matt Kinney. 02/05: Reaching out to AMS. 01/30: This will take longer than expectd. Have to get info from 3rd parties. Have to chase down contact info. 01/08: Partially developed
02/29: No progress due to higher priorities. 02/19: Working on a generic script with manual workarounds. Will automate later after we take over. 02/12: Difficult to get an answer from AMS. Escalated to Brian Froney and John Doyle 02/05: got access to code. Seems to be a mismatch between code in repository and code being executed. Follow-up with AMS. 01/30: Escalated to Brian Forney 01/08: Still looking for code. Escalted to Debbie Williams. 12/11: need access to code
02/29: Mail not working. 02/19: Bumped due to higher priorities this week. 02/12: SMTP not configured properly. workling with SA's. 02/05: Checking all servers. Mail not working. 01/30: WIP. Verisign certs managed by DK. Self-signed not centrally managed. App teams resp. Dean is looking at a governance process. Also disabling old IBM Id's as part of this effort. 01/08: on schedule 02/29: Request into Kristina for Steve's support. 02/19: No progress -- waiting for support 02/12: Steve Garrison working on higher priority activities. No progress. 02/05: Still waiting on Steve getting vendor support. 01/30: CDE done 01/27 and got errors. Steve is working with vendor. 01/08: Waiting on Steve Garrison
02/29: Experiencing Oracle issues. escalated to IBM. 02/19: made some progress, but ran into an Oracle issue that is being worked. 02/12: Websphere and Netinsight loaded. Still have some files that need to be loaded. Some compatability issues. Working with IBM to resolve. 02/05: two issues. Oracle issue fixed. IBM investigating licensing. 01/30: WIP on Phase 1 12/11: just started 01/08: Nikhil + goutham to provide date 02/26: on schedule. 02/19: on schedule. 02/12: on schedule. 02/05: on schedule. Move to Stage the end of March. 01/30: Test on 01/23. 01/08: Test scheduled for 01/23. Prod 4/23. 12/11: CDE done. Prod in April 2014. 02/26: 02/19: working on install. Migration started. 02/12: New plan as follows: 4.1 to 5.0 upgrade on Solaris 5.0 to 5.0 SP1 upgrade on Solaris 5.0 SP1 to 5.0 SP2 final on Linux 02/05: Installing 3.0 on RH 5. Working with HP. 02/19: Working with vendor -- migration manager not working. 02/12: 5.0 in CDE 02/05: We have right plan. Working on Dev box. 01/30: DB loaded. Starting software install 01/30. 01/08: Server built. Need to deploy DB's and install and config WS.
C : \ D oc u m e n t s a n d S e t t i n g s \ rm a rs h 01 \ M y D oc u m e n t s \ Wi n d ow s P a t c h i n g \ s t a n d a rd s c h e d u l e m a y 20 12 13 . p d f
C : \ D oc u m e n t s a n d S e t t i n g s \ rm a rs h 01 \ M y D oc u m e n t s \ Wi n d ow s P a t c h i n g \ s t a n d a rd s c h e d u l e m a y 20 12 13 . p d f
02/26: no progress. Need to contact PM to see what's going on. 02/19: Testing, found bluesnet config not set up. Gerry white and Paul O'Neill working to resolve. 02/12: Did not capture the update. 02/05: Good progress. Prod seems to be working. Test needs more work. Working with Nasco to resolve Test Id issue. 01/30: Firewall changes made on bioth sides. Test next week. 01/08: Had a couple of meetings to define reqs. Trying to line up nasco environments with BCBSMA environments. 12/17: Working with Paul O'Neill and Paul Skowronski from Nasco
02/26: Servernot being built. Elliot exploring an SSL solution. 02/19: server being built. 02/12: presented in Work Intake. Work to start. 02/05: waiting to present at work intake. 01/28: Started work intake process. 02/26: IP allocated. Appliance racked. 02/19: Kickoff meeting scheduled. 02/12: Need to fill out proforma. Talk to Martin. 01/30: In work intake process.
02/26: Dev needs some fix patches installed. Stg + Prod running late from SA's. 02/19: Dev Websphere almost done. Waiting on IHS -- need v8 binaries. Test week of 2/24. Stg and PRD -- waiting for server. 02/12: attended kickoff meeting. Setting up test. Project team wants 3/7 for Stage and Prod. 02/05: Dev server ready. Need to get access. Need WS 8 binaries. 01/30: all environments 02/26: Introduce manny and ETL to David Wilson. 02/05: Team is participating as needed. 01/28: Others to participate. Bob meet with Dave Wilson. 03/03: Are we ready to take over? 01/30: working with IBM to transition. Ongoing patching coordinated by Scott Hunt.
