Sie sind auf Seite 1von 3

Role of a SAP Functional Consultant

Link to this Page Link Tiny Link OK Know n Location You must make a Role of a SAP Fu Page Ordering Editing restricted Wiki Markup Cancel Close Click to select the Move Page Rol Search Error reading the

Set Page Location Move Recently View ed There w ere no re

The specified pag Brow se Failed to retrieve ERP Logistics Op Back Cancel Reorder Close

You could try relo HTTP Status Move failed. Ther ERP Operations Unknow n user or 26769 You cannot move You cannot move Page Restrictions

There w ere no pa Show ing <b>{0}< ERPLO Move Save

Page restrictions apply Added by Rajesh Banka, last edited by Alon Mizrahi on Nov 07, 2011 (view change)
view

For those who wished to know the role of a functional consultant. Below is one view: A functional consultant evaluates the demands in talking with the customer's representatives, transforms the essence into an abstract and algorithmic business model. Hence, he identifies the use cases and transforms them into logical and technical views. Then the main task starts: customizing the respective business area and making sure the system reacts in the manner according to the constraints of the requested use case. The consultant documents the settings and prepares proper guidelines that allow other consultants to do further changes or repairs with due efforts. The consultant takes care that proper training is given to the users and that the system is usable, performing appropriately and the business flow is complete and correct. During go live he assists the technical staff by testing the behaviour of the system. After go live he guarantees that the procedures remain usable and consistent in real live situation and proposes enhancements. The main duty of a consultant is to transfer external know-how to the client. It is not manpower that counts but intelligence, understanding of processes, a feeling for defects and general a common sense. Role of a Functional Consultant in an End To End Implementation When you talk about the role of a Functional consultant in an end to end implementation, I think it won't be possible for me or anybody to define everything but I will try to summarize it: 1. Functional consultant is expected to generate knowledge about the current business process, design current business flows, study current business processes and its complication, in all we can say getting through with current business setup. Flow diagrams and DFD are prepared, most of the time in Vision format, all this forms the part of AS IS document. 2. Everything configured has to be documented as per their categories in the form of predefined templates, these have to be then approved by the team leads or who ever the consultant is reporting to. 3. Mapping and GAP analysis is done for each module, I have seen people defining integration after mapping, gap analysis and configuration is done, but as per my experience in implementation, it is a simultaneous process.

4. Before starting configuring future business processes in SAP, the DFD/ERD are prepared, this documentation is called TO BE, which can be also siad as the result of mapping and gap analysis. 5. Sometimes Functional consultants are also expected to prepare test scripts for testing the configured scenarios. 6. End user manual and user training is also expected from F.Consultants. The project normally starts off with a Kick off meeting in which the team size, team members, reporting system, responsibilities, duties, methodlogy, dates and schedules, working hours which have been predicided are formally defined. ASAP, it won't be possible for me to explain it here, but all I can tell you about it is that it is SAP standard implementation methodology, which SAP prescribes but is not mandatory for any company to follow, but recommended to follow the same. Five Phases of ASAP methodlogy. Phase 1: Project Preparation - The purpose of this phase is to provide initial planning and preparation for your SAP project. Phase 2: Business Blueprint - The purpose of this phase is to achieve a common understanding of how the company intends to run its business within the SAP System. The result is the Business Blueprint, a detailed documentation of the results gathered during requirements workshops. The Business Blueprint document represents the business process requirements of the company. It is the agreed statement of how the company intends to run its business within the SAP System. Phase 3: Realization - The purpose of this phase is to implement all the business process requirements based on the Business Blueprint. The system configuration methodology is provided in two work packages: Baseline (major scope); and Final configuration (remaining scope). Phase 4: Final Preparation - The purpose of this phase is to complete the final preparation (including testing, end user training, system management and cutover activities) to finalize your readiness to go live. The Final Preparation phase also serves to resolve all critical open issues. On successful completion of this phase, you are ready to run your business in your live SAP System. Phase 5: Go Live and Support - The purpose of this phase is to move from a project-oriented, pre-production environment to live production operation. Additionally: Some additional Infomation on ASAP methodology: Phase 1 - Project Preparation Change Charter - Goals and objectives of Organizational Changen Management Project Plan - This is a first cut focusing on milestones andn Work Packages; details to come. Scope - Sets the initial definition of then project; input from sales cycle. Project Team Organization - Sets the whon of the project: Standards and Procedures - Sets the why and how of the project. Phase 2 - Business Blueprint - Requirements reviewed for each SAP Reference Structure item and defined using CI Templates (in the Q and Adb). Business Blueprint - This is the output of the Q and Adb and is the key document for Phase 3. Phase 3 - Realization - Master Lists - Define business scenarios and R/3 transactions to be realized in the system. BPP Business Process Procedures representing R/3 transactions; used for unit testing and documentation. Planning - Defines how the configuration will be done and how it will be tested. Development Programs - Provides details of the external programming requirements. EU Training Material - End User training material and process documentation. Phase 4 - Final Preparation Stress and Volume Tests - Plans for confirming the production hardware's capabilities Cutover Plan - The details of how to move to the production environment and go live Conduct End User Training - Delivery of the necessary levels of R/3 End User training prior to going live Phase 5 - Go Live and Support: Ensuring system performance through SAP monitoring and feedback.

Labels parameters

Edit

Add Labels

http://w iki.sdn.sa

33352

ERPLO

Labels

Are you sure you

Click to toggle the

Das könnte Ihnen auch gefallen