01/20: Waiting on Health connector to provide file. No ETA. All SeeBeyond scripting complete. Working with AMS developers to assist in testing and implementation 12/11: in Prod, waiting for first file 01/08: Working, but manually invoked. Rob Wyner says we are waiting on State of MA. Then need to re-assess based on what we get.
01/20: Waiting on Health connector to provide file. No ETA. All SeeBeyond scripting complete. Working with AMS developers to assist in testing and implementation 12/11: in Prod, waiting for first file 01/08: Working, but manually invoked. Rob Wyner says we are waiting on State of MA. Then need to re-assess based on what we get. Nagios Server configuration is complete. SNMP trap setup is implemented in DEV SR was created to IBM to deploy the configuration onto Stage and Prod.
Log Target setup n DEV SR created to IBM to deploy configuration onto CDE ,TEST,STAGE and Prod 02/19: Still working the issue. 02/12: investigation started.
Project Name
# from KT Description Create Date Target Date Closed Date Teams Involed Issues Enable GC engine within all This will free up space within the heap 11/13/2013 11/13/2013 11/13/2013 Infrastruture the ETL regions to recify space that resides within the issues with heap space application's JVM. memory constraints. 4010 820 file bypass FACILEDI SeeBeyond will receive the 820 file and bypass FACILEDI for processing 11/21/2013 11/21/2013 SeeBeyond
Odonnell/Janasi k
DP KT CheckList
Review historical DataPower changes and incidents Review appliance configuration and for service and object status Review DataPower Hardware and Software aspects for support For IHCM Address cleansing.
12/11/2013
11/13/2013 12/27/2013
12/27/2013 Sales
Matt Smith
11/13/2013 12/27/2013
12/27/2013 Infrastruture
Amy Frias
new
12/20/2013
Goutham
DP Basic Monitoring
Nagios , SNMP traps , Log monitors , Certificate monitors , Battery expiry monitors Auditing firmware Versions , Application Domains ,Code Versions , User Access / Privileges Assess gaps in monitoring and logging (Access to to Log Server to test nfs static mounts and review security implications due to archiving logs) Assess status of DataPower projects in Dev and Test environments (Connect with PMs)
1/31/2014
12/27/2013
12/31/2013 12/27/1013
Review online IBM trainings and documentation to come up with a plan to cater to hardware and software aspects of DP Mandate developers to follow request ,respose and error rule structure to implement monitoring Operations/Run book for the MDM platform to be used as a reference doc by both technical support and application solution teams. New portfolio project for sales organization 11/13/2013
1/15/2014
1/8/2013
12/27/2013
12/27/2013
1/31/2014
1/29/2014 Infrastruture
Manny Santo
3/13/2013 On-going
1/30/2014 Sales
Matt Smith
Internal training
11/13/2013
1/31/2014
1/30/2014 Infrastruture
Manny Santo
Standardize firmware versions, code versions, user access and privileges and domain compositions Analyse and Resolve Inconsistencies between Prod and Stage environments Implement monitors for breakpoints
11/13/2013
3/31/2014
1/30/2014
11/13/2013
2/28/2014
2/19/2014 Infrastruture
SeeBeyond and HP are working with IBM tech support to restore the STAG FACILEDI server from a hardware fail. The STAG server was moved to be a PROD secondary server when the PROD server failed
12/5/2014
2/7/2014
Odonnell
To pull data from oracle views within the MDM database and propagated into the EDW
11/13/2013
2/28/2014
Status/Comment
All SeeBeyond scripting complete. Working with AMS developers to assist in testing and implementation
Portfolio Driven (12/10) Needed to configue the IDQ services within the ETL data regions and receive proper license keys to configure Address doctor. Portfolio Driven (12/10) Smoke testing the load within the Netezza applicance. Need to get benchmark statistics reading and writing to tables within the database. Working to complete by next week.
Requested by both provider and sales organizations. 12/10: Draft completed. Making provisions 01/08: Making updates Portfolio Driven
01/30: initial training of Krishna and Venkat complete. Need to look at training others. Initial plan has been put in place and sent out to Bob. 01/08: Started and in progress. Venkat and Krishna in training. 01/08: Started
02/12: Approved by user teams. 02/05: still waiting on review to take place. 01/30: Document complete, ready for review 01/08: WIP -- reqs defined 02/12: Successful test in Staging. 02/05: Being tested. 01/30: working with AMS to test. Close to completion. 01/08: WIP Waiting for IBM tech support to design a hardware solution 12/11: need to create some q's
02/19: tracking to 2/28. 02/12: tracking to 2/28. 02/05: Stage done. Planning for Prod. 01/30: WIP -- In Stage this week. Prod in 2 to 3 weeks. 01/08: Dev and Test done. Staging end of Jan. No hard date. Prod scheduled for mid Feb